CDRLFATP.pdf

PDF 157 KB Posted

Attached to
ICBM Cable Assembly, Powe
Solicitation number
SPRHA2-25-R-0001
Issued by

About this file

This is a DD Form 1423-1 Contract Data Requirements List (CDRL) for a First Article Test Plan related to an electrical cable assembly. The document is associated with contract number FD20202600001 and is categorized as an NDTI (Non-Developmental Technical Item) data item. The specific data item (A002) requires a Test Plan with a First Article Test Plan subtitle, with the requiring office being 414 SCMS.

Key submission requirements include: the contractor must submit the initial draft First Article Test Plan no later than 90 calendar days prior to the planned start of first article test, with the government providing comments within 60 calendar days. The final First Article Test Plan must be submitted 14 calendar days after receiving government comments. The document contains a warning about technical data export restrictions under the Arms Export Control Act and includes instructions for electronic submission through Wide Area Work Flow (WAWF) with notification to specific email addresses. The estimated total price for this data item is $0.00, and it is marked with a price group of NSP (Not Separately Priced).

View the file

Other files

File Type Posted
SPRHA225R0001_______0002.pdf PDF
SPRHA225R0001_______0001.pdf PDF
SPI-6150-00-613-0343.pdf PDF
CDRLPEDDAL.pdf PDF
EDR-6150-00-264-0733.pdf PDF
SPI-6150-00-264-0733.pdf PDF
SPRHA225R0001.pdf PDF
CDRLFATR.pdf PDF
SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A002
title: Test Plan
sub: First Article Test Plan
auth: DI-NDTI-80566A
ref:
req_ofc: 414 SCMS
dd250: LT
appcode: A
dist: SEE BLK 16
freq: SEE BLK 16
asof: SEE BLK 16
firstsub: SEE BLK 16
subsub: SEE BLK 16
addressee1: SEE BLK 16
draft1: 1
reg1: 1
repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 1
total_reg: 1
total_repro: 0
remarks:

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

BLOCK D:

National Stock Number (NSN): 6150-00-613-0343, Part Number (PN): 21-58700-3, Noun:CABLE ASSEMBLY, ELECTRICAL National Stock Number (NSN): 6150-00-264-0733, Part Number (PN): 21-53482-0624, Noun: CABLE ASSEMBLY, ELECTRICAL

Block 9: Data submittal shall be marked with the following on the cover page:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only for Controlled Technical Information & Export Controlled: determined (insert date). Other requests for this document shall be referred to 414 SCMS/GUMBC, 6031 Gum Lane, Bldg. 1227, Hill AFB, UT 84056-5816.

WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 Of Title 22, United States Code) or the Export Control Reform Act Of 2018 (Chapter 58 Sections 4801-4852 Of Title 50, United States Code). Violations of these export-control laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD directive 5230.25 and DoD instruction 2040.02.

DESTRUCTION: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLOCKS 10, 11, 12, & 13: CONTRACTOR SHALL SUBMIT INITIAL DRAFT FIRST ARTICLE TEST PLAN NO LATER THAN (NLT) 90 CALENDAR DAYS PRIOR TO THE PLANNED START OF FIRST ARTICLE TEST. GOVERNMENT WILL HAVE 60 CALENDAR DAYS TO PROVIDE COMMENTS. FINAL FIRST ARTICLE TEST PLAN SUBMITTAL SHALL BE DELIVERED NLT 14 CALENDAR DAYS FOLLOWING RECEIPT OF GOVERNMENT COMMENTS.

group: NSP
total_price: 0.00
prep_name:
line_item:
exhibit: A
xtdp: Off
xtm: Off
othercat: X-NDTI
system: SEE BLK 16
ctr_no: FD20202600001
contr:
remarksb:

Block 14: Submit electronically in Wide Area Work Flow (WAWF). Upload as an attachment during the invoice process. Provide notification of delivery to:

414scms.gumc.buycontracts@us.af.mil laycee.allen@us.af.mil darren.rabosky@us.af.mil rebecca.senkel.2@us.af.mil

Page2:
Reset:
2025-07-16T07:27:16-0600
RABOSKY.DARREN.R.1514951469
prep_date: 20250716
app_by:
2025-07-21T07:11:42-0600
ALLEN.LAYCEE.NICOLE.1280799684
app_date: 20250721
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .