About this file
This document is an Engineering Data Requirements form for a specific electrical cable assembly. The document identifies a cable assembly with Part Number 21-53482 and National Stock Number 6150-00-264-0733AH, prepared by Menke, Garrett N from the 414 SCMS/GU E A A office on 18 March 2025. The form provides critical manufacturing instructions, including key requirements such as mandatory adherence to specified standards, prohibition of unauthorized deviations from control drawings, and a requirement that any material substitutions must receive prior approval from the AFLCMC Cognizant Engineering Activity. Additionally, the document specifies that marking must be completed per MIL-STD-130, and that military specifications/standards will not be furnished in the bid set.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRHA225R0001_______0002.pdf | ||
| SPRHA225R0001_______0001.pdf | ||
| CDRLPEDDAL.pdf | ||
| CDRLFATR.pdf | ||
| SOW.pdf | ||
| SPI-6150-00-613-0343.pdf | ||
| SPI-6150-00-264-0733.pdf | ||
| CDRLFATP.pdf | ||
| SPRHA225R0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV: BC ENGINEERING DATA REQUIREMENTS
(ENGINEERING INSTRUCTIONS)
NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.
1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:
CABLE ASSEMBLY, ELECTRICAL
2. PART NUMBER:
21-53482
3. NATIONAL STOCK NUMBER:
6150-00-264-0733AH
PREPARED BY:
Menke, Garrett N
OFFICE SYMBOL:
414 SCMS / GU E A A
DATE:
18 March 2025
HILL AFB FORM 462 Page 1 of 1
4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE
SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.
5. THE SOURCES/MATERIALS IF LISTED ON THE STANDARDS, SPECIFICATIONS AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY AFLCMC COGNIZANT
ENGINEERING ACTIVITY.
6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR
APPROVAL BY AFLCMC ENGINEERING.
7. MARKING PER MIL-STD-130.
File details come from the government source that posted it. Updated .