EDR-6150-00-264-0733.pdf

PDF 71 KB Posted

Attached to
ICBM Cable Assembly, Powe
Solicitation number
SPRHA2-25-R-0001
Issued by

About this file

This document is an Engineering Data Requirements form for a specific electrical cable assembly. The document identifies a cable assembly with Part Number 21-53482 and National Stock Number 6150-00-264-0733AH, prepared by Menke, Garrett N from the 414 SCMS/GU E A A office on 18 March 2025. The form provides critical manufacturing instructions, including key requirements such as mandatory adherence to specified standards, prohibition of unauthorized deviations from control drawings, and a requirement that any material substitutions must receive prior approval from the AFLCMC Cognizant Engineering Activity. Additionally, the document specifies that marking must be completed per MIL-STD-130, and that military specifications/standards will not be furnished in the bid set.

View the file

Other files

File Type Posted
SPRHA225R0001_______0002.pdf PDF
SPRHA225R0001_______0001.pdf PDF
CDRLPEDDAL.pdf PDF
CDRLFATR.pdf PDF
SOW.pdf PDF
SPI-6150-00-613-0343.pdf PDF
SPI-6150-00-264-0733.pdf PDF
CDRLFATP.pdf PDF
SPRHA225R0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REV: BC ENGINEERING DATA REQUIREMENTS

(ENGINEERING INSTRUCTIONS)

NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.

1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:

CABLE ASSEMBLY, ELECTRICAL

2. PART NUMBER:

21-53482

3. NATIONAL STOCK NUMBER:

6150-00-264-0733AH

PREPARED BY:

Menke, Garrett N

OFFICE SYMBOL:

414 SCMS / GU E A A

DATE:

18 March 2025

HILL AFB FORM 462 Page 1 of 1

4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE

SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.

5. THE SOURCES/MATERIALS IF LISTED ON THE STANDARDS, SPECIFICATIONS AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY AFLCMC COGNIZANT

ENGINEERING ACTIVITY.

6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR

APPROVAL BY AFLCMC ENGINEERING.

7. MARKING PER MIL-STD-130.

File details come from the government source that posted it. Updated .