Asbestos Continuous Air Monitoring and Final Air Clearance at the Ely Elementary School located in Rugby, ND (207 2nd St SW)
Solicitation number
303-23-021
Issued by
Pembina County, North Dakota

About this file

This document is a State of North Dakota Invitation for Bid (IFB) issued by the North Dakota Department of Environmental Quality (NDDEQ) Brownfields State Response Program for asbestos continuous air monitoring and final air clearance services at Ely Elementary School in Rugby, ND. The project involves monitoring asbestos abatement activities scheduled for June 2-6 and 9-13, 2025, which will include removing approximately 4,500 square feet of non-friable asbestos-containing floor tile and mastic from various hallways and rooms. The bid response deadline is May 2, 2025, with a contract period from May 13 to July 15, 2025, and no automatic renewal option. The state intends to award the contract to Total Control Inc. and requires bidders to provide continuous air monitoring, final air clearance using Transmission Electron Microscopy (TEM), and submit a Sampling Analysis Plan by May 21, 2025.

Bidders must meet specific mandatory requirements, including being licensed as Asbestos Abatement Project Monitors, not having active Notices of Violation, and being registered in the federal System for Awards Management. The pricing structure involves per-day rates for continuous air monitoring (estimated 10 days), additional daily rates if needed, and costs for final air clearance per containment area. The total bid will be evaluated based on six line items covering continuous monitoring, potential additional monitoring days, air clearance, and the Sampling Analysis Plan. All bidders must comply with AHERA and OSHA regulations, and the final monitoring report is due by July 15, 2025, with invoicing contingent upon report approval by the NDDEQ Brownfields State Response Program and Asbestos staff.

View the file

Other files

File Type Posted
A4-+Ely+Elem+Building+Diagram.pdf PDF
A6-+Sampling+Analysis+Plan+Example.docx DOCX document
A1-+Ely+Elem+Asbestos+Survey+1991.pdf PDF
A2-+Ely+Elem+3+Year+Reinspection+2021.pdf PDF
A7-+Air+Monitoring+Regulatory+Guidance.pdf PDF
A3-+Ely+Elementary+Building+Photos.docx DOCX document
A5-+PSA.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF NORTH DAKOTA

INVITATION FOR BID (IFB)

(February 2024)

DATE ISSUED
April 14, 2025
BID NUMBER
303-23-021
BID TITLE
Asbestos Continuous Air Monitoring and Final Air Clearance at the Ely Elementary School located in Rugby, ND (207 2nd St SW)
COMMODITY CODE(S)
910 (40)

918 (13) (43) 926 (15) (58)

BID QUESTION DEADLINE
April 22, 2025 by 2:00 PM CT
CONTRACT NUMBER
N/A
BID RESPONSE DEADLINE
May 2, 2025 by 2:00 PM CT
CONTRACT PERIOD
May 13, 2025 through July 15, 2025

PROCUREMENT OFFICER

The Procurement Officer is the point of contact for this IFB. Bidders shall direct all communications regarding this IFB to the Procurement Officer. Please do not add the Procurement Officer to any marketing distribution lists.

PURCHASING AGENCY (STATE): North Dakota Department of Environmental Quality PROCUREMENT OFFICER: Amy Cannon EMAIL: amy.cannon@nd.gov

PHONE: (701) 328-7258

TTY Users call: 7-1-1

Engaging in unauthorized communication or seeking to obtain information about an open solicitation with any state employee or official other than the responsible Procurement Officer or designee is sufficient grounds for suspension or debarment. [N.D.A.C. § 4-12-05-04(7)]

BID QUESTION DEADLINE

Bidders should carefully review the IFB including all attachments. Bidders may ask questions to obtain clarification and request additional information, or object to material in the IFB. Questions and objections must be submitted to the Procurement Officer in writing by the deadline identified in the IFB. If no deadline is specified, questions or objections must be received at least seven days prior to the Bid Response deadline. The Procurement Officer may elect to respond to questions received after the deadline.

Email is the preferred method of submission with the IFB number and title cited in the email subject line. Responses to questions will be distributed as a solicitation amendment unless the question can be answered by referring the bidder to a specific section of the IFB.

A person or firm interested in submitting a proposal should ensure all communications related to the procurement are only with the designated point of contact. This section does not restrict communication with state officials or any member of the legislative assembly unless the state official or member of the legislative assembly is involved directly with the procurement for which the person is interested or has submitted a bid or proposal (N.D.C.C. § 54-44.4-01.1).

STATE PROCUREMENT WEBSITE (SPO ONLINE)

This IFB and any related amendments and notices will be posted on the North Dakota OMB website using the State Procurement Online system (SPO Online). Bidders are responsible for checking this website to obtain all information and documents related to this IFB: https://apps.nd.gov/csd/spo/services/bidder/main.htm

Select Recent Solicitations and find this solicitation. Recent solicitations are listed by close date.

Bidders not having completed the Bidders List registration may request to receive notices related to this IFB by contacting the Procurement Officer in writing with the following information: IFB title, business name, contact person, mailing address, telephone number, and email address.

SECTION 1: BIDDERS INSTRUCTIONS

1. Bidder Checklist. Have you remembered to?

· Ensure your Bid Response complies with all instructions, terms and conditions, delivery requirements, and specifications.

· Prepare your price in the specified unit of measure, FOB: Destination to the shipping location.

· Sign your bid, and initial any changes or corrections

· Ensure your Bid Response is received by the Procurement Officer by the Bid Response deadline. Called to confirm receipt.

· If using a delivery service, check tracking to ensure the Bid Response will be delivered on time. Contact the Procurement Officer as soon as possible in the event of delays due to weather, etc.

· Submit any required samples or documents.

2. Definitions.

· Administrative Consent Agreement (ACA): agreement entered into by the NDDEQ and a party against whom the NDDEQ has identified violations of a statute, rule, permit, or other environmental law.

· Bidder: any person or firm submitting a competitive bid in response to a solicitation.

· Bid Response: the executed document submitted by a Bidder in response to a solicitation.

· Commodities: all property, including equipment, supplies, materials, printing, insurance, and the lease of equipment.

· Contractor: any person or firm having a contract with a governmental body.

· Expedited Settlement Agreement (ESA): settlement agreement entered into by the NDDEQ and a party against whom the NDDEQ has identified violations of a statute, rule, permit, or other environmental law.

· Procurement Officer: an individual duly authorized to enter into and administer purchasing contracts and make written determinations with respect thereto; also includes an authorized representative acting with the limits of designated purchasing authority.

· Purchasing Agency (STATE): the entity on which the purchase is being made on behalf of.

· Services: the furnishing of labor, time, or effort by a Contractor, not involving the delivery of a specific end product other than reports that are merely incidental to the required performance.

· Solicitation: a document to notify prospective Bidders of a bidding opportunity.

· N.D.A.C.: North Dakota Administrative Code; rules with the force and effect of law.

· N.D.C.C.: North Dakota Century Code; state laws.

· Notice of Violation (NOV): a written notice from NDDEQ informing a person or entity that they have allegedly violated a statute, rule, permit, or other environmental law.

· OMB: Office of Management and Budget (OMB); a North Dakota state agency.

· SPO: State Procurement Office, a division of the Office of Management and Budget.

· SPO Online: a procurement information website maintained by the State Procurement Office pursuant to N.D.C.C. § 54-44.4-14.

3. Secretary of State Registration Requirements. The North Dakota Secretary of State has registration requirements for individuals and businesses transacting business in North Dakota. If the successful Offeror is determined to have a registration requirement with the North Dakota Secretary of State, they must be registered before the contract award and registration must remain active for the duration of the contract period (N.D.C.C. § 54-44.4-09.1)

See the OMB Guidelines to Vendor Registry for more information.

Visit the Secretary of State's Vendor Registration webpage for information on registration requirements and fees. Visit FirstStop, the Secretary of State's business and licensing software, for online form options.

· Check the Business Records database to see if a business is registered.

· Contact Secretary of State's office by email or call 701-328-2900 (choose menu item 2, then option 1).

· If you need to register, fees apply.

· Vendors may need to obtain businesses licenses. See the list of licenses required of businesses in the State of North Dakota. The link includes information on who to contact, application fees, renewal dates, and the legal reference.

4. Bidders List. Individuals or business entities desiring to be notified of bidding opportunities may apply to be placed on the Bidders List (N.D.C.C. § 54-44.4-09) Bidders Lists are used to notify vendors when solicitations are issued on the State Procurement Office Online system (SPO Online). Placement on the Bidders List does not guarantee a vendor will receive notice of every solicitation (N.D.A.C. § 4-12-05-01). There are no fees to register as a bidder. The online application form requests contact information for the receipt of solicitation notices. The Bidders List application and SPO Online system use commodity codes to identify categories of goods, services, and information technology.

The commodity codes used for this solicitation are: 910 (40); 918 (13) (43); and 926 (15) (58).

Visit the OMB website for instructions and the online Bidders List Application:

Bidders List Registration Website For assistance with Bidders List Registration, contact State Procurement Help Desk at 701-328-1728 or infospo@nd.gov.

5. Submission Instructions. Please follow these instructions to submit your Bid Response. Bid Responses must be received by the Procurement Officer by the Bid Response deadline. Bidders assume the risk of the delivery method selected. Late Bid Responses will be rejected.

Upload Response Through the State Procurement Online System (SPO Online):

Bidders MUST electronically submit Bid Responses through the State Procurement Office Online system (SPO Online) by the Bid Response deadline.

DO NOT WAIT UNTIL THE “LAST MINUTE” TO SUBMIT A RESPONSE. Recommend uploading response 24 hours prior to the Bid Response deadline.

Bidder must begin the electronic submission process well in advance of the Bid Response deadline to allow for transmission and resolution of any technical difficulties. Be advised that the STATE is not responsible for a Bidder’s failure to timely submit a Bid Response due to any technical difficulties. If you experience any technical difficulties contact the Procurement Officer or the State Procurement Office at infospo@nd.gov or 701.328.2740.

If documents are in the process of being uploaded when the Bid Response deadline occurs, the upload process will stop. The attempted submission will not be uploaded successfully and is ineligible for consideration. The STATE takes no responsibility for electronic submissions that are captured, blocked, filtered, quarantined, or otherwise prevented from uploading by any anti-virus or other security software.

1. This solicitation is posted on SPO Online at: https://apps.nd.gov/csd/spo/services/bidder/main.htm

2. Select “Recent Solicitations” and find this solicitation. Solicitations are listed by close date.

3. Use “Upload Response” to upload a maximum of five (5), clearly labeled documents before the Bid Response deadline.

4. Offerors must upload their Bid Response as requested in the Bid Response section of this IFB.

5. The maximum file size allowed is 50mb per file.

6. There is a 50 character file name limitation for the document being uploaded.

7. There is 75 character limit in the TITLE field within SPO Online.

8. All SPO Online field entries must be alphanumeric. Dashes and underscores are allowed; however, the system does not accept other special characters such as apostrophe, & symbol, quotation marks, etc.

9. DO NOT submit documents that are embedded (zip files), movies, wmp, encrypted, or mp3 files.

10.Bidder will receive an email confirmation from infospo@nd.gov that the upload response was received including the “File Description” for the uploaded files. Review this email to ensure all files were successfully uploaded. If Bidder do not receive an email confirmation, the upload was not successful, and you will need to upload the files again. If Bidder does not receive an email confirmation after the reattempt, contact the Procurement Officer or the State Procurement Office at infospo@nd.gov or 701.328.2740.

Visit https://www.omb.nd.gov/sites/www/files/documents/doing-business-with-the-state/procurement/spo-electronic-response-external-job-aid.pdf for the SPO Electronic Response Job Aid which describes how to submit an electronic response.

6. Additional Terms and Conditions. Additional terms and conditions submitted with a Bid Response are of no effect unless accepted in writing by the Procurement Officer. Bid Responses with additional terms and conditions may be rejected as non-responsive. (N.D.A.C. § 4-12-11-06).

7. Assistance to Bidders with a Disability. Bidders with a disability that need an accommodation must contact the Procurement Officer prior to Bid Response deadline so reasonable accommodation can be made.

8. Bid Response Held Firm. Bid Responses are not awarded at the bid opening. Bidders must hold their Bid Responses firm for 30 days, unless otherwise specified by the Procurement Officer in writing.

9. Bid Response Opening. A public Bid Response opening will not be held.

10. Bid Response Results. Interested parties may contact the Procurement Officer to obtain a summary of all Bid Responses received and the award. Bid Response results may be posted on SPO Online: https://apps.nd.gov/csd/spo/services/bidder/main.htm

11. Bidders List - Suspension and Debarment. Placement on the Bidders List does not guarantee a vendor will receive notice of every solicitation. A vendor may be removed from the Bidders List if a solicitation notice is undeliverable. Vendors may be suspended or debarred from the Bidders List for cause. (N.D.A.C. ch. 4-12-05)

12. Changes/Corrections. Bidders must initial any changes or corrections to the Bid Response, such as erasures and crossed out/rewritten prices. The Procurement Officer may confirm the Bid Response when changes are not initialed.

13. Multiple Bid Responses. Bidders may submit more than one Bid Response in response to this solicitation. Each Bid Response submitted must be prepared in accordance with the Bid Response instructions and meet the stated requirements.

14. Open Records Requests. Bid Responses are exempt records until the date and time of the Bid Response opening. After the Bid Response opening, all Bid Responses are subject to North Dakota open records laws. Interested parties may contact the Procurement Officer to request information related to this solicitation.

15. Packaging. All packaging must be strong and secure in accordance with accepted commercial practices.

16. Protests. Protests of the solicitation must be received by the Procurement Officer within seven days before the Bid Response deadline. Protests of the award or Notice of Intent to Award must be received by the Procurement Officer within seven days after receiving notice of award. Seven calendar days after award or issuance of the Notice of Intent to Award it will be assumed that all interested parties knew or should have known all the facts surrounding the award. Protests must be made in writing to the Procurement Officer and include the basis for the protest. (N.D.C.C. § 54-44.4-12; N.D.A.C. ch. 4-12-14.)

17. Signature. The Bidder’s authorized representative must provide their printed name, title, and sign the Bid Response. The lack of a signature may be waived as a minor informality, provided a signed Bid Response is submitted by the deadline established by the Procurement Officer. (N.D.A.C. ch. 4-12-10)

18. Specifications, Compliance. All Bid Responses must comply with the stated specifications, and the successful Bidder will be held responsible. Bidders who desire to submit commodities or services that deviate from these specifications or have any objections to the stated specifications must contact the Procurement Officer by the deadline for questions or at least seven days before the Bid Response deadline, so the Procurement Officer can determine whether the specifications need to be amended.

19. Specifications Prepared by Non-State Personnel. When a purchasing agency has specifications prepared by someone other than a state employee or official on behalf of the state, that person or business entity must be excluded from submitting bids or proposals in accordance with N.D.A.C. § 4-12-06-06.

20. Supplier Registration (Payee). The successful Bidder will be required to complete Supplier Registration, if not already registered as a Supplier. Any individual or business who will be receiving payment from a state agency or higher education institution must complete a registration process to collect important financial and taxpayer information. Payments are generally made by check or automatic clearing house (ACH), and taxpayer information must be collected in compliance with IRS requirements. The State and North Dakota University System (NDUS) have separate financial systems and vendor registration processes.

21. Withdrawal or changes to a Bid Response prior to the Bid Response deadline. Before the Bid Response deadline, the Bidder’s authorized representative may withdraw or change a Bid Response by making a written request to the Procurement Officer.

22. Withdrawals or changes to a Bid Response after the Bid Response deadline. After the Bid Response deadline, no changes may be made to Bid Response, except as provided in N.D.A.C. ch. 4-12-10. The Bidder’s authorized representative may make a written request to withdraw the Bid Response.

SECTION 2: EVALUATION AND AWARD

1. Award. Award will be made to the responsible Bidder with the lowest priced Bid Response that is responsive to the specifications and all other requirements stated herein. Award will be made as follows:

· All or none.

2. Award – Preference Laws. The reciprocal preference law, N.D.C.C.§ 44-08-01, was repealed effective August 1, 2023.

3. Award – Tie Bid Response Preference. If a tie occurs between two or more Bidders with equal Bid Response prices or offerors with identical evaluation scores:

a. Preference must be given to a resident North Dakota bidder, seller, vendor, offeror, or contractor as defined in N.D.C.C § 44-08-02

b. If a tie still remains, award shall be made in accordance with N.D.A.C. § 4-12-11-05.

4. Late Bid Responses. Bid Response responses must be received by the Procurement Officer by the Bid Response deadline. Late Bid Responses will be rejected, regardless of the degree of lateness, unless the delay is due to the error of the Procurement Officer and discovered before the selection of the successful Bidder. (N.D.A.C. § 4-12-08-13)

5. Responsiveness of the Bid Response. Any Bid Response that does not meet the requirements of the solicitation, other than mistakes determined to be minor informalities, will be rejected. (N.D.A.C. § 4-12-11-03)

6. Minor Informalities. The STATE reserves the right to waive minor informalities in Bid Responses. Minor informalities are insignificant omissions or nonjudgmental mistakes that are matters of form rather than substance, evident from the Bid Response document, with a negligible effect on price, quantity, quality, delivery, or contractual conditions that can be waived or corrected without prejudice to other Bidders. (N.D.A.C. ch. 4-12-10)

7. Mistakes. The Procurement Officer may confirm the Bid Response in the event of apparent errors, such as an unreasonably priced Bid Response. Mistakes will be handled in accordance with N.D.A.C. ch. 4-12-10.

8. Responsibility of the Bidder. The Procurement Officer, at any time, may make a supplementary investigation as to the responsibility of any Bidder, even though the Bidder may be on the Bidders List. If a Bidder is determined to be not responsible, that Bid Response will be rejected even if it is the lowest Bid Response, and the Bidder may be debarred or suspended from the Bidders List. (N.D.A.C. § 4-12-11-04)

9. Rejection. The STATE reserves the right to reject any and all Bid Responses in whole or in part. The Procurement Officer will send a rejection notice, including the reason for rejection. Bid Responses will be rejected if:

a. the Bid Response is determined to be not responsive to the instructions, specifications, and other requirements of the solicitation, other than mistakes or omissions determined to be minor informalities;

b. the Bid Response is determined to be late;

c. the Bidder fails to comply with Bidders List Application requirements by the stated deadline;

d. the Bidder is determined to be not responsible, in accordance with N.D.A.C. § 4-12-11-04;

e. the Bid Response is not legible.

If all Bid Responses are rejected, the Procurement Officer will send written notice to Bidders, including the reason all Bid Responses were rejected. (N.D.A.C. § 4-12-11-09)

SECTION 3: SPECIAL TERMS AND CONDITIONS

1. Term of the Contract. The term of the contract issued as a result of this solicitation will be as follows:

a. Contract Period. This Contract term (Term) begins on May 13, 2025, and July 15, 2025.

b. No Automatic Renewal. This Contract will not automatically renew.

c. Extension Option. STATE reserves the right to extend this Contract for an additional period of time, not to exceed twelve (12) months, beyond the current termination date of this contract.

2. Billing Address. After delivery of commodities or services under contract, the CONTRACTOR must submit a correct invoice. Payment will be made after inspection and acceptance. Invoices must be addressed to the Purchasing Agency. All invoice and payment inquiries must be directed to the Purchasing Agency.

3. Contract Amendment – Unanticipated Amendment. After a binding contract has been entered into, no changes may be made, unless prior written approval has been obtained from the Purchasing Agency through execution of a contract amendment. The Contractor may request changes, such as substitutions of a product, by submitting a written request to the Procurement Officer. Unanticipated amendments must be within the scope of the original contract, authorized by the terms of the contract and due to legitimate, unforeseen circumstances. (N.D.A.C. ch. 4-12-13)

4. Completion of Services Required. The CONTRACTOR must meet the specified service completion requirements. If services cannot be performed within the specified time, the CONTRACTOR must notify the Purchasing Agency in writing of the delay and the approximate date delivery may be expected. Service completion is required by the date indicated in the Specifications of this solicitation.

5. Inspection and Acceptance or Rejection. The STATE reserves the right to conduct inspections and investigations related to the Bidder and the offered commodities or services, including but not limited to the firm, personnel, qualifications, and the commodities and services offered to make determinations regarding compliance with the Bid Response requirements and responsibility of the Bidder. All material and workmanship are subject to inspection and testing by the STATE at the point of manufacturer, place of storage, or upon receipt. The STATE reserves the right to reject any commodities or services and terminate the contract if the CONTRACTOR fails to comply with the specifications, terms and conditions, or the seller’s express or implied warranties. Rejected commodities will be removed at the CONTRACTOR’s expense. Failure to satisfactorily perform may result in suspension or debarment from the Bidders List.

If commodities or services are rejected as being not compliant with the requirements of this solicitation, the STATE will inform the CONTRACTOR in writing. The Purchasing Agency may provide the CONTRACTOR with a reasonable opportunity to cure, whenever practicable, as set forth in writing by the Purchasing Agency.

6. Invoicing. All invoices and payment inquiries must be directed to the Purchasing Agency.

7. Pricing – Tax Exempt. All prices must be in United States currency. Bid Response prices must include all discounts and deductions, and to be less federal and state taxes. Bidders may contact the Procurement Officer to obtain the Purchasing Agency’s tax exemption number and tax-exempt certificate.

8. Price Adjustment. Pricing during the term of the contract will be as follows: Firm-Fixed. Pricing shall be firm for the period of the contract.

9. Pricing, Unit of Measure. The unit prices is to be according to the unit of measurement specified in the solicitation. In the event of mathematical differences between the unit price and extended total, the unit price will prevail. (N.D.A.C. § 4-12-10-02)

10. Travel. CONTRACTOR acknowledges travel costs are covered by the Contractual Amount and shall not invoice STATE for travel costs.

11. Time is of the Essence. CONTRACTOR hereby acknowledges that time is of the essence for performance under this Contract unless otherwise agreed to in writing by the parties.

SECTION 4: RISK MANAGEMENT REQUIREMENTS

Bidders are instructed to review the following provisions. Objections to these provisions must be made in writing to the Procurement Officer by the deadline for questions.

1. Indemnification. Indemnification provisions are incorporated and made part of this solicitation and resultant contract.

· Bidders are instructed to review the indemnification provision in Attachment 5.

2. Insurance. Insurance provisions are incorporated and made part of this solicitation and resultant contract. Bidders are instructed to review the Insurance Requirements. The Successful Bidder will be required to provide the required proof of insurance prior to contract award, and failure to provide evidence of insurance coverage is a material breach and grounds for award rescission. Failure of the CONTRACTOR to keep the required insurance in effect during the term of the contract is grounds for termination of the contract.

· Bidders are instructed to review the insurance provisions in Attachment 5.

SECTION 5: BID SPECIFICATIONS

The North Dakota Department of Environmental Quality (NDDEQ), Brownfields State Response Program is soliciting bids for asbestos continuous air-monitoring and final air-clearance, using the Transmission Electron Microscopy (TEM) method at the Ely Elementary School (207 2nd St SW) located in Rugby, ND.

The NDDEQ intends to award a contract for asbestos abatement activities at the Ely Elementary School to Total Control Inc. Abatement activities will take place between June 2-6 and 9-13, 2025. Continuous air monitoring and final air clearance is required for all asbestos abatement work on this project. The awarded Bidder must have personnel and equipment available to provide the required services for the entire abatement window, which may require additional days of continuous air monitoring beyond those listed if the abatement contractor encounters a delay during their work.

BACKGROUND

An asbestos survey of the building was completed in September 1991 and is included as Attachment 1. A 3-year re-inspection was conducted in May 2021 and is included as Attachment 2. Site photographs from December 2024 are included in Attachment 3. Locations of asbestos containing floor tile and associated mastic are detailed on the building diagram in Attachment 4. Asbestos activities include the removal and proper disposal of approximately 4,500 square feet of non-friable tan colored asbestos containing 9”x9” floor tile and associated mastic located under carpet in the East/West Hallway, North/South Hallway, Northeast Entry, Southeast Entry, and Rooms 115, 116 and 123. No mechanical methods for removal will be used that could potentially render the tile or mastic friable. The building is a working K-12 school and may be occupied by school staff or students in other areas of the building.

ONSITE VISIT: Bidders that wish to visit the site should contact Derek Hall at (701) 328-5168 or dahall@nd.gov for more information.

MANDATORY REQUIREMENTS

1. Provide asbestos continuous air monitoring services during all onsite asbestos abatement activities. The dates the asbestos abatement contractor is expected to complete the abatement are June 2-6, and 9-13, 2025, depending upon the asbestos abatement contractor. The abatement contractor will be working 10 hours per day.

2. Provide final asbestos air-clearance utilizing the Transmission Electron Microscopy (TEM) method for each separate asbestos containment area located onsite. The final number of containment areas will be determined by the asbestos abatement contractor after they are set up onsite. As of now, the estimated number of containment areas for this project is one (1).

3. Compose and submit a Sampling Analysis Plan (SAP)-Attachment 6 to the NDDEQ by May 21, 2025. The SAP must detail quality assurance/control concerns for the continuous air monitoring and final air clearance portions of the project and must follow the format provided in Attachment 6.

4. Bidders must meet the following requirements to be eligible to submit a Bid Response.

· Contractor or subcontractor must not be a party to an active NOV issued by the NDDEQ within one year of the Bid Response deadline.

· Contractor or subcontractor must not have entered into an ACA or ESA with the NDDEQ or be the subject of an administrative order issued by the NDDEQ within one year of the Bid Response deadline.

· Bidders must be registered through the federal system for awards management (www.sam.gov) prior to contract execution.

5. The Bidder and all employees working on the project must be licensed as Asbestos Abatement Project Monitors through the NDDEQ’s Asbestos Control Program. Bid responses must include proof of licenses for Contractor and subcontractors and certifications for all individuals who will be working on the project. Bid responses that do not follow these instructions may be deemed non-responsive.

6. Bidder must comply with all applicable government regulations with regards to continuous asbestos air monitoring and final air-clearance (See Attachment 7) detailed in the Asbestos Hazard Emergency Response Act (AHERA) listed in 40 CFR Part 763 subpart E for occupied schools, and all applicable workplace and work force safety requirements for workers conducting construction activities as required by the Occupational Safety and Health Administration (OSHA), as described in 29 CFR 1926.1101. The AHERA and OSHA requirements will be incorporated into the resulting contract.

7. Continuous air-monitoring and final air clearance is required for all asbestos abatement work on this project. Asbestos abatement activities cannot be performed unless the air monitoring Contractor is onsite and providing air monitoring. The NDDEQ will coordinate onsite abatement activities and air monitoring services. Bidder must ensure final air clearance standards are achieved and will direct the asbestos abatement contractor to re-clean any areas that fail final air clearance until final air clearance standards are met. Additional air clearance sampling must be completed until the final air clearance standards are met.

8. A continuous air monitoring and final air clearance report for the site must be submitted to the NDDEQ before July 15, 2025. The report must include a daily log of work completed at the site and the continuous air monitoring and final air clearance results must accompany the report. The report will be reviewed by Brownfields State Response Program and Asbestos staff to determine if it meets the criteria listed above. If the report does not meet the criteria, the awarded Bidder will be required to address any deficiencies before any contract invoices will be paid.

9. Submit a final itemized invoice for all costs including the number of days of onsite air continuous air-monitoring, final air clearance, mobilization, laboratory analysis, sample shipping, and report writing. Amount invoiced for the continuous air monitoring portion should be for total days onsite only, as the abatement contractor may finish the project before the projected end date.

Bidders that meet the mandatory requirements may submit a Bid Response by completing and submitting Section 6: Bid Response. Bid Submission instructions are outlined in Section 1.

SECTION 6: BID RESPONSE

ELY ELEMENTARY SCHOOL - BID RESPONSE

Award will be based upon the total cost of items 1 through 6.

ITEM NO.
UNIT
SCOPE OF WORK
UNIT PRICE
TOTAL COST
1
Per Day for 10 Days

Asbestos Continuous Air Monitoring – 10 Days Provide asbestos continuous air monitoring services during all onsite asbestos abatement activities. The dates the asbestos abatement contractor is expected to complete the abatement are June 2-6 and 9-13, 2025, depending upon the asbestos abatement contractor. The abatement contractor will be working an estimated ten (10) hours per day.

2
Per Day

Asbestos Continuous Air Monitoring – Cost Per Day Provide the cost per day to provide asbestos continuous air monitoring services if needed beyond the dates identified in Scope of Work Item 1.

3
One (1) Containment Area

Final Air Clearance – One (1) Containment Areas Provide final asbestos air clearance utilizing the Transmission Electron Microscopy (TEM) method for each separate asbestos containment area located onsite. The final number of containment areas will be determined by the asbestos abatement contractor after they are set up onsite. As of now, the estimated number of containment areas for this project is one (1).

4
Per Containment Area

Final Air Clearance – Per Containment Area If additional containment areas are identified by the asbestos contractor, provide the cost per containment area that would be charged to complete final air clearance utilizing the TEM method.

5
Per Sample

Additional Air Clearance Samples If additional samples are required to verify final air clearance standards, provide the cost per additional sample that would be charged.

6
N/A

Sampling Analysis Plan (SAP) Compose and submit an SAP (See Attachment 6) to the NDDEQ by May 21, 2025.

TOTAL COST (1-6)
$

Bidder affirms that the Bid Response includes proof of licenses for Contractor and any subcontractors and certifications for all individuals who will be working on the project.

YES NO

Bidder affirms their ability to provide the services during the dates provided in Mandatory Requirements.

YES NO

BIDDER INFORMATION AND SIGNATURE

By submitting a Bid Response, the Bidder agrees to sell, furnish, and deliver to the STATE all commodities and services contained in this Invitation for Bid for which a contract is awarded by the STATE. The Bidder shall fully perform the contract in accordance with all the specifications, requirements, terms, and conditions, and shall comply with all applicable provisions of the North Dakota Century Code, including chapters 54-44.4, 46-02, and 44-08, and North Dakota Administrative Code Chapter 4-12, made part of the Invitation for Bid and resultant contract by reference.

Written acceptance of the Bid Response by the STATE constitutes a binding contract made and entered into by and between the State of North Dakota, acting through the Purchasing Agency, and the Bidder named below. Written acceptance may be made by execution of a contract, purchase order, or order using a state purchasing card.

NOTICE. All notices or other communications required under this Contract must be given by registered or certified mail and are complete on the date postmarked when addressed to the parties identified herein. Notice provided under this provision does not meet the notice requirements for monetary claims against the STATE found at N.D.C.C. § 3212.204.

Bidder/Contractor Name:

Contractor Federal Employer Identification Number (FEIN)

Bidder Street Address/ P.O. Box:

City, State ZIP:

Contact Name:

Contact Title:

Telephone Number:

Email:

Authorized Representative Signature:

Date:

STATE OF NORTH DAKOTA

BID ACCEPTANCE AND CONTRACT AWARD

The STATE intends to execute a contract substantially similar to the Purchase of Service Agreement (PSA) provided in Attachment 5. The Contractor must comply with the terms and conditions set forth in the attached contract. North Dakota procurement statutes, rules, and policies allow some negotiation of the terms and conditions. No changes to the terms and conditions will be permitted without prior written approval from the STATE.

Pursuant to N.D.A.C. § 4-12-11-06, bid responses subject to conditions imposed by the Bidder may be rejected as nonresponsive, as determined by the STATE.

Proposed terms and conditions that conflict with those contained in the attached contract or that diminish the STATE’s rights under the contract shall be considered null and void. The terms and conditions in the attached contract shall prevail in the event a conflict arises between a term or condition in the proposal and a term or condition in the attached contract.

Part or all of this IFB and bid response may be incorporated into the attached contract. The STATE may deem any failure to object to a contract provision as the Bidder’s acceptance of that provision.

ATTACHMENTS

1. Initial Asbestos Survey

2. Asbestos 3-Year Re-Inspection

3. Site Photographs

4. Building Diagram

5. Purchase of Service Agreement (PSA)

6. Sampling Analysis Plan (SAP) Example

7. Air Monitoring Regulatory Guidance

File details come from the government source that posted it. Updated .