EGSC Fulford HVAC Drawings _ Final.pdf
PDF 1 MB Posted
- Attached to
- PN0070-2267 Fulford Ctr HVAC Replacement
- Solicitation number
- PE-57200-RFQ-2024-000000004
- Issued by
- Douglas County, Georgia
About this file
This document contains drawings and specifications for the Fulford Center HVAC Replacement project at East Georgia State College. Pursuant to the State Purchasing Act, the Board of Regents of the University System of Georgia is seeking proposals from qualified suppliers/contractors to replace the existing air handler AHU-1 and condensing unit CU-1 with a new unit. The project scope includes adding bi-polar ionization and improved air filtration. Bids are being solicited for this project, which is located in Emanuel County, Georgia.
The document outlines the design conditions, HVAC equipment and system requirements, and electrical work needed for the project. Pricing terms, set asides, incumbents, funding sources, and other salient contract details are not provided in the document. The procurement process and timeline are also not specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tabulation Sheet (Fulford Center HVAC Rep.xlsx | XLSX spreadsheet | |
| PN 0070_2267 Addendum 1.pdf | ||
| EGSC Fulford HVAC Specs _ Final.pdf | ||
| Bid Tabulation Sheet (Modernization Academic .xlsx | XLSX spreadsheet | |
| NOIA 0070 2267_0001.pdf | ||
| Pre Bid Sign In Sheet PN 0070_2267.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING LIST: CONTACT LIST:
(912) 238-2400
SAVANNAH, GA 31405-1396
109 PARK OF COMMERCE DRIVE, SUITE 6
CHATHAM ENGINEERING COMPANY, LLC
CODE REQUIREMENTS:
National Electrical Code
International Fire Code
International Energy Conservation Code ...2015
International Mechanical Code
International Building Code
T0.1
TITLE SHEET
SMP
SMP
M1.1 FLOOR PLANS - MECHANICAL/ELECTRICAL
M0.1 LEGENDS, ABBREVIATIONS, & SCHEDULES
T0.1 TITLE SHEET
PROJECT NO. 0070-2267
FULFORD CENTER HVAC REPLACEMENT
EAST GEORGIA STATE COLLEGE
CADD PLOT
mpeavler
16:33
27-FEB-2024
c
Sheet No.Date
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description
P a rk o f
C o m m e rc e D ri v e S u it e
S a v a n n a h
G e o rg ia
T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d
R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e
E:\E GA College Fulford Center HVAC -23088.00\CADD\T0_1.dgn1 INCH
Stamp
P H
O N
E -2
F
A X -2
C h a th a m E n g in e e ri n g C o m p a n y L L C
P ri n ts a re t o b e r e tu rn e d t o C h a th a m E n g in e e ri n g C o m p a n y L L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f
C h a th a m E n g in e e ri n g C o m p a n y L L C i s n o t p e rm it te d
R E L E
A S
D
F O
C
N S T R
U C
T
IO
N
23088.00
02/28/24
S W
A
IN
S B
O R
O
G E
O R
G
IA
P
O J E
C T N
O -2
F U
L F
O R
D C
E N
T E
R H
V A
C R
E P
L A
C E
M E
N T
A S
T G
E O
R G
IA
S
T A T E C
O L L E
CADD PLOT
mpeavler
16:24
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description
P a rk o f
C o m m e rc e D ri v e S u it e
S a v a n n a h
G e o rg ia
T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d
R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e
E:\E GA College Fulford Center HVAC -23088.00\CADD\M0_1.dgn1 INCH
Stamp
P H
O N
E -2
F
A X -2
C h a th a m E n g in e e ri n g C o m p a n y L L C
P ri n ts a re t o b e r e tu rn e d t o C h a th a m E n g in e e ri n g C o m p a n y L L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f
C h a th a m E n g in e e ri n g C o m p a n y L L C i s n o t p e rm it te d
L E
A S
N S T R
U C
T
IO
N
23088.00
02/28/24
S W
A
IN
S B
O R
O
G E
O R
O J E
C T N
O -2
F U
L F
O R
D C
E N
T E
R H
V A
C R
E P
L A
C E
M E
S
T G
E O
R G
IA
S
T A T E C
O L L E
G E
SMP
SMP
ABBREVIATION DESCRIPTIONSYMBOL ABBREVIATION DESCRIPTION
MLD/MD
A/C
MANUAL DAMPER
ABOVE CEILING
AHU AIR HANDLING UNIT
AD DUCT ACCESS DOOR
T'STAT THERMOSTAT
BTUH BRITISH THERMAL UNITS PER HOUR
CFM CUBIC FEET PER MINUTE
CLG CEILING
DN DOWN
DWGS DRAWINGS
EF EXHAUST FAN
ELEC ELECTRIC
EXH EXHAUST
EXIST EXISTING
GPM GALLONS PER MINUTE
HVAC HEATING VENTILATING & AIR CONDITIONING
MAX MAXIMUM
MIN MINIMUM
SINGLE LINE DUCT
FLEXIBLE DUCT
DUCT TRANSITION
ROUND
TG TRANSFER GRILLE
TYP TYPICAL
VAV VARIABLE AIR VOLUME UNIT
AFF ABOVE FINISHED FLOOR
LEGEND & ABBREVIATIONS
DIRECTION OF FLOW
CTE CONNECT TO EXISTING
TT
DESIGN CONDITIONS
DESIGN WEATHER CONDITIONS
SUMMER DESIGNWINTER DESIGN
DB (°F) DB (°F) / WB (°F)
27.1 95.5 / 77.3
INTERIOR DESIGN CONDITIONS 70.0 75.0 / 62.5
1 1
1 PER ASHRAE WEATHER DATA
1. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO INSTALLATION.
3. DUCT SIZES SHOWN ARE ACTUAL INSIDE DIMENSIONS.
FLEXIBLE OR ROUND DUCT SHALL BE CONNECTED TO RECTANGULAR OR SQUARE DUCT
2. UNLESS OTHERWISE INDICATED, INSTALL ALL SPACE THERMOSTATS, HUMIDISTATS AND SENSORS
4.
5. INSTALL TURNING VANES IN ALL 45 AND 90 DEGREE MITERED ELBOWS.
WITH A SPIN-IN COLLAR WITH SCOOP AND DAMPER.
48 INCHES ABOVE FINISHED FLOOR.
IN MECHANICAL ROOMS PRIOR TO FABRICATION OF DUCTWORK.
MODIFICATIONS MAY BE REQUIRED. CONTRACTOR SHALL ALSO VERIFY SPACE ABOVE CEILINGS AND
THE DESIGN DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY AS
DEVIATIONS ARE DISCOVERED BETWEEN THE ACTUAL CONDITIONS AND THE CONDITIONS SHOWN ON
PLANS WHERE AVAILABLE. AS SUCH, THE CONTRACTOR SHALL FIELD VERIFY CONDITIONS. IF ANY
EXISTING CONDITIONS: THE DESIGN IS BASED ON BASIC FIELD INVESTIGATIONS AND EXISTING 6.
SYMBOL
TYPE
MINIMUM CFM
TOTAL CFM
MAX. FAN MOTOR HP
CAPACITY, BTU/HR
ENT. AIR DB, F
ENT. AIR WB, F
LVG. AIR DB, F
LVG. AIR WB, F
LOCATION
REMARKS
C O
O L I
I
L
AIR CFM
MINIMUM OUTSIDE
PRESSURE, IN. H 0
EXT. STATIC
CHARACTERISTICS
ELECTRICAL
VELOCITY, FPM
MAX. FACE
DROP, IN. H 0
MAX AIR PRESSURE
SEE ELEC DWGS
ATTIC
1.0
53.0
55.0
65.1
78.3
207,000
267,000
7.5
1.5
HORIZONTAL
AHU-1 / CU-1
SENSIBLE, BTU/HR
C O I
L S
C O
O L I
S
C T I
O N
A C
C E
N
P L
E N
U M
RA
OA SA
M E
V
B O
X
M I
X I
I
L T
ELECTRICAL GENERAL NOTES & SPECIFICATIONS
ELECTRICAL LEGEND
GROUND
ENCLOSED CIRCUIT BREAKER
MOTOR
OVERHEAD SERVICE
UNDERGORUND SERVICE
HOME RUN
REQUIRED BY NEC.
EG-8. SUPPORT ALL CONDUITS AND EQUIPMENT USING GALVANIZED CHANNEL AS
EG-7. CONNECT TO NEW AHU AND CONDENSING UNIT WITH SEALTITE FLEX.
GALVANIZED.
CONDUITS EXPOSED OUTSIDE OR SUBJECT TO DAMAGE TO BE RIGID
NOT SUBJECT TO DAMAGED TO BE EMT WITH COMPRESSION FITTINGS.
EG-6. CONDUIT IN CONTACT WITH EARTH TO BE SCH. 40 PVC. CONDUIT INSIDE,
EG-5. PROVIDE GREEN EQUIPMENT GROUNDING CONDUCTOR IN ALL CONDUITS.
EXISTING.
EG-4. ALL WIRING TO BE STRANDED COPPER, TYPE THWN. COLOR CODED TO MATCH
EG-3. SCHEDULE ALL SHUTDOWNS WITH OWNER AND UTILITY PROVIDER.
EG-2. COORDINATE ALL WORK WITH OTHER TRADES AND EXISTING CONDITIONS.
EG-1. ALL WORK SHALL CONFORM TO 2020 NEC AND ALL STATE ORDINANCES.
GENERAL NOTES
M0.1
SCHEDULES
ABBREVIATIONS, &
LEGENDS,
ATU AIR TERMINAL UNIT
VFD VARIABLE FREQUENCY DRIVE
CU CONDENSING UNIT
SA SUPPLY AIR
RA RETURN AIR
OA OUTSIDE AIR
SKD DUCT MOUNTED SMOKE DETECTOR
CONDENSING UNITS
AIR HANDLING AND
CADD PLOT
mpeavler
16:32
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description
P a rk o f
C o m m e rc e D ri v e S u it e
S a v a n n a h
G e o rg ia
T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d
R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e
E:\E GA College Fulford Center HVAC -23088.00\CADD\M1_1.dgn1 INCH
Stamp
P H
O N
E -2
F
A X -2
C h a th a m E n g in e e ri n g C o m p a n y L L C
P ri n ts a re t o b e r e tu rn e d t o C h a th a m E n g in e e ri n g C o m p a n y L L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f
C h a th a m E n g in e e ri n g C o m p a n y L L C i s n o t p e rm it te d
L E
A S
N S T R
U C
T
IO
N
23088.00
02/28/24
S W
A
IN
S B
O R
O
G E
O R
O J E
C T N
O -2
F U
L F
O R
D C
E N
T E
R H
V A
C R
E P
L A
C E
M E
S
T G
E O
R G
IA
S
T A T E C
O L L E
G E
NOTE ED2
NOTE ED1
NOTE E2
NOTE E1
7.5HP, 3PH, 208V
NEW AHU-1
NOTE E1
MECHANICAL
NEW VFD BY
NOTE ED3
CONDENSING UNIT.
EXISTING
NOTE ED3
CIRCUIT BREAKER.
EXISTING 175A
IN FIELD.
VERIFY LAYOUT
TRANSFORMER.
PAD MOUNTED
EXISTING
TRANSFORMER.
PAD MOUNTED
EXISTING
NOTE E3
FEEDER.
NEW U/G
3PH, 208V
120 MCA,
NEW CU-1 (2"C W/ 3 NO.2/0)
TRANSFORMER TO NEW SERVICE BREAKER.
MAINTAIN EXISTING CONNECTION FROM
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
SKD
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
SKD
AHU
CU
VFD WITH BYPASS
THROUGH FLOOR
REFRIGERANT LINES
M1.1
SMP
SMP
M1.1
SCALE: 1 / 8 " = 1' - 0"
ATTIC DEMOLITION PLAN - HVAC
M1.1
SCALE: 1 / 8 " = 1' - 0"
DEMOLITION PLAN - HVAC
M1.1
SCALE: 1 / 8 " = 1' - 0"
ATTIC FLOOR PLAN - HVAC
M1.1
SCALE: 1 / 8 " = 1' - 0"
FLOOR PLAN - HVAC
TYPICAL TO REMAIN
TYPICAL TO BE REMOVEDD1
D2
TYPICAL NEW WORK
TYPICAL EXISTING TO REMAIN
CONNECT TO EXISTING3
PROVIDE AND INSTALL NEW BI-POLAR IONIZATION IN AIR UNIT AS SPECIFIED.
P-TRAP IN LINE.
NEW CONDENSATE DRAIN LINE FROM UNIT TO EXISTING FLOOR DRAIN. INSTALL
CU
AHU
ELECTRICAL NOTES:
3 NO.2/0, 1 NO.6(G) FROM NEW BREAKER TO NEW CU-1.
CONNECT TO EXISTING SERVICE GROUNDING SYSTEM. EXTEND 2"C W/
EXISTING SERVICE EXTENDING FROM EXISTING TRANSFORMER.
MOUNT NEW 150A BREAKER TO EXISTING SUPPORTS. CONNECT TO E3.
SHUTDOWN WIRING TO NEW VFD.
MAINTAIN CONNECTION TO EXISTING SMOKE DETECTOR AND CONNECT E2.
CONNECT TO NEW AHU-1.
NEW VFD. EXTEND 1"C W/ 3 NO.8, 1 NO.10(G) FROM VFD AND
CONNECT EXISTING 50A/3P CIRCUIT EXTENDING FROM PANEL MDP TO E1.
ELECTRICAL DEMOLITION NOTES:
DISCONNECT EXISTING CONDENSING UNIT.
TRANSFORMER AND FEEDER FROM THIS BREAKER TO EXISTING CONDENSING UNIT.
ED3. REMOVE EXISTING 175A CIRCUIT BREAKER EXTENDING FROM PAD MOUNTED
ED2. MAINTAIN SMOKE DETECTOR IN DUCT OF AHU-1.
ARE BEING REMOVED. MAINTAIN CIRCUIT FROM PANEL MDP.
ED1. DISCONNECT ELECTRICAL CIRCUIT SERVING EXISTING VFD AND AHU-1 WHICH
HVAC DEMOLITION NOTES:
HVAC NEW WORK NOTES:
MECHANICAL/ELECTRICAL
FLOOR PLANS -
PLUMBING DRAIN IN FLOOR
CONDENSATE DRAIN TO
D2
D3
D3
D4
BEFORE CAPPING.
THE CEILING AND ABANDONED IN THE WALL. REMOVE ALL REFRIGERANT
REFRIGERANT PIPING IN WALL TO BE CAPPED UNDER THE DECK AND IN
D4
HANDLER.
SETS OF REFRIGERANT LINES TO INTERTWINED DX COIL IN AIR
AND DISPOSE OF PROPERLY OFFSITE. NOTE CONDENSING UNIT HAS 2
CONDENSING UNIT AND REFRIGERANT LINES TO BE REMOVED AS SHOWN
D5
FOR REFERENCE.
EXISTING AIR TERMINAL UNIT TO REMAIN. ESTIMATE LOCATION SHOWN
D5
D5
D5
D5
D5
D5
D5
D5
D5
OFFSITE.
ASSOCIATED DUCTS AND PIPING AS SHOWN AND DISPOSE OF PROPERLY
REMOVE AIR HANDLER, AUXILLARY DRAIN PAN, WOOD SUPPORTS,
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS.
MECHANICAL ATTIC SPACE USING EXISTING HOLE IN ATTIC FLOOR. FIELD
THROUGH FLOOR IN CORNER OF STORAGE ROOM, ACROSS CEILING AND UP INTO
ROUTE NEW REFRIGERANT LINES FROM CONDENSING UNIT, UNDER DECK, UP
NOTE E3
SERVICE RATED, LOCKABLE
IN NEMA 3R ENCLOSURE.
NEW 150A/3P BREAKER
TO ROUTE ALONG THE FLOOR.
NEW REFRIGERANT LINES DOWN THROUGH FLOOR.OFFSET AS NEEDED FROM UNIT
AND TESTED FOR LEAKS BEFORE INSTALLING.
MAINTENANCE WHEN FLOAT SWITCH IS ACTIVATED. PAN SHALL BE FULLY WELDED
PLUMBING DRAIN AND CAP WITH REMOVABLE CAP FOR EASE OF DRAINING PAN BY
APPROXIMATELY 1/3 FULL OF WATER. PROVIDE LINE FROM PAN OVER TO
FLOAT SWITCHES IN PAN TO DE-ENERGIZE UNIT UPON ACTIVATION WHEN PAN IS
PROVIDE AND INSTALL NEW AUXILLARY DRAIN PAN UNDER UNIT. PROVIDE NEW
INSTALLATION OF P-TRAP.
EXISTING RETURN DUCT HEIGHT OVER TOP OF UNIT. MINIMUM HEIGHT 2" FOR
NEW AUXILLARY DRAIN PAN. COORDINATE IN FIELD HEIGHT OF BEAM BASED ON
UNIT SHALL BE MOUNTED ON NEW GALVANIZED STEEL BEAMS LOCATED INSIDE
9 8
LOUVER TO REMAIN
OUTSIDE AIR
REMOVE EXISTING UNIT.
SPACE TO BE USED TO
MECHANICAL ATTIC
LOUVER OPEN TO
WOODEN DECK AROUND THE BUILDING.
OWNER REMOVAL OF OLD UNIT AND INSTALLATION OF NEW TO PROTECT THE
UTILIZE OPENING AT LOUVER FOR INSTALLING NEW UNIT. COORDINATE WITH
CONTROL PANEL
EXISTING SIEMENS
SHALL BE REPLACED
AIR MONITORING STATION
DAMPERS IN UNIT.
UNIT. CONTROLS CONTRACTOR TO PROVIDE ACTUATORS NEEDED TO CONTROL
NEW AIR MONITORING STATION IN OUTSIDE AIR DUCT AND RECONNECT TO NEW
| T0_1 |
| T0_1 |
| BDR, CHATHAM 30X42.dgn |
| M0_1 |
| M0_1 |
| bdr, CHATHAM 30X42.dgn |
| M1_1 |
| M1_1 |
| scrbgnd-new, 07-048 - Base.dwg, Model |
| scrbgnd, 07-048 - Base.dwg, Model |
| scrbgnd-attic, 07-048 - Base.dwg, Model |
| bdr, CHATHAM 30X42.dgn |
| scrbgnd-attic-new, 07-048 - Base.dwg, Model |
| HVACDEMO1, M1_1.dgn |
| HVACDEMO2, M1_1.dgn |
File details come from the government source that posted it. Updated .