This document is a Schedule of Price attachment (ELIN J-2000000-13.xlsx) for a U.S. Navy preventive maintenance contract for High Quality Water (HQW) and Feed Water facilities at Commander Fleet Activities Yokosuka (CFAY). The contract is structured with a base period from 2026-2030 and four subsequent one-year option periods, totaling $600,000,000 in value. Each annual period includes two primary line items: a recurring lump sum for program management and preventive maintenance services, and a non-recurring lump sum of $120,000,000 for major repair work that exceeds routine maintenance limitations.

The recurring work encompasses emergency, urgent, and routine maintenance across multiple systems including HQW systems, electrical control systems, potable water systems, HVAC, EDG, N2, and FSA systems at specific plants (YSK-5229 and YSK-2043). The non-recurring work covers major repair tasks that include direct labor, material costs, transportation, disposal, reporting, and overhead profits. Task orders will specify completion times, and the contract allows for flexible maintenance and repair services with a not-to-exceed pricing model. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command, with the contract number N40084-26-X-XXXX.

View the file

Other files

File Type Posted
SF 1449 - N4008425B0414.pdf PDF
N4008425B0414_Attachment (3) PreBid Inquiry Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C

SCHEDULE OF PRICE
Date:#DD/MM/YYYY
NAME OF OFFEROR OR CONTRACTOR:
LINE ITEMITEMQ'TYUNITAMOUNT
NO.
Item 0001Recurring, Base Period1LS¥
Provide PM Program and Work Orders Services for the
High Quality Water (HQW) and Feed Water facilities
From 1 January 2026 to 31 December 2026.
Item 0002Non-Recurring, Base Period1LS¥ 120,000,000
Provide Unit Priced Task Work(NTE)
Upon Receipt of a Task Order
From 1 January 2026 to 31 December 2026.
Item 0003Recurring, First Option Period1LS¥
Provide PM Program and Work Orders Services for the
High Quality Water (HQW) and Feed Water facilities
From 1 January 2027 to 31 December 2027.
Item 0004Non-Recurring, First Option Period1LS¥ 120,000,000
Provide Unit Priced Task Work(NTE)
Upon Receipt of a Task Order
From 1 January 2027 to 31 December 2027.
Item 0005Recurring, Second Option Period1LS¥
Provide PM Program and Work Orders Services for the
High Quality Water (HQW) and Feed Water facilities
From 1 January 2028 to 31 December 2028.
Item 0006Non-Recurring, Second Option Period1LS¥ 120,000,000
Provide Unit Priced Task Work(NTE)
Upon Receipt of a Task Order
From 1 January 2028 to 31 December 2028.
Item 0007Recurring, Third Option Period1LS¥
Provide PM Program and Work Orders Services for the
High Quality Water (HQW) and Feed Water facilities
From 1 January 2029 to 31 December 2029.
Item 0008Non-Recurring, Third Option Period1LS¥ 120,000,000
Provide Unit Priced Task Work(NTE)
Upon Receipt of a Task Order
From 1 January 2029 to 31 December 2029.
Item 0009Recurring, Fourth Option Period1LS¥
Provide PM Program and Work Orders Services for the
High Quality Water (HQW) and Feed Water facilities
From 1 January 2030 to 31 December 2030.
Item 0010Non-Recurring, Fourth Option Period1LS¥ 120,000,000
Provide Unit Priced Task Work(NTE)
Upon Receipt of a Task Order
From 1 January 2030 to 31 December 2030.

TOTAL: (LINE ITEM 0001 through 0010) ¥ 600,000,000

CLIN 9000 Exhibit A (Base Period)

CLIN 9001 Exhibit B (First Option Period)

CLIN 9002 Exhibit C (Second Option Period)

CLIN 9003 Exhibit D (Third Option Period)

CLIN 9004 Exhibit E (Fourth Option Period)

NOTE:The number of Placeholders established depends on the maximum number of lines
of accounting anticipated on an individual task order.

Detail line items for task order is located in Attachment J-0200000-07

CLIN = CONTRACT LINE ITEM
LS = LUMP SUM
NTE = NOT-TO-EXCEED
Q'TY = QUANTITY

Note: GE is based on the actual bid prices considered marlet increasing prices.

&"Times New Roman,Regular"CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] Page &P of &N

CUI // FEDCON [when filled in]

BR

Atachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitforion/Contract No.: N40084-26-X-XXXX
EXHIBIT A - CLIN 9000
Line Item XXXX -: 0001- Recurring Work - Base Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINsA001 to A002
ELIN /Sub ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
1502000Facility Investment
A001SRF
Emergency, Urgent, and Routine (E/U/R) Work
A001AA15020003.1.1Emergency - Historically, approximately one Time annually12MO¥
A001AB15020003.1.2Urgent - Historically, approximately Two Times annually12MO¥
A001AC15020003.1.3Routine - Historically, approximately Three Times annually12MO¥
Preventive Maintenance
A001AD15020003.2.1.2HQW System for HQW Plant (YSK-5229)12MO¥
A001AE15020003.2.1.4EDG System for HQW Plant (YSK-5229)12MO¥
A001AF15020003.2.1.5N2 System for HQW Plant (YSK-5229)12MO¥
A001AG15020003.2.1.6FSA System for HQW Plant (YSK-5229)12MO¥
A001AH15020003.2.1.7HPA System for HQW Plant (YSK-5229)12MO¥
A001AI15020003.2.1.8Electrical Control Systems for HQW Plant (YSK-5229)12MO¥
A001AJ15020003.2.2Feed Water Plant (YSK-2043)12MO¥
SRF Total¥
A002CNIC
Emergency, Urgent, and Routine (E/U/R) Work
A002AA15020003.1.1Emergency - Historically, approximately Zero Time annually12MO¥
A002AB15020003.1.2Urgent - Historically, approximately Zero point Two Times annually12MO¥
A002AC15020003.1.3Routine - Historically, approximately Zero point Four Times annually12MO¥
Preventive Maintenance
A002AD15020003.2.1.1Potable Water System for HQW Plant (YSK-5229)12MO¥
A002AE15020003.2.1.9HVAC Systems for HQW Plant (YSK-5229)12MO¥
CNIC Total¥

Total Recurring Work: ¥

&"Times New Roman,Regular"CUI // FEDCON SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]

CUI // FEDCON [when filled in&"Arial,Regular"]

BN

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitation/Contract No.: N40084-26-X-XXXX
EXHIBIT A - CLIN 9000
Line Item: 0002 Non-Recurring Price - Base Period
Provide Prices For Facility Investment Services
ELINs A700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
A700Major Repair Work (Negotiated)Major Repair Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-Recurring work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring limitations of a service order or PM repair. Task order completion times will be specified in task order.1LS¥ 120,000,000¥ 120,000,000
TOTAL NON-RECUURRING PRICE¥ 120,000,000
HR =Hours
LS =Lump SumDA =Days
EA =EachUN =Unit

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON [when filled in&"Arial,Regular"]

1R

Atachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitation/Contract No.: N40084-26-X-XXXX
EXHIBIT B - CLIN 9001
Line Item XXXX -: 0003- Recurring Work - First Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINsB001 to B002
ELIN /Sub ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
1502000Facility Investment
B001SRF
Emergency, Urgent, and Routine (E/U/R) Work
B001AA15020003.1.1Emergency - Historically, approximately one Time annually12MO¥
B001AB15020003.1.2Urgent - Historically, approximately Two Times annually12MO¥
B001AC15020003.1.3Routine - Historically, approximately Three Times annually12MO¥
Preventive Maintenance
B001AD15020003.2.1.2HQW System for HQW Plant (YSK-5229)12MO¥
B001AE15020003.2.1.4EDG System for HQW Plant (YSK-5229)12MO¥
B001AF15020003.2.1.5N2 System for HQW Plant (YSK-5229)12MO¥
B001AG15020003.2.1.6FSA System for HQW Plant (YSK-5229)12MO¥
B001AH15020003.2.1.7HPA System for HQW Plant (YSK-5229)12MO¥
B001AI15020003.2.1.8Electrical Control Systems for HQW Plant (YSK-5229)12MO¥
B002AJ15020003.2.2Feed Water Plant (YSK-2043)12MO¥
SRF Total¥
B002CNIC
Emergency, Urgent, and Routine (E/U/R) Work
B002AA15020003.1.1Emergency - Historically, approximately Zero Time annually12MO¥
B002AB15020003.1.2Urgent - Historically, approximately Zero point Two Times annually12MO¥
B002AC15020003.1.3Routine - Historically, approximately Zero point Four Times annually12MO¥
Preventive Maintenance
B002AD15020003.2.1.1Potable Water System for HQW Plant (YSK-5229)12MO¥
B002AE15020003.2.1.9HVAC Systems for HQW Plant (YSK-5229)12MO¥
CNIC Total¥

Total Recurring Work: ¥

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON [when filled in&"Arial,Regular"]

1N

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitation/Contract No.: N40084-26-X-XXXX
EXHIBIT B - CLIN 9001
Line Item: 0004 Non-Recurring Price - First Option Period
Provide Prices For Facility Investment Services
ELINs B700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
B700Major Repair Work (Negotiated)Major Repair Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-Recurring work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring limitations of a service order or PM repair. Task order completion times will be specified in task order.1LS¥ 120,000,000¥ 120,000,000
TOTAL NON-RECUURRING PRICE¥ 120,000,000
HR =Hours
LS =Lump SumDA =Days
EA =EachUN =Unit

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON [when filled in&"Arial,Regular"]

2R

Atachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitation/Contract No.: N40084-26-X-XXXX
EXHIBIT C - CLIN 9002
Line Item XXXX -: 0005- Recurring Work - Second Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINsC001 to C002
ELIN /Sub ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
1502000Facility Investment
C001SRF
Emergency, Urgent, and Routine (E/U/R) Work
C001AA15020003.1.1Emergency - Historically, approximately one Time annually12MO¥
C001AB15020003.1.2Urgent - Historically, approximately Two Times annually12MO¥
C001AC15020003.1.3Routine - Historically, approximately Three Times annually12MO¥
Preventive Maintenance
C001AD15020003.2.1.2HQW System for HQW Plant (YSK-5229)12MO¥
C001AE15020003.2.1.4EDG System for HQW Plant (YSK-5229)12MO¥
C001AF15020003.2.1.5N2 System for HQW Plant (YSK-5229)12MO¥
C001AG15020003.2.1.6FSA System for HQW Plant (YSK-5229)12MO¥
C001AH15020003.2.1.7HPA System for HQW Plant (YSK-5229)12MO¥
C001AI15020003.2.1.8Electrical Control Systems for HQW Plant (YSK-5229)12MO¥
C002AJ15020003.2.2Feed Water Plant (YSK-2043)12MO¥
SRF Total¥
C002CNIC
Emergency, Urgent, and Routine (E/U/R) Work
C002AA15020003.1.1Emergency - Historically, approximately Zero Time annually12MO¥
C002AB15020003.1.2Urgent - Historically, approximately Zero point Two Times annually12MO¥
C002AC15020003.1.3Routine - Historically, approximately Zero point Four Times annually12MO¥
Preventive Maintenance
C002AD15020003.2.1.1Potable Water System for HQW Plant (YSK-5229)12MO¥
C002AE15020003.2.1.9HVAC Systems for HQW Plant (YSK-5229)12MO¥
CNIC Total¥

Total Recurring Work: ¥

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON [when filled in&"Arial,Regular"]

2N

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitation/Contract No.: N40084-26-X-XXXX
EXHIBIT C - CLIN 9002
Line Item: 0006 Non-Recurring Price - Second Option Period
Provide Prices For Facility Investment Services
ELINs C700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
C700Major Repair Work (Negotiated)Major Repair Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-Recurring work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring limitations of a service order or PM repair. Task order completion times will be specified in task order.1LS¥ 120,000,000¥ 120,000,000
TOTAL NON-RECUURRING PRICE¥ 120,000,000
HR =Hours
LS =Lump SumDA =Days
EA =EachUN =Unit

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON [when filled in&"Arial,Regular"]

3R

Atachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitation/Contract No.: N40084-26-X-XXXX
EXHIBIT D - CLIN 9003
Line Item XXXX -: 0007- Recurring Work - Third Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINsD001 to D002
ELIN /Sub ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
1502000Facility Investment
D001SRF
Emergency, Urgent, and Routine (E/U/R) Work
D001AA15020003.1.1Emergency - Historically, approximately one Time annually12MO¥
D001AB15020003.1.2Urgent - Historically, approximately Two Times annually12MO¥
D001AC15020003.1.3Routine - Historically, approximately Three Times annually12MO¥
Preventive Maintenance
D001AD15020003.2.1.2HQW System for HQW Plant (YSK-5229)12MO¥
D001AE15020003.2.1.4EDG System for HQW Plant (YSK-5229)12MO¥
D001AF15020003.2.1.5N2 System for HQW Plant (YSK-5229)12MO¥
D001AG15020003.2.1.6FSA System for HQW Plant (YSK-5229)12MO¥
D001AH15020003.2.1.7HPA System for HQW Plant (YSK-5229)12MO¥
D001AI15020003.2.1.8Electrical Control Systems for HQW Plant (YSK-5229)12MO¥
D002AJ15020003.2.2Feed Water Plant (YSK-2043)12MO¥
SRF Total¥
D002CNIC
Emergency, Urgent, and Routine (E/U/R) Work
D002AA15020003.1.1Emergency - Historically, approximately Zero Time annually12MO¥
D002AB15020003.1.2Urgent - Historically, approximately Zero point Two Times annually12MO¥
D002AC15020003.1.3Routine - Historically, approximately Zero point Four Times annually12MO¥
Preventive Maintenance
D002AD15020003.2.1.1Potable Water System for HQW Plant (YSK-5229)12MO¥
D002AE15020003.2.1.9HVAC Systems for HQW Plant (YSK-5229)12MO¥
CNIC Total¥

Total Recurring Work: ¥

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON [when filled in&"Arial,Regular"]

3N

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitation/Contract No.: N40084-26-X-XXXX
EXHIBIT D - CLIN 9003
Line Item: 0008 Non-Recurring Price - Third Option Period
Provide Prices For Facility Investment Services
ELINs D700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
D700Major Repair Work (Negotiated)Major Repair Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-Recurring work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring limitations of a service order or PM repair. Task order completion times will be specified in task order.1LS¥ 120,000,000¥ 120,000,000
TOTAL NON-RECUURRING PRICE¥ 120,000,000
HR =Hours
LS =Lump SumDA =Days
EA =EachUN =Unit

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON [when filled in&"Arial,Regular"]

4R

Atachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitation/Contract No.: N40084-26-X-XXXX
EXHIBIT E - CLIN 9004
Line Item XXXX -: 0009- Recurring Work - Forth Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINsE001 to E002
ELIN /Sub ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal Price
1502000Facility Investment
E001SRF
Emergency, Urgent, and Routine (E/U/R) Work
E001AA15020003.1.1Emergency - Historically, approximately one Time annually12MO¥
E001AB15020003.1.2Urgent - Historically, approximately Two Times annually12MO¥
E001AC15020003.1.3Routine - Historically, approximately Three Times annually12MO¥
Preventive Maintenance
E001AD15020003.2.1.2HQW System for HQW Plant (YSK-5229)12MO¥
E001AE15020003.2.1.4EDG System for HQW Plant (YSK-5229)12MO¥
E001AF15020003.2.1.5N2 System for HQW Plant (YSK-5229)12MO¥
E001AG15020003.2.1.6FSA System for HQW Plant (YSK-5229)12MO¥
E001AH15020003.2.1.7HPA System for HQW Plant (YSK-5229)12MO¥
E001AI15020003.2.1.8Electrical Control Systems for HQW Plant (YSK-5229)12MO¥
E002AJ15020003.2.2Feed Water Plant (YSK-2043)12MO¥
SRF Total¥
E002CNIC
Emergency, Urgent, and Routine (E/U/R) Work
E002AA15020003.1.1Emergency - Historically, approximately Zero Time annually12MO¥
E002AB15020003.1.2Urgent - Historically, approximately Zero point Two Times annually12MO¥
E002AC15020003.1.3Routine - Historically, approximately Zero point Four Times annually12MO¥
Preventive Maintenance
E002AD15020003.2.1.1Potable Water System for HQW Plant (YSK-5229)12MO¥
E002AE15020003.2.1.9HVAC Systems for HQW Plant (YSK-5229)12MO¥
CNIC Total¥

Total Recurring Work: ¥

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON [when filled in&"Arial,Regular"]

4N

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
Solicitation/Contract No.: N40084-26-X-XXXX
EXHIBIT E - CLIN 9004
Line Item: 0010 Non-Recurring Price - Forth Option Period
Provide Prices For Facility Investment Services
ELINs E700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
E700Major Repair Work (Negotiated)Major Repair Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-Recurring work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring limitations of a service order or PM repair. Task order completion times will be specified in task order.1LS¥ 120,000,000¥ 120,000,000
TOTAL NON-RECUURRING PRICE¥ 120,000,000
HR =Hours
LS =Lump SumDA =Days
EA =EachUN =Unit

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON [when filled in&"Arial,Regular"]

NAVFAC UOMs

ACAcreFRFramePDPad
AMAmpouleFTFootPGPackage
ATAssortmentFVFivePIPillow
AYAssemblyFYFiftyPMPlate
BABallGGGreat GrossPRPair
BDBundleGIGillPTPint
BEBaleGLGallonPXPellet
BFBoard FootGMGramPZPacket
BGBagGNGrainQTQuart
BKBookGPGroupRARation
BLBarrelGRGrossRDRound
BOBoltHDHundredRLReel
BQBriquetHFHundred FeetRMReam
BRBarHKHankRORoll
BTBottleHPHundred PoundsRXThousand Rounds
BXBoxHRHoursSBSquare Mile
CACartridgeHSHundred Square FeetSCSquare Centimeters
CBCarboyHWHundred WeightSDSkid
CCCubic CentimeterHYHundred YardsSESet
CDCubic YardINInchSFSquare Foot
CEConeJRJarSHSheet
CFCubic FootKGKilogramSISquare Inch
CGCentigramKMKilometerSKSkein
CICubic InchKRCaratSLSpool
CKCakeKTKitSMSquare Meter
CLCoilLBPoundSOShot
CMCentimeterLFLinear FootSPStrip
CNCanLGLengthSQSquare
COContainerLHLabor HoursSXStick
CUCurieLILiterSYSquare Yard
CYCylinderLMLinear MeterTCTruckload
CZCubic MeterLOLotTDTwenty-Four
DADaysLSLump SumTETen
DCDecagramLYLinear YardTFTwenty-Five
DEDecimeterMCThousand Cubic FeetTGGross Ton
DGDecigramMEMealTNTon
DLDeciliterMFThousand FeetTOTroy Ounce
DMDramMGMilligramTSThirty-Six
DODollarsMIMileTTTablet
DRDrumMLMilliliterTUTube
DWPennyweightMMMillimeterUNUnit
DZDozenMOMonthsUSUS U.S.P Unit
EAEachMRMeterVIVial
ENEach CollectionMXThousandWKWeek
EXExposureOTOutfitYDYard
FDFoldOZOunceYRYears

&"Times New Roman,Regular"&UATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

&"Times New Roman,Regular"Page &P of &N

File details come from the government source that posted it. Updated .