Amendment 0002.pdf

PDF 1 MB Posted

Attached to
NATIONAL ASSESSMENT OF EDUCATIONAL PROGRESS (NAEP) ALLIANCE 2013 -2017
Solicitation number
ED-IES-12-R-0021
Issued by

About this file

Amendment 0002

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243

Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code

2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE

(x) 9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)

CODE FACILITY CODE

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

Check One

A. THIS ORDER ID ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA

(Signature of person authorized to sign)

15C. DATE SIGNED

(Signature of Contracting Officer)

16C. DATE SIGNED

PAGE 2 OF 3 ED-IES-12-R-0021/0002

The purpose of this Amendment is to delete Exhibit D and replace it with the Exhibit D below.

The Department of Education has determined that it is in the Government’s best interest to extend the existing 2008-2012 NAEP Alliance contracts through March 2013. Therefore, all activities described in the PWS that was posted on May 23, 2012 as required up through the 2013 NAEP data collection will no longer be part of this solicitation. Analysis and Reporting of the 2013 data collected in 2013, including special studies will remain a part of this solicitation. Offerors should prepare their proposals accordingly.

Exhibit D. NAEP “Top-Level” Work Plan

Year Item Development Pilot Testing Operational

Assessments Analysis & Reporting

2015 Science 2016 Arts (8) 2017 Mathematics 2017 Reading 2018 U.S. History 2018 Civics 2018 Geography

2014 TEL (8)

2015 Mathematics (4,8) 2015 Reading (4,8)

Mathematics Reading

2012 LTT Mathematics 2012 LTT Reading 2012 Economics (12) 2013 Mathematics 2013 Reading

2017 Mathematics 2017 Reading 2019 Science

2016 Arts (8) 2018 U.S. History

2018 Geography

U.S. History Civics Geography

TEL (8)

2013 Reading (12) 2013 Mathematics (12)

2018 Economics (12) 2019 Reading 2019 Mathematics 2020 LTT Mathematics 2020 LTT Reading 2021 Writing

2017 Mathematics

2017 Writing

Reading (4,8) Mathematics (4,8) Science HS Transcript Study

2014 U.S. History 2014 Civics 2014 Geography

2014 TEL (8)

2015 Reading (4, 8) 2015 Mathematics (4, 8)

2019 Reading 2019 Mathematics 2021 Writing

2018 U.S. History

2018 Geography 2018 Economics 2020 LTT Mathematics 2020 LTT Reading

LTT Mathematics LTT Reading Arts (8)

2015 Reading (12) 2015 Mathematics (12)

2021 Mathematics 2021 Reading

2019 Reading 2019 Mathematics 2019 Science

Mathematics Reading Writing

2016 LTT Mathematics 2016 LTT Reading 2017 Mathematics

Activities shown above generally begin in the fall prior to the year shown in the first column. The Operational Assessments occur in grades 4, 8 and 12 unless otherwise noted. Long-term trend (LTT) assessments are ages 9, 13, and 17. Special studies are not shown.

PAGE 3 OF 3 ED-IES-12-R-0021/0002

During the contract period of performance, the National Assessment Governing Board may decide to revise the schedule, which would affect the activities above.

Activities in RED for 2013 (i.e., pilot testing, the operational assessments, and the analysis and reporting for 2012 LTT Math and Reading) will be performed under existing contracts and are no longer included in this solicitation. A pilot of Science items in 2013 is no longer being considered and has been deleted from the “top-level” work-plan.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT:
IDCode:
pdfpage1: 1
Pages: 3
DocNo: 0002
EffDate: JUN 13, 2012
ReqNo: EDOIES-12-000197
ProjNo:
IssuedByCode: CPOD
IssuedBy: Contracts & Acquisitions Mgt., Group D

US Dept of Education, 550 12th St SW - 7th Floor Washington DC 20202-4230

AdminByCode:
AdminBy: See Block 6
ContractorCode:
FacCode:
SolChg: Yes
AwdChg: Off
SolNo: ED-IES-12-R-0021
SolDate: MAY 23, 2012
AwdNo:
AwdDate:
NoCopies:
Amended: Yes
OffrExt: Off
OffrNoEx: No
ApprData: See Schedule
ChgeOrd: Off
ChgeOrder:
Modify: Off
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).:
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript:
SignName:
SignTitl:
ContDate:
ContrOfficerInfo:
CODate:
Contractor Info:
ContractorPOC:
Contractor:
ModAmount:
Header:
15B. CONTRACTOR/OFFEROR:
Footer1:
signature:

File details come from the government source that posted it. Updated .