This document contains a set of plans and specifications for the Ely Puckett Creek Wetlands AMD Maintenance IX project in Lee County, Virginia. The project is being managed by the Commonwealth of Virginia's Department of Energy, Mined Land Repurposing, Abandoned Mine Land Section. The work includes mobilization, cleaning and repair of drainage pipes, access road repair, miscellaneous drainage control work, cleanup and repair of damages, safety conditions, and revegetation of all disturbed areas. The project must be completed within 45 calendar days after receipt of the Notice to Proceed. Bidders must attend a mandatory pre-bid conference on July 3, 2024, and bids are due by July 16, 2024. The contract will be awarded to the lowest responsive and responsible bidder.

This procurement has set-aside designations for SBSD-certified micro businesses (bids up to $10,000) and SBSD-certified small businesses (bids up to $100,000), if the agency determines the bid price is fair and reasonable. Bidders must comply with federal requirements such as the Buy America and Buy American Act and submit all required forms and certifications. No additional details are provided regarding pricing terms, incumbents, or funding sources.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA MAP

PROPOSED AGGREGATE

STOCKPILE LOCATION

LICK BRANCH SITE

AMD MAINTENANCE IX PROJECT

PROJECT LOCATION

PENNINGTON GAP QUADRANGLE

MINED LAND REPURPOSING

ABANDONED MINED LAND SECTION

ELY PUCKETT CREEK WETLANDS

1 Cover Sheet

DESCRIPTION

INDEX OF SHEETS

2 Site Plan Existing 3 Site Plan Proposed

GENERAL NOTES

1. Before performing any excavation, contact Miss Utility, (800) 810-7197, to confirm the location of any below ground utility lines in the work area.

2. Before starting the work, contact the Agency for proper clearance and be governed by the Agency's instructions.

3. The contractor is responsible for scheduling, expediting, directing, inspecting and coordinating the work so as to complete the work in the time agreed upon.

4. Work in close cooperation with the Agency and others engaged in the project so that the work will be completed in an orderly manner.

5. Provide temporary supports as may be required during construction to ensure the stability of the proposed excavation.

4 Embankment Section

DESCRIPTION

INDEX OF SHEETS

May 23, 2024

GENERAL NOTES

1. Before performing any excavation, contact Miss Utility, (800) 810-7197, to confirm the location of any below ground utility lines in the work area.

2. Before starting the work, contact the Agency for proper clearance and be governed by the Agency's instructions.

3. The contractor is responsible for scheduling, expediting, directing, inspecting and coordinating the work so as to complete the work in the time agreed upon.

4. Work in close cooperation with the Agency and others engaged in the project so that the work will be completed in an orderly manner.

5. Provide temporary supports as may be required during construction to ensure the stability of the proposed excavation.

5 Erosion Details

SCALE:1"=1000'

50001000 100050001000 1000

SCALE:1"=2000'

100002000 2000

COORDINATES:

6 Typical Ditch Details 1

/ Location Map

7 Typical Ditch Details 2 of2 7

Sheet Number:

D a t e

P l a n

V i e w

E x i s t i n g

C o n d i t i o n s

D e s i g n e d

D r a w n

E L

Y

P

U C

K E

T T

C

R E

E K

W

T

L A

N D

S

A

M D

M

A I N

T E

N A

N C

E

I X

L E

E

C

O U

N T

Y

V

I R

G I N

I A

S c a l e

R e v i s i o n s

N

B i g

S t o n e

G a p

V i r g i n i a

M R

C

M R

C

N of3 7

Sheet Number:

D at e:

SI

TE

P

LA

N

PR

O

PO

SE

D

D es ig ne d:

D ra w n:

LE

E

C O

U N

TY

, V

IR

G

IN

IA

Sc al e:

1"

R ev is io ns

Bi g

St on e G ap , V irg in ia (2

) 5

-8

4/

/2

M R

C

M R

C

EL

Y

PU

C

KE

TT

C

R

EE

K W

ET

LA

N D

S

AM

D M

AI

N

TE

N

AN

C

IX

of5 6

D at e:

PR

O

PO

SE

D

E M

BA

N

KM

EN

T

SE

C

TI

O N

D es ig ne d:

D ra w n:

LE

E

C O

U N

TY

, V

IR

G

IN

IA

Sc al e:

N

.T .S

R ev is io ns

Bi g

St on e G ap , V irg in ia (2

) 5

-8

5/

/2

M R

C

M R

C of4 7

Sheet Number:

EL

Y

PU

C

KE

TT

C R

EE

K

W

ET

LA

N

D S

AM

D

M

AI

N

TE

N

AN

C

FILTER FABRIC

3. BACKFILL AND

COMPACT THE

EXCAVATED SOIL.

1. SET POSTS 5' APART AND

EXCAVATE A 4" X 4" TRENCH

UPSLOPE ALONG THE LINE OF POSTS.

2. ATTACH THE FILTER FABRIC

TO THE POSTS AND EXTEND IT

INTO THE TRENCH.

Silt Fence Typical N.T.S.

1. DITCHES SHALL BE AT LEAST ONE FOOT IN DEPTH.

2. MINIMUM SLOPES OF 1% FOR ROADSIDE DITCHES.

V-shaped Ditch N.T.S.

A

PROPER PLACEMENT OF STRAW BALE BARRIER IN DRAINAGE WAY

Note: Embed hay bales a minimum of 4 inches.

Prevent Piping Compacted Soil to

Straw Bale Staked and Entrenched

Runoff Sediment Laden

Filtered Runoff or Twine Binding Wire

Points A should be higher than point B

B

A

Straw Bales-Barrier N.T.S.

GRADED ROAD DITCHES

Typical Section

SS

1 1

SS

D

FB

1'

Diversion Ditch of5 7

Sheet Number:

D at e:

ER

O

SI

O N

D

ET

AI

LS

D es ig ne d:

D ra w n:

LE

E

C O

U N

TY

, V

IR

G

IN

IA

Sc al e:

N

.T .S

R ev is io ns

Bi g

St on e G ap , V irg in ia (2

) 5

-8

5/

/2

M R

C

M R

C

EL

Y

PU

C

KE

TT

C

R

EE

K W

ET

LA

N D

S

AM

D M

AI

N

TE

N

AN

C of6 7

D at e:

D es ig ne d:

D ra w n:

LE

E

C O

U N

TY

, V

IR

G

IN

IA

Sc al e:

N

.T .S

R ev is io ns

Bi g

St on e G ap , V irg in ia (2

) 5

-8

5/

/2

M R

C

M R

C

EL

Y

PU

C

KE

TT

C

R

EE

K W

ET

LA

N D

S

AM

D M

AI

N

TE

N

AN

C

E

IX

TY

PI

C

AL

P R

EC

AS

T

TR

EN

C

H D

IT

C

H D

ET

AI

LS

of7 7

D at e:

TY

PI

C

AL

T

R

EN

C H

G R

AT

E

D

ET

AI

LS

D es ig ne d:

D ra w n:

LE

E

C O

U N

TY

, V

IR

G

IN

IA

Sc al e:

N

.T .S

R ev is io ns

Bi g

St on e G ap , V irg in ia (2

) 5

-8

5/

/2

M R

C

M R

C

EL

Y

PU

C

KE

TT

C

R

EE

K W

ET

LA

N D

S

AM

D M

AI

N

TE

N

AN

C

2024-06-07T16:39:38-0400
Holly F White
2024-06-07T16:39:39-0400
Holly F White
2024-06-07T16:39:39-0400
Holly F White
2024-06-07T16:39:40-0400
Holly F White
2024-06-07T16:39:41-0400
Holly F White

File details come from the government source that posted it. Updated .