EGYN221009 Questions and Answers.pdf

PDF 88 KB Posted

Attached to
EGYN221009 - Access Control Anti-Terrorism/Anti-Force Options
Solicitation number
EGYN221009
Issued by

About this file

This document is a set of Questions and Answers related to a Request for Information (RFI) for the EGYN221009 - Access Control Anti-Terrorism/Anti-Force Options project. The RFI is seeking an Architectural/Engineering (A/E) Design Firm to provide a Planning Charrette Report I (PCR I) to assess the current anti-terrorism and anti-force conditions of the Access Control Point (ACP) at Building 711 on Cavalier Space Force Station. The A/E firm will be required to conduct site investigations, interviews with various stakeholders, and provide a traffic study, draft DD Form 1391, and other deliverables as outlined in the supporting documents. The applicable NAICS codes are 541310 - Architectural Services and 541330 - Engineering Services. The contracting agency is the Department of the Air Force Air Mobility Command.

View the file

Other files

File Type Posted
EGYN 22-1009_TS_PCR_20240516.pdf PDF
AE Evaluation Criteria EGYN221009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EGYN221009 Access Control Anti-Terrorism/Anti-Force Options RFI

August 6, 2024

1.Are you expecting any big additions to the space force at this location?

a. No.

2.Do you have a rough order of magnitude for price validation?

a. There is not an order of magnitude for price validation for A&E projects.

3.Do all professionals need to be certified?

a. Engineers and Architects should have valid licenses for any state in the US.

4.What are your expectations of on-site visitation?

a. One pre-proposal site visit, and others per the TS.

5.What is the acceptable percentage of work to be performed by the prime?

a. The prime then cannot pay more than 50% of the contract subcontractors that are not “similarly situated entities”. Based on the prime being a small business concern, “similar type entities” then would be any other small business concerns (including the four socio-economic concerns). Payments to them don’t count against the 50% cap that can be subcontracted out. Payments to subcontractors though that are not similar type entities as the prime (i.e., they’re other tan small business) would count against the 50% subcontracting cap.

6.Why is mechanical engineer required?

a. There is no reference for a mechanical engineer in the TS.

7.Are you looking to upgrade the guard shack?

a. Please refer to the TS section 1.1.1: “TITLE I Design Services required to develop a comprehensive PCR I to clearly identify all the project requirements and associated scope at the ACP on Cavalier SFS, ND.”