Department of Education, Federal Student Aid (FSA) Program/Project Management Support Services (PPMSS) Solicitation Number: EDENFS-16-R-0004

Governments Response to Contractors Questions RFP Number: EDENFS-16-R-0004

#
RFP Section

Provided by Offerors Question

1.
L.3 Type of Contract ,Page 52
“The offeror shall submit a single Volume I and Volume II with clearly identified components of the Basic IDIQ and Task Order 0001 as indicated within the RFP instructions” Does this mean the response to the Task Order 0001 is included within the 10 pages allocated in Volume 1?

Government Response: The Offeror shall submit a single Volume I and Volume II which contain clearly identified components of the Basic IDIQ and Task Order 0001. These Volumes include:

Volume I- Technical/Management Proposal (IDIQ and TO) Tab-A Cover Letter , Executive Summary Tab-B Program/Project Management Tab –C Staffing

Volume II – Cost/Pricing (IDIQ and TO) Tab-A Exceptions, Deviations and Assumptions Tab-B Standard Form SF-33 Tab-C Price Proposal

Volume III - Past Performance (needed for the basic IDIQ only) Tab- A Past Performance Tab –B Relevant Experience

2.
L.9.1 VOL I Tab C: Staffing,

Does the Key Personnel need letter of Commitment?

Government Response: Yes

3.
L.9.2 Vol II, Tab C: Pricing Proposal, Page 58
“In addition to its hardcopy proposal, the Offeror’s completed worksheets shall be submitted to FSA in Microsoft Excel 2003 format via electronic email (email and CD)” Do Offerors need to submit the excel worksheet as an attachment in addition to including in the CD?

Government Response: Yes

4.
L.9.3 Vol III, Page 59
What is the minimum and maximum past performances can a

offeror submit? If it is more than one past performances submission, does the page limit of 3 is for all the past performances?

Government Response: There is no minimum, the government has requested that three (3) past performance be submitted.

5.
L.9.3 Vol III, Tab B: Relevant Experience, Page 60
“At least (1) experience must demonstrate the use of creative support or innovations in achieving or exceeding customer objective” Can it be an experience with a subcontractor?

Government Response: Yes, however one of the experiences must be as a prime contractor.

6.
Attachment J-8
The personnel listed for the Task Order 0001, are the Project Manager and Investment Analyst key personnel? Do we need to submit a resume? Do we need to submit Letter of Commitment?

Government Response: Yes, resumes are required for all labor categories listed for TO 0001 services which, include the Program Manager, Project Manager and Investment Analyst. All are considered Key Personnel.

Yes, a letter of commitment is required.

7.
Attachment J-6
Is the government’s intention to have every location listed in Regional _Offices_Attachemen_J-6 prices out with an on and off site rate for every labor category in all the locations?

Government Response: All services shall be performed at FSA Washington, DC locations.

Attachment J-6 “Regional offices” is a listing of all DoEd offices where contractors may obtain PIV cards or assistance. For contractors working in the DC area please refer to attachment J-4 page 5, #6 for designated DC, PIV enrollment support.

8.
Task Order 0001
For Task Order 1, it appears the government has provided a price spreadsheet; however, it does not appear that a technical response is required. Can the government provide any guidance?

Government Response: Technical response is required per instructions on page fifty six (56) of the RFP .

9.
General
The government indicates that an electronic copy, a DVD/CD, and a hard copy are required. Would the government consider modifying this to only an electronic copy?

Government Response: No the Government will not reconsider.

10.
General
Delivery methods do not appear to allow for an in-person delivery. Can you allow for a direct drop off option?

Government Response: Please refer to the Amended section L.5.2 delivery of proposals.

Yes, a in person delivery may be conducted at the FSA location 830 First Street N.E. Washington, DC 20202 on or before the revised closing deadline of September 30, 2016 by 2:00 pm est. (LATE PROPOSALS EITHER HAND DELIVERY OR BY MAIL WILL NOT BE ACCEPTED).

Contractors shall contact the assigned contract specialist or contracting office (before the closing deadline) to receive hand delivered proposals upon arrival to the lobby. The RFP will be amended to include this language.

11.
General
Would the government consider a one-week extension?

Government Response: The Government will extend the response date to September 30, 2016 By 2:00 pm est. Amendment 0001 has been posted to FBO on 9/8/16 specifying this change.

12.
General
The word “offeror” is used many times throughout the RFP, sometimes in seemingly ambiguous manner. For purposes of this RFP, does the word offeror mean the prime contractor or the collective participating contracting team members?

Government Response: The word “Offeror” is referring to the prime contractor.

13
Page 55
The last sentence of the next to last paragraph on the page reads “Electronic files shall be named as specified throughout the”. Will the government please complete the sentence?

Government Response: The sentence is complete there was a spacing issue. It is listed as follows:

Electronic files shall be named as specified throughout the Instructions to Offerors, Section L. Individual file sizes shall not exceed 5 MB. CDs shall be labeled on the disc to include: Offeror Name, Offeror DUNS number, Solicitation name and number, Volume Number, and Copy Number (e.g. Original, etc.)

14.
Page 56
Can the offeror provide a table of contents as part of Tab A?

Government Response: No table of content was requested however, the contractor is required to clearly identify each section related to the Basic IDIQ and TO 0001in their proposals.

15.
Page 58
Under Tab B - Contract Documents-(Form SF-33) Volume II , is line item “a)” missing or should the items be renumbered?

Government Response: This typo will be corrected and this sections will be amended to read : a) b) and c).

16.
Page 59
The requirements for Tab A - Past Performance are unclear. Subparagraph (a) discusses past performance questionnaires and the governments reserved rights for gathering past performance information through alternative means. However, the paragraph specifies, “The completed Questionnaire shall not be submitted with the Offeror’s proposal submission.” Subparagraph (b) refers to offerors without past performance. Please clarify. What is the offeror to provide in Tab A - Past Performance

Government Response: Please see amended L.9.3 Vol III Past Performance (a).

17.
Page 59
There is a reference to Tab C in paragraph (a). What or where is Tab C?

Government Response: The reference is in section L.9.1 Tab C-Staffing.

18
Task Order 0001
Please confirm that the offeror only needs to price task order 1 per attachment “Task_Order_0001_Labor_rates_table_Revised_Attachement_J-8.pdf” and no other response is required?

Government Response: Offers shall submit pricing for both the IDIQ (see attachment J-1 for labor categories and estimated hours) and TO 0001.

19
Labor Rates Table IDIQ (J-1) Labor Category Descriptions (J-3) Pages 1-10
Will the Government accept the submission date and time of electronic mail as the correct and official submission date and time? Potential delays outside of vendors' mail submissions can be beyond their control.

Government Response: The closing deadline has been extended (please see the response to question eleven (11). However, it is the contractors responsibility to submit all requested proposal documents on or before the closing deadline.

20
L.5.2, Page 54
In addition to the labor categories currently established, is it the intention of the Government to also request offeres to make available a Task Order Manager/Lead? If so, how do vendors account for the added costs and LOE?

Government Response: Please see page 53 of the RFP, section L.2 (b) (1) first bullet “Labor Hour Rates” in its entirety.

21
C.1.2, Page 6
When is the Government looking to make an award?

Government Response: Early fiscal year 2017. Per the response to question eleven (11) this RFP has extended the closing deadline to September 30, 2016.

22
General
Were these services performed under a previous IDIQ vehicle or contract with the Government?

Government Response: No, there is no incumbent providing these services for FSA.

23
Labor rates table IDIQ pages 1-10 Attachment J-3
There is a desicripency between the Labor categories description showing 23 descriptions and the Labor rate table showing 24 categories. Business Analyst is listed twice (please see Labor Category 7 and 20). Is it the intention of FSA to have 2 "Business Systems Analysts" supporting this contract? At your earliest convenience please advise.

Government Response: This is a duplication and only one Business Analyst position is required, and attachment J-1 will be amended.

Is the Executive Summary in Volume I intended to summarize the contents of all volumes, or only Volume I?

Government Response: Please refer back to the RFP, section L.9.1 Tab –A last paragraph.

25
Vol II, Tab C
Could the government please specify which financial statements should be included in the electronic submission of Volume II, Tab C, Financial Statements?

Government Response: This question is unclear.

26
L.2 page 52
RFP Section L.2, sub-bullet "Labor Rates", page 52 states that a Teaming Coordinator is a contract-level support management cost. To clarify, should Offerors submit CVs for both a Program Manager and a Teaming Coordinator at the IDIQ level?

Government Response: This is an error and will be amended there is no “Teaming Coordinator” required.

27
General
May the Offerors write about other relevant past performance in the Relevant Experience narrative, or are we bound only to discuss the three projects whose PPRs/PPQs we submit?

Government Response: The offeror’s “Relevant Experience” must be the same or similar to the work requested under the SOW Section C.

28
Page 59
RFP page 59, final paragraph, first sentence seems to be missing an ending. Could the Government please revise?

Government Response: The ending of the paragraph is not missing there is a spacing typo between the word indicate: and PPMSS which will be corrected are follows:

email shall clearly indicate: PPMSS Past Performance Questionnaire Submission for Offeror [Name]; or The Government reserves the right to contact customers identified in the proposal and solicit further information about performance in regard to quality, timeliness, cost, and business relationship ect….

29
General
In which volume, and under which tab, should Representations and Certifications be included?

Government Response: Page 58, Vol II, Tab-B

30
Attachment J-3
For the Volume I and II responses to Task Order 0001, should the Offeror designate Key Personnel from the labor categories provided in J-3?

Government Response: Yes, or the offer may provide alternative labor categories which fit the key personnel descriptions outlined under attached J-3 (labor category descriptions).

31
Attachment J-3
Attachment J-3, CLIN 022 specifies a labor category of "Administrative Support/Administrative Assistant Sr. & Jr." Should this be divided into two CLINs and read as two positions whose LOE adds up to 1929?

Government Response: Yes, there should be two separate CLIN’s for Admin Support Sr. and Admin Support Jr. and attachment J-3 will be amended.

All IDIQ estimated labor hours shall be for 1920 not 1929 and attachment J-1 will be amended.

32
Attachment J-3
Attachment J-3 lists "Enterprise Architecture" as a position under CLIN 0019. Could the government confirm if this is the correct labor category title?

Government Response: The labor category should read “Enterprise Architect” and will be corrected.

33
Page 59
RFP page 59 states that there is a naming convention for "Volume III –Tab A –Past Performance Statement-Offeror Name.doc." There are no other naming conventions specified that break out each volume by tab. Therefore, may we electronically and via CD submit file using the naming conventions below?:

•Volume I Basic IDIQ-Technical Management Proposal-Offeror Name.doc •Volume II Basic IDIQ-Cost Small Business Participation Price Proposal-Offeror Name.doc •Volume III Basic IDIQ-Past Performance Statement-Offeror Name.doc •Volume I Task 0001-Technical Management Proposal-Offeror Name.doc •Volume II Task 0001-Cost Small Business Participation Price Proposal-Offeror Name.doc Government Response: See the response to question one (1).

See section L.9.3 Vol III Past Performance Page 59 “File name shall be”

34
General
It is our understanding that the government intends for offerors to respond as prime only and does not intend to evaluate capabilities, past performance, or relevant experience of subcontractors. Please confirm that our understanding is correct.

Government Response: The Government will evaluate capabilities, past performance, or relevant experience for the Prime Offeror and it’s sub-contractor, where applicable.

35
L.5.2 – Delivery of Proposal

Page #: 53 It is indicated that proposals are emailed and one (1) hard copy and one (1) CD is mailed. The table outlined in section L.8.2 contains the file names contained in each volume. For the emailed proposal, may the Offerors send all of the listed files in a single Zip file?

Government Response: No, please follow the written terms and conditions of the solicitation.

36
L.9.3 – Volume III – Past Performance

Page #: 59 Please clarify what needs to be submitted in Tab A.

Government Response: The Offeror shall provide information to demonstrate its past performance. Past Performance is comprised of both amended sections (a) and (b). See amended attachment: Section L.

37
L.9.3 – Volume III – Past Performance

Page #: 59 Is it permitted to reference or include the CPARS records for past performance in place of Attachment J-2, Past Performance Questionnaire?

Government Response: No, offerors CPARS records shall not replace the request for attachment J-2 Past Performance Questionnaire.

38
Section L.9.3 – Volume III - Past Performance

Page #: p. 60 The RFP indicates that at least one experience described must be as the offeror. We understand this statement to mean that at least one experience must be a contract wherein the offeror serves/served as the prime contractor. Please confirm that this understanding is correct.

Government Response: This is correct.

39
General
FSA has also posted an RFP for Application Development Group Support Services (ADGSS) - RFP# ED-FSA-16-R-4567. If a vendor responds to and receives an award for PPMSS, will they be OCI'd out from responding to ADGSS?

Government Response: PPMSS and ADGSS are two separate requirements. Offers may submit proposals for ADGSS and PPMSS with no conflict.

40
Attachment J-8 table
There are 2 places to enter fully loaded Off-Site rates on Attachment J Price Sheet, can we assume one of these should be for On-Site rates?

Government Response: Yes, attachment J-8 has been amended to correct this error.

41
J-1
Fully loaded hourly rates are requested for both on site and off site, but the table only has one Total column. Can we request that a second Total column be added or have them clarify if the onsite or off site rate should be used to calculate the Total?

Government Response: This is an error and will be corrected to read “On-site and Off –site” rates.

42
J-2
Will you please provide Attachment J-2 in Word format for easy input?

Government Response: Yes, attachment J-2 past performance questionnaire will be provided in a Word format.

43
J-7
Conflicting GFE guidance. Page 3 - 4 "All work shall be performed in the Washington DC metro area. No travel is anticipated to be required. Because several of the work activities must be performed onsite at the FSA". Page 5 - "FSA will not provide Government Furnish property or Information under this task order".

Government Response: In general Government Furnished Property will be designated and identified per individual Task Order(s) (only when GFP is deemed necessary for the performance).

44
J-8
There are two Fully Loaded Hourly Rates (off site) columns. Can they clarify if one of these columns should be the IDIQ Fully Loaded Hourly Rates (off site) and the other be Task Order 0001 Fully Loaded Hourly Rates (off site)?

Government Response: Please see amendment to attachment J-8.

45
Page 49 and J-7 page 3
What level security clearance is required for the submission? TO1 states the need for 6C and the RFP states 5C.

Government Response: In general, contractor’s employees must be able to pass an overall security clearance of level 5C however, the program office may request a higher security clearances(up to 6C) depending on the nature of the work requested under individual task order’s.

46
Page 57 Tab C
The table on RFP page 55 indicates that the Staffing section (Tab C) has a page limit of 2 pages per resume. RFP page 57 indicates that the Staffing section (Tab C) has a 2 page limit excluding resumes. Please confirm that the following is correct:

Page Limit for Staffing = 2 Pages Excluding Resumes, which are limited to 2 pages each.

Government Response: Yes, this is correct.

47
Page 57 Tab C
Will the Government consider extending the page limit for the staffing section if the above is accurate? It may take more than two pages to cover the other items requested on RFP page 57, including the Offeror's plan to recruit, retain, train, and hire employees with the appropriate security clearances.

Government Response: No, the Government will not change the page limitation for this Tab.

48
Task Order 0001 SOW J-7, page 4
Items 3 and 5 in the Deliverables table reference "ECPIC". However, this acronym is not defined in the RFP or Task Order SOW. What does it refer to?

Government Response: The Department of Education’s IT portfolio management tool, electronic Capital Planning and Investment Control (eCPIC). The eCPIC tool is used for reporting the IT Investment Business Case, Business Case Detail, and Agency portfolio data requirements to the Office of the Chief Information officer (OCIO) and submitting the Agency IT portfolio budget request as well as Monthly progress data on Major IT investments to the Federal IT Dashboard.

49
B.3 Supplies and Services
In reference to the following text: "The Contractor shall provide, in accordance with issued individual Task Orders (TOs), all management, supervision, labor, facilities, and materials necessary to perform program/project management support services". Is the contractor expected to procure licenses for S/W required for the purposes of Program or Project Management?

Government Response: Yes, as stated under the RFP page 4, section B.3 the contractor shall provide all labor, facilities and materials necessary to perform program/project management support services.

50
C.1.3, page 7
In reference to the following text: "The Contractor shall provide the full range of business and technical management services in support of FSA offices, projects, and programs. These services encompass all areas of administrative and IT policy/planning including, but not limited to: capital planning, strategic planning, performance management, data management, information sharing, information security, training, enterprise resource management, business process re-engineering, IT transformation and strategy, organizational change management, and program management office support". Please elaborate on what is meant by 'technical management services'

Government Response: Technical Management Services provide expert training and consulting in support of agency management, organizational and business improvement efforts. These services include professional development training, studies, analyses and reports to help the agency.

J-7
Place of performance contradicts Section D. #4 statement that TO work is at FSA location. Please clarify.

Government Response: The contractor shall be primarly offsite. However, all contractor staff shall be required to be available Mon-Fri from 8-4:30 pm, five days a week for meetings, collaboration sessions and related business at Union Center Plaza (UCP), 830 First Street, NW Washington DC 20202. The contractor shall, also, furnish all staff members with equipment capable of accessing FSA controlled system environment via CITRIX. Proper controls and security of all FSA document artifacts and deliverables must be maintained only in the FSA SharePoint environment.

52
G.6, page 15
In reference to the following text: "All no bid justifications shall include a brief statement as to why the Contractor is unable to perform, i.e. conflict of interest". Is there a predetermined list of acceptable justifications to not bid? If the answer is yes, then please provide how this list can be accessed/viewed

Government Response: There is no list regarding no bid justifications however, refer to the conflict of intersect clause 3452.209-71 on page 47 of the RFP.

53
Page 24 and 25
In reference to the example privilege user roles listed on page 24 & 25 (e.g. "Database Administrator", "Application Administrator", "System Administrator", "Network Administrator"); will the TO issued require the contractor to staff these types of roles as part of the TO? These roles fall outside the realm of program or project management

Government Response: The IDIQ statement of work is a general list of services which may be required under individual TO’s. The SOW for TO 0001 is within scope of the IDIQ and services requested for TO 0001 are specific to the work required under TO 0001.

54
Section I Page 40
The Full Text FSA Clause 37-2, Continuation of Mission Critical Contractor Services (Oct 2012), listed on pages 39-41 of the SOW, indicates that a “…preliminary plan describing how it will continue to perform the Contractor services listed in Section C.” is required to be submitted with its offer. Please clarify that this preliminary plan is indeed required for the proposal submission, and if so, which volume/section it should appear.

Government Response: The preliminary plan is not required to be submitted with it offer, but will be required to be submitted for approval as stated within the clause after award.

55
L.8.2, Page 55
The paragraph below the table says "Electronic copies shall be provided on CDs and shall be formatted using Microsoft Office 2003 (MS Office 2003) or Portable Document Format (.PDF) as specified in the Proposal Organization Table below." Instead of below, does it mean "above"? Also, the table only shows PDF as the file type except for pricing, but this sentence says Microsoft Office (presumably Word .doc files). Can it be both?

Government Response: the word “below” will be changed to “above”.

The table on page 55 Vol II, (Tab C- price proposal) shall be amended to “ Excel 2003” as requested in the instructions on page 58 Tab C of the RFP.

56
L.9.1, L.9.2,L.9.3, Page 56-60
In all of these sections, the only filename convention provided is for Volume III, Tab A "The filename shall be “Volume III –Tab A –Past Performance Statement-Offeror Name.doc” What names should we use for the other volumes/tabs? This indicates ".doc", but the table in L.08.2 indicates ".pdf". Which should it be?

Government Response: Please refer to the amended chart on page 55 of the RFP.

57
L.9.1, Page 57 Tab C
In reference to the following text: "the resume of the proposed shall describe the qualifications of fulfilling the responsibilities of the Key Personnel and its plan for recruiting, training, and retaining qualified personnel and personnel with appropriate security clearances as required by individual Task Orders". According to Page 18 of the RFP (Section H.2), it is stated that "The Government will not allow costs, nor reimburse costs associated with the Contractor training employees in an effort to attain and/or maintain minimum personnel qualification requirements of this contract". Please clarify if the expected protocol is either 1.) The contractor is to recruit already skilled employees and there is no expectation of training or if 2.) Alternatively, the contractor is to have a formal training plan for its employees as part of on-boarding on an awarded TO and the cost of training is to be borne solely by the contractor.

Government Response: The contractor is responsible for providing skilled staff who possess the qualifications, educational requirements and year of experience which are identified under attachment J-3 labor descriptions.

58
L.9.2, Page 58 Tab C
The section instructions the offeror as follows "Offerors shall include an explanation of other factors to be considered along with proposed prices in the written pricing volume. The Offeror shall submit the following information:" However, item (b) it says "For the purpose of the pricing template, materials means direct materials, subcontracts for supplies and incidental services, and other direct costs as defined in FAR 16.601, Time-and- Materials contracts, except applicable indirect costs." What information is the offeror expected to provide for this item (b)?

Government Response: The IDIQ terms and conditions state that the contract type is a hybrid mix. The Task Order 0001 is a labor hour contract type, that does not warrant any “materials.” Offerors are to provide an explanation for the IDIQ where applicable.

59
L.8.2, Page 54 and 55
Should the Volume II Tab B page limit be changed to accommodate the request for complete Reps and Certs and OCI statements? Currently it just allows the SF33.

Government Response: The Reps and Certs and OCI statements are not part of any page count.

60
L.8.2, Page 55 and 57
There seems to be conflicting instruction on the page limits and content for the staffing section:

On page 55, For Vol 1, Tab C –Staffing, the table says 2 pages per resume page limit, with no reference to page limits for the staffing narrative.

On page 57, Tab C Staffing says (Two (2) page limit excluding resumes).

Please clarify page limits for the staffing narrative and resumes and confirm that Tab C should contain the PM resume plus narrative about plans for recruiting/training qualified personnel for the TO.

Government Response: Tab C - Staffing (Two (2) page limit, excluding resumes) Volume I The filename shall be “Volume I –Tab C – Staffing -Offeror Name.doc”

Tab C shall provide the resume of the proposed PM that describes the qualifications of fulfilling the responsibilities in Program Management per 3452.243-70 Key Personnel (section I); the resume of the proposed shall describe the qualifications of fulfilling the responsibilities of the Key Personnel and its plan for recruiting, training, and retaining qualified personnel and personnel with appropriate security clearances as required by individual Task Orders.

61
L.9.1, Page 56
The requirements state that the cover letter shall also contain a certification that the hard copy version of the proposal is exactly the same as the electronic version (excluding Volume II, Tab C, Financial Statements, which are only included on the electronic version). There is no requirement to provided Financial Statements in the instructions for Volume II. Please clarify if financial statements are required.

Government Response: The FSA needs some sort of assurance that your firm has the financial wherewithal to perform the requirement. The intent of the financial statement is to demonstrate to FSA this capability. Yes, the financial statements are required.

62
L.9.3 Tab A, Page 59
Is there a requirement that the Past Performance Questionnaire references be from within a certain number of years? We find 5 years rather than provides a better opportunity for small business to showcase relevant work given the volume of work businesses can generate and remain within the size standard. It also demonstrates an ability to maintain a relationship with customers and staff over a longer timeframe which is an important element of past performance.

Government Response: The requested three (3) years shall remain.

63
L.9.3 Tab A, Page 59
Must all past performance references be from the prime contractor? If not, is there a minimum number of past performance refere3nces that must be from the prime contractor?

Government Response: At least one reference must be from a prime.

64
L.9.3 Tab B, Page 60
Please clarify what is meant by “team member who performed the work”. Do you mean an individual (person) who should be named? Or to you mean the company who performed the work, if two or more firms are bidding as a team for this work?

Government Response: Team member” will be removed.

65
L.9.3 Tab B, Page 60
Can the three Relevant Experience projects be different than the PPQ references?

Government Response: Experiences must be same or similar to the work requested under the SOW

66
Attachment J-2
Would the Government please provide a version of Attachment J-2 (Past Performance Questionnaire) that can be filled out electronically? This would facilitate more rapid population and submission of the form.

Government Response: Yes

67
Attachment J-3, Page 4
The labor category descriptions for 21. Share Point Administrator and 22. Enterprise IT Governance Specialist are identical. Should the Enterprise IT Governance Specialist have a different description?

Government Response: The description for the Enterprise IT Governance Specialist will be amended under attachment J-3.

68
Attachment J-7, Page 1
Paragraph 1 under Section C, Work Scope of the TO 0001 RFP references paragraph “A.4 above”. There is no paragraph A.4. Can the government please clarify the requirement?

Government Response: The reference to A.4 has been deleted in the TO 0001.

69
Attachment J-8, Page 1
For Task Order 1, is the expectation that the Project Manager (PM) and Investment Analyst (IA) will be working part-time on the TO over the course of a year? Or, is the expectation that they will be used full-time, but only for a short period of time (i.e., 12 weeks for the PM, 6 week for the IA)?

Government Response: The estimated hours for TO 0001 are as listed under attached J-8 for the performance of 12 months.

70
Attachment J-8, Page 1
For Task Order 1, would the government permit swapping the hours for Project Manager and Program Manager? It may be more appropriate to have a full-time Project Manager supporting TO1 instead of the IDIQ Program Manager. This will enable to Government to more accurately assess to true cost of TO1 across all vendors.

Government Response: No

71
Attachment J-1
Can the Government confirm the Program Manager/Director and Earned Value Management Analyst descriptions in the IDIQ Labor Rates Table are the same as the Program Manager and Scheduling/Earned Value Management (EVM) Subject Matter Expert (SME) labor categories listed in the Labor Category Descriptions Attachment J-3?

Government Response: These are separate labor categories

72
B.3, Page 4
Please confirm that bidders may team with and subcontract to non-HubZone or non-SDVOSB businesses under this IDIQ.

Government Response: Yes, but the HubZone and SDVOSB rules are applicable to this solicitation.

73
3 Administrative, Page 8
Please confirm that the Government will accept OCI plans and establishment of boundaries to fire-wall off team members assisting with acquisition support activities, thereby allowing us to bid on future FSA solicitations.

Government Response: The Government will review OCI plans and make a determination, when applicable, as to whether or not an OCI exists.

74
F.5, Page 11
Based on the scope of work, we expect several working documents and status reports will be developed under this IDIQ and resulting TOs. Will the Government consider relaxing the requirement for cover letters for each deliverable (or package of deliverables) to be only for deliverables identified as needing such a cover letter by the COR for each Task Order?

Government Response: No, the government will not relax the requirement for deliverables cover letters.

75
L.2, Page 51
Can the government clarify any known role distinctions between a Program Manager and a Teaming Coordinator?

Government response: The language regarding “Teaming Coordinator” will be removed.

76
L.9.1, Page 57
Is the government only requesting resumes at the IDIQ level for the Program Manager?

Government Response: Yes

77
L.9.3, Page 59
Can the government confirm which Tab C it is referencing? Volume III - Past Performance does not have a Tab C listed.

Government Response: Section L has been amended to reference L.9.1 Tab C-Staffing.

78
L.9.3, Page 59
For the 3 page limit (excluding Questionnaire) covering Past Performance, does the government have requirements for what content should be presented?

Government Response: Section L has been amended and include, L.9.3 Volume III-Past Performance, Tab A, newly added (a).

79
L.9.3, Page 59
Can the government clarify across the Past Performance and Relevant Experience, how many total unique contracts should be referenced?

Past Performance (non-questionnaire): X Past Performance (questionnaire): X Relevant experience: 3 Government Response: Past performance three (3) relevant experience (3)

80
L.9.3, Page 60
We recognize that Relevant Experience is not the same as Past Performance. As such, can the Government confirm that the three examples of relevant experience requested as part of the Relevant Experience section should refer to separate contracts from the references requested as part of the Past Performance Questionnaire section?

Government Response: Past Performance and Relevant Experience can refer to the same contracts.

81
Attachment J-8, Page 1-6
Please clarify any key personnel requirements for Task Order 0001-- are the three LCATs listed in Attachment J-8 all considered Key Personnel?

Government Response: Yes all LCATs listed are consider Key Personnel.

82
Attachment J-7
Can the government clarify whether it is requesting a technical and/or management approach response on Task Order 0001?

Government Response: Yes, Proposal submissions on page 56 of the RFP will be amended to include TO 0001.

83
Attachment J-1
How should the "Total" Column be calculated?

*Fully Loaded Hourly Rates (on site) less discount multiplied by estimated hours *Fully Loaded Hourly Rates (off site) less discount multiplied by estimated hours Government Response: The discount columns under attachments J-1 and J-8 will be removed.

84
General
Does the government have a current IT strategic plan?

Government Response: The Government will need assistance with developing an IT strategic plan, and may need assistance with updating and maintaining it throughout the life of the TO.

85
L.8.2, Page 56
Will the government allow table font size to be Times New Roman 10pt?

Government Response:: No, please follow submission instructions as stated. See page 56 of the RFP.

86
L.9.1, Page 56
Is the government expecting solicitors to provide proposal write-ups outllining their approach to address the PWS requirements?

Government Response: The question is not clear. This is a SOW not a PWS.

87
M.4.4, Page 62
If the proposed BPA program manager is not a current employee of the company, does the government require a letter of commitment? If so, is the document excluded from page count?

Government Response: This is a IDIQ not a BPA as stated on page 3 of the RFP. A letter of commitment is required and is not included in the page count.

88
L.9.3
In paragraph (a) of L.9.3 VOLUME III – Past Performance the solicitation states that “The Offeror shall provide information … comprised of: (a) A completed Past Performance Questionnaire submitted by each of the references cited in Tab C.” It also requires in the same paragraph: “The completed Questionnaire shall not be submitted with the Offeror’s proposal submission.” Does the government want a copy of the completed Past Performance Questionnaire to be included in Tab A, or a Past Performance Questionnaire that includes only the reference to whom it was sent?

Government Response: Questionnaire shall be submitted by the contractors customer however, the offer shall provide reference to whom the questionnaire was sent? See MS word, attachment J-2 Past Performance Questionnaire.

89
L.5.2
Para. L.5.2 Delivery of Proposal states “Proposals (in their entirety) are due NO LATER THAN 2:00 P.M. Eastern Time on September 14, 2016 to the email address: FSAEAT@ed.gov and one (1) hard copy marked “original” and 1 CD.” Clarify copy of proposal is emailed, while a hard copy and a CD copy is delivered via mail?

Government Response: Yes, all before the proposal submission due date and time.

90
General
Is the contractor required to have an approved accounting system to respond to T&M task orders?

Government Response: When applicable, a TO contract type would be T&M, not cost reimbursable, therefore, no, an approved accounting system is not mandatory.

Page 53, section L.5.2 – As it states that one of the approved delivery methods include electronic mail, would the government consider removing the requirement for CDs and hard copy delivery of the proposal? Just making this an electronic submission.

Government Response: No, the CD is required per RFP instructions.

92
General
As this solicitation is open to Hubzone or SDVOSB vendors, does the government intend to further set aside future task orders on this vehicle? For example, would certain task orders be set aside for hubzone and some for SDVOSB?

Government Response: As stated on page 4 of the RFP section B.3 this requirement is intended to be a multiple award, IDIQ contract. Therefore, task orders awarded against this IDIQ will be competed among the awardees of this IDIQ contract, no additional set-aside will be established after award of the RFP.

93
General
Will there be a down select process?

Government Response: No, there will be no down select process.

94
General
Is it the expectation that all support services will need to be performed at Regional Offices in addition to the headquarters at the TO level?

Government Response: Service will be conduct in the DC area not at the DoEd reginal offices listed under attachment J-6.

95
Attachment J-8
Attachment J-8 – Please clarify that the offeror is to propose the number of hours listed in the table – although the actual effort required to perform this work may deviate from the number of hours provided in the table.

Government Response: This is correct for the basic IDIQ and the TO 0001.

96
General
As a small company that is not HUB Zone or Service Disabled Veteran Owned can we sub with someone that is HUB Zone?

Government Response: The Prime Offeror must be either 100% HubZone or Service Disabled Veteran Owned concern.

97
L.2, Page 51 Attachment J-1
Attachment J-1 does not indicate “levels of security”. Please clarify.

Government Response: The general level 5 of security is listed on page 49 of the RFP however, individual TO may request level 6 security clearance.

98
SF-33, Block 9, L.5.2
The date for receipt of Proposals does not match Section L.5.2. Please clarify.

Government Response: The date of receipt of proposals has been change per amendment 0001.

99
L.9.3, Page 59, Tab A

L.8.1, Page 54, Tab B Does the Government want one file containing Tab B information named “Tab B - Relevant Experience” or should it be named “Volume III –Tab A –Past Performance Statement-Offeror Name.doc”?

Government Response: Please see the response to question one (1)

100
L.9.3, Page 59 Tab A
Should the tab reference be “Tab B”, as there is no Tab C in this volume?

Government Response: No, it should be Volume III Tab A –past performance and Tab B-Relevant Experience (past performance questionnaire) .

101
L.9.1, Page57 Tab C
Does the Government want the “resume” to include a plan for recruiting, training, retaining, etc.? That is not typically information contained within a resume as it pertains to the company methods and procedures.

Government Response: No, this information is included in the 2 page limit, excluding resumes.

102
Attachment J-1

Attachment J-8 1.What should be in the “Total” column – on-site rates x est. hours, or off-site rates x est. hours?

Government Response: Labor rate tables have been amended to add total columns for on-site and off-site

2. What is the discount column related to? Is it the difference between the offsite and on site rates?

The Discount Colum will be removed.

103
Attachment J-8
The hours listed for each labor position for Task Order 0001

Is less than one FTE. Does the Government anticipate additional Task Orders to provide full-time hours for these personnel?

Government Response: The contracting office anticipates additional TO’s will be issued whenever needs arise. However, At this time the contracting office cannot predict the estimated Hours that will be utilized for future TO’s.

104
General
Can the government provide any information on existing task

orders that will be issued under this contract vehicle (i.e., timing and value) and anticipated new task orders (i.e., timing and value)?

Government Response: No, TO’s will be issued based on FSA’s needs.

105
Attachment J-7,Task

Order 0001 Does the government anticipate awarding this task order on 9/30/2016 or is it just a sample task for evaluation purposes? If so, is the PM on this TO expected to be the same Key Personnel PM for the IDIQ? Should the offeror provide resumes for the three positions on Task Order 0001 with its proposal submission?

Government Response: TO 0001 is an actual task order not a draft. All labor categories listed for TO 0001 (attachment J-8) are key personnel and require an resumes are required. This will be an FY 2017 award, subject to availability of funds.

106
H.3.4, Page 18
Is it anticipated that the government contractor will purchase

equipment/supplies at the Task Order level? If so, please provide examples of what may be purchased.

Government Response: Types of supplies and equipment will be identified under individual TO’s if applicable.

107
H.7, Page 21
Can the government provide the last row (page 21) as it is cutoff

on the right side.

Government Response: Should read “Name.”

108
H.8.1 Page 26
Which Volume should the Representations - Voluntary Product

Accessibility Template be provided in and will this count towards the page limitation?

Government Response: Amended section L.9.2, Volume II, is where both should go and no, they do not count towards the page limit.

109
Section I.1, page 29
FAR Clause 52.219-4 Notice of Price Evaluation Preference for

HUBZone Small Business Concerns. Since the solicitation is set aside for HUBZone and Service Disabled Veteran Small Businesses will the government utilize this price preference evaluation?

Government Response: This clause has been removed from the RFP.

110
Section M.5 Method

of Evaluation, page Under M.5.1, The 2nd sentence reads "Factor 1 will be rated in accordance with the following adjectival rating definitions…".

Will this adjectival rating definition also be applied to Factor 2 Relevant Experience? Government Response: Yes Will FSA make an award to an Offeror with a neutral rating in Factor 2?

Government Response: the Government will make award based on best value.

111
Section M.4.5

Pricing, Page 63 How will the government account for the HUBZone price preference (if used) in it's price analysis as it relates to realism?

How will the government evaluate realism to the total summed up evaluated price? How will the government evaluate price risk and affordability?

Government Response: FAR Clause 52.219.4 has been removed from the RFP. Please refer back to the written terms and conditions in the RFP, section M4.5.

112
Section 9.2 and

Attachment J-1 Section 9.2 states that Attachment J-1 is to be completed and submitted with the proposal submission however, Section J-1 Attachment J-1 states it is reserved for completion after contract award. Can the government clarify if offerors are supposed to complete this attachment and submit with its proposal submission.

Government Response: No,that is part of the Offerors ability to follow the instructions for price proposal submission

113
Section J,

Attachment 3 Section J, Attachment 3 references Section L 10.2 however there is no Section L 10.2. Did the government mean to reference Section L 9.2?

Government Response: The question is not clear, there is no section J under attachment 3.

114
Attachment J-7
Is Task 0001 response included in the page count for Volume I?

Government Response: yes

115
Attachment J-7
What is the proposed level of effort in terms of hours expected

for Task 0001?

Government Response: The estimated hours are listed under attachment J-8 for TO 0001

116
Page 55 and 57
On the table on Pg. 55, Volume 1 shows that Tab B contains Program/Project Management and is limited to 10 pages, and Tab C contains Staffing and is limited to 2 pages per resume. However, pg 57 indicates that Tab C is limited to 2 pages “excluding resumes” and “should include the plan for recruiting, training, and retaining qualified personnel and personnel with appropriate security clearances as required by individual Task Orders.” Is the implication that Tab C may have a 2 page response that is independent and in addition to the Key Personnel resume in order to address these requirements, or should the requirements be addressed within the Key Personnel resume 2 page limit by demonstrating the Key Personnel can accomplish them?

Government Response: Tab C has a 2 page response limit independent of the resume submissions.

117
Page 24
Pg. 24 of the Request for Proposal (Revised 6) lists several examples of “Examples of Privilege User Roles and Job Functions”, however, these role titles do not align with any of the roles listed in the Labor Rate Table included in the attachments. Are the roles listed in pg 24 simply examples of other roles that may not be included in this IDIQ, or is the implication that the roles listed on pg 24 will be conducted by some of the roles in the Labor Rate Table? Can the government provide the alignment between these two if that is the case?

Would the government like to see Key Personnel for these roles? Or sample resumes that may be able to fulfill the requirements?

Government Response: They are simply examples of other roles that may be included the IDIQ. Resumes are for proposed Key personnel as indicated in both the IDIQ and TO 0001.

118
General
How many awardees from each set aside category (SDVOSB and HUBZone) does the government intend to select for award?

Government Response: As stated in the RFP page 4 section B.3 the government intends to award to either a HubZone or SDVOSB

119
General
What type of labor categories or roles is the government expecting will be needed to staff the task orders issued under this IDIQ?

Government Response: The government has already provided a list of potential labor categories which may be utilized under Attachment J-1 and a list of descriptions under attachment J-3.

120
C.13, Page 7
On pg 7, C.13, Section 1: Security Management – does FSA

have a current framework or industry standard that they are using for risk management and incident response? If so what is that framework or standard? If not, does FSA have a preferred framework they would like to implement?

Government Response: FSA would prefer the best practice industry standard.

121
C.13, Page 7
On pf 7, C.13, Section 2: Data Management/Governance – Is

there an existing data dictionary for FSA?

Government Response: Yes, there is an existing one.

Does FSA envision an offeror needing a data center to fulfill TO requirements around data governance?

Government Response: No, a data center is not anticipated, at this time.

123
H.8, Page 26
On pg 26, H.8 FSA Provisions, H8.1 paragraph (a) – Does this

section only apply to TOs where the offeror may be proposing IT technology and solutions? Would the government like a statement included in the IDIQ response certifying that all IT solutions will be 508 compliant?

Government Response: Your question is unclear the government is requesting services not data.

124
Page 57 Tab C
On pg 57, Tab C: Staffing – Should the offeror include additional staffing information besides the Program Manager resume in Tab C? (ex. Maintaining high quality staff, training programs, transitions of staff/key personnel, etc.)

Government Response: Yes, see amended section L for additional instructions.

125
General
Should other Key Personnel be included in the Staffing section for TO 0001 response?

Government Response: See attachment J-8 for TO 0001 staff.

The labor categories listed under J-8 are all are key personnel.

126
Page 58 Tab C
On pg 58, Tab C: Price Proposal, sub-section (b) – should this

be a sub-bullet of sub-section (a) instead of its own bullet for the offerors to write explicitly to? If no, please elaborate on the question in sub-section (b)?

Government Response: This question is not clear as to exactly what is being asked.

127
Page 58 Tab C
On pg 58, Tab C: Price Proposal, sub-section (d) – Should the detailed pricing methodology or algorithm include the calculation of a PM Rate as a separate item or include the cost of the PM into our wrap rate structure for the IDIQ?

Government Response: The PM Rate for the IDIQ should be billed into the fully burdened rate for individual Task Orders, as the IDIQ will not obligate funds, the task orders will.

128
L.9.3, Page 59
Pg 59, L.9.3: Volume III – Past Performance, Tab A, paragraph

(a) indicates “the Offeror shall be responsible for ensuring that each of the customer references receives, completes, and returns Attachment J-2, Past Performance Questionnaire, to the Contracting Officer. The Offeror shall complete the project title and contract reference number to match its Tab C proposal information before sending the form to three of its references.” Should the reference to Tab C actually be referencing Tab B, paragraph (b) instead?

Government Response: Yes

129
M.4.1, Page 62
Pg 62, M.4.1 Factor 1: Past Performance
oWill past performance submitted from the Prime contractor’s sub-contractor be counted towards the 3 past performances? (ex. Company A is seeking to Prime PPMSS IDIQ and Company B is a sub-contractor with relevant experience that aligns to the PWS. Can this past performance be used and will it be rated equally?)
oIf yes, will it be evaluated any differently than if the Prime contractor was just to submit all three past performances?

Government Response: Yes, past performance submitted from…