Summary of Electrical Drawings for Illinois Secretary of State Chicago West Facility Boiler Replacement
This document comprises electrical drawings and specifications prepared by a licensed architect/engineer for the Illinois Secretary of State's boiler replacement project at the Chicago West facility located at 5301 W. Lexington Street, Chicago, Illinois 60644. The project involves the installation of new condensing boilers (CB-2 and CB-3) and associated electrical infrastructure, including new constant flow pumps (HWP-7 and HWP-8), control systems, and wiring modifications to existing electrical distribution panels. The electrical work includes the installation of new branch circuits, conduit runs, panelboard connections, and equipment connections in compliance with the 2019 Chicago Building Code, the 2018 Illinois Accessibility Code, and the 2018 Chicago Electrical Code. The drawings were issued for 50% review on May 9, 2025, for review on August 1, 2025, and for 75% review on August 13, 2025. All work must be performed by licensed electrical contractors and coordinated with the project architect, engineer, owner's representative, and other construction trades to ensure minimal disruption to building operations.
The specifications establish comprehensive requirements for materials, labor, and installation procedures, mandating that all electrical equipment, including panelboards and disconnects, be sourced from approved manufacturers (GE, Square D, or approved equivalents) and comply with UL, ETL, or CSA listings. Contractors are required to provide temporary lighting and power throughout construction, perform all cutting and patching of existing structures, install UL-approved firestopping compounds for raceway penetrations in fire-rated assemblies, and submit as-built drawings in AutoCAD format with three sets of hard copies upon completion. The project specifies minimum conduit sizes of 3/4 inch, copper wiring with 75-degree Celsius insulation, and branch circuit protection sized according to the Chicago Electrical Code, with specific amperage and wire gauge requirements detailed for various load configurations. Contractors must conduct thorough site inspections prior to bidding, coordinate all shutdowns with the owner's representative at least 48 hours in advance, and maintain daily debris removal and site protection throughout construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Mechanical Drawings.pdf | ||
| Chicago West Boiler IFB 26PS759001.pdf | ||
| Vendor Disclosure v 24.1 Formerly Forms A~17.docx | DOCX document | |
| IPG Active Registered Vendor Disclosure formerly Forms B v.23.1~40.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ILLINOIS SECRETARY
OF STATE CHICAGO
WEST FACILITY
BOILER REPLACEMENT
5301 W. LEXINGTON ST.,
CHICAGO, IL 60644
SHEET NO.
DESIGN BY: RO
DRAWN BY: SMA
CHECKED BY: PBL
PROJECT NO.
ISSUE DESCRIPTION DATEREV.
ISSUED FOR 50% REVIEW 05/09/2025
I HAVE PREPARED OR CAUSED TO BE PREPARED UNDER MY DIRECT
SUPERVISION, THE ATTACHED PLANS AND SPECIFICATIONS. I STATE
THAT, TO THE BEST OF MY KNOWLEDGE AND BELIEF AND TO THE
EXTENT OF MY CONTRACTUAL OBLIGATION, THEY ARE IN
COMPLIANCE WITH THE 2019 CHICAGO BUILDING CODE
MANDATED BY THE CITY OF CHICAGO BUILDING
DEPARTMENT/CODE ENFORCEMENT AND THE ILLINOIS
ACCESSIBILITY CODE, 2018 EDITION
STATEMENT OF COMPLIANCE
SIGNED:
INDIANA REGISTRATION NO.:
DATE:
ARCHITECT/ENGINEER
623 COOPER COURT
SCHAUMBURG, IL 60173
(312) 346-8181
CITY APPROVAL STAMP BOX
N
ILLINOIS SECRETARY OF STATE
KEY PLAN
ISSUED FOR REVIEW 08/01/2025
ISSUED FOR 75% REVIEW 08/13/2025
E-000
ELECTRICAL
SPECIFICATIONS,
GENERAL NOTES, AND
SYMBOLS
CONDUIT CONCEALED IN FLOOR SLAB
WIREWAY
OR UNDERGROUND
FLEXIBLE CONDUIT CONNECTION
CONCEALED CONDUIT
RACEWAYS & WIRING
HOMERUN TO PANEL
EXPOSED CONDUIT
PHASE WIRE IN CONDUIT
GROUND WIRE IN CONDUIT
NEUTRAL WIRE IN CONDUIT
NEW WORK
TO BE REMOVED
KEY NOTE TAG
EXISTING TO REMAIN
HVAC/MECHANICAL EQUIPMENT TAG
XR
X
N
GENERAL
GROUND
TRANSFORMER
NON-MOTOR LOAD (NUMBER INDICATES kW)
CONTROL OR MISCELLANEOUS PANEL AS NOTED
POWER OR DISTRIBUTION PANELBOARD
LIGHTING OR RECEPTACLE PANELBOARD
NON-FUSED DISCONNECT SWITCH
CONTACTOR
DISCONNECT SWITCH
DISCONNECT SWITCH
FUSED DISCONNECT SWITCH
AS REQUIRED.
JUNCTION BOX
COMBINATION STARTER WITH NON-FUSED
JUNCTION BOX AND FLEXIBLE CONNECTION
MOTOR (NUMBER INDICATES HORSEPOWER)
CONDUIT STUB-UP AND JUNCTION BOX
COMBINATION STARTER WITH FUSED
STARTER
POWER
F
J
AMPERE
ALTERNATING CURRENT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AMPERES INTERRUPTING CAPACITY
BUILDING
BREAKER
BOLTED PRESSURE SWITCH
CONDUIT
CIRCUIT BREAKER
CIRCUIT
CEILING
DIRECT CURRENT
DISCONNECT
DISCONNECT SWITCH
DOWN
DISTRIBUTION PANEL
DRAWING
EXISTING
EACH
ELECTRICAL CONTRACTOR
EXHAUST FAN
EMERGENCY LIGHTING CONTROL PANEL
EMERGENCY
ELECTRICAL METALLIC TUBING
ELECTRIC WATER COOLER
ELECTRIC WATER HEATER
FIRE ALARM
FIRE ALARM ANNUNCIATOR
FIRE ALARM CONTROL PANEL
FIRE ALARM EQUIPMENT PANEL
FIXTURE
FLOOR
FUSE
FULL VOLTAGE, NON-REVERSING
FULL VOLTAGE, REVERSING
GENERATOR
GROUND FAULT CIRCUIT INTERRUPTER
GROUND
GALVANIZED RIGID STEEL
HEATING AND AIR-CONDITIONING RATED
HAND-OFF-AUTO
HORSEPOWER
HEATER
ISOLATED GROUND
INTERMEDIATE METAL CONDUIT
JUNCTION BOX
KILOWATT
KILOVOLTAMPERES
LIGHT-EMITTING DIODE
LIGHTING CONTROL PANEL
LIGHTING PANEL
LIGHTING
MAXIMUM
MINIMUM
MANUFACTURER
MAIN LUG ONLY
MOUNTED
MOUNTING
MOTOR
NEUTRAL, NORMAL
NATIONAL ELECTRICAL CODE
NUMBER
NOT IN CONTRACT
NOT TO SCALE
OCCUPANCY SENSOR
PULLBOX
PANEL
PERCENT IMPEDENCE
PHASE
POWER PANEL
RECEPTACLE
REQUIRED
RIGID GALVANIZED STEEL
RECEPTACLE PANEL
SEPARATE CIRCUIT
SWITCH
SWITCHBOARD
TELEPHONE
TELEPHONE TERMINATION BOARD
TELEPHONE TERMINATION CABINET
TYPICAL
UNLESS OTHERWISE NOTED
UNDERWRITERS LABORATORY
VOLT
WEATHERPROOF
TRANSFORMER
A
AC
AFF
AFG
AIC
BLDG
BKR
BPS
C C/B
CCT
CLG
DC
DISC
DS
DN.
DP
DWG.
(E)
EA.
EC
EF
ELCP
EM
EMT
EWC
EWH
FA
FAA
FACP
FAEP
FIXT.
FL.
FU
FVNR
FVR
GEN
GFCI
GND
GRS
HACR
HOA
HP
HTR
IG
IMC
JB
KW
KVA
LED
LCP
LP
LTG.
MAX.
MIN.
MANUF
MLO
MTD
MTG
MTR
N
NEC
NO
NIC
NTS
OS
PBX
PNL
%Z Ø
PP
REC
REQ'D
RGS
RP
SC
SW
SWBD
TELE
TTB
TTC
TYP
U.O.N.
U.L.
V
WP
XFMR
ELECTRICAL SPECIFICATIONS AND GENERAL NOTES
1. THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIAL
NECESSARY FOR A COMPLETE AND FUNCTIONING ELECTRICAL
SYSTEM.
2. ALL WORKMEN PERFORMING WORK UNDER THE SCOPE OF
WORK SHALL BE LICENSED (OR CERTIFIED) SKILLED IN THEIR
RESPECTIVE TRADE.
3. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE
FOLLOWING APPLICABLE CODES AND STANDARDS:
- 2018 CHICAGO ELECTRICAL CODE
- NATIONAL ELECTRICAL SAFETY CODE (NESC)
- LAWS AND ORDINANCES OF FEDERAL & LOCAL AUTHORITIES
- OCCUPATIONAL HEALTH AND SAFETY ADMINISTRATION
(OSHA)
- UNDERWRITERS LABORATORIES (UL)
- FACTORY MUTUAL RESEARCH CORPORATION (FM)
- INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS
(IEEE)
- INSULATED CABLE ENGINEERING ASSOCIATION (ICEA)
- AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
- NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
(NEMA)
- NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
- INTERNATIONAL ENERGY CONSERVATION CODE (IECC) 2018
4. MATERIALS AND EQUIPMENT SHALL BE LISTED AND/OR
LABELED BY U.L., E.T.L., C.S.A.
5. THE CONTRACTOR SHALL CAREFULLY EXAMINE THE
CONTRACT DOCUMENTS, VISIT THE SITE AND THOUROUGHLY
BECOME FAMILIAR WITH THE BUILDING STANDARDS AND
LOCAL CONDITIONS RELATING TO THE WORK. FAILURE TO DO
SO WILL NOT RELIEVE THE CONTRACTOR OF THE
OBLIGATIONS OF THE CONTRACT.
6. THE CONTRACTOR IS RESPONSIBLE FOR CLEAN-UP AND
REMOVAL FROM THE PREMISES OF ALL WASTE MATERIALS,
RUBBISH, WRAPPING, AND SALVAGES AS GENERATED BY THE
CONSTRUCTION.
7. CONSTRUCTION OPERATIONS SHOULD BE SCHEDULED WITH
ARCHITECT AND OWNER.
A. ALL DRILLING SHALL BE ACCOMPLISHED DURING STATED
WORKING HOURS.
B. CONTRACTOR SHALL VERIFY ALLOWED HOURS WITH
OWNER.
8. CONSTRUCTION WORK SHALL BE CONFINED TO THE SPACE
SHOWN ON THE PLANS AND ASSOCIATED INFRASTRUCTURE
SUPPORT SPACE. WORK INCLUDED UNDER THIS CONTRACT
SHALL NOT CREATE DUST, DIRT OR OTHER SUCH
INCONVENIENCES TO BUILDING ACTIVITIES.
9. THE CONSTRUCTION PROCEDURE INCLUSIVE OF MATERIAL
STORAGE, WASTE STORAGE, WORK IN PROGRESS, ETC, SHALL
NOT BLOCK HALLWAYS OR MEANS OF EGRESS OF THE
BUILDING. SHOULD IT BE NECESSARY TO OBSTRUCT A
HALLWAY OR OTHER MEANS OF EGRESS, AN ALTERNATE
CONSTRUCTION SCHEDULE SHALL BE INCLUDED AS PART OF
THE BASE BID AND NOT CONSIDERED AS AN EXTRA SERVICE.
10. THE CONTRACTOR SHALL PROVIDE TEMPORARY LIGHTING,
POWER AND WIRING FOR THE PERFORMANCE OF ALL TRADES,
FOR THE ENTIRE PERIOD OF THE CONSTRUCTION AND SHALL
REMOVE ALL TEMPORARY WIRING AT THE COMPLETION OF
CONSTRUCTION.
11. EXCEPT AS NOTED OTHERWISE, ALL WORK REQUIRED FOR
THE INSTALLATIONS AS SHOWN ON DRAWINGS INCLUDING
LABOR, EQUIPMENT AND MATERIALS SHALL BE IN STRICT
COMPLIANCE WITH ALL APPLICABLE CODES.
12. IF DAMAGE OCCURS TO THE SURFACES AND FINISHES WHICH
ARE TO REMAIN DURING DEMOLITION OR ANY STAGE OF
WORK, IT SHALL BE REPAIRED AND RESTORED BY THE
CONTRACTOR AT HIS EXPENSE TO ITS ORIGINAL CONDITION.
13. THE CONTRACTOR SHALL NOTIFY THE OWNER/ARCHITECT OF
ANY MATERIALS OR APPARATUS BELIEVED TO BE
INADEQUATE, UNSUITABLE, IN VIOLATION OF LAWS,
ORDINANCES, RULES OR REGULATIONS OF AUTHORITIES
HAVING JURISDICTION.
14. NOTIFY ENGINEER AND OWNER OF CONFLICTS BETWEEN
DRAWINGS, SPECIFICATIONS, AND FIELD CONDITIONS BEFORE
SUBMITTAL OF PROPOSAL.
15. THE CONTRACTOR SHALL PROVIDE LIGHTING AND POWER IN
LOCATIONS ILLUSTRATED ON THE PLANS WITH CIRCUITRY AS
INDICATED.
16. ALL MATERIALS AND EQUIPMENT SHALL BE ERECTED,
INSTALLED, CONNECTED, CLEANED, ADJUSTED, TESTED,
CONDITIONED AND PLACED IN SERVICE IN ACCORDANCE WITH
THE MANUFACTURER'S DIRECTIONS AND RECOMMENDATIONS,
UNLESS OTHERWISE SPECIFIED ON THE PLANS.
17. ALL CUTTING, DRILLING AND PATCHING OF MASONRY, STEEL
OR IRON WORK BELONGING TO THE BUILDING MUST BE DONE
BY THIS CONTRACTOR IN ORDER THAT THE WORK MAY BE
PROPERLY INSTALLED, BUT UNDER NO CONDITIONS SHALL
ANY STRUCTURAL MEMBER BE CUT, EXCEPT AT THE
DIRECTION OF THE ARCHITECT/ENGINEER.
18. ALL PENETRATIONS THROUGH NON-FIRE RATED
CONSTRUCTION SHALL BE SLEEVED, SEALED AND PATCHED
TO MATCH EXISTING SURFACES.
19. REFER TO DRAWINGS FOR EXACT LOCATIONS AND MOUNTING
HEIGHTS OF ELECTRICAL EQUIPMENT AND WIRING DEVICES.
20. PROVIDE "AS-BUILT" DRAWINGS AND SUBMIT FOR APPROVAL
TO THE ARCHITECT/ENGINEER. AS-BUILTS SHALL BE
SUBMITTED ON AUTOCAD DISC AND (3) SETS OF FULL SIZE
HARD COPIES.
21. ALL MATERIAL, EQUIPMENT, WIRING DEVICES, ETC. SHALL BE
NEW, UNLESS SPECIFICALLY INDICATED AS EXISTING TO BE
REUSED.
A. ALL NEW RECEPTACLES SHALL BE PROVIDED AS INDICATED
ON PLANS AS NEMA 5-20R UNLESS INDICATED OTHERWISE.
B. ALL NEW SWITCHES SHALL BE PROVIDED AS INDICATED ON
PLANS.
22. MINIMUM CONDUIT SIZE SHALL BE 3/4".
23. ALL WIRES SHALL BE COPPER, 75°C, 600V INSULATION,
STRANDED TYPE, UNLESS OTHERWISE NOTED.
A. FOR INTERIOR DRY LOCATIONS TYPE THWN
THERMOPLASTIC 600 VOLT INSULATED COPPER CONDUCTORS
SHALL BE USED.
B. FOR EXTERIOR WET LOCATIONS TYPE XHHW
POLYETHYLENE 600 VOLT INSULATED COPPER CONDUCTOR
SHALL BE USED.
C. WIRE SMALLER THAN #10 AWG MAY BE SOLID OR
STRANDED, WIRE #10 AWG AND LARGER SHALL BE STRANDED.
D. NO WIRE SMALLER THAN #12 AWG SHALL BE USED FOR
POWER, LIGHTING OR BRANCH CIRCUIT WIRING.
24. IN SUSPENDED CEILINGS, SUPPORT CONDUIT AND JUNCTION
BOXES DIRECTLY FROM THE STRUCTURAL SLAB, DECK, OR
FRAMING PROVIDED FOR THAT PURPOSE. BRANCH CIRCUIT
CONDUITS SHALL NOT BE CLIPPED TO THE CEILING SUPPORT
WIRES, SPLINE OR MECHANICAL DUCTS, PIPES, ETC.
25. ALL HANGERS, CLAMPS, FITTINGS AND RODS SHALL BE
MALLEABLE STEEL AND EITHER U.L., NEMA OR ANSI
APPROVED. ALL HANGERS, CLAMPS, FITTINGS AND RODS
SHALL BE HOT-DIPPED GALVANIZED STEEL WHERE SUBJECT
TO CORROSION.
26. NUMBERED CIRCUITS ARE SHOWN FOR THE CONVENIENCE OF
DESIGN ONLY. DESIGN INTENT MUST BE FOLLOWED
THROUGHOUT, INDICATE THE ACTUAL CIRCUIT NUMBERS
USED ON THE "AS-BUILT" DRAWINGS. EMERGENCY PANEL
CIRCUIT NUMBERS MAY VARY. ACTUAL FIELD CONDITIONS
SHALL BE VERIFIED.
27. BRANCH CIRCUIT WIRING:
A. BRANCH CIRCUIT HOMERUNS SHALL HAVE DEDICATED
PHASE, NEUTRAL AND EQUIPMENT GROUND CONDUCTORS
FOR EACH LINE TO NEUTRAL CIRCUIT. WHERE HOMERUN
EXCEEDS 100 LINEAR FEET, CONDUCTOR SIZE SHALL BE
INCREASED ONE WIRE GAUGE, UON.
B. BRANCH CIRCUIT WIRING SHALL BE AS FOLLOWS FOR 3
PHASE LOADS, WITH ASSOCIATED BRANCH CIRCUIT
PROTECTION, UON.
20A-3#12AWG + #12AWG GROUND IN 3/4"C
30A-3#10AWG + #10AWG GROUND IN 3/4"C
40A-3#8AWG + #10AWG GROUND IN 3/4"C
50A-3#8AWG + #10AWG GROUND IN 3/4"C
60A-3#6AWG + #10AWG GROUND IN 3/4"C
28. ALL ELECTRICAL DISTRIBUTION EQUIPMENT I.E.
PANELBOARDS, DISCONNECTS, TRANSFORMERS, MOTOR
STARTERS, ETC. SHALL BE OF ONE MANUFACTURER.
APPROVED MANUFACTURERS: GE, SQUARE"D", OR APPROVED
EQUAL.
29. ALL INSTALLATIONS SHALL HAVE EQUIPMENT GROUNDING
CONDUCTORS SIZED IN ACCORDANCE WITH ARTICLE 250 OF
THE CHICAGO ELECTRICAL CODE.
30. ALL ELECTRICAL DRAWINGS ARE TO BE READ IN
CONJUNCTION WITH THE ENTIRE PROJECT SPECIFICATIONS
AND ALL OTHER TRADE DRAWINGS RELATED TO THE
PERFORMANCE OF THE ENTIRE SCOPE OF WORK.
31. BECOME THOROUGHLY FAMILIAR WITH THE PROJECT
SPECIFICATIONS PRIOR TO COMMENCING ANY WORK. THE
PROJECT SPECIFICATIONS AND DRAWINGS FORM THE BASIS
OF THE CONTRACT REQUIREMENTS AND INCLUDE THE TYPE
AND GRADE OF MATERIALS TO BE USED, EQUIPMENT TO BE
FURNISHED, THE MANNER BY WHICH TO BE INSTALLED AND
WHERE TO BE LOCATED.
32. CHECK CAREFULLY ALL CONSTRUCTION DRAWINGS AND
SPECIFICATIONS THAT ARE PART OF THIS PROJECT TO
ENSURE THAT NO FIXTURE, OUTLET, CONTROL OR POWER
WIRING IS OMITTED. CONSULT ALL TRADES FURNISHING
EQUIPMENT AND OBTAIN FROM THEM ALL DATA. IN SOME
CASES, EQUIPMENT, FIXTURES AND DEVICES ARE SHOWN
ONLY. ASCERTAIN AND PROVIDE THE WIRING AND CONTROL
STATIONS REQUIRED FOR THE PROPER OPERATION OF
BUILDING EQUIPMENT. NO EXTRA CHARGES WILL BE
ACCEPTED BY OWNER AFTER BIDDING FOR SUCH EQUIPMENT
AND LABOR.
33. EQUIPMENT LABELS AND INSTRUCTIONS REGARDING THE
APPLICATION AND INSTALLATION OF THE LISTED EQUIPMENT
SHALL BE FOLLOWED TO ENSURE THAT THE EQUIPMENT IS
BEING USED IN ACCORDANCE WITH THE MANUFACTURER'S
LISTING INSTRUCTIONS. THE TEMPERATURE RATING AND LUG
SIZES OF THE EQUIPMENT TERMINATIONS MUST BE
CAREFULLY COORDINATED WITH THE SPECIFIED CONDUCTOR
AMPACITY TO PREVENT OVERHEATING AND PREMATURE
FAILURE.^p
34. CONDUIT RUNS SHOWN ON DRAWINGS ARE DIAGRAMMATIC.
ALL CONDUITS SHALL RUN CONCEALED, EXCEPT IN
EQUIPMENT ROOMS.
35. COORDINATE LOCATION OF ALL ELECTRICAL & DATA OUTLETS
WITH MILLWORK AND ARCHITECTS PRIOR TO ROUGH-IN.
36. ELECTRICAL CONTRACTOR SHALL VISIT SITE AND BECOME
FAMILIAR WITH ALL ASPECTS AND REQUIREMENTS FOR THIS
PROJECT.
37. USE CAUTION IN WORK AS ACTUAL CONDITIONS MAY VARY
FROM ORIGINAL DOCUMENTS AS WELL AS OBTAINED IN BRIEF
OBSERVATIONS FROM A/E SITE VISITS. ALL CONDITIONS SHALL
BE DETERMINED IN FIELD BY CONTRACTOR. DO NOT
DISCONNECT ANY POWER, ALARM AND COMMUNICATION
WIRING WITHOUT CONSULTATION AND APPROVAL OF OWNER.
38. BRING ALL QUESTIONS TO THE OWNER FOR DIRECTIONS
BEFORE PROCEEDING WITH WORK. FIELD COORDINATION IS
ESSENTIAL.
39. ALL RECEPTACLES, DATA OUTLETS, LIGHT SWITCHES, FIRE
ALARM SYSTEM, ETC. IN THE SCOPE OF THIS PROJECT SHALL
BE NEW & LABELED WITH PROPER I.D. TAGS, UON.
40. PROVIDE ALL ADDITIONAL HARDWARE FOR FIXTURE
MOUNTING AS REQUIRED, AT NO EXTRA COST. FOR DRYWALL
CEILING, ADDITIONAL FLANGES MAY BE REQUIRED. CHECK
ARCHITECTURAL DRAWINGS FOR PLASTER/DRYWALL CEILING.
41. COORDINATE WITH ARCHITECTURAL DRAWINGS AND CEILING
CONTRACTOR FOR EXACT LIGHTING FIXTURE LOCATIONS.
42. UPON COMPLETION OF THE JOB, THE CONTRACTOR SHALL
SUBMIT A CERTIFICATE OF INSPECTION AND A CERTIFICATE
OF SUBSTANTIAL COMPLETION.
43. E.C. SHALL PROVIDE UL APPROVED FIRESTOPPING
COMPOUNDS SUCH AS "3M" FIRESEAL SYSTEMS OR
APPROVED EQUAL FOR ALL RACEWAY PENETRATIONS IN FIRE
RATED WALLS AND FLOORS. VERIFY FIRE RATING CONDITIONS
AND LOCATIONS PRIOR TO FINAL BIDS. ALL OPEN CONDUIT
SLEEVE PENETRATIONS SHALL BE FIRESEALED AFTER CABLES
ARE COMPLETELY INSTALLED . SEALING METHODS SHALL BE
PROVIDED, SUBJECT TO APPROVAL OF CABLE CONTRACTOR.
44. IDENTIFY ALL RECEPTACLES AND SWITCHES WITH THEIR
RESPECTIVE CIRCUIT NO'S AND PANEL DESIGNATIONS FROM
WHICH THEY ARE FED.
45. RACEWAYS SHALL BE USED FOR THEIR INTENDED PURPOSE.
COMMUNICATION CABLES OR WIRES SHALL NOT BE STRAPPED
, TAPED, OR ATTACHED BY ANY MEANS TO EXTERIOR OF ANY
CONDUIT OR RACEWAY AS A MEANS OF SUPPORT.
ELECTRICAL INSTALLATION NOTES :
1. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD
VERIFICATION OF ALL DIMENSIONS, SIZES, SYSTEM
VOLTAGES, QUANTITIES AND EXTENT OF WORK.
2. THIS CONTRACTOR IS ADVISED TO CONSULT WITH THE
CONSTRUCTION MANAGER PRIOR TO BID SUBMITTAL FOR
PHASE OPERATION AND SCHEDULING OF THE WORK.
3. CONTRACTORS SHALL REFER TO THE ARCHITECTURAL,
STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS
AND SPECIFICATIONS FOR COORDINATION AND EXTENT OF
THE WORK OF THE VARIOUS TRADES.
4. WHERE THE WORK OF ONE TRADE WILL INTERFACE WITH
THE WORK OF OTHER TRADES, ALL TRADES SHALL ASSIST
IN WORKING OUT SPACE CONDITIONS, MAKE
SATISFACTORY ADJUSTMENTS AND PREPARE AND REVISE
COORDINATED SHOP DRAWINGS.
5. WITH THE APPROVAL OF THE ARCHITECT/ENGINEER, AND
WITHOUT ADDITIONAL COST TO THE OWNER, MAKE MINOR
MODIFICATIONS IN THE WORK, INCLUDING REROUTING AS
REQUIRED BY INTERFERENCES WITH STRUCTURAL,
GENERAL WORK OF OTHER TRADES OR FOR PROPER
EXECUTION OF THE WORK.
6. WORK INSTALLED BEFORE COORDINATING WITH OTHER
TRADES SO AS TO CAUSE INTERFERENCE WITH THE WORK
OF SUCH OTHER TRADES SHALL BE CHANGED TO CORRECT
SUCH CONDITION WITHOUT ADDITIONAL COST TO THE
OWNER.
7. TEMPORARY SERVICES SHALL BE PROVIDED WHEN
REQUIRED.
8. THE CONTRACTORS SHALL MAKE ALL NECESSARY
PROVISIONS TO PURSUE THEIR WORK IN A MANNER WHICH
WILL ASSURE THAT THE OPERATION OF THE EXISTING
BUILDINGS IS MINIMALLY IMPAIRED. THIS SHALL INCLUDE,
BUT NOT BE LIMITED TO, DELIVERY OF SUPPLIES,
TEMPORARY UTILITY CONNECTIONS, ETC.
9. CUTTING AND PATCHING FOR ELECTRICAL WORK SHALL BE
PERFORMED BY THE CONTRACTOR UNLESS NOTED
OTHERWISE.
10. SEAL ALL PENETRATIONS USING UL APPROVED FIRE
STOPPING COMPOUND.
11. ABANDONED CIRCUITS SHALL BE REMOVED TO A PANEL OR
TERMINATED IN A CODE COMPLIANT BOX.
MANUAL STARTERM
AutoCAD SHX Text %%uABBREVIATIONS
AutoCAD SHX Text %%uSYMBOLS
AutoCAD SHX Text T
ILLINOIS SECRETARY
OF STATE CHICAGO
WEST FACILITY
BOILER REPLACEMENT
5301 W. LEXINGTON ST.,
CHICAGO, IL 60644
SHEET NO.
DESIGN BY: RO
DRAWN BY: SMA
CHECKED BY: PBL
PROJECT NO.
ISSUE DESCRIPTION DATEREV.
ISSUED FOR 50% REVIEW 05/09/2025
I HAVE PREPARED OR CAUSED TO BE PREPARED UNDER MY DIRECT
SUPERVISION, THE ATTACHED PLANS AND SPECIFICATIONS. I STATE
THAT, TO THE BEST OF MY KNOWLEDGE AND BELIEF AND TO THE
EXTENT OF MY CONTRACTUAL OBLIGATION, THEY ARE IN
COMPLIANCE WITH THE 2019 CHICAGO BUILDING CODE
MANDATED BY THE CITY OF CHICAGO BUILDING
DEPARTMENT/CODE ENFORCEMENT AND THE ILLINOIS
ACCESSIBILITY CODE, 2018 EDITION
STATEMENT OF COMPLIANCE
SIGNED:
INDIANA REGISTRATION NO.:
DATE:
ARCHITECT/ENGINEER
623 COOPER COURT
SCHAUMBURG, IL 60173
(312) 346-8181
CITY APPROVAL STAMP BOX
ILLINOIS SECRETARY OF STATE
ISSUED FOR REVIEW 08/01/2025
ISSUED FOR 75% REVIEW 08/13/2025
E-101
PANEL SCHEDULES
PANEL: DP-1
NEW OR EXISTING: EXISTING VOLTAGE/PHASE : 208Y/120 V NEUTRAL BUS: 100%
LOCATION : ELECTR. ROOM BUS AMPS : 600A GROUND BUS: 100%
MOUNTING : SURFACE MAIN BREAKER : 600A ISO. GRND. BUS: NONE
ENCLOSURE: NEMA 1 FED FROM : FULLY RATED AIC: 10,000
ENTRANCE: BOTTOM SUB-FEED TO : SPD: NONE
LOAD DESCRIPTION LOAD
TYPE NOTE
VOLT-AMPS
CKT BKR/
POLE A B C BKR/
POLE CKT
VOLT-AMPS
NOTE LOAD
TYPE LOAD DESCRIPTION
A B C A B C
PP-2
P 1 1
100/3
100/3
2 1 L
LP-7AP 1 3 - * - 4 1 L
P 1 5 - - * 6 1 L
LP-4
L 1 7
100/3
100/3
8 1
L LP-2L 1 9 - * - 10 1
L 1 11 - - * 12 1
LP-5A
L 1 13
60/3
100/3
14 1
L LP-5BL 1 15 - * - 16 1
L 1 17 - - * 18 1
LP-7
L 1 19
100/3
100/3
20 1 L
LP-6L 1 21 - * - 22 1 L
L 1 23 - - * 24 1 L
Spare S
1 25
100/3
100/3
26 1 P
PP-11 27 - * - 28 1 P
1 29 - - * 30 1 P
Boiler Wireway E
1 31
30/3
60/3
32 1 S
Spare1 33 - * - 34 1 S 1 35 - - * 36 1 S
HWP-8 (1HP) (NOTE 3)
M 1 553 37
15/3
15/3
38 553 1 M
HWP-7 (1HP) (NOTE 3)M 1 553 39 - * - 40 553 1 M
M 1 553 41 - - * 42 553 1 M
BREAKER NOTES CONNECTED PHASE LOADS Type Description Connected Demand Type Code
1) Thermal Magnetic TOTAL ØA = 1,106 VA Lighting (L) = 0 0 L
2) Shunt trip TOTAL ØB = 1,106 VA Receptacles (R)= 0 0 R
3) Lock-out device TOTAL ØC = 1,106 VA Motors (M)= 3318 2157 M
4) GFEP Electric Heating (H) = 0 0 H
5) GFIC Equipment (E) = 0 0 E
6) AFCI (Dedicated Neutral Required) Panels (P) = 0 0 P
7) Aux Switches Spare (S) = 0 0 S
8) HACR Space (X) = 0 0 X
9) Existing Breaker Total VA = 3,318 2157
10) Dedicated Neutral Required Total Added Amps = 9.2 6.0
PANEL: DP-2
NEW OR EXISTING: EXISTING VOLTAGE/PHASE : 208Y/120 V NEUTRAL BUS: 100%
LOCATION : ELECTR. ROOM BUS AMPS : 600A GROUND BUS: 100%
MOUNTING : SURFACE MAIN BREAKER : 600A ISO. GRND. BUS: NONE
ENCLOSURE: NEMA 1 FED FROM : XFMR #2 FULLY RATED AIC: 10,000
ENTRANCE: BOTTOM SUB-FEED TO : SPD: NONE
LOAD DESCRIPTION LOAD
TYPE NOTE
VOLT-AMPS
CKT BKR/
POLE A B C BKR/
POLE CKT
VOLT-AMPS
NOTE LOAD
TYPE LOAD DESCRIPTION
A B C A B C
LP-4A
L 1 1
100/3
100/3
2 1 L
LP-5L 1 3 - * - 4 1 L
L 1 5 - - * 6 1 L
LP-3
L 1 7
100/3
100/3
8 1
L LP-1L 1 9 - * - 10 1
L 1 11 - - * 12 1
TVSS E
1 13
60/3
100/3 14 1 L
LP-81 15 - * - 16 1 L
1 17 - - * 18 1 L
P-1 E 1 19
20/3
20/3 20 1 E
P-21 21 - * - 22 1 E 1 23 - - * 24 1 E
P-3
E 1 25
20/3
20/3
26 1 E
P-4E 1 27 - * - 28 1 E E 1 29 - - * 30 1 E
P-5
E 1 31
20/3
20/3
32 1 E
Sump PumpE 1 33 - * - 34 1 E E 1 35 - - * 36 1 E
Water Heater E 1 37 20/1 * - - 20/3
38 1 E Cond. Boiler Pumpcontrol E 1 39 20/1 - * - 40 1 E
Cond. Boiler 120V E 1 41 20/1 - - * 42 1 E
BREAKER NOTES CONNECTED PHASE LOADS Type Description Connected Demand Type Code
1) Thermal Magnetic TOTAL ØA = 0 VA Lighting (L) = 0 0 L
2) Shunt trip TOTAL ØB = 0 VA Receptacles (R)= 0 0 R
3) Lock-out device TOTAL ØC = 0 VA Motors (M)= 0 0 M
4) GFEP Electric Heating (H) = 0 0 H
5) GFIC Equipment (E) = 0 0 E
6) AFCI (Dedicated Neutral Required) Panels (P) = 0 0 P
7) Aux Switches Spare (S) = 0 0 S
8) HACR Space (X) = 0 0 X
9) Existing Breaker Total VA = 0 0
10) Dedicated Neutral Required Total Added Amps = 0.0 0.0
PANEL: PP-1
NEW OR EXISTING: NEW VOLTAGE/PHASE : 208Y/120 V NEUTRAL BUS: 100%
LOCATION : ELECTR. ROOM BUS AMPS : 100A GROUND BUS: 100%
MOUNTING : SURFACE MAIN BREAKER : 100A ISO. GRND. BUS: NONE
ENCLOSURE: NEMA 1 FED FROM : XFMR #2 FULLY RATED AIC: 10,000
ENTRANCE: BOTTOM SUB-FEED TO : SPD: NONE
LOAD DESCRIPTION LOAD
TYPE NOTE
VOLT-AMPS
CKT BKR/
POLE A B C BKR/
POLE CKT
VOLT-AMPS
NOTE LOAD
TYPE LOAD DESCRIPTION
A B C A B C
WMS HAND DRYER E 1 1 20/1 * - - 20/1 2 1 E WMS HAND DRYER
WMS HAND DRYER E 1 3 20/1 - * - 20/1 4 1 E WMS HAND DRYER
WMS HAND DRYER E 1 5 20/1 - - * 20/1 6 1 E FIAG
WMS HAND DRYER E 1 7 20/1 * - - 20/1 8 1 S SPARE
GEN. E 1 9 20/1 - * - 20/1 10 1 S SPARE
GEN. E 1 11 20/1 - - * 20/1 12 1 S SPARE
ELEV. RM. LTS L 1 13 20/1 * - - 20/1 14 1 S SPARE
ELEV. RM. OUTLET R 1 15 20/1 - * - 20/1 16 1 S SPARE
SPARE S 1 17 20/1 - - * 20/1 18 1 E 24V AUTOMATED
SPARE S 1 19 20/1 * - - 30/1 20 1,800 1 E BOILER CB-2 (NOTE 4)
ELEV. PIT SUMP PUMP E 1 21 20/1 - * - 30/1 22 1,800 1 E BOILER CB-3 (NOTE 4)
ELEV. PIT LIGHT L 1 23 15/1 - - * 20/1 24 1 S SPARE
MAIN PRINCIPAL
P 1 25 100/3
P 1 27 - * -
P 1 29 - - *
BREAKER NOTES CONNECTED PHASE LOADS Type Description Connected Demand Type Code
1) Thermal Magnetic TOTAL ØA = 1,800 VA Lighting (L) = 0 0 L
2) Shunt trip TOTAL ØB = 1,800 VA Receptacles (R)= 0 0 R
3) Lock-out device TOTAL ØC = 0 VA Motors (M)= 0 0 M
4) GFEP Electric Heating (H) = 0 0 H
5) GFIC Equipment (E) = 3600 2340 E
6) AFCI (Dedicated Neutral Required) Panels (P) = 0 0 P
7) Aux Switches Spare (S) = 0 0 S
8) HACR Space (X) = 0 0 X
9) Existing Breaker Total VA = 3,600 2340
10) Dedicated Neutral Required Total Added Amps = 10.0 6.5
NOTES:
1. FOR ELECTRICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS SEE DWG. E-000.
2. ALL BRANCH CIRCUIT WIRING SHALL BE SIZED IN ACCORDANCE
WITH THE CURRENT CHICAGO ELECTRICAL CODE.
3. CONTRACTOR SHALL FURNISH AND INSTALL CIRCUIT BREAKER
TO MATCH WITH EXISTING INSTALLATION. FIELD VERIFY EXISTING
INSTALLATION PRIOR TO ORDERING.
4. RE-USE EXISTING CIRCUIT BREAKERS TO FEED BOILERS CB-2
AND CB-3.
NOTE:
ELECTRICAL PANELS AND CIRCUIT BREAKERS
ARE EXISTING UNLESS OTHERWISE NOTED
AIR SEPARATOR
EXISTING BOILER
CONDENSING
BOILER
CB-1
BOILER
B07
ELECTRICAL ROOM
4 5 6 6.1
BOILER ROOM
VESTIBULE
PUMP-XX
PUMP-XX
PUMP-XX
PUMP-XX
(ABOVE)
EXISTING
PANEL DP-1
EXISTING
PANEL DP-2
EXISTING
TRANSFORMER 1
EXISTING
TVSS
EXISTING
PANEL PP-1
EXISTING
TRANSFORMER 2
EXISTING C/T
CABINET AND METER
EXISTING
MDP
(NOTE 9)
C
D
E
ILLINOIS SECRETARY
OF STATE CHICAGO
WEST FACILITY
BOILER REPLACEMENT
5301 W. LEXINGTON ST.,
CHICAGO, IL 60644
SHEET NO.
DESIGN BY: RO
DRAWN BY: SMA
CHECKED BY: PBL
PROJECT NO.
ISSUE DESCRIPTION DATEREV.
ISSUED FOR 50% REVIEW 05/09/2025
I HAVE PREPARED OR CAUSED TO BE PREPARED UNDER MY DIRECT
SUPERVISION, THE ATTACHED PLANS AND SPECIFICATIONS. I STATE
THAT, TO THE BEST OF MY KNOWLEDGE AND BELIEF AND TO THE
EXTENT OF MY CONTRACTUAL OBLIGATION, THEY ARE IN
COMPLIANCE WITH THE 2019 CHICAGO BUILDING CODE
MANDATED BY THE CITY OF CHICAGO BUILDING
DEPARTMENT/CODE ENFORCEMENT AND THE ILLINOIS
ACCESSIBILITY CODE, 2018 EDITION
STATEMENT OF COMPLIANCE
SIGNED:
INDIANA REGISTRATION NO.:
DATE:
ARCHITECT/ENGINEER
623 COOPER COURT
SCHAUMBURG, IL 60173
(312) 346-8181
CITY APPROVAL STAMP BOX
N
ILLINOIS SECRETARY OF STATE
KEY PLAN
ISSUED FOR REVIEW 08/01/2025
ISSUED FOR 75% REVIEW 08/13/2025
E-200D
POWER PLAN DEMO
Boiler Room - Electrical Plan Demo 1/2" = 1'-0"
NORTH
0 5' 10'
NOTES:
1. COORDINATE ALL WORK WITH OWNER.
2. EXISTING SYSTEMS SHOWN ARE BASED ON VISUAL INSPECTION &
AS-BUILT DRAWINGS. THESE DRAWINGS MAY NOT REFLECT THE ACTUAL
CONDITIONS. THE CONTRACTOR SHALL INSPECT THE SITE AND EXAMINE
THE WORK BEFORE EXECUTION OF ANY WORK.
3. COORDINATE AND OBTAIN WRITTEN PERMISSION FOR SHUTDOWNS OF
ELECTRICAL POWER FROM THE OWNER'S REPRESENTATIVE AT LEAST
FORTY-EIGHT (48) HOURS PRIOR TO SHUTDOWN.
4. REMOVE ALL DEBRIS DAILY FROM SITE AND DISPOSE OF ALL MATERIAL
IN A LEGAL AND RESPONSIBLE MANNER.
5. PROTECT INSTALLED WORK. DAMAGE TO EXISTING INSTALLATION FROM
CONSTRUCTION ACTIVITIES SHALL BE REMEDIED AT THE CONTRACTOR'S
EXPENSE.
6. SEAL AND FILL ANY OPENING AFTER REMOVING EQUIPMENT.
7. RE-SUPPORT ELECTRICAL EQUIPMENT AFTER DEMOLITION, IF REQUIRED.
8. CONDUIT AND WIRING REMOVED DURING DEMOLITION SHALL BE
DISPOSED OF BY THE CONTRACTOR
9. DE-TERMINATE POWER AND CONTROL CABLES TO THE EXISTING BOILER.
PUMP-HWP-3 (EXISTING)
PUMP-SPARE (EXISTING)
PUMP-HWP-1 (EXISTING)
PUMP-HWP-5
(EXISTING)
(ABOVE)
ELECTRICAL ROOM
4 5 6 6.1
C
D
E
BOILER ROOM
VESTIBULE
EXISTING
AIR
SEPARATOR
EXISTING
CONDENSING
BOILER
CB-1
EXISTING
BOILER
B07
CONDENSING
BOILER
CB-2
EXISTING
HOT
WATER
BOILER
HWB-1
CONSTANT
FLOW
PUMP
HWP-7
CONSTANT
FLOW
PUMP
HWP-8
EXISTING
PANEL DP-1
EXISTING
PANEL DP-2
EXISTING
TRANSFORMER 1
EXISTING
TVSS
EXISTING
PANEL PP-1
EXISTING
TRANSFORMER 2
EXISTING C/T
CABINET AND METER
EXISTING
MDP
PROPOSED BOILER 1
CONDENSING
BOILER
CB-3
EXISTING
CONSTANT
FLOW
PUMP HWP-6
(NOTE 3)F
MS-7
2#10, 1#10 GND, 3/4"C
TO PP-1
CKT: 20
4#14, IN 3/4"C
3#12, 1#12 GND, 3/4"C
2#10, 1#10 GND, 3/4"C
TO PP-1
CKT: 22
(NOTE 3)F
MS-8
3#12, 1#12 GND, 3/4"C
TO DP-1
CKT: 38,40,42
TO DP-1
CKT: 37,39,41
4#14, IN 3/4"C
E-200
POWER PLAN
ILLINOIS SECRETARY
OF STATE CHICAGO
WEST FACILITY
BOILER REPLACEMENT
5301 W. LEXINGTON ST.,
CHICAGO, IL 60644
SHEET NO.
DESIGN BY: RO
DRAWN BY: SMA
CHECKED BY: PBL
PROJECT NO.
ISSUE DESCRIPTION DATEREV.
ISSUED FOR 50% REVIEW 05/09/2025
I HAVE PREPARED OR CAUSED TO BE PREPARED UNDER MY DIRECT
SUPERVISION, THE ATTACHED PLANS AND SPECIFICATIONS. I STATE
THAT, TO THE BEST OF MY KNOWLEDGE AND BELIEF AND TO THE
EXTENT OF MY CONTRACTUAL OBLIGATION, THEY ARE IN
COMPLIANCE WITH THE 2019 CHICAGO BUILDING CODE
MANDATED BY THE CITY OF CHICAGO BUILDING
DEPARTMENT/CODE ENFORCEMENT AND THE ILLINOIS
ACCESSIBILITY CODE, 2018 EDITION
STATEMENT OF COMPLIANCE
SIGNED:
INDIANA REGISTRATION NO.:
DATE:
ARCHITECT/ENGINEER
623 COOPER COURT
SCHAUMBURG, IL 60173
(312) 346-8181
CITY APPROVAL STAMP BOX
N
ILLINOIS SECRETARY OF STATE
KEY PLAN
ISSUED FOR REVIEW 08/01/2025
ISSUED FOR 75% REVIEW 08/13/2025
Boiler Room - Electrical Plan 1/2" = 1'-0"
NORTH
0 5' 10'
NOTES:
1. FOR ELECTRICAL SPECIFICATIONS, GENERAL NOTES, AND
SYMBOLS SEE DRAWING E-000.
2. FOR PANEL SCHEDULE SEE DRAWING E-001.
3. PROVIDE AND INSTALL, NEMA 1, 250V, 3P FUSIBLE
DISCONNECT.
4. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN
ACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS.
5. PROVIDE PROPER WORKING SPACE IN FRONT OF THE
ELECTRICAL PANELS.
AutoCAD SHX Text 14'-0"
AutoCAD SHX Text 14'-0"
| E-000 Specifications, General Notes and Symbols-Layout1 |
| Layout1 |
| E-101 Panel Schedule-Layout1 |
| Layout1 |
| E-200D Power Plan-Demo-Layout1 |
| Layout1 |
| E-200 Power Plan-Layout1 |
| Layout1 |