Bid Tabulation Sheet (Fulford Center HVAC Rep.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
PN0070-2267 Fulford Ctr HVAC Replacement
Solicitation number
PE-57200-RFQ-2024-000000004
Issued by
Douglas County, Georgia

About this file

This document is a Bid Tabulation Sheet for a project titled "PN0070-2267 Fulford Ctr HVAC Replacement" for East Georgia State College in Swainsboro, Georgia. The project involves replacing the existing air handler (AHU-1) and condensing unit (CU-1) to provide cleaner air to the Fulford Center building through the addition of bi-polar ionization and better filtration. The bid opening was held on April 2, 2024, at 3:30 P.M., and the apparent low bidder is Y-delta with a base bid of $224,685.00.

The project is being procured under the State Purchasing Act of Georgia by the Board of Regents of the University System of Georgia on behalf of East Georgia State College, which is located in Emanuel County, Georgia. No specific pricing terms, set-asides, incumbents, or funding details are provided in the Bid Tabulation Sheet.

View the file

Other files

File Type Posted
PN 0070_2267 Addendum 1.pdf PDF
EGSC Fulford HVAC Drawings _ Final.pdf PDF
EGSC Fulford HVAC Specs _ Final.pdf PDF
Bid Tabulation Sheet (Modernization Academic .xlsx XLSX spreadsheet
NOIA 0070 2267_0001.pdf PDF
Pre Bid Sign In Sheet PN 0070_2267.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Bid Tabulation Sheet April 2, 2024 3:30 P.M.
For PROJECT # 0070-2267
Fulford Center HVAC Replacement
EAST GEORGIA STATE COLLEGE SWAINSBORO, GA
ContractorBID BONDADDENDA ACKDBASE BID
Y-deltaCincinnati Insurance Comp.5% Yes$224,685.00
Air ManagementNo Bid
Copper Const.No Bid
I certify that this is a correct tabulation of bids as read aloud, and I certify that I have personally and visually checked the tabulation agains the proposal forms submitted.
Y-deltais the apparent low bidder.
Signed:David SteptoeDate:11/28/23
Director of Plant Operations or
Ron Stalnaker, VP for Business Affairs (depending on who does the bid opening)

File details come from the government source that posted it. Updated .