Bid Tabulation Sheet (Fulford Center HVAC Rep.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- PN0070-2267 Fulford Ctr HVAC Replacement
- Solicitation number
- PE-57200-RFQ-2024-000000004
- Issued by
- Douglas County, Georgia
About this file
This document is a Bid Tabulation Sheet for a project titled "PN0070-2267 Fulford Ctr HVAC Replacement" for East Georgia State College in Swainsboro, Georgia. The project involves replacing the existing air handler (AHU-1) and condensing unit (CU-1) to provide cleaner air to the Fulford Center building through the addition of bi-polar ionization and better filtration. The bid opening was held on April 2, 2024, at 3:30 P.M., and the apparent low bidder is Y-delta with a base bid of $224,685.00.
The project is being procured under the State Purchasing Act of Georgia by the Board of Regents of the University System of Georgia on behalf of East Georgia State College, which is located in Emanuel County, Georgia. No specific pricing terms, set-asides, incumbents, or funding details are provided in the Bid Tabulation Sheet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PN 0070_2267 Addendum 1.pdf | ||
| EGSC Fulford HVAC Drawings _ Final.pdf | ||
| EGSC Fulford HVAC Specs _ Final.pdf | ||
| Bid Tabulation Sheet (Modernization Academic .xlsx | XLSX spreadsheet | |
| NOIA 0070 2267_0001.pdf | ||
| Pre Bid Sign In Sheet PN 0070_2267.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Bid Tabulation Sheet April 2, 2024 3:30 P.M. |
| For PROJECT # 0070-2267 |
| Fulford Center HVAC Replacement |
| EAST GEORGIA STATE COLLEGE SWAINSBORO, GA |
| Contractor | BID BOND | ADDENDA ACKD | BASE BID |
| Y-delta | Cincinnati Insurance Comp. | 5% Yes | $224,685.00 |
| Air Management | No Bid | ||
| Copper Const. | No Bid |
| I certify that this is a correct tabulation of bids as read aloud, and I certify that I have personally and visually checked the tabulation agains the proposal forms submitted. | |
| Y-delta | is the apparent low bidder. |
| Signed: | David Steptoe | Date: | 11/28/23 |
| Director of Plant Operations or | |||
| Ron Stalnaker, VP for Business Affairs (depending on who does the bid opening) |
File details come from the government source that posted it. Updated .