Inspection, Testing, and Repairs of Aboveground and Underground Storage Tanks, NSA, Crane, Indiana
Solicitation number
N40085-21-R-0040
Issued by

View the file

Other files

File Type Posted
AMND_01_N4008521R0040.pdf PDF
AMND_01_N4008521R0040.pdf PDF
N4008521R0040_Solicitation_SAM.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELINs BASE - Recurring

ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
CONTRACT #N40085-21-R-0040
EXHIBIT A
Recurring Services (Base Period)
PROVIDE PRICES FOR ENVIRONMENTAL SERVICES - RECURRING SERVICES - IN ACCORDANCE WITH SECTION 1800000 Environmental, SPEC ITEM 3
ELINs A001 through A038
EXHIBIT LINELINE ITEMESTIMATEDUNIT OFUNITEXTENDED
ITEM NUMBERDESCRIPTIONQUANTITYISSUEPRICEAMOUNT
NSA
A001 - Conduct Tank Leak Tightness Testing (40 CFR 280 Tanks)This ELIN shall be for all labor, material, equipment to conduct tank leak tightness testing at 0.1 gph (gallons per hour) rate for 40 CFR 280 state regulated underground fuel storage tanks in accordance with all applicable documents listed in Attachment J-0200000-03. Tanks range in size from 6,000 gallons to 12,000 gallons and are double walled. This ELIN shall include providing a written test report telling at a minimum the NSA Crane tank name, tank test results, tank testing procedure used, tank test date and printed name along with signature of qualified person completing test. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.4EA$0.00$0.00
A002 - Conduct Cathodic Protection TestingThis ELIN shall be for all labor, material, equipment to conduct cathodic protection testing for 40 CFR 112, 40 CFR 280 and 40 CFR 264 underground storage tanks and associated underground metal piping in accordance with all applicable documents listed in Attachment J-0200000-03. Tanks are 6,000 gallons and have galvanic anodes. This ELIN shall include providing a written test report telling at a minimum the NSA Crane tank name, tank test results, tank testing procedure & standard used, tank test date and printed name along with signature of qualified person completing test. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.2EA$0.00$0.00
A003 - Conduct Veeder Root TestingThis ELIN shall be for all labor, material and equipment to conduct calibration, testing and maintenance on one (1) Veeder Root TLS-350 UST Monitoring System in accordance with the latest version of Petroleum Equipment Institute Recommended Practice 1200 (PEI/RP1200) and all applicable documents listed in Attachment J-0200000-03. Work shall be completed by a Veeder Root Level 2 or Level 3 Certified person. This shall include testing and ensuring the Veeder Root alarm is operable, verifying correct system configuration and test battery backup. All probes and sensors shall be inspect for residual buildup, ensure floats move freely, ensure shaft is not damaged, ensure cables are free of kinks and breaks, and test alarm for operability and communication with controller. All automatic line leak detectors shall be tested for operation by simulating a leak in accordance with PEI/RP1200. All vacuum pumps and pressure gauges shall be ensured proper communication with sensors and controller. Work shall include pumping water/oil out of sumps, replacing light bulbs and paper in Veeder Root console and etc. Currently three (3) systems exist at NSA Crane with one at each B-22, B-2984 and B-3280. B-22 system serves the most tanks by currently serving 3 double walled tanks (Tank names are 3TNKA, 22TNKA and 22TNKB), 3 dispensers and associated sumps. B-2984 system serves two double walled tanks (Tank names are 2984TNKA and 2984TNKB), 2 dispensers and associated pumps. This ELIN shall include providing a written report telling at a minimum the Veeder Root building location, NSA Crane tank names the system serves, Veeder Root functionality testing used along with description of testing procedure, automatic line leak detector testing procedure, Veeder Root print-outs proving system is operational along with all sensors working properly, print-outs showing all sensors alarm functioning, system testing date and printed name along with signature of certified person completing test. Report shall also include copy of Veeder Root Certification of person conducting tests. Report shall also include verification that testing contractor is certified by the Office of the State Fire Marshal under rules of fire prevention and building safety commission at 675 IAC 12-12. Printouts from Veeder Root shall be copied clear and legible in report and it shall be clear what tank/testing each printout is associated with. Report shall be submitted electronically in PDF format. B-3280 report shall be a separate report than that of B-22 and B-2984 report. Refer to Section 1800000 Environmental and Section J for more information.3EA$0.00$0.00
A004 - Conduct STI -SP001 Inspections (55 gal - 9,999 gal AST's)This ELIN shall be for all labor, material, equipment for a Steel Tank Institute (STI) AST Certified Inspector to conduct an STI-SP001 Annual Inspection in accordance with STI-SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Tanks range in size from 55 gallons to 9,999 gallons. Attachment J-0200000-05 (AST Annual Inspection Checklist) shall be used and completely filled out for each tank inspection. Each inspection sheet shall have signature of STI AST Certified Inspector. This ELIN shall include providing a written report detailing at a minimum the methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall also include all AST Annual Inspection Checklists along with a copy of the STI Certified AST Inspectors training certification. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.6EA$0.00$0.00
A005 - Conduct STI-SP001 Inspections (B-3280 AST's)This ELIN shall be for all labor, material, equipment for a Steel Tank Institute (STI) AST Certified Inspector to conduct STI-SP001 Annual Inspections in accordance with STI-SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. This ELIN is inspecting six (6) tanks located at B-3280 government fueling station. Capacities are one (1) 2,000 gallon, one (1) 5,000 gallon, one (1) 10,000 gallon and three (3) 11,600 gallon tanks. The 2K gallon and 10K gallon tanks are double walled tanks with aboveground piping running to two (2) dispensers. The 5K gallon and 11,600 gallon tanks are vertical cylindrical tanks located within concrete dikes with underground piping running to two (2) dispensers. All tanks except for 2K gallon tank will require a telescoping manlift and require fall protection. Height of largest tanks are approximately 18-feet high. Attachment J-0200000-05 (AST Annual Inspection Checklist) shall be used and completely filled out for each tank inspection. Each inspection sheet shall have signature of STI AST Certified Inspector. This ELIN shall include providing a written report detailing at a minimum the methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall also include all AST Annual Inspection Checklists along with a copy of the STI Certified AST Inspectors training certification. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.1EA$0.00$0.00
A006 - Annual Operation & Maintenance Walkthrough InspectionThis ELIN shall be for all labor, material and equipment to conduct an annual operation and maintenance walkthrough inspection of one (1) underground storage tank system in accordance with the latest version of Petroleum Equipment Institute Recommended Practice 900 (PEI/RP900) and all applicable documents listed in Attachment J-0200000-03. Contractor shall use annual inspection checklists from of PEI/RP900 or contractor produced checklists. Contractor produced checklists at a minimum shall list all inspection items included on PEI/RP900 annual inspection checklists. Go to www.pei.org/RP900 for electronic versions of checklists. Checklist shall include printed name along with signature of qualified person completing inspection. This ELIN shall include a written report detailing methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall include all inspection checklists and report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.4EA$0.00$0.00
A007 - Spill Prevention & Overfill Prevention Equipment TestingThis ELIN shall be for all labor, material and equipment to conduct spill prevention equipment (spill bucket) testing and overfill prevention equipment inspection/testing for one (1) underground storage tank in accordance with the latest version of Petroleum Equipment Institute Recommended Practice 1200 (PEI/RP1200) and all applicable documents listed in Attachment J-0200000-03. Spill prevention equipment testing shall be by hydrostatic method in Section 6 of PEI/RP1200. Overfill prevention equipment inspection/testing shall be in accordance with Section 7 of PEI/RP1200. Contractor shall use testing/inspections forms C-3 and C-5 of PEI/RP1200 or contractor produced forms. Contractor produced forms at a minimum shall list all items included on PEI/RP1200 forms. Go to www.pei.org/RP1200 for electronic versions of forms. Testing/inspection forms shall include printed name along with signature of qualified person completing test/inspection. This ELIN shall include a written report detailing methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall include all testing/inspection forms and report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.4EA$0.00$0.00
A008 - Conduct Monthly Inspection of Regulated UST's - NSAThis ELIN shall be for all labor, material and equipment to conduct monthly inspections of four (4) underground storage tanks and fueling systems in accordance with 40 CFR 280.36, NFPA30A and all applicable documents listed in Attachment J-0200000-03. Work shall be completed by an IDEM Certified UST Class B Operator. The tanks are 3TNKA, 22TNKA, 2984TNKA and 2984TNKB and are located at Building 3, Building 22 and Building 2984. This shall include, but not limited to, visually checking spill prevention equipment for damage and removing any liquid or debris, check for and remove any obstructions in fill pipe, check the fill cap to make sure it is securely on the fill pipe and visually inspecting dispensing equipment for damage and removing any liquid or debris in dispenser sump, pump sumps and piping sumps. This shall also include checking to make sure Veeder Root leak detection system is operating with no alarms or any other unusual operating conditions and ensuring the records for leak detection testing are reviewed and current. Currently two (2) Veeder Root leak detection systems exist for these UST’s with one (1) at each B-22 and B-2984. B-22 system serves three (3) double walled tanks (Tank names are 3TNKA, 22TNKA and 22TNKB), three (3) dispensers and associated sumps. B-2984 system serves two (2) double walled tanks (Tank names are 2984TNKA and 2984TNKB), two (2) dispensers and associated sumps. This ELIN shall include providing a completed inspection form for each tank using NSA Crane’s “Aboveground Storage Tank (AST) & Underground Storage Tank (UST) Monthly Inspection Checklist” and providing Veeder Root print-outs for each tank showing the completed Continuous Statistical Leak Detection (CSLD) 0.2 gph tank test and the Pressurized Line Leak Detection for all three (3) of 3.0 gph, 0.2 gph and 0.1 gph tests. Printouts from Veeder Root shall be copied clear and legible and attached to each associated tank inspection form. Inspection form is fillable PDF and shall be filled out electronically for each tank. Inspection form shall be signed by the IDEM Certified UST Class B operator completing the inspection. Three (3) separate reports shall be submitted electronically in PDF format by the end of each month and within three (3) working days of completing inspection. One (1) report for 3TNKA, one (1) report for 22TNKA and one (1) report for 2984TNKA & 2984TNKB. Each report shall include inspection form on first page and Veeder Root printouts on second page for each tank. Veeder Root printouts for each tank shall be copied on one (1) page. Refer to Section 1800000 Environmental and Section J for more information.12EA$0.00$0.00
A009 - Conduct Monthly Inspection of 40 CFR 112 AST's - NSAThis ELIN shall be for all labor, material and equipment to conduct monthly inspections of eleven (11) aboveground storage tanks in accordance with 40 CFR 112, STI SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Work shall be completed by a Certified Steel Tank Institute (STI) AST Inspector or an individual that has completed and obtained his/her STI Tank Integrity Management Certificate. The tanks range in size from 80 gallons to 11,600 gallons. This shall include, but not limited to, visually checking spill prevention equipment for damage and removing any liquid or debris, check for and remove any obstructions in fill pipe, visually inspecting all externally accessible portions of tank, tank system and fuel piping, sticking the tank for water detection in fuel, sticking the interstitial space for any fuel/condensation/water in interstitial space, removing any condensation/water in interstitial space when detected, activating any test buttons on alarms, visually inspecting dispensing equipment for damage and removing any liquid or debris in dispenser or fuel piping sumps. This ELIN shall include providing a completed inspection form for each tank using NSA Crane’s “Aboveground Storage Tank (AST) & Underground Storage Tank (UST) Monthly Inspection Checklist”. Inspection form is fillable PDF and shall be filled out electronically for each tank. Inspection form shall be signed by the STI AST inspector completing the inspection. Inspection form shall be submitted electronically in PDF format by the end of each month and within three (3) working days of completing inspection. This ELIN shall also include providing a Veeder Root printout for tanks associated with vehicle refueling station. The Veeder Root printout shall show that all functions are normal, alarm status and all sensors are normal. Printouts from Veeder Root shall be copied clear and legible and attached to each associated tank inspection form. Refer to Section 1800000 Environmental and Section J for more information.12EA$0.00$0.00
A010 - Tank Program Meetings and Assist Visits - NSAThis ELIN shall be for all labor, material and equipment to provide storage tank program support via meetings and assisting with regulatory visits for a period of 12 months. This work shall include conducting a storage tank program meeting bi-monthly which is once per two (2) months. A proposed meeting agenda shall be submitted electronically in PDF format three (3) work days prior to scheduled meeting. Meeting notes shall be collected and submitted within three (3) work days after scheduled meeting. Meeting notes shall be submitted electronically in PDF format. This ELIN shall include providing on site assistance (80 hours total) during regulatory visits. This assistance can include but not limited to opening spill equipment, sumps, dispensers, assisting in access and escorting regulatory inspector to portable container locations and tank locations. Refer to Section 1800000 Environmental and Section J for more information.1EA$0.00$0.00
A011 - Spill Prevention Testing (Containment Sump for Tank Pump)This ELIN shall be for all labor, material and equipment to conduct spill prevention equipment (containment sump for tank pump) integrity testing for one (1) underground storage tank in accordance with the latest version of Petroleum Equipment Institute Recommended Practice 1200 (PEI/RP1200) and all applicable documents listed in Attachment J-0200000-03. Spill prevention equipment testing shall be by hydrostatic method in Section 6.5 of PEI/RP1200. Contractor shall use testing form C-4 of PEI/RP1200. Go to www.pei.org/RP1200 for electronic version of form. This ELIN shall include a written report detailing methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall include testing form and report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.4EA$0.00$0.00
A012 - Spill Prevention Testing (Dispenser Containment Sump)This ELIN shall be for all labor, material and equipment to conduct spill prevention equipment (dispenser containment sump) integrity testing for one (1) underground storage tank in accordance with the latest version of Petroleum Equipment Institute Recommended Practice 1200 (PEI/RP1200) and all applicable documents listed in Attachment J-0200000-03. Spill prevention equipment testing shall be by hydrostatic method in Section 6.5 of PEI/RP1200. Contractor shall use testing form C-4 of PEI/RP1200. Go to www.pei.org/RP1200 for electronic version of form. This ELIN shall include a written report detailing methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall include testing form and report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.4EA$0.00$0.00
CAAA$0.00
A013 - Conduct Tank Leak Tightness Testing (40 CFR 280 Tanks)This ELIN shall be for all labor, material, equipment to conduct tank leak tightness testing at 0.1 gph (gallons per hour) rate for 40 CFR 280 state regulated underground fuel storage tanks in accordance with all applicable documents listed in Attachment J-0200000-03. Tank is 10,000 gallons and double walled. This ELIN shall include providing a written test report telling at a minimum the NSA Crane tank name, tank test results, tank testing procedure used, tank test date and printed name along with signature of qualified person completing test. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.1EA$0.00$0.00
A014 - Conduct Tank Leak Tightness Testing (40 CFR 264 Tanks)This ELIN shall be for all labor, material, equipment to conduct tank leak tightness testing at 0.1 gph (gallons per hour) rate for 40 CFR 264 underground storage tanks in accordance with all applicable documents listed in Attachment J-0200000-03. Tanks are 2,000 gallons in size and are double walled and have an approximately 24-inch diameter manway access that will need to be sealed to complete testing. This ELIN shall include providing a written test report telling at a minimum the NSA Crane tank name, tank test results, tank testing procedure used, tank test date and printed name along with signature of qualified person completing test. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.3EA$0.00$0.00
A015 - Conduct Cathodic Protection TestingThis ELIN shall be for all labor, material, equipment to conduct cathodic protection testing for 40 CFR 112, 40 CFR 280 and 40 CFR 264 underground storage tanks and associated underground metal piping in accordance with all applicable documents listed in Attachment J-0200000-03. Tanks are 2,000 gallons and have galvanic anodes. This ELIN shall include providing a written test report telling at a minimum the NSA Crane tank name, tank test results, tank testing procedure & standard used, tank test date and printed name along with signature of qualified person completing test. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.2EA$0.00$0.00
A016 - Conduct Pollulert TestingThis ELIN shall be for all labor, material, equipment to conduct calibration, testing and maintenance on a Pollulert FD102N Fluid Detection System and the Sensaphone Model 4100 alert system in accordance manufacturer's instructions and all applicable documents listed in Attachment J-0200000-03. This shall include cleaning off all leak detection probes, ensuring probes are calibrated properly, pumping water/oil out of sumps and replacing light bulbs in console and sensors. One (1) system of this type currently exists at NSA Crane and it serves three (3) 40 CFR 264 underground storage tanks that are double walled at the Ammunition Burning Grounds (ABG). This ELIN shall include providing a written report telling at a minimum the NSA Crane tank names the system serves, Pollulert and Sensaphone functionality testing used along with description of testing procedure, Pollulert sensors and Sensaphone operational or not, system testing date and printed name along with signature of qualified person completing test. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.1EA$0.00$0.00
A017 - Conduct STI -SP001 Inspections (55 gal - 9,999 gal AST's)This ELIN shall be for all labor, material, equipment for a Steel Tank Institute (STI) AST Certified Inspector to conduct an STI-SP001 Annual Inspection in accordance with STI-SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Tanks range in size from 55 gallons to 9,999 gallons. Attachment J-0200000-05 (AST Annual Inspection Checklist) shall be used and completely filled out for each tank inspection. Each inspection sheet shall have signature of STI AST Certified Inspector. This ELIN shall include providing a written report detailing at a minimum the methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall also include all AST Annual Inspection Checklists along with a copy of the STI Certified AST Inspectors training certification. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.15EA$0.00$0.00
A018 - Conduct STI-SP001 Inspections (10,000 gal - 25,000 gal AST's)This ELIN shall be for all labor, material, equipment for a Steel Tank Institute (STI) AST Certified Inspector to conduct an STI-SP001 Annual Inspections in accordance with STI-SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Tanks range in size from 10,000 gallons to 25,000 gallons. Attachment J-0200000-05 (AST Annual Inspection Checklist) shall be used and completely filled out for each tank inspection. Each inspection sheet shall have signature of STI AST Certified Inspector. This ELIN shall include providing a written report detailing at a minimum the methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall also include all AST Annual Inspection Checklists along with a copy of the STI Certified AST Inspectors training certification. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.3EA$0.00$0.00
A019 - Annual Operation & Maintenance Walkthrough InspectionThis ELIN shall be for all labor, material and equipment to conduct an annual operation and maintenance walkthrough inspection of one (1) underground storage tank system in accordance with the latest version of Petroleum Equipment Institute Recommended Practice 900 (PEI/RP900) and all applicable documents listed in Attachment J-0200000-03. Contractor shall use annual inspection checklists from of PEI/RP900 or contractor produced checklists. Contractor produced checklists at a minimum shall list all inspection items included on PEI/RP900 annual inspection checklists. Go to www.pei.org/RP900 for electronic versions of checklists. Checklist shall include printed name along with signature of qualified person completing inspection. This ELIN shall include a written report detailing methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall include all inspection checklists and report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.1EA$0.00$0.00
A020 - Spill Prevention & Overfill Prevention Equipment TestingThis ELIN shall be for all labor, material and equipment to conduct spill prevention equipment (spill bucket) testing and overfill prevention equipment inspection/testing for one (1) underground storage tank in accordance with the latest version of Petroleum Equipment Institute Recommended Practice 1200 (PEI/RP1200) and all applicable documents listed in Attachment J-0200000-03. Spill prevention equipment testing shall be by hydrostatic method in Section 6 of PEI/RP1200. Overfill prevention equipment inspection/testing shall be in accordance with Section 7 of PEI/RP1200. Contractor shall use testing/inspections forms C-3 and C-5 of PEI/RP1200 or contractor produced forms. Contractor produced forms at a minimum shall list all items included on PEI/RP1200 forms. Go to www.pei.org/RP1200 for electronic versions of forms. Testing/inspection forms shall include printed name along with signature of qualified person completing test/inspection. This ELIN shall include a written report detailing methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall include all testing/inspection forms and report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.1EA$0.00$0.00
A021 - Conduct Monthly Inspection of Regulated UST - CAAAThis ELIN shall be for all labor, material and equipment to conduct monthly inspections of one (1) underground storage tank and fueling system in accordance with 40 CFR 280.36, NFPA30A and all applicable documents listed in Attachment J-0200000-03. Work shall be completed by an IDEM Certified UST Class B Operator. The tank is 22TNKB and is located at Building 22. This shall include, but not limited to, visually checking spill prevention equipment for damage and removing any liquid or debris, check for and remove any obstructions in fill pipe, check the fill cap to make sure it is securely on the fill pipe and visually inspecting dispensing equipment for damage and removing any liquid or debris in dispenser sump, pump sumps and piping sumps. This shall also include checking to make sure Veeder Root leak detection system is operating with no alarms or any other unusual operating conditions and ensuring the records for leak detection testing are reviewed and current. The Veeder Root leak detection system at B-22 system serves three (3) double walled tanks (Tank names are 3TNKA, 22TNKA and 22TNKB), three (3) dispensers and associated sumps. This ELIN shall include providing a completed inspection form for the tank using NSA Crane’s “Aboveground Storage Tank (AST) & Underground Storage Tank (UST) Monthly Inspection Checklist” and providing Veeder Root print-outs for the tank showing the completed Continuous Statistical Leak Detection (CSLD) 0.2 gph tank test and the Pressurized Line Leak Detection for all three (3) of 3.0 gph, 0.2 gph and 0.1 gph tests. Printouts from Veeder Root shall be copied clear and legible and attached to the tank inspection form. Inspection form is fillable PDF and shall be filled out electronically for each tank. Inspection form shall be signed by the IDEM Certified UST Class B operator completing the inspection. Inspection form is fillable PDF and shall be filled out electronically for the tank. One (1) report shall be submitted electronically in PDF format by the end of each month and within three (3) working days of completing inspection. The report shall include inspection form on first page and Veeder Root printouts on second page. Veeder Root printouts for the tank shall be copied on one (1) page. Refer to Section 1800000 Environmental and Section J for more information.12EA$0.00$0.00
A022 - Conduct Monthly Inspection of ABG UST's - CAAAThis ELIN shall be for all labor, material and equipment to conduct monthly inspections of three (3) explosive contaminated sludge/water underground storage tanks in accordance with all applicable documents listed in Attachment J-0200000-03. Work shall be completed by an IDEM Certified UST Class B Operator. The tanks are DU-1, DU-2 and DU-3 and are located at the Ammunition Burning Grounds (ABG). This shall include, but not limited to, visually inspecting all externally accessible portions of tank system and checking to make sure leak detection system is operating with no alarms or any other unusual operating conditions. Inspection shall be completed utilizing NSA Crane’s “Aboveground Storage Tank (AST) & Underground Storage Tank (UST) Monthly Inspection Checklist” for each of the three (3) tanks. Inspection form is fillable PDF and shall be filled out electronically for each tank. Inspection form shall be signed by the IDEM Certified UST Class B operator completing the inspection. One (1) report shall be submitted electronically in PDF format containing the three (3) inspection forms by the end of each month and within three (3) working days of completing inspection. Refer to Section 1800000 Environmental and Section J for more information.12EA$0.00$0.00
A023 - Conduct Monthly Inspection of 40 CFR 112 AST's - CAAAThis ELIN shall be for all labor, material and equipment to conduct monthly inspections of eighteen (18) aboveground storage tanks in accordance with 40 CFR 112, STI SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Work shall be completed by a Certified Steel Tank Institute (STI) AST Inspector or an individual that has completed and obtained his/her STI Tank Integrity Management Certificate. The tanks range in size from 59 gallons to 25,000 gallons. This shall include, but not limited to, visually checking spill prevention equipment for damage and removing any liquid or debris, check for and remove any obstructions in fill pipe, visually inspecting all externally accessible portions of tank, tank system and fuel piping, sticking the tank for water detection in fuel, sticking the interstitial space for any fuel/condensation/water in interstitial space, removing any condensation/water in interstitial space when detected, activating any test buttons on alarms, visually inspecting dispensing equipment for damage and removing any liquid or debris in dispenser or fuel piping sumps. This ELIN shall include providing a completed inspection form for each tank using NSA Crane’s “Aboveground Storage Tank (AST) & Underground Storage Tank (UST) Monthly Inspection Checklist”. Inspection form is fillable PDF and shall be filled out electronically for each tank. Inspection form shall be signed by the STI AST inspector completing the inspection. Inspection form shall be submitted electronically in PDF format by the end of each month and within three (3) working days of completing inspection. Refer to Section 1800000 Environmental and Section J for more information.12EA$0.00$0.00
A024 - Conduct Monthly Inspection of Portable Containers - CAAAThis ELIN shall be for all labor, material and equipment to conduct monthly inspections of fifteen (15) portable containers or portable container locations in accordance with 40 CFR 112, STI SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Work shall be completed by a Certified Steel Tank Institute (STI) AST Inspector or an individual that has completed and obtained his/her STI Tank Integrity Management Certificate. “Portable Container” in this ELIN means petroleum drum storage containers/area, mobile tanks and petroleum tank trucks. This shall include, but not limited to, visually checking condition of containers, ensuring adequate secondary containment of containers, ensuring secondary containment is free of liquid and debris, proper container storage and visually inspecting tank, tank system and petroleum lines. This ELIN includes coordination with building supervisors at most locations prior to completing inspection and also includes a follow-up visit to container storage area to ensure inspection deficiencies are corrected. Follow-up visits typically are needed after approximately 10% of inspections. This ELIN shall include providing a completed inspection form for each portable container or portable container location using NSA Crane’s “Portable Container Inspection Checklist”. Inspection form is fillable PDF and shall be filled out electronically for each portable container or portable container location. Inspection form shall be signed by the STI AST inspector completing the inspection. Inspection form shall be submitted electronically in PDF format by the end of each month and within three (3) working days of completing inspection. Refer to Section 1800000 Environmental and Section J for more information.12EA$0.00$0.00
A025 - Spill Prevention Testing (Containment Sump for Tank Pump)This ELIN shall be for all labor, material and equipment to conduct spill prevention equipment (containment sump for tank pump) integrity testing for one (1) underground storage tank in accordance with the latest version of Petroleum Equipment Institute Recommended Practice 1200 (PEI/RP1200) and all applicable documents listed in Attachment J-0200000-03. Spill prevention equipment testing shall be by hydrostatic method in Section 6.5 of PEI/RP1200. Contractor shall use testing form C-4 of PEI/RP1200. Go to www.pei.org/RP1200 for electronic version of form. This ELIN shall include a written report detailing methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall include testing form and report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.1EA$0.00$0.00
A026 - Spill Prevention Testing (Dispenser Containment Sump)This ELIN shall be for all labor, material and equipment to conduct spill prevention equipment (dispenser containment sump) integrity testing for one (1) underground storage tank in accordance with the latest version of Petroleum Equipment Institute Recommended Practice 1200 (PEI/RP1200) and all applicable documents listed in Attachment J-0200000-03. Spill prevention equipment testing shall be by hydrostatic method in Section 6.5 of PEI/RP1200. Contractor shall use testing form C-4 of PEI/RP1200. Go to www.pei.org/RP1200 for electronic version of form. This ELIN shall include a written report detailing methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall include testing form and report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.1EA$0.00$0.00
NSWC$0.00
A027 - Conduct STI -SP001 Inspections (55 gal - 9,999 gal AST's)This ELIN shall be for all labor, material, equipment for a Steel Tank Institute (STI) AST Certified Inspector to conduct an STI-SP001 Annual Inspection in accordance with STI-SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Tanks range in size from 55 gallons to 9,999 gallons. Attachment J-0200000-05 (AST Annual Inspection Checklist) shall be used and completely filled out for each tank inspection. Each inspection sheet shall have signature of STI AST Certified Inspector. This ELIN shall include providing a written report detailing at a minimum the methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall also include all AST Annual Inspection Checklists along with a copy of the STI Certified AST Inspectors training certification. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.10EA$0.00$0.00
A028 - Conduct STI-SP001 Inspections (10,000 gal - 25,000 gal AST's)This ELIN shall be for all labor, material, equipment for a Steel Tank Institute (STI) AST Certified Inspector to conduct an STI-SP001 Annual Inspections in accordance with STI-SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Tanks range in size from 10,000 gallons to 25,000 gallons. Attachment J-0200000-05 (AST Annual Inspection Checklist) shall be used and completely filled out for each tank inspection. Each inspection sheet shall have signature of STI AST Certified Inspector. This ELIN shall include providing a written report detailing at a minimum the methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall also include all AST Annual Inspection Checklists along with a copy of the STI Certified AST Inspectors training certification. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.3EA$0.00$0.00
A029 - Conduct Monthly Inspection of 40 CFR 112 AST's - NSWCThis ELIN shall be for all labor, material and equipment to conduct monthly inspections of thirteen (13) aboveground storage tanks in accordance with 40 CFR 112, STI SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Work shall be completed by a Certified Steel Tank Institute (STI) AST Inspector or an individual that has completed and obtained his/her STI Tank Integrity Management Certificate. The tanks range in size from 84 gallons to 25,000 gallons. This shall include, but not limited to, visually checking spill prevention equipment for damage and removing any liquid or debris, check for and remove any obstructions in fill pipe, visually inspecting all externally accessible portions of tank, tank system and fuel piping, sticking the tank for water detection in fuel, sticking the interstitial space for any fuel/condensation/water in interstitial space, removing any condensation/water in interstitial space when detected, activating any test buttons on alarms, visually inspecting dispensing equipment for damage and removing any liquid or debris in dispenser or fuel piping sumps. This ELIN shall include providing a completed inspection form for each tank using NSA Crane’s “Aboveground Storage Tank (AST) & Underground Storage Tank (UST) Monthly Inspection Checklist”. Inspection form is fillable PDF and shall be filled out electronically for each tank. Inspection form shall be signed by the STI AST inspector completing the inspection. Inspection form shall be submitted electronically in PDF format by the end of each month and within three (3) working days of completing inspection. Refer to Section 1800000 Environmental and Section J for more information.12EA$0.00$0.00
A030 - Conduct Monthly Inspection of 40 CFR 112 AST at Lake Glendora Testing Facility - NSWCThis ELIN shall be for all labor, material and equipment to conduct monthly inspections of one (1) aboveground storage tank in accordance with 40 CFR 112, STI SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Work shall be completed by a Certified Steel Tank Institute (STI) AST Inspector or an individual that has completed and obtained his/her STI Tank Integrity Management Certificate. Current total tank capacity is 1,000 gallons with a dual compartment consisting of 700 gallons of gasoline and 300 gallons of diesel at Lake Glendora Testing Facility. This shall include, but not limited to, visually checking spill prevention equipment for damage and removing any liquid or debris, check for and remove any obstructions in fill pipe, visually inspecting all externally accessible portions of tank, tank system and fuel piping, sticking the tank for water detection in fuel, sticking the interstitial space for any fuel/condensation/water in interstitial space, removing any condensation/water in interstitial space when detected, activating any test buttons on alarms and visually inspecting dispensing equipment for damage. This ELIN also includes coordination with Glendora Testing Facility Manager prior to arriving on site. This ELIN shall include providing a completed inspection form for the tank using NSA Crane’s “Aboveground Storage Tank (AST) & Underground Storage Tank (UST) Monthly Inspection Checklist”. Inspection form is fillable PDF and shall be filled out electronically for each tank. Inspection form shall be signed by the STI AST inspector completing the inspection. Inspection form shall be submitted electronically in PDF format by the end of each month and within three (3) working days of completing inspection. Refer to Section 1800000 Environmental and Section J for more information.12EA$0.00$0.00
A031 - Conduct Monthly Inspection of Portable Containers - NSWCThis ELIN shall be for all labor, material and equipment to conduct monthly inspections of five (5) portable containers or portable container locations in accordance with 40 CFR 112, STI SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Work shall be completed by a Certified Steel Tank Institute (STI) AST Inspector or an individual that has completed and obtained his/her STI Tank Integrity Management Certificate. “Portable Container” in this ELIN means petroleum drum storage containers/area, mobile tanks and petroleum tank trucks. This shall include, but not limited to, visually checking condition of containers, ensuring adequate secondary containment of containers, ensuring secondary containment is free of liquid and debris, proper container storage and visually inspecting tank, tank system and petroleum lines. This ELIN includes coordination with building supervisors at most locations prior to completing inspection and also includes a follow-up visit to container storage area to ensure inspection deficiencies are corrected. Follow-up visits typically are needed after approximately 10% of inspections. This ELIN shall include providing a completed inspection form for each portable container or portable container location using NSA Crane’s “Portable Container Inspection Checklist”. Inspection form is fillable PDF and shall be filled out electronically for each portable container or portable container location. Inspection form shall be signed by the STI AST inspector completing the inspection. Inspection form shall be submitted electronically in PDF format by the end of each month and within three (3) working days of completing inspection. Refer to Section 1800000 Environmental and Section J for more information.12EA$0.00$0.00
A032 - Conduct Monthly Inspection of Portable Containers - Glendora Test FacilityThis ELIN shall be for all labor, material and equipment to conduct monthly inspections of two (2) portable containers or portable container locations at Glendora Test Facility in accordance with 40 CFR 112, STI SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Work shall be completed by a Certified Steel Tank Institute (STI) AST Inspector or an individual that has completed and obtained his/her STI Tank Integrity Management Certificate. “Portable Container” in this ELIN means petroleum drum storage containers/area, mobile tanks and petroleum tank trucks. This shall include, but not limited to, visually checking condition of containers, ensuring adequate secondary containment of containers, ensuring secondary containment is free of liquid and debris, proper container storage and visually inspecting tank, tank system and petroleum lines. This ELIN includes coordination with building supervisors at most locations prior to completing inspection and also includes a follow-up visit to container storage area to ensure inspection deficiencies are corrected. Follow-up visits typically are needed after approximately 10% of inspections. This ELIN shall include providing a completed inspection form for each portable container or portable container location using NSA Crane’s “Portable Container Inspection Checklist”. Inspection form is fillable PDF and shall be filled out electronically for each portable container or portable container location. Inspection form shall be signed by the STI AST inspector completing the inspection. Inspection form shall be submitted electronically in PDF format by the end of each month and within three (3) working days of completing inspection. Refer to Section 1800000 Environmental and Section J for more information.12EA$0.00$0.00
NAVFAC UEM$0.00
A033 - Conduct STI -SP001 Inspections (55 gal - 9,999 gal AST's)This ELIN shall be for all labor, material, equipment for a Steel Tank Institute (STI) AST Certified Inspector to conduct an STI-SP001 Annual Inspection in accordance with STI-SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Tanks range in size from 55 gallons to 9,999 gallons. Attachment J-0200000-05 (AST Annual Inspection Checklist) shall be used and completely filled out for each tank inspection. Each inspection sheet shall have signature of STI AST Certified Inspector. This ELIN shall include providing a written report detailing at a minimum the methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall also include all AST Annual Inspection Checklists along with a copy of the STI Certified AST Inspectors training certification. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.2EA$0.00$0.00
A034 - Conduct STI-SP001 Inspections (10,000 gal - 25,000 gal AST's)This ELIN shall be for all labor, material, equipment for a Steel Tank Institute (STI) AST Certified Inspector to conduct an STI-SP001 Annual Inspections in accordance with STI-SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Tanks range in size from 10,000 gallons to 25,000 gallons. Attachment J-0200000-05 (AST Annual Inspection Checklist) shall be used and completely filled out for each tank inspection. Each inspection sheet shall have signature of STI AST Certified Inspector. This ELIN shall include providing a written report detailing at a minimum the methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall also include all AST Annual Inspection Checklists along with a copy of the STI Certified AST Inspectors training certification. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.2EA$0.00$0.00
A035 - Conduct Monthly Inspection of 40 CFR 112 AST's - NAVFAC UEMThis ELIN shall be for all labor, material and equipment to conduct monthly inspections of four (4) aboveground storage tanks in accordance with 40 CFR 112, STI SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Work shall be completed by a Certified Steel Tank Institute (STI) AST Inspector or an individual that has completed and obtained his/her STI Tank Integrity Management Certificate. The tanks range in size from 305 gallons to 10,000 gallons. This shall include, but not limited to, visually checking spill prevention equipment for damage and removing any liquid or debris, check for and remove any obstructions in fill pipe, visually inspecting all externally accessible portions of tank, tank system and fuel piping, sticking the tank for water detection in fuel, sticking the interstitial space for any fuel/condensation/water in interstitial space, removing any condensation/water in interstitial space when detected, activating any test buttons on alarms, visually inspecting dispensing equipment for damage and removing any liquid or debris in dispenser or fuel piping sumps. This ELIN shall include providing a completed inspection form for each tank using NSA Crane’s “Aboveground Storage Tank (AST) & Underground Storage Tank (UST) Monthly Inspection Checklist”. Inspection form is fillable PDF and shall be filled out electronically for each tank. Inspection form shall be signed by the STI AST inspector completing the inspection. Inspection form shall be submitted electronically in PDF format by the end of each month and within three (3) working days of completing inspection. Refer to Section 1800000 Environmental and Section J for more information.12EA$0.00$0.00
NAVFAC TRANS$0.00
A036 - Conduct STI -SP001 Inspections (55 gal - 9,999 gal AST's)This ELIN shall be for all labor, material, equipment for a Steel Tank Institute (STI) AST Certified Inspector to conduct an STI-SP001 Annual Inspection in accordance with STI-SP001, NFPA30 and all applicable documents listed in Attachment J-0200000-03. Tanks range in size from 55 gallons to 9,999 gallons. Attachment J-0200000-05 (AST Annual Inspection Checklist) shall be used and completely filled out for each tank inspection. Each inspection sheet shall have signature of STI AST Certified Inspector. This ELIN shall include providing a written report detailing at a minimum the methodology, non-conformance items and recommendations, and photos of non-conformance items. Report shall also include all AST Annual Inspection Checklists along with a copy of the STI Certified AST Inspectors training certification. Report shall be submitted electronically in PDF format. Refer to Section 1800000 Environmental and Section J for more information.5EA$0.00$0.00