This document is a set of special conditions and technical specifications for the Ely Puckett Creek Wetlands AMD Maintenance IX project in Lee County, Virginia, procured by the Commonwealth of Virginia's Department of Energy, Mined Land Repurposing, Abandoned Mine Land Section. The work consists of mobilization, cleaning and repair of drainage pipes, access road repair, miscellaneous drainage control work, cleanup and repair of damages, safety conditions, and revegetation of all disturbed areas. The project must be completed within 45 calendar days. Bidders must attend a mandatory pre-bid conference on July 3, 2024, and bids are due by July 16, 2024. The contract will be awarded to the lowest responsive and responsible bidder.
This procurement has set-aside designations for SBSD-certified micro businesses (bids up to $10,000) and SBSD-certified small businesses (bids up to $100,000), if the agency determines the bid price is fair and reasonable. Bidders must comply with federal requirements such as the Buy America and Buy American Act and submit all required forms and certifications. No additional details are provided regarding pricing terms, incumbents, or funding sources.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL CONDITIONS AND TECHNICAL SPECIFICATIONS
FOR
ELY PUCKETT CREEK WETLANDS
AMD MAINTENANCE IX
Located off SR765
LEE COUNTY, VIRGINIA
PREPARED BY:
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF ENERGY
MINED LAND REPURPOSING
ABANDONED MINE LAND SECTION
May 28, 2024
Table of Contents
SPECIAL CONDITIONS
TECHNICAL SPECIFICATIONS
1. MOBILIZATION
2. SITE PREPARATION
3. EROSION CONTROL
4. ACCESS ROAD REPAIR
5. SURFACE GROUTING of RIPRAP
6. AGGREGATE
7. GRADING AND DITCHING
8. TRENCH DRAIN INLET
9. REVEGETATION
10. CLEAN UP AND REPAIR OF DAMAGE
11. SAFETY PRECAUTIONS
SPECIAL CONDITIONS
ELY PUCKETT CREEK WETLANDS MAINTENANCE IX PROJECT
Section 1.
All of the following parts considered as a whole shall comprise the complete specifications. They are complementary and anything called for by one and not the others shall be considered binding as though called for by all.
1.1 Bid Package (General Clauses, General Conditions, Notice and Instructions to Bidders, etc.).
1.2 Special Conditions (Pages 3 - 7) and Construction Specifications (Pages 8-21)
1.3 Construction Drawings (Sheets 1-7).
Section 2. DEFINITIONS
2.1 The word “Agency” shall mean the Commonwealth of Virginia, Department of Energy, Mined Land Repurposing, Abandoned Mine Land
Section.
2.2 The word “Inspector” shall mean any personnel employed by or representing the Agency.
2.3 Where the word “Contract” is used, it shall be understood to refer either to a purchase order placed by the Agency and accepted by the
Contractor together with this specification and all other documents referred to in such purchase order; or to a formal contract executed by the Agency and the Contractor, together with this specification and other documents referred to in such formal contract.
2.4 The word “Contractor” means the person, firm, or corporation named as such in the contract and includes the plural number and the feminine gender when such are named in the contract as the Contractor.
2.5 The word “Subcontractor” means only those having a direct contract with the Contractor and it includes one who furnishes material worked to a special design but does not include one who merely furnishes material not so worked.
2.6 Where the word “Work” is used, it shall be understood to mean and include any and all labor, supervision, services, materials, machinery, equipment, tools, supplies and facilities called for by, and to complete, the Contract.
Section 3. SCOPE OF WORK
3.1 The work performed under the terms of this Specification consists of mobilization, cleaning and repair of drainage pipes, access road repair, miscellaneous drainage control work, clean up and repair of damages, safety conditions, and revegetation of all disturbed areas on the site known as ELY PUCKETT CREEK WETLANDS AMD MAINTENANCE IX Project for the Commonwealth of Virginia. It shall also include necessary modifications to the drainage pattern to ensure adequate positive drainage in conjunction with existing drainage structures. The job site is located off SR 765 along an access road (Baltic Dr.) in a remote section nearby St. Charles, Virginia. Approximate coordinates: Lat.: 36° 47' 19.5'' N Lon.: 83° 04' 18.1''W.
3.2 The intent of this Specification is to prescribe the complete work of the project. The specification permits and directs the work conducted by the selected Contractor. If there are any contradictions between the Specifications and Drawings, the Contractor shall bring these facts to the attention of the Agency and obtain the Agency’s decision as to the true meaning and intention.
3.2.1 The Contractor remains responsible for timely identifying any conflicts found to the attention of the Agency.
3.2.2 In the absence of a formal written response from the agency, or in the event the Contractor fails to bring such to the attention of the agency, the Contractor is responsible to ensure compliance with the most stringent requirement.
Section 4. TIME SCHEDULE
4.1 The Work shall be executed with sufficient personnel, equipment and material to complete the work in a period of 45 calendar days.
Section 5. WORK BY CONTRACTOR
The Contractor shall:
5.1 Furnish all supervision, labor, materials, tools and equipment necessary to perform all work. The work shall consist principally of the following:
5.1.1 Mobilization
5.1.2 Install erosion and sediment control measures, as necessary to protect the stream from any and all materials.
5.1.3 Establish an aggregate supply within the designated area of the Lick Branch AMD-treatment site prior to interruption of the one-lane entry to ensure adequate and timely supplies of aggregate during construction.
5.1.4 Clean debris and sediment from existing drainage structures and excavate material blocking access to a consolidated foundation.
5.1.5 Repair the access road, areas 1 & 2, on the northern side of Baltic Dr. where driveways intersect from the south.
5.1.6 Add large, VDOT Class I-aggregate to the bottom of the Repair Area 1 slope for support of the roadway as directed by the Project Inspector to establish a non-erodible slope to be surfaced with grout.
5.1.7 Install filter fabric per specifications against original ground slope to ensure integrity of sub-surface before establishing rock-lined slope.
5.1.8 Provide an adequate rock-lined surface slope to re-establish the road surface and grout all riprap for water infiltration prevention.
5.1.9 Establish open-graded stone as a base and surface aggregate to final grade of road surfaces per Inspector.
5.1.10 Apply Grout surfacing of the established Riprap areas, inlets, and ditches, as necessary, to provide water-resistant barriers in drainage ways subject to erosion.
5.1.11 Relocate an existing, buried steel drain pipe approximately + 50 degree rotation to bury under the access road to receive the roof discharge.
5.1.12 Install one pre-cast concrete Trench Drain Inlet box at Repair Area 2 with a heavy duty, metal grate cover load capacity rating of H20, or greater, coupled with Type A slots. Grout the receiving slope embankment.
5.1.13 Restore all drainage ditches flowing to / from adjacent driveways as necessary to carry surface runoff outside the limits of disturbance. Add surface treatment to the extent of the access road or until deemed sufficient by the Project Inspector.
5.1.14 Revegetate all disturbed areas.
5.1.15 Remove all temporary erosion and sediment control measures.
5.1.16 Ensure all Safety Conditions are met.
5.2 Be responsible for receiving, unloading, storing, protecting and handling all materials and equipment furnished by the Contractor or the Agency for the execution of all work under this Specification.
5.3 Be responsible for demurrage or claims incurred because of negligence in expediting the unloading of materials or equipment.
5.4 Replace any defective material furnished by the Contractor or any defective work performed by the Contractor’s forces at the
Contractor’s own expense.
5.5 Furnish to the Agency for approval before start of work, a Schedule of Work and procedure for construction of the work covered by the contract.
5.6 Be responsible for scheduling, expediting, directing, inspecting and coordinating the work to complete the work in the agreed upon time. The Contractor shall immediately notify the Agency of any impending problems, which could delay the completion of the work.
5.7 Before starting the work, contact the Agency for proper clearance and be governed by the Agency’s instructions.
5.8 Be responsible for locating, relocating and protecting from damage existing underground and overhead utilities when such utilities are clearly visible. Be responsible for verifying the location of all utilities, pipes, etc. before initiating the work.
5.9 Confine all workers to the construction area.
5.10 Provide drinking water and containers.
5.11 Provide watchmen, safety barricades, lights, signs and other items necessary for layout and installation of the work.
5.12 Furnish all labor, stakes, templates and tools and perform all field surveying and engineering to establish construction quantities and the lines and grades necessary for layout and installation of the work.
5.13 Be completely familiar with the location and accessibility of various construction and storage sites to determine the best material and equipment handling methods for the orderly completion of the work.
5.14 Have on the work site during construction a competent superintendent, duly authorized to represent and act for the Contractor in all matters pertaining to the work covered by this Specification.
5.15 Not perform any additional or temporary work for the Agency’s account unless on specified written orders, signed by the
Agency’s authorized representative and Contractor and only in the amounts of the various types of work specified in said orders.
5.16 Work in close cooperation with the Agency and others engaged in the project so that the work will be completed with dispatch and in an orderly manner.
5.17 Continuously maintain adequate weather and fire protection of the Contractor’s work from damage and shall protect property from damage or loss arising in connection with this contract. The Contractor shall make good any such damage or loss.
5.18 Comply with the provisions of the “Occupational Safety and Health Act of 1970, Public Law 91-596”, 29 CFR and 30 CFR;
and the Safety Codes Commission of the Commonwealth of Virginia, issued by the Department of Labor and Industry under Title 40.1 of the Code of Virginia (1950), as amended. The Contractor shall be held liable to the Agency for any health and/or safety infractions, on the Contractor’s part, which cause the Agency or surface owner to receive a citation and/or fine from any local, state or federal agency. Actual costs involved will require satisfaction, by the Contractor, to the Agency or surface owner.
5.19 Maintain the site of work in an orderly manner. The Contractor shall provide personnel and supervision to continuously clean up the construction area under this jurisdiction. Should the Contractor refuse or fail to clean up or remove debris when requested by the Agency, it is understood that the Agency may employ others to do this work, and without further authority withhold the cost thereof from any payment due the Contractor.
5.20 Dispose of all debris and waste resulting from work at a disposal site approved by the Agency. The Contractor shall comply with all Department of Environmental Quality requirements concerning the use, handling, and disposal of petroleum products, working in or near streams and wetlands, burning or releasing emissions into the air, and disposal of solid waste and hazardous or toxic waste. The Contractor shall not put or spill any materials into any drainage system that would pollute area streams or waterways. The Contractor shall be liable for any pollution caused directly or indirectly by the Contractor’s employees or those of any subcontractors.
5.21 Furnish all special apparatus, welding machines, air compressors, hoisting equipment, tools, implements, cartage, scaffolding, ladders, planks, acetylene gas, oxygen gas, expendable materials, temporary light and heat, construction materials, shims, and all other materials that may be required for the proper completion of the work.
5.22 Furnish electrical power, gas, compressed air, and any other utilities required for use during construction. The Contractor shall remove all temporary wiring, switches, lights, piping, and connections to service facilities used during construction.
Such connections shall not be made without approval of the Agency.
5.23 Provide temporary supports as may be required during construction including those necessary to ensure the stability of the proposed excavation or working under coal mine roofs.
5.24 Not be permitted to drive any crawler type equipment or rollers on any paved roads (sidewalks) except on rubber tire floats or similar vehicles. The Contractor shall protect pavement when it is necessary to move such type of equipment across any paved roadway.
5.25 Not be permitted to keep within buildings or structures any stock of gasoline, kerosene, diesel fuel or similar flammable material. Any such flammables shall be stored in areas arranged by the Contractor, in a manner approved by the Agency and in compliance with the Department of Environmental Quality’s AST Regulations.
5.26 Be responsible for shoring as required to prevent damage to any adjacent structures, utilities or property.
5.27 Repair to the satisfaction of the Agency, at the Contractor’s own expense, any damage to adjacent structures, utilities or property.
5.28 Allow and provide the Agency access to the work for inspection whenever it is in preparation or progress, and provide proper facilities for such access and inspection.
5.29 The drawings and specifications illustrate the general character and scope of the work. Any additional detail and other information deemed necessary by the Agency will be furnished to the Contractor when and as required by the work.
5.30 Where the word “similar” appears on the drawings, it shall be interpreted in its general sense and not as meaning identical, and all details shall be worked out in relation to their location and their connection with other parts of the work.
5.31 The specifications are divided into several parts for convenience only, since the entire specifications must be considered as a whole. The divisions of the specifications are not intended to control the Contractor in dividing the work among subcontractors or to limit the work performed by any trade. The Contractor shall be responsible for the coordination of the trades, subcontractors, and venders engaged upon this work.
5.32 The Contractor shall verify measurements or dimensions shown on the drawings at the site. Where there are discrepancies, the Agency shall be consulted.
5.33 The Contractor shall maintain at the site one copy of all drawings, specifications, addenda, change orders and other modifications, in good order and marked to record all changes made during construction.
5.34 Before performing any excavation, contact Miss Utility, (800) 810-7197, to confirm the location of any below ground utility lines in the work area. The affected utility companies will mark the location of the underground lines within 48 hours after being notified. If the work is to continue more than 15 days, they will return to remark the utility lines as requested. Further details about the Miss Utility program and its requirements are available at the website www.missutilityofvirginia.com.
5.35 The Contractor shall comply with all regulations governing storm water discharges from construction activities. The contractor shall implement an erosion and sediment control plan throughout the duration of construction activities.
5.36 The Contractor shall certify that all materials meet the requirements of these specifications and governing authorities.
5.37 The Contractor shall comply with permits issued by the Army Corps of Engineers and any other permits required to complete construction for this project when applicable.
http://www.missutilityofvirginia.com/
Section 6. WORK BY AGENCY
The Agency will:
6.1 Furnish the site in an “as is” condition.
6.2 Provide limited area, not necessarily adjacent to the site, for storage purposes and for the Contractor’s offices, change houses, sanitary stations, and tool and storage sheds. The Contractor shall make and maintain access to the facilities.
6.3 Furnish all design and detail drawings necessary to complete the specified work. One set of Plans and Specifications will be sold to interested bidders. Additional sets of Plans and Specifications will be issued to the selected Contractor as needed.
6.4 Designate in the field the manner in which the work is to be performed, as conditions warrant, if not detailed in the Specifications or shown on the Drawings.
6.5 Inspect the work during its progress. No work will be considered completed until approved by the Agency.
6.6 Obtain right of entry.
TECHNICAL SPECIFICATIONS
FOR
ELY PUCKETT CREEK WETLANDS AMD MAINTENANCE IX PROJECT
1. MOBILIZATION
1.A SCOPE
This item shall consist of the mobilization and demobilization of the Contractor’s forces and equipment necessary for performing the work required to complete the Contract.
1.B PROCEDURE
1.B.i It shall include the purchase of contract bonds (if applicable), eVA fees, insurance, transportation of personnel, equipment and operating supplies to the site, and other preparatory work at the site. It shall also include making necessary repairs to any access roads.
1.B.ii It shall not include mobilization for any specific item of work for which payment for mobilization is provided elsewhere in the Contract.
1.B.iii This item covers mobilization for work required by the Contract at the time of award. If additional mobilization costs are incurred during performance of the contract as a result of changed or added items of work for which the Contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the items of work changed or added.
1.B.iv Any unintended or undesired impacts to paved road surfaces by the contractor shall be repaired by the contractor at the contractor’s expense.
1.C MEASUREMENT AND PAYMENT
1.C.i Measurement: Measurement for MOBILIZATION shall be LUMP SUM for the job as shown in the project Scope of Work.
1.C.ii Payment: Total payment for MOBILIZATION shall not exceed 10% of the Base Bid amount. Exceeding this limit may be basis for rejection of the bid as non-responsive. The Base Bid amount shall be the total of all sub-items on the Bid Schedule, less the amount for Mobilization.
Payment for MOBILIZATION shall be the LUMP SUM amount listed on the Bid Schedule and shall constitute full compensation for all labor, equipment, materials and incidentals necessary to complete the work.
Payment for MOBILIZATION shall be made on the basis of 50% of the Lump Sum amount on the first invoice submitted and the remaining 50% on the final invoice.
2. SITE PREPARATION
2.A SCOPE
This item shall include all quality control, clearing, grubbing, general site access, and general site preparation work on all areas within the Limits of Disturbance as directed by the Project Inspector / Project Manager. Specifically, but not limited to, this work must include the removal and disposal of loose road material, debris items such as tires, appliances, etc. and organics within the road-repair area footprint. There is a disposal site 0.3 miles NW of the project site. NOTE: There may be a waterline or existing drainage structures located within the boundary of the existing Access Road roadbed, all utility locations to be confirmed by the contractor via Miss Utility. Careful inspection of the areas to be ditched is required prior to excavation activities by equipment.
2.B PROCEDURE
Materials which are cleared, grubbed, stripped or otherwise included as part of this work may be disposed on-site and off-site at the landfill. Do not leave any windrows of brush. Material disposed on-site shall be evenly and neatly distributed as approved by the Project Inspector.
Any trees with 4” or larger diameter needing removal shall be cut into 2-feet segments and given to the property owner for firewood. The contractor shall exercise extreme caution if tree removal is necessary around / above the portal area; no personnel shall be beneath the tree while removal occurs. The Project Inspector will specify the exact disposal location of the firewood.
2.C MEASUREMENT AND PAYMENT
2.C.i Measurement: Measurement for SITE PREPARATION shall be on a PER JOB basis for all work accepted and approved by the Agency.
2.C.ii Payment: SITE PREPARATION shall be based upon the LUMP SUM amount on the Bid Schedule. Payment as specified shall be full compensation for all labor, materials, equipment and incidentals, such as disposal fees, necessary to complete the work.
3. EROSION CONTROL
3.A SCOPE
This item shall consist of furnishing, maintaining, and removing temporary silt fence as directed by the Inspector. Straw bales shall be strategically placed upstream at pipe inlets to prevent blockage of drainage structures. Silt fence and straw bale barriers shall be maintained as necessary to prevent siltation from entering the stream. A filter fabric shall be placed between original ground and riprap slope.
3.B MATERIALS
3.B.i Silt Fence:
Silt Fence filter fabric shall be Terra Tex SD-F made by Hanes Geo Components or equivalent, and shall be specifically recommended for this purpose by the manufacturer and shall meet or exceed the following specifications:
U.V. Resistance (ASTM D-4355) 80% Grab Tensile (ASTM D-4632) 125 lbs.
Permittivity (ASTM D-4491) 0.1 sec-1 Flow Rate (ASTM D-4491) 8 gpm/ft2
Silt Fence posts shall be either timber stakes (2” x 2” min.) or pressed steel stakes set plumb and to sufficient depth to provide a sound anchor for the supporting wire fence and/or filter fabric.
3.B.ii Straw Bales-Barrier: As needed, and appointed by the Project Inspector / Project Manager, straw bale-barriers shall be installed at critical drain ways during construction to aid the Silt Fence filter fabric (Terra Tex SD-F made by Hanes Geo Components, or equivalent); see the DETAILS drawing sheet of the plans for exact layout. Standard square straw bales (approximately 18”x14”x36”) shall be either wire-bound or string tied. Wooden stakes (2”x2”x36”) or standard “T” or “U” steel posts shall be used to anchor.
3.B.iii Filter Fabric: As instructed by the Project Inspector / Project Manager, a filter fabric cloth shall be installed at critical stages during construction to aid the consolidation of fine materials; and, the filter fabric shall be placed between the soil (or original ground) and the Riprap stone layers. The fabric shall be tucked away underneath the stone as to not expose any edges near the final roadbed subgrade.
3.C INSTALLATION
Silt fence shall be placed at all necessary locations to prevent erosion and as approved by the Inspector. Vertical wood posts shall be protected by means of a metal cap or other device to prevent damage when hammers are used to drive the posts into the ground.
Straw bales shall be placed at strategic inlet points to prevent the closure of drainage structures or used as an “in-stream” barrier to flowing sediment.
Filter fabric shall be a woven geotextile manufactured for use as a slope lining between layers. Minimum specifications shall be as follows:
Property Value Grab Strength 400 x 250 lbs.
Burst Strength 500 psi Equivalent Opening Size
70-100 sieve
Typical commercial products are Mirafi 700X, Exxon GTF 400E, Supac 6WM or equivalents.
shall be placed against the soil layer after excavation prior to placement of the aggregate layers.
MAINTENANCE
Silt fences shall maintain functionality in sound condition and accumulations of silt removed each day. Following the usefulness of each structure, it shall be removed. Straw bales-barriers shall be replaced as needed due to bale deterioration to prevent the closure / clogging of drainage structures.
3.D MEASUREMENT AND PAYMENT
3.D.i Measurement: SILT FENCE shall be measured on a LINEAR FEET basis for the length of sediment control actually installed, maintained, removed, and accepted by the Agency.
3.D.ii Payment: Payment for SILT FENCE shall be based upon the LINEAR FEET accepted and approved of each item by the Agency and the Unit Price listed in the Bid Schedule for each pay item. Payment as specified shall be full compensation for all labor, materials, equipment and incidentals required to install, maintain and remove the items specified.
3.D.iii Measurement: STRAW BALES shall be measured on an EACH bale basis for the number of bales actually installed, maintained, removed, and accepted by the Agency.
3.D.iv Payment: Payment for STRAW BALES shall be based upon EACH bale accepted and approved of each item by the Agency and the Unit Price listed in the Bid Schedule for each pay item. Payment as specified shall be full compensation for all labor, materials, equipment and incidentals required to install, maintain and remove the items
3.D.v Measurement: FILTER FABRIC shall be measured on a SQUARE FEET basis for the area of sediment control actually installed and accepted by the Agency.
3.D.vi Payment: Payment for FILTER FABRIC shall be based upon the SQUARE FEET accepted and approved of by the Agency and the Unit Price listed in the Bid Schedule for each pay item. Payment as specified shall be full compensation for all labor, materials, equipment and incidentals required to install, maintain and remove the items
4. ACCESS ROAD REPAIR
4.A SCOPE
This item shall consist of all necessary excavation, grading of roadside ditches, and grading of the road embankment slope, and stone placement to repair the necessary sections of the ACCESS ROAD (also known as Baltic Drive); the main concern is a deteriorated area that is approximately twenty-five (25) slope feet in width and sixty (60) feet in road length. The secondary concern, repair area 2, is in the curve and associated drainage from the Kegley property. The repair must ensure safe access to the Lick Branch AMD site from the State Route 765. It shall include any necessary regrade or upgrade of any and all access road components in regard to the work area and / or disposal site. This shall include downslope impacts such as road drainage and crossings under Baltic Drive. Further, it should subsequently include the strategic placement of specified stone and aggregate layers for establishing permanent access to the areas of the mine discharge treatment facility according to the location and details shown on the Drawings and described in the Specifications. There are existing drop inlets and buried pipes which are to NOT BE disturbed. Removal of large stones / rocks / boulders from along the roadside edge shall be carefully placed behind the existing wooden safety fence on the southern edge.
4.B MATERIAL
4.B.i VDOT Class 1 Riprap as specified in Section 204 and 414 of the VDOT Road and Bridge Specifications. See SECTION 6 - AGGREGATE for information regarding the aggregate to be used as access road repair materials.
4.B.ii VDOT No.3 AGGREGATE as specified in Section 203 of the VDOT Road and Bridge Specifications. See SECTION 6 - AGGREGATE for information regarding the aggregate to be used as temporary access materials.
4.B.iii VDOT Crusher Run AGGREGATE as specified in Section 205 of the VDOT Road and Bridge Specifications. See
SECTION 6 - AGGREGATE for information regarding the aggregate to be used as roadway base materials.
4.B.iv VDOT #57 STONE as specified in Section 203 of the VDOT Road and Bridge Specifications. See SECTION 6- AGGREGATE for information regarding the aggregate to be used as surfacing material for the Access Road Repair.
4.C PROCEDURE
To repair the existing road embankment deterioration, carefully remove any loose material and then over excavate the unconsolidated material to establish an area below the road embankment area to original ground to begin placement of Class 1 Riprap. The filter fabric lining shall not be placed until foundation preparation is completed and the subgrade surfaces have been inspected and approved by the Inspector. Filter fabric shall be laid smooth and free of tension, stress, folds, wrinkles or creases. Where laps occur, the up-slope piece shall lay overtop the down-slope piece. Minimum overlap shall be 18 inches.
Place the layers of stone and grade the area as smooth as possible into the adjacent ground while promoting positive drainage away from the roadbed. Apply the surface grouting layer, per Section 5 GROUTING, to provide water-resistance to the newly established riprap-armored embankment. Upon completion of Access Road repair activities, resurface the road and any impacted approaches and remove all temporary structures; revegetate all disturbed area in accordance with SECTION 9-
REVEGETATION.
4.D MEASUREMENT AND PAYMENT
4.D.i Measurement: Measurement for ACCESS ROAD REPAIR shall be on a PER JOB basis for all work accepted and approved by the Agency.
4.D.ii Payment: Payment for ACCESS ROAD REPAIR shall be based upon the LUMP SUM amount on the Bid Schedule.
Payment as specified shall constitute full compensation for all labor, materials, equipment, and incidentals necessary to complete the work. Payment for all aggregate shall be included in SECTION 6 – AGGREGATE; payment for all revegetation shall be included in SECTION 9 – REVEGETATION.
5. SURFACE GROUTING of RIPRAP
5.A SCOPE
This item shall consist of the GROUTING of the riprap-armored slope surfaces used to repair the road in areas that are along Baltic Drive and the adjacent driveway(s) / access to the cemetery where drainage discharges down the northern embankment. Grout shall consist of 1-part hydraulic cement and 3-parts sand, thoroughly mixed with water to produce grout having a thick, creamy consistency. Application shall be thorough enough to provide water-resistant surface completely covering the riprap stone while preventing entrance to any nearby streams.
5.B PROCEDURE
The riprap shall be prepared for GROUTING by cleaning up the stone, removing any soil, and clearing debris that may have fallen in front of the slope.
Construction of the access road repair via grouting riprap is to be conducted in a safe manner using proper equipment for the work being performed. Spotters will be used to control work such that all material is prevented from rolling, slipping, or sliding down slope.
The GROUTING shall commence as soon as the Project Inspector grants permission, and the slope repair has been prepped for grout. The Contractor shall work as quickly and safely as possible to minimize the number of total hours the road is rendered closed and to minimize access interruption to persons effected.
5.C MEASUREMENT AND PAYMENT:
5.C.i Measurement: The GROUTING shall be on a per CUBIC YARD basis for all incidentals and time, labor, and equipment necessary to complete the removal of water from the portal area.
5.C.ii Payment: The payment for GROUTING shall be on a CUBIC YARD basis. Payment as specified shall be full compensation for all labor, materials, equipment and incidentals required to complete the work. The final fee of the GROUTING is subject to quantity of material, in cubic yards, approved by the Project Inspector and the line item in the bid schedule which represents the maximum allowable dollar amount published at the time of this contract.
6. AGGREGATE
6.A SCOPE
This item shall consist of the preparation, haulage, and placement of aggregate stone on the site for access as well as for repair of the access road as needed and directed by the Project Inspector.
6.B MATERIAL
6.B.i VDOT No. 57 Stone as specified in Section 203 of the VDOT Road and Bridge Specifications shall be used as access road bedding. See SECTION 2 – SITE PREPARATION.
6.B.ii VDOT No.3 Stone as specified in Section 204 of the VDOT Road and Bridge Specifications shall be used as fill material to repair the road.
6.B.iii VDOT Class 1 Riprap as specified in Section 204 and 414 of the VDOT Road and Bridge Specifications shall be used for the construction of the repaired slope of the access road.
6.B.iv VDOT Crusher Run stone as specified in Section 205 of the VDOT Road and Bridge Specifications shall be used as access road bedding and backfill as needed.
6.C PROCEDURE
6.C.i Aggregate shall be transported and handled to prevent dirt and debris from entering the stone; and to prevent spalling and breakage of the stone.
6.C.ii Aggregate shall be placed according to Construction Drawings and as directed by the Project Inspector.
6.D MEASUREMENT AND PAYMENT
6.D.i Measurement: Measurement for all types of AGGREGATE shall be on a per TON basis for the type and amount of aggregate delivered and installed. Weight tickets shall be submitted as documentation for payment. Tickets shall include the total weight of the truck empty and loaded and the net stone weight, the name of the project, date, and type of stone.
6.D.ii Payment: Payment for all types of AGGREGATE (Class I, NO.3, NO.57, and Crusher Run) shall be on a per TON
Cost basis for the type and amount of aggregate delivered and accepted by the Agency and the Unit Price listed on the Bid Schedule. Payment shall be full compensation for all labor, equipment, materials and incidentals required to perform the work.
7. GRADING AND DITCHING
7.A SCOPE
This item shall consist of all work / excavation and or grading, and placement of materials necessary to recreate, shape, and completely armor the existing road ditches, the newly created ditches, the relocation of an existing pipe (rotation), and the disposal area at Lick Branch. It involves the excavation and forming of surface material to the required grade for construction of the road ditches and the area immediately surrounding and encompassing the disposal area at the Lick Branch AMD site to ensure positive flow to the appropriate hydraulic structures. The existing pipe will be re-buried in approximately the same location, rotated +50 degrees.
7.B PROCEDURE
The construction of the ditches will begin at the most upstream point within the project limits to capture flows from the existing driveways. The extents will be determined by the positive flows achieved, the tie-in to existing drainage structures, and the approval of the Project Inspector. The existing drainage structures will only require minimal armoring and/or surfacing, if any. Road surfaces will be graded on a banked slope to the ditch side for sheet flows to accumulate; water bars shall be installed as necessary.
7.C MATERIAL
7.C.i VDOT No. 57 Stone as specified in Section 203 of the VDOT Road and Bridge Specifications shall be used as access road bedding.
7.C.ii VDOT Crusher Run stone as specified in Section 205 of the VDOT Road and Bridge Specifications shall be used as access road bedding and backfill as needed.
7.C.iii EXISTING PIPE located as shown on the Existing Site Plan is a steel pipe currently buried within the curve across from the Kegley property. The pipe shall be relocated under Baltic Drive access road as a substitute for a waterbar which currently receives runoff from the building. The pipe shall be reburied within the road surface at approximately 50-degrees rotation of existing location and on a slope that coincides with the installed ditches which ensures positive drainage.
7.D MEASUREMENT AND PAYMENT
7.D.i Measurement: Measurement for the grading of ditches will be on a LINEAR FEET basis of complete grading, forming and compacting of the foundations of the ditches or armored with aggregate for erosion control. It shall be on a per LINEAR FEET basis for all ditches fully armored or installed and approved by the Agency. See the LINEAR FEET unit price listed in the Bid Schedule.
7.D.ii Payment: Payment for the GRADING and DITCHING will be made per LINEAR FEET basis of completed ditching approved by the Agency via Project Inspector. See the linear feet unit price listed in the Bid Schedule.
Payment for all aggregate shall be included in SECTION 6 – AGGREGATE.
7.D.iii Payment: Payment for the EXISTING PIPE shall be on a LUMP SUM basis of completed installation of the relocated pipe under the access road as approved by the Agency via the Project Inspector approval.
8. TRENCH DRAIN INLET
8.A SCOPE
This item shall consist of all work, excavation and / or grading, and materials necessary to create a cross trench, and INSTALL a 16’-long, 18”-deep, 12”-wide precast trench vault with a slotted 14”-cast iron (or steel) trench grate cross-drain inlet under Baltic Drive at the intersection with the driveway of Marion Kegley. The drainage structure should coincide with the low point in elevation that best conveys the flow of surface runoff / storm drainage to the north side of the access road. Currently, a waterbar is constructed at the proposed location. See the typical drawings for exact measurements to ensure that the trench drain system components connect properly.
8.B PROCEDURE
The construction of the trench drain will be at the most ideal point (waterbar location) within the project limits to capture flows from the existing driveways / access roads. The skew shall be such that a minimum of 1% slope is maintained inside the drain. The extents will be determined by the positive flow achieved, the tie into existing structures, if necessary, and at the approval of the Project Inspector. Please note locations of existing drainage drop-inlets that are NOT to be disturbed during this construction.
Note: The trench area opening through Baltic Drive shall not be initiated or left open without the documented permission of the Project Inspector. The installation shall be with the consideration of the residents who reside beyond the impacted construction area via the single ingress / egress route of Baltic Drive.
8.C MATERIAL
8.C.i The TRENCH DRAIN INLET shall be a 16’ long, pre-cast concrete base box with a heavy-duty metal grate inlet.
The metal grate lid shall be similar to the EJ 6900Z1 series with 14”- wide type A-slots at least 1” thick, rated H-20, or equivalent. The concrete frame box shall be placed per manufacturer’s instructions on a prepared uniform support of compacted VDOT Crusher Run stone as specified in Section 205 of the VDOT Road and Bridge Specifications.
Any joints shall be additionally supported by leveling blocks. Compaction shall be via hand-operated roller or rammer tamper-jumping jack; no HD roller (sheepsfoot-type) shall be allowed to proceed over the precast box.
The protection of the trench drain inlet structure requires the installation of it to be the last item installed after all aggregate delivery is completed.
Note: Typically, a 5-week minimum notice is required to be given to a precast box manufacturer for sufficient time of concrete curing to be accomplished; order and plan accordingly.
8.C.ii Grout: The depth of the drain will be placed to accommodate both the road surface and the pipe’s discharge; the outlet end shall be strategically placed to ensure flush discharge. The slope from the discharge of the trench drain to the toe of the road embankment shall be grouted.
8.D MEASUREMENT AND PAYMENT
8.D.i Measurement: Measurement for the trench drain inlet installation will be on a LINEAR FEET basis of complete grading, forming and units installed. See the LINEAR FEET unit price listed in the Bid Schedule.
8.D.ii Payment: Payment for the TRENCH DRAIN INLET will be made per LINEAR FEET basis of completed ditching approved by the Agency via Project Inspector. See the LINEAR FEET unit price listed in the Bid Schedule.
Payment for all grouting shall be included in SECTION 5 – SURFACE GROUTING. Payment for VDOT Crusher Run stone shall be included in SECTION 6 – Aggregate.
9. REVEGETATION
9.A SCOPE
This item covers the furnishing of all labor, equipment, and material for preparing the seedbed, liming, fertilizing, tilling, seeding and mulching on the designated areas. Designated areas encompass all areas and access roads within the project limits. It is anticipated that the number of total acres required will be less than 1 acre, but shall also include the disturbed area associated with the access road repair of Section 4.
9.B CERTIFICATION
The Contractor shall certify that all seed, soil amendments and mulch to be used in vegetation operations meet the requirements of these specifications and governing authorities.
9.C MATERIALS
9.C.i Lime: Lime material shall be ground agricultural limestone and shall conform to the minimum Calcium Carbonate Equivalent (C.C.E.) guaranteed by the supplier and approved by the Project Inspector.
a) Application: Lime shall be applied as directed by the Project Inspector prior to final grading (tracking) for incorporation into the soil.
b) Lime Rate: Lime shall be spread at two (2) tons per acre.
c) Lime Analysis: Agricultural limestone applied for seeding shall have a minimum C.C.E. of ninety percent (90%). The supplier shall certify this analysis.
9.D SEEDING
All seeding work shall be performed by the Contractor or licensed subcontractor, approved by the Agency, with demonstrated experience and who has the necessary equipment to complete all operations required. Seeding may be accomplished by the use of a hydroseeder or other methods as approved by the Agency.
9.D.i Seeding Schedule
Upon completion of grading and liming operations, the areas shall be seeded. Areas eroded by rainfall or crusted over shall be repaired prior to seeding.
The Project Inspector shall approve all seeding operation time schedules. It is recommended that the seeding operations be confined between February 15th to June 15th, and September 1st to November 1st to obtain satisfactory results.
There may be some occasions such as during winter or summer months, when some areas may require temporary seeding. The Project Inspector may require these operations when deemed necessary to prevent erosion and sedimentation. Temporary seed mixtures and rates shall be applied during these periods.
9.D.ii Permanent Seed Mixture
Permanent seed mixture and rates are specified below. The Project Inspector shall approve any substitution or adjustments.
Permanent Seed
Name Lbs. /Acre Orchard Grass 25 Annual Ryegrass 10 Red Clover 5 Ladino Clover 5 Birdsfoot Trefoil 5 Redtop grass 3
TOTAL 53
9.D.iii Temporary Seeding
Temporary seeding mixtures and rates are specified below. The Project Inspector shall approve any substitution or
Summer Mixture
German Foxtail Millet 40 Annual Ryegrass 20
TOTAL 60
Winter Mixture
Annual Ryegrass 20 Cereal Rye 40
TOTAL 60
Permanent seed mixtures shall be applied at the first available seeding period on all temporary seeded areas.
9.E FERTILIZER
9.E.i Type / Rate
Fertilizer shall be standard commercial product. The rate of fertilizer applied shall be 300 pounds per acre of 16-27- 14 or equivalent. Fertilizer may be applied by mechanical spreader or hydraulically by a hydroseeder. Fertilizer and seed may be applied at the same time with a hydroseeder. Water used in a hydroseeder shall have a pH between 6.0 and 9.0.
9.E.ii Inoculant
All leguminous seed shall be inoculated with inoculant specified for use on that particular seed. The Manufacturer’s directions for inoculating seed shall be followed. Inoculants shall be applied at double the manufacturer’s rate.
Inoculant shall be mixed with legume seed prior to mixing with other seeds. Pre-inoculated legume seed from a supplier may be used.
9.F MULCHING
9.F.i Wood Cellulose or Paper Fiber
Wood cellulose or paper fiber mulch for use with a hydroseeder shall be applied at the rate of 1,500 pounds per acre.
This mulch shall be applied along with seed and fertilizer mixtures.
9.F.ii Straw or Hay Mulch
Material for mulching shall consist of dry straw or hay, free of noxious weeds. The mulch shall be reasonably bright in color and shall not be musty, moldy, caked, decayed or very dusty. The application rate for hay or straw shall be 2,000 pounds per acre. Erosion control blanket may be substituted for straw or hay mulch.
9.G LAWN SEED MIXTURE
Lawn seed mixture and rates are specified below. The Project Inspector shall approve any substitution or
Permanent Seed
Name Lbs. /Acre Kentucky Bluegrass 20 Perennial Ryegrass 10 Ladino Clover 5 Red Fescue 15
TOTAL 50
9.H MAINTENANCE
Areas reseeded or replanted shall also include construction maintenance areas where vegetation is destroyed due to repair work. Progressive seeding of small project areas shall be required during the complete project. Maintenance work for revegetation shall be reviewed prior to each seeding operation throughout the project and corrective action on prior seeded/planted areas may be required.
The Contractor at his/her cost shall complete revegetation maintenance.
The Agency’s Project Inspector shall be required to sample and test the soil on any areas, which fail to support vegetation after one reseeding/replanting by the Contractor or at the end of the guarantee period, whichever is later.
9.I MEASUREMENT AND PAYMENT
9.I.i Measurement: REVEGETATION will be measured in units of Acres.
9.I.ii Payment: REVEGETATION shall be the product of the number of acres seeded and the Unit Price per acre listed on the Bid Schedule. The Unit Price shall include all labor, seed, lime, fertilizer, mulch, equipment, and apparatus necessary to complete the work.
9.J REPAIRS
Other provisions of these Contract Documents notwithstanding, disturbances outside the project limits caused by the
Contractor shall be seeded in accordance with these specifications at the Contractors expense, under the direction of the Project Inspector.
10. CLEAN UP AND REPAIR OF DAMAGE
10.A SCOPE
This item shall consist of cleaning up the site prior to demobilization, repairing damage and guarantee of workmanship.
10.B CLEANING UP
After all construction work is complete, prior to final payment, all exposed areas shall be cleaned and left in an acceptable condition. All unused material shall be removed from the site or otherwise disposed of as directed by the Agency. Any bare areas shall be seeded and treated in accordance with the applicable specification.
10.C REPAIRING DAMAGE
Any damage done to structures, fill, or other areas shall be repaired at the Contractors expense before final payment is made.
In the event such damage occurs as a result of instructions from the Agency, payment will be made at the price agreed to by the Contractor and Agency.
Contractor should locate any buried water or gas lines located in the work area and exercise care in and around these lines. Replacement of any destroyed, functioning gas line shall be at the contractor’s expense.
10.D GUARANTEE
The Contractor shall assume responsibility for all workmanship and materials for a period of time as described in the General Conditions.
10.E MEASUREMENT AND PAYMENT
No separate measurement and payment will be made for CLEANUP AND REPAIR OF DAMAGE. This work shall be considered incidental to Mobilization.
11. SAFETY PRECAUTIONS
11.A SCOPE
This item consists of the procedures and protocol that are to be followed to ensure the safety of the public and workers in or around the construction site.
11.B PROCEDURE
11.B.i It shall be the Contractors’ responsibility to provide protective clothing and equipment, emergency breathing apparatus, medical supplies and instrumentation for monitoring potentially unhealthy working conditions encountered during construction.
11.B.ii The Contractor shall train all equipment operators, laborers and other personnel of the hazardous or unhealthy conditions which may be encountered during the work, and possible courses of action to be implemented to avoid an accident as required by applicable OSHA and MSHA regulations.
11.B.iii The Contractor shall examine all areas within and adjacent to the project sites for unstable rock, debris, and any other hazards to safety.
11.B.iv In the event of an injury or fatality (from the project’s activities), proper notification shall be immediately made to
DMLR and, as applicable, to the appropriate office of the Virginia Department of Labor and Industry – Occupational Safety and Health Compliance (OSHA), the Mine Safety and Health Administration (MSHA), and/or the State Fire Marshall.
11.B.v HAZARDOUS AND TOXIC MATERIALS
If hazardous or toxic materials (i.e. PCB’s, Asbestos Containing Material (ACM), lead-acid batteries, etc.) are encountered during the work, the Contractor shall immediately notify the Agency. The Department of Environmental Quality guidelines for handling and cleaning up the site shall be followed.
11.C MEASUREMENT AND PAYMENT
There will be no separate payment for this item. If necessary, in the event that the required action will not be incidental to existing pay items, appropriate change orders shall be executed.
| SPECIAL CONDITIONS |
| TECHNICAL SPECIFICATIONS |
| 1. MOBILIZATION |
| 2. SITE PREPARATION |
| 3. EROSION CONTROL |
| 4. ACCESS ROAD REPAIR |
| 5. SURFACE GROUTING of RIPRAP |
| 6. AGGREGATE |
| 7. GRADING AND DITCHING |
| 8. TRENCH DRAIN INLET |
| 9. REVEGETATION |
| 10. CLEAN UP AND REPAIR OF DAMAGE |
| 11. SAFETY PRECAUTIONS |
| 2024-06-06T16:33:18-0400 | |
| Holly F White |