ED_900D_V1.2_2028.pdf

PDF 117 KB Posted

Attached to
FY 2025 EDA Public Works and Economic Adjustment Assistance Programs
Opportunity number
PWEAA2023
Issued by

About this file

The ED-900D is a federal form for Design and Engineering Assistance from the Economic Development Administration (EDA). The document outlines requirements for grants focused solely on design and engineering work for complex or environmentally sensitive projects, with the critical caveat that EDA's funding for design does not obligate future construction funding. The form requires applicants to provide detailed information including: a project description, reasons for separating design from construction, estimated timeline for design and engineering work (including permit acquisitions), proposed financing methods for future construction, and projected timeframe to begin the construction phase.

Key requirements include demonstrating a reasonable expectation that construction will proceed after design completion, potentially providing documentation for a National Environmental Policy Act (NEPA) analysis, and detailing the specific complexities or environmental sensitivities that necessitate a dedicated design phase. The form carries an OMB Number 0610-0094 with an expiration date of 01/31/2028, and references 13 C.F.R. § 305.4 regarding EDA's investment guidelines. Applicants must comprehensively explain their project's unique characteristics and provide a clear pathway from design to potential construction.

ED900D

View the file

Other files

File Type Posted
EDA PWEAA NOFO AI Addendum Update (technical corrections 5.12).pdf PDF
EDA PWEAA NOFO AI Addendum Update Final 5.5.26.pdf PDF
SF424D-V1.1.pdf PDF
SF424C_2_0-V2.0.pdf PDF
SF424A-V1.0.pdf PDF
SF424_4_0-V4.0.pdf PDF
SFLLL_2_0-V2.0.pdf PDF
CD511-V1.1.pdf PDF
ED_900F_V1.2_2028.pdf PDF
ED_900E_V1.2_2028.pdf PDF
ED_900C_V1.3_2028.pdf PDF
ED_900B_V2.2_2028.pdf PDF
ED_900_GA_V1.3_2028 -updated 06262025.pdf PDF
EDA PWEAA NOFO Update Final 9.16.25.pdf PDF
EDA PWEAA NOFO Update AIC 9.17.24.pdf PDF
EDA PWEAA NOFO Update AIC-FINAL-10-1-2024.pdf PDF
SF424_4_0-V4.0.pdf PDF
ED_900_GA_1_2-V1.2.pdf PDF
EDA PWEAA NOFO Final 3.16.23.pdf PDF
SF424D-V1.1.pdf PDF
SF424C_2_0-V2.0.pdf PDF
SF424A-V1.0.pdf PDF
ED_900F_1_1-V1.1.pdf PDF
ED_900E_1_1-V1.1.pdf PDF
ED_900D_1_1-V1.1.pdf PDF
ED_900C_1_2-V1.2.pdf PDF
ED_900B_2_1-V2.1.pdf PDF
SFLLL_2_0-V2.0.pdf PDF
CD511-V1.1.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB Number: 0610-0094 Expiration Date: 01/31/2028

ED-900D – Requirements for Design and Engineering Assistance

When the primary purpose of the EDA investment is to accomplish only the design and engineering work required for the construction of a complex and/or environmentally sensitive project, this form must be completed. EDA will award grants for design and engineering work only when there is a reasonable expectation that construction of the project can and will begin soon after the completion of design and engineering. EDA’s funding of the project for the design and engineering work does not in any way obligate EDA to fund construction of the project. See 13 C.F.R. § 305.4.

Note: Prior to beginning final design activities, the Applicant may be required to provide EDA with the documentation EDA determines is necessary to complete its National Environmental Policy Act (NEPA) analysis.

1. Insert the project description from Section B.1. of the ED-900GA.

2. Explain the reasons why the design and engineering work needs to be completed as a separate project from the project’s construction phase, including any specialized/complex features and/or the environmentally sensitive nature of the project.

3. Estimate how many months will be required for the design and engineering work to be completed. Include the number of months needed to obtain all the applicable permits and approvals from state and federal regulatory authorities (such as the Environmental Protection Agency, U.S. Army Corps of Engineers, etc).

4. Describe the proposed method of financing and funding sources that will be used to finance the construction of the project upon completion of the design and engineering work, including current financial commitments made, if any, and any possible requests to federal agencies (EDA or another federal assistance agency).

5. Estimate how many months will be required after the design and engineering work is completed for the project’s construction phase to begin, including the timeframe required to obtain the construction funds for the project if applicable.

File details come from the government source that posted it. Updated .