EAST PIPELINE CULVERT REPLACEMENT DRAWINGS IFB_ADD1 .pdf
PDF 4 MB Posted
- Solicitation number
- RFQ - 171 - 220000000581
- Issued by
- Dickinson County, Michigan
About this file
This document is a set of drawings and related information for the East Pipeline Culvert Replacement project in Felch Township, Dickinson County, Michigan. The project is being managed by the Michigan Department of Technology, Management, and Budget (DTMB). The scope of work includes demolishing an existing 24-inch diameter CMP culvert under East Pipeline Road and replacing it with a new 102-inch diameter culvert, along with associated site work such as grading, erosion control, and guardrail installation. The drawings provide details on the proposed conditions, traffic control, stream cross-sections, and construction methods. Bids for this project are due by 2:00 PM on the bid due date.
The bid attachments must be uploaded to the SIGMA VSS system, with a maximum file size of 6 MB per attachment. Bidders are required to submit shop drawings and other specifications for approval. The project will be awarded based on the MDOT HL-93 loading design criteria, and the contractor must ensure the culvert structure can support this loading. The project is funded by the State of Michigan and the estimated quantities and pay items are provided in the drawings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROBERTS, ISAAC W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\COVER SHEET.dwg - 9/27/2022
EAST PIPELINE CULVERT REPLACEMENT
DICKINSON COUNTY
FELCH TOWNSHIP
T43N, R29W, SECTION 33
STATE or COUNTY MAP
(NOT TO SCALE)
SITE LOCATION MAP
(NOT TO SCALE)
PREPARED FOR:
DEPARTMENT OF TECHNOLOGY,
MANAGEMENT, AND BUDGET
3111 WEST ST. JOSEPH ST
LANSING, MI 48917
(906) 643-6181
GEI PROJECT NO. 2104383
DTMB FILE NO. 751/20116.JBB
SITE
SOURCE:
2021 MICROSOFT AERIAL IMAGERY
SOURCE:
MICHIGAN ROAD MAP
For Bid Not For Construction
NO. DATE ISSUE/REVISION APP
A 9/30/2022 ISSUE FOR BID INR
GMM
Consultants
PREPARED BY:
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
DWG. NO.
SHEET NO.
G-001
G-001
SITE
GENERAL NOTES:
EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS AND SPECIFICATIONS CONTAINED THEREIN, ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE 2020 MICHIGAN DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR CONSTRUCTION, THE MICHIGAN MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.
46°04'59.5"N 87°56'46.2"W
LER
ZA R
D
COUNTY ROAD 569
LEEMAN RD
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
M -95
M -95
SAGOLA
RANDVILLE
SHEET INDEX
Sheet Number Sheet Title
G-001 COVER SHEET
G-002 GENERAL NOTES AND LEGEND
C-100 TRAFFIC CONTROL PLAN
C-110 EXISTING CONDITIONS & DEMOLITION PLAN
C-120 PROPOSED CONDITIONS
C-130 EXCESS SPOILS AREA
C-210 PIPE LINE RD PROFILE
C-220 RIVER PROFILE
C-310 STREAM CROSS SECTIONS
C-410 DETAILS (1 OF 2)
C-420 DETAILS (2 OF 2)
PIPELINE LINE RD
Number
C101
L101
C102
BEGIN STA
-0+00
1+00.22
1+65.46
END STA
1+00.22
1+65.46
2+24.27
LENGTH
99.17
65.24
58.72
BEGIN NORTHING
475345.17
475,438.73
475503.72
BEGIN EASTING
26,006,607.74
26,006,640.63
26,006,646.32
END NORTHING
475,438.73
475,503.72
475,561.44
END EASTING
26,006,640.63
26,006,646.32
26,006,657.15
DIRECTION
N33° 43' 05"E
N5° 00' 31"E
N5° 00' 31"E
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
P.E. No.: 64048
INR
GENERAL NOTES
AND LEGEND
G-002
LINE TYPES
SYMBOLS
DISCIPLINE IDENTIFIER
INSTRUMENTATION
DISCIPLINE
KEY PLAN
GENERAL
K
I
G
C-1.0
DISCIPLINE IDENTIFIER
INDICATES DETAIL NUMBER
INDICATES DRAWING NUMBER ON WHICH SECTION IS DRAWN
DETAIL
10-A-1
INDICATES SECTION DESIGNATION
20-A-2 A
SHEET REFERENCE NUMBER
DETAILS
PLUMBING
ELECTRICAL
ARCHITECTURAL
MECHANICAL/PROCESS
STRUCTURAL
CIVIL
D
P
E
A
M
C
S
SECTION LEGEND
DRAWING NUMBER DESIGNATION
INDICATES DRAWING NUMBER
ON WHICH DETAIL IS DRAWN
REMOVAL R
HATCH LEGEND
MATERIAL
DESCRIPTION
EXISTING
(DEMOLITION)
PATTERN
NEW
PROPOSED
PATTERN
DEMO EROSION BALES
GUARD POST/BOLLARD
SIGN POST
MISCELLANEOUS
PROPOSEDEXISTING DESCRIPTION
PK NAIL
DRAINAGE UTILITIES
PROPOSED DESCRIPTION
STM UG STORM MAINSTM
EROSION CONTROL
PROPOSED DESCRIPTION
SF SILT FENCE
EXISTING
EXISTING
EDGE OF WATER
LOC
MISCELLANEOUS
PROPOSED DESCRIPTION
GUARDRAIL
EXISTING
TREE LINE
LIMITS OF CONSTRUCTION
EDGE OF UNPAVED ROADWAY
ROW ROW RIGHT-OF-WAY
PARCEL LINE
TOPOGRAPHY
PROPOSED DESCRIPTION
MAJOR CONTOUR
EXISTING
MINOR CONTOUR
UTILITY REMOVALX
SURVEY BENCHMARK
SURVEY POINT
GENERAL NOTES:
1. ANY EXISTING UTILITIES, PAVEMENT, CURBS, SIDEWALKS, STRUCTURES, TREES,
ETC., NOT PLANNED FOR DEMOLITION OR REMOVAL THAT ARE DAMAGED OR
REMOVED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED AT THE
CONTRACTOR'S EXPENSE.
2. THE CONTRACTOR SHALL VERIFY ALL DEPTHS AND LOCATIONS OF EXISTING
UTILITIES PRIOR TO ANY CONSTRUCTION. ANY DISCREPANCIES WITH THE
CONSTRUCTION PLANS FOUND IN THE FIELD SHALL BE BROUGHT IMMEDIATELY
TO THE ATTENTION OF THE ENGINEER.
3. ALL AREAS DISTURBED OR EXPOSED DURING CONSTRUCTION SHALL BE
REVEGETATED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.
HOWEVER, THE TYPE OF REVEGETATION MUST EQUAL OR EXCEED THE TYPE OF
VEGETATION PRESENT BEFORE CONSTRUCTION UNLESS OTHERWISE
SPECIFIED.
4. PRIOR TO ANY CONSTRUCTION, A PRECONSTRUCTION CONFERENCE BETWEEN
THE OWNER, THE CONTRACTOR, UTILITY COMPANIES, ANY AFFECTED PARTIES,
AND ANY OTHER ENTITY THE OWNER MAY REQUIRE SHALL CONVENE.
5. THE CONTRACTOR OR HIS/HER DESIGNATED AGENT SHALL KEEP ACCURATE
RECORDS OF ALL CONSTRUCTION THAT DEVIATES FROM THE PLANS. THE
CONTRACTOR OR HIS/HER DESIGNATED AGENT SHALL FURNISH THE ENGINEER
ACCURATE "AS-BUILT" DRAWINGS FOLLOWING COMPLETION OF ALL
CONSTRUCTION. THESE "AS-BUILT" DRAWINGS SHALL MEET WITH THE
SATISFACTION OF THE OWNER PRIOR TO FINAL ACCEPTANCE. FINAL “AS-
BUILTS” DRAWINGS SHALL BE DELIVERED TO THE ENGINEER IN PDF FORM AND
ON A CD/DVD IN CAD.DWG FORMAT.
6. PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR OR HIS/HER DESIGNATED
AGENT SHALL APPLY FOR AND SECURE ALL PROPER PERMITS FROM THE
APPROPRIATE AUTHORITIES.
7. SURVEY CONDUCTED BY TRIMEDIA ENVIRONMENTAL & ENGINEERING, IN
DECEMBER OF 2021. CONTRACTOR TO FIELD VERIFY PRIOR TO CONSTRUCTION.
8. CONTRACTOR TO NOTIFY MDNR A MINIMUM OF TWO WEEKS PRIOR TO ANY
ROAD CLOSURES.
9. THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, IS AN
INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF GEI
CONSULTANTS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF GEI CONSULTANTS.
PROJECT SAFETY NOTES:
1. PROJECT SAFETY SHALL BE IN ACCORDANCE WITH THE LAWS OF THE STATE OF
MICHIGAN AND THE MICHIGAN OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION'S CURRENT REGULATIONS.
TRAFFIC CONTROL NOTES:
1. ANY METHODS, STREET MARKINGS AND SIGNAGE NECESSARY FOR WARNING
MOTORISTS, WARNING PEDESTRIANS OR DIVERTING TRAFFIC DURING
CONSTRUCTION SHALL CONFORM TO THE MICHIGAN MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, LATEST EDITION.
2. ALL MARKERS, TRAFFIC BUTTONS, TRAFFIC CONTROLS AND SIGNS SHALL BE
INSTALLED IN ACCORDANCE WITH THE MICHIGAN DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATIONS FOR CONSTRUCTION OF
HIGHWAYS, STREETS AND BRIDGES AND THE MICHIGAN MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, LATEST EDITIONS.
CONSTRUCTION NOTES (APPLICABLE TO ALL SHEETS):
1. ALL FITTINGS AND ASSOCIATED APPURTENANCES SHALL BE STOCKPILED SUCH
THAT THEY DO NOT INTERFERE WITH THE SAFE AND FREE MOVEMENT OF
TRAFFIC. IF EQUIPMENT USES OR OBSTRUCTS ANY PORTION OF PUBLIC
ROADWAYS DURING THE PERFORMANCE OF THE WORK, PROPER TRAFFIC
CONTROL (INCLUDING FLAG PERSONS) SHALL BE REQUIRED.
2. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORT AND BRACING DURING
EXCAVATION, DEWATERING, AND BACKFILLING OPERATIONS TO PROTECT THE
STRUCTURAL INTEGRITY OF ALL SHOULDERS AND UTILITIES LOCATED WITHIN
THE PUBLIC ROAD RIGHT-OF-WAY. SHEETING AND BRACING SHALL BE
REQUIRED WHEN ANY EXCAVATION IS LOCATED WITHIN THE 1-ON-1 SLOPE
FROM THE SHOULDER POINT TO THE BOTTOM OF ANY EXCAVATION.
3. SAFETY REQUIREMENTS SHALL BE CONFORMED TO AND ALL OPERATIONS
SHALL BE CONDUCTED SO AS NOT TO DAMAGE, DESTROY, OR ENDANGER THE
INTEGRITY OF THE ROADWAY STRUCTURE. ALL WORK WITHIN THE PUBLIC
RIGHT-OF-WAY SHALL BE CONDUCTED IN ACCORDANCE WITH MIOSHA SAFETY
RULES AND REGULATIONS.
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO PERFORM SITE CLEARING AND
GRUBBING OUTSIDE OF THE LIMITS INDICATED ON THE DRAWINGS WITHOUT
PRIOR WRITTEN PERMISSION OF THE OWNER.
5. THE CONTRACTOR SHALL FIELD VERIFY EXACT LOCATIONS AND BURY DEPTHS
OF ALL UTILITY CROSSINGS. THE LOCATIONS AND DEPTHS SHOWN ON THE
PLAN SHEETS ARE APPROXIMATE.
6. CONTRACTOR TO SUBMIT SHOP DRAWINGS AND SPECIFICATIONS TO THE
ENGINEER FOR APPROVAL.
7. IF THE CONTRACTOR DESIREE'S ALTERNATE CONSTRUCTION METHOD, THEY
WILL RESPONSIBLE FOR PERMIT REVISIONS.
EROSION AND SEDIMENT CONTROL NOTES:
1. EROSION CONTROL MEASURES, SITE WORK AND RESTORATION WORK SHALL BE
IN ACCORDANCE WITH THE MICHIGAN DEPARTMENT OF TECHNOLOGY,
MANAGEMENT, AND BUDGET SOIL EROSION AND SEDIMENT CONTROL
GUIDEBOOK OF BEST MANAGEMENT PRACTICES FOR MICHIGAN WATERSHEDS.
2. ALL SLOPES SHALL BE MULCH BLANKETED, SODDED OR SEEDED WITH
APPROVED GRASS, GRASS MIXTURES OR GROUND COVER SUITABLE TO THE
AREA PER PROJECT TECHNICAL SPECIFICATIONS.
3. SILT FENCES, ROCK BERMS, SEDIMENTATION BASINS AND SIMILARLY
RECOGNIZED TECHNIQUES AND MATERIALS SHALL BE EMPLOYED DURING
CONSTRUCTION TO PREVENT POINT SOURCE SEDIMENTATION LOADING OF
DOWNSTREAM FACILITIES. SUCH INSTALLATION SHALL BE REGULARLY
INSPECTED BY THE CONTRACTORS CERTIFIED STORM WATER OPERATOR FOR
EFFECTIVENESS. ADDITIONAL MEASURES MAY BE REQUIRED IF, IN THE OPINION
OF THE ENGINEER OR FIELD REPRESENTATIVE, THEY ARE WARRANTED.
4. ALL MUD, DIRT, ROCKS, DEBRIS, ETC., SPILLED, TRACKED OR OTHERWISE
DEPOSITED ON EXISTING PAVED STREETS, DRIVES AND AREAS USED BY THE
PUBLIC SHALL BE CLEANED UP IMMEDIATELY.
5. A FEE OF $500 PER DAY WILL BE IMPLEMENTED FOR FAILURE TO IMPLEMENT
ADEQUATE SOIL EROSION AND SEDIMENT CONTROL MEASURES.
GUARDRAIL, GUARDRAIL APPROACH AND GUARDRAIL DEPARTURE NOTES:
1. DETAILS SPECIFIED ON THIS STANDARD ARE ACCORDING TO THE
AASHTO-AGC-ARTBA JOINT COMMITTEE. TASK FORCE 13 PUBLICATION TITLED "A
GUIDE TO STANDARDIZED HIGHWAY BARRIER HARDWARE."
2. WOOD POSTS WITH 12" BEVELS AT THE TOP. THE LENGTH, WIDTH AND DEPTH OF
THE POST SHALL BE AS SPECIFIED ON THIS STANDARD AND THE POST BOLT
HOLES SHALL BE LOCATED TO ENSURE PROPER RAIL HEIGHT.
3. WOOD OFFSET BLOCKS WITH 12" BEVELS AT THE TOP AND BOTTOM OR A 1"
BEVELED TOP MAY BE USED IN LIEU OF WOOD BLOCKS WITHOUT BEVELS
SPECIFIED. THE LENGTH (FRONT AND BACK FACE), WIDTH AND DEPTH OF THE
BLOCK SHALL BE AS SPECIFIED ON THIS STANDARD AND THE POST BOLT HOLES
SHALL BE LOCATED TO ENSURE PROPER RAIL HEIGHT AND COMPATIBILITY WITH
POST HOLES.
4. WHEN THE FACE OF GUARDRAIL IS PLACED FLUSH WITH FACE OF CURB, THE
RAIL HEIGHT SHOULD BE MEASURED FROM THE FRONT EDGE OF THE GUTTER
PAN, WHICH IS THE POINT ON THE GUTTER PAN THAT IS CLOSEST TO THE EDGE
OF THE TRAVELED LANE. WHEN THE FACE OF THE GUARDRAIL PANEL IS
LOCATED BEHIND THE CURB THE RAIL HEIGHT SHOULD BE MEASURED FROM
THE GROUND JUST IN FRONT OF THE GUARDRAIL.
UTILITY AND CONSTRUCTION IN RIGHTS OF WAY NOTES:
1. ALL UTILITY AND CONSTRUCTION WORK DONE IN PUBLIC RIGHTS OF WAY OR
EASEMENTS MUST BE DONE IN ACCORDANCE WITH MICHIGAN DEPARTMENT OF
TRANSPORTATION AND ALL LOCAL STANDARDS AND SPECIFICATIONS.
MDOT CLASS II
MDOT 23A
EXISTING GROUND
STONE
EXISTING
EMBANKMENT
SUMMARY OF HYDRAULIC ANALYSIS
FLOOD
DATA
DISCHARGE
(CFS)
PROPOSED
WATER SURFACE
ELEV. AT U/S FACE
OF STRUCTURE
VELOCITY IN
D/S CHANNEL
(FPS)
WATERWAY
AREA (SF)
AT D/S FACE
100-YEAR 270 1227.78 8.73 16.97
HYDRAULIC ANALYSIS NOTES
1. FLOOD AND DISCHARGE ESTIMATES WERE PERFORMED BY MICHIGAN'S DEPARTMENT OF ENVIRONMENT, GREAT LAKES, AND
ENERGY (EGLE) AND ISSUED TO GEI ON FEBRUARY 25, 2022.
2. THE DRAINAGE AREA CONTRIBUTING TO THIS CROSSING IS 2.1 SQUARE MILES.
3. THE WATER SURFACE AND/OR ENERGY GRADE ELEVATIONS SHOWN ON THE ABOVE HYDRAULIC TABLE ARE TO BE USED FOR
COMPARISON PURPOSES ONLY AND ARE NOT TO BE USED FOR ESTABLISHING A REGULATORY FLOODPLAIN.
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\GENERAL NOTES.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
SOIL BORINGB-1
ROAD
CLOSED
BRIDGE
CLOSED
AHEAD
TYPE III BARRICADES WITH LIGHTS
TYPE III BARRICADES WITH LIGHTS
TYPE III BARRICADES
BRIDGE
OUT
BRIDGE
OUT
ROAD
CLOSED
BRIDGE
CLOSED
AHEAD
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\TRAFFIC CONTROL.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
TRAFFIC
CONTROL PLAN
C-100
LEEMAN ROAD
EAST PIPELINE ROAD
LEEMAN ROAD
CULVERT REPLACEMENT LOCATION
TRAFFIC CONTROL NOTES:
1. CONTRACTOR TO NOTIFY THE MDNR A MINIMUM OF 2 WEEK PRIOR TO CLOSING EAST
PIPELINE ROAD.
2. CONTRACTOR SHALL PROVIDE AN ESTIMATE TO THE MDNR AND AFFECTED PROPERTY
OWNERS OF DURATION OF ROAD CLOSURE.
3. ALL TRAFFIC CONTROLS AND SIGNS SHALL BE INSTALLED IN ACCORDANCE WITH THE
MICHIGAN DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR
CONSTRUCTION OF HIGHWAYS, STREETS AND BRIDGES AND THE MICHIGAN MANUAL OF
UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, LATEST EDITIONS.
SCALE, FEET
200 400
© 2022 MICROSOFT CORPORATION © 2022 MAXAR ©CNES (2022) DISTRIBUTION AIRBUS DS
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
P.E. No.: 64048
INR
24" CMP
IE=1222.41
24" CMP
IE=1222.95
SAND AND GRAVEL
FLAT BOTTOM CREEK
B-1
EA
ST
P
IP
EL
IN
E R
D
SF
SF
1+
2+
-0+
2+
.27
REMOVE EXISTING CULVERT
SILT FENCE (TYP.)
SEE DETAIL 3 ON SHEET D-401.
1+00
2+00
3+00
4+00
SF
SF
SILT FENCE (TYP.)
SEE DETAIL 3 ON SHEET D-401.
SILT FENCE (TYP.)
SEE DETAIL 3 ON SHEET D-401.
SILT FENCE (TYP.)
SEE DETAIL 3 ON SHEET D-401.
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\EXISTING CONDITIONS.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
EXISTING
CONDITIONS &
DEMOLITION PLAN
C-100
SURVEY POINT INFORMATION
NO. NORTHING EASTING ELEVATION DESCRIPTION
BM2 475,535.75 26,006,657.87 1232.05 GPS SPIKE
BM3 475,316.44 26,006,607.42 1234.38 GPS SPIKE
EXISTING STRUCTURE:
THE EXISTING STRUCTURE IS A CMP CULVERT UNDERNEATH EAST PIPELINE ROAD THAT IS 24" IN DIAMETER
AND 31' IN LENGTH.
NOTES:
1. COORDINATES ARE MICHIGAN STATE PLANE COORDINATE SYSTEM NAD 83 (2011), NORTH ZONE, INTERNATIONAL FEET
2. VERTICAL DATUM BASED UPON NAVD 88 (GEOID18)
3. 2 FOOT CONTOUR INTERVAL
4. FIELD SURVEY CONDUCTED BY TRIMEDIA ENVIRONMENTAL & ENGINEERING WAS COMPLETED DECEMBER 8, 2021. CONTRACTOR TO FIELD VERIFY.
5. WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING AND
DETERMINATION OF WATER LEVELS THAT MAY EXIST DURING CONSTRUCTION AND APPROPRIATE
MANAGEMENT PLAN.
6. PRIOR TO CONSTRUCTION OF THE SANDBAG PLUG; CONTRACTOR SHALL VERIFY NO SIGNIFICANT RAINFALL
EVENTS ARE FORECASTED DURING STREAM DIVERSION.
7. APPROXIMATE FLOODPLAIN IMPACT: 0.15 AC 165 CUYD EXCAVATION.
8. CONTRACTOR TO USE SANDBAG FILL WITHIN LIMITS OF STREAM BED. CONTRACTOR MAY USE EXISTING
ONSITE MATERIAL TO FILL SANDBAGS.
9. BYPASS SYSTEM MUST BE CAPABLE OF SAFELY HANDLING THE 2-YR, 35 CFS RAIN EVENT.
10.CONTRACTOR TO SUBMIT BYPASS PLAN TO THE ENGINEER AND OWNER A MINIMUM OF 14 DAYS PRIOR TO
START OF WORK FOR APPROVAL.
SCALE:
20 40
1" = 20'
TRIBUTARY OF STURGEON RIVER
ENGINEERS ESTIMATE OF QUANTITIES
TOTAL UNIT DESCRIPTION
0.1 AC CLEARING AND GRUBBING
190 FT EROSION CONTROL, SILT FENCE
900 CYD EXCAVATION, EARTH
50 CYD EMBANKMENT, CL III
EARTHWORK:
FLOODPLAIN IMPACT: 0.17 AC, 850 CUYD EXCAVATION
WETLAND IMPACT: 0.05 AC, 50 CUYD FILL
SANDBAG PLUG, SEE NOTE 10.
SANDBAG PLUG, SEE NOTE 10.
REMOVE AND DISPOSE OF EXISTING VEGETATION
REMOVE AND DISPOSE OF EXISTING VEGETATION
REMOVE AND DISPOSE OF EXISTING VEGETATION
REMOVE AND DISPOSE OF EXISTING VEGETATION
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
B-1
EA
ST
P
IP
EL
IN
E R
D
2+00
3+00
1+
CL CULVERT
STA=2+31
CL CULVERT
STA=2+55
PIPELINE LINE RD
POB
STA=0+90
PIPELINE LINE RD
POE
STA=1+70
CENTER OF RIVER
POE
STA=3+16
CENTER OF RIVER
POB
STA=1+68
POB GUARDRAIL APPROACH
STA=1+42, OFF -10 LT
POE GUARDRAIL DEPARTURE
STA=0+95, OFF -10 LT
POB GUARDRAIL APPROACH
STA=0+97, OFF 10 RT
POE GUARDRAIL DEPARTURE
STA=1+44, OFF 10 RT
POB GUARDRAIL
STA=1+31, OFF -7 LT
1225 1225
2H:1V
???H:1V
2H:1V
2H:1V
8H:1V
6H:1V
4H:1V
L1
L3
L2
L4 L5 L6 L7 L8
L9
L1
L1
L1
L13
L14
L1 L2
L15
84°
POB GUARDRAIL
STA=1+08, OFF 7 RT
12'
2'
12.8'
CENTER OF RIVER
Number
L1
L2
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L16
START NORTHING
475,450.94
475,454.68
475,448.42
475,451.55
475,457.81
475,457.69
475,457.57
475,457.45
475,458.12
475,458.96
475,460.03
475,462.77
475,466.09
475,468.83
475,473.63
475,475.24
475,477.56
START EASTING
26,006,540.52
26,006,593.58
26,006,579.92
26,006,586.75
26,006,600.41
26,006,609.17
26,006,617.93
26,006,626.69
26,006,657.90
26,006,664.45
26,006,670.32
26,006,672.84
26,006,675.72
26,006,678.25
26,006,684.36
26,006,691.96
26,006,707.27
END NORTHING
475,448.42
475,457.81
475,451.55
475,454.68
475,457.69
475,457.57
475,457.45
475,458.12
475,458.96
475,460.03
475,462.77
475,466.09
475,468.83
475,473.63
475,475.24
475,477.56
475,476.09
END EASTING
26,006,579.92
26,006,600.41
26,006,586.75
26,006,593.58
26,006,609.17
26,006,617.93
26,006,626.69
26,006,657.90
26,006,664.45
26,006,670.32
26,006,672.84
26,006,675.72
26,006,678.25
26,006,684.36
26,006,691.96
26,006,707.27
26,006,720.04
Length
39.48
7.51
7.51
7.51
8.76
8.76
8.76
31.22
6.60
5.97
3.72
4.40
3.72
7.77
7.77
15.48
12.86
Line/Chord Direction
S86°20'25"E
N65°22'46"E
N65°22'46"E
N65°22'46"E
S89°12'55"E
S89°12'55"E
S89°12'55"E
N88°46'13"E
N82°40'14"E
N79°41'35"E
N42°41'47"E
N40°52'24"E
N42°41'47"E
N51°50'55"E
N78°04'06"E
N81°21'03"E
S83°23'26"E
Radius
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\PROPOSED CONDITIONS.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
PROPOSED
CONDITIONS
C-110
NOTE:
1. DO NOT RELY UPON ENGINEERS ESTIMATE OF QUANTITIES. CONTRACTOR MUST
CALCULATE QUANTITIES FOR BIDDING.
EARTHWORK:
FLOODPLAIN IMPACT: 0.09 AC, 350 CUYD FILL
WETLAND IMPACT: 0.05 AC, 50 CUYD FILL
ENGINEERS ESTIMATE OF QUANTITIES
TOTAL UNIT DESCRIPTION
24 FT 102 INCH CULVERT
130 SYD AGGREGATE SURFACE COURSE, 23A, 12 INCH
50 CYD SAND SUBBASE, CL II
20 CYD EMBANKMENT, CL II
600 CYD EMBANKMENT, CL III
40 SYD AGGREGATE BASE, 6A, 12 INCH
48 FT GUARDRAIL, MDOT TYPE B
24 FT GUARDRAIL APPROACH
24 FT GUARDRAIL DEPARTURE
10 SYD RIPRAP, MDOT, SPECIAL, 8" TO 24"
50 SYD TOPSOIL SURFACE, SALV, 4 INCH
50 SYD EROSION CONTROL, MULCH BANK, HIGH VELOCITY
10 LBS SEED, OTTAWA MIX
10 LBS FERTILIZER, MDOT CLASS A
TRIBUTARY OF STURGEON RIVER
CENTERLINE ALIGNMENT
EDGE OF EXISTING ROAD
PROPOSED 102 INCH CULVERT
SCALE:
5 10
1" = 5'
EAST PIPELINE RD CENTERLINE
GUARDRAIL APPROACH,
12 FT, SEE DETAIL ON
SHEET D-100
GUARDRAIL DEPARTURE, 12 FT,
SEE DETAIL ON SHEET D-100
GUARDRAIL DEPARTURE, 12 FT,
SEE DETAIL ON SHEET D-100
GUARDRAIL APPROACH, 12 FT,
SEE DETAIL ON SHEET D-100
GUARDRAIL MDOT TYPE B, 24 FT (EA)
WING WALL, 9FT
WING WALL, 9 FT
WING WALL, 9 FT
WING WALL, 9 FT
HEADWALL
HEADWALL
EDGE OF PROPOSED ROADWAY
PROPOSED STREAM FLOW CHANNEL
RIPRAP, MDOT SPECIAL
GEOTEXTILE FABRIC, 7 OZ/SYD
RIPRAP, MDOT SPECIAL
GEOTEXTILE FABRIC, 7 OZ/SYD
RIPRAP, MDOT SPECIAL
GEOTEXTILE FABRIC, 7 0Z/SYD
RIPRAP, MDOT SPECIAL
GEOTEXTILE FABRIC, 7 OZ/SYD
10'
14'
15°
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\TRAFFIC CONTROL.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
EXCESS
SPOILS AREA
C-130
LEEMAN ROAD
LEEMAN ROAD
EXCESS SPOILS AREA
46.088 N
-087.988 W
SCALE, FEET
500 1000
© 2022 MICROSOFT CORPORATION © 2022 MAXAR ©CNES (2022) DISTRIBUTION AIRBUS DS
PROJECT SITE
LE
R
ZA
R
O A
D
EL
EV
AT
IO
N
FE
ET
EL
EV
AT
IO
N
FE
ET
-0+00 0+25 0+50 0+75
.6
1+00
.7
1+25
.1
1+50 1+75 2+00 2+24
.7
-0+00
.6
0+25
.8
0+50
.7
0+75
.7
1+00
.7
1+25
.2
1+50
.9
1+75
.7
2+00
.6
2+24
EXISTING GRADE
100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR
PR 100-YR FLOOD EL. 1227.78'
PR. STREAMBED EL. 1222.35'
PR 102" CULVERT,
24FT, ALUMINUM OR CONCRETE, 1% SLOPE
PR GUARDRAIL
12.1'
1.5
BOTTOM OF EXCAVATION EL 1219'
PVI STA = 1+32.13
PVI ELEV = 1230.50
A.D. = 3.59% K = 20.03
72' VC
PV
C
: 0 +9
6.
EL
EV
: 1
0.
PV
T:
+6
8.
EL
EV
: 1
1.
LOW POINT ELEV = 1230.62
LOW POINT STA = 1+03.78
POB
STA: 0+90
ELEV: 1230.66
POE
STA: 1+70
ELEV: 1231.72
PR GUARDRAIL
DEPARTURE
PR GUARDRAIL
APPROACH
PR. CULVERT INVERT EL. 1220.35'
PR. TOP OF CULVERT EL. 1228.85'
PR. BOTTOM OF LINE POST EL. 1229.05'
EX 24" CMP CULVERT
MDOT 6A, OPEN GRADED AGGREGATE
CULVERT BEDDING MATERIAL,
SEE DETAIL ON SHEET C-110
HAZARD SIGN,
SEE DETAIL 7 ON SHEET C-100
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\PIPE LINE RD PROFILE.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
PIPELINE RD
PROFILE
C-210
VERTICAL SCALE, FEET
HORIZONTAL SCALE, FEET
100 20
NOTE: 5x VERTICAL EXAGGERATION
0 2 4
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
AT
IO
N
FE
ET
EL
EV
AT
IO
N
FE
ET
1+20 1+25 1+50
.5
1+75
.0
2+00
.4
2+25 2+50
.0
2+75
.0
3+00 3+25 3+50 3+70
.6
1+20
.6
1+25
.8
1+50
.6
1+75
.5
2+00
.0
2+25
.5
2+50
.2
2+75
.7
3+00
.8
3+25
.1
3+50
.6
3+70
EXISTING GRADE
1.5'
24'
6.5'
2'
~8
STA: 2+31
ELEV: 1222.35
STA: 2+55
ELEV: 1222.11
STA: 2+44
ELEV: 1230.69
STA: 2+31
ELEV: 1228.85
STA: 3+16
ELEV: 1221.97
100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR
PR 100-YR FLOOD EL. 1227.78'
PR STREAM PROFILE
HEADWALL
WING WALL
GUARDRAIL, MDOT TYPE B
STA: 1+68
ELEV: 1223.71
14'
MDOT 6A, OPEN GRADED AGGREGATE
CULVERT BEDDING MATERIAL,
SEE DETAIL ON SHEET C-110
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\RIVER PROFILE.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
RIVER PROFILE
C-220
VERTICAL SCALE, FEET
HORIZONTAL SCALE, FEET
100 20
NOTE: 5x VERTICAL EXAGGERATION
0 2 4
EXCAVATED STREAM MATERIAL PLACED
IN CULVERT, SEE DETAIL ON SHEET C-420
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
AT
IO
N
FE
ET
2+28
EL
EV
AT
IO
N
FE
ET
EL
EV
AT
IO
N
FE
ET
2+60
EL
EV
AT
IO
N
FE
ET
2+03
EL
EV
AT
IO
N
FE
ET
1+78
EL
EV
AT
IO
N
FE
ET
EL
EV
AT
IO
N
FE
ET
1+53
EL
EV
AT
IO
N
FE
ET
2+85
EL
EV
AT
IO
N
FE
ET
3+10
EL
EV
AT
IO
N
FE
ET
3+35
.9
.0
.0
.0
.9
.0
.7
.8
.4
.4
.0
.0
.7
.8
.2
.2
.0
.0
.0
.1
.4
.5
.4
.5
.1
.1
.7
.7
.2
.3
.6
.6
.9
.9
.4
.5
.9
.9
.8
.8
.9
.9
.3
.4
.1
.2
.6
.6
.9
.0
.2
.2
.6
.6
.6
.7
.7
.8
.5
.5
.5
.5
.3
.4
.3
.4
.3
.4
.9
.9
.5
.6
.5
.5
.6
.6
.7
.7
.7
.8
.1
.1
.3
.3
.5
.6
.3
.3
.5
.6
.2
.2
.1
.1
.6
.7
.5
.6
.6
.7
.1
.1
.9
.9
.5
.5
.8
.9
.1
.1
.2
.2
EXISTING GRADE EXISTING GRADE
EXISTING GRADE EXISTING GRADE
EXISTING GRADE EXISTING GRADE
EXISTING GRADE
EXISTING GRADE
PROPOSED GRADE
EL. 1223.48'
PROPOSED GRADE
EL. 1222.42'
PROPOSED GRADE
EL. 1222.10'
PROPOSED GRADE
EL. 1222.04'
PROPOSED GRADE
EL. 1221.98'
PROPOSED GRADE
EL. 1222.95'
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\STREAM CROSS SECTIONS.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
STREAM CROSS
SECTIONS
C-300
SCALE:
UPSTREAM SECTION AT 1+53
1"=10'1 SCALE:
UPSTREAM SECTION AT 1+78
1"=10'2 SCALE:
UPSTREAM SECTION AT 2+03
1"=10'3 SCALE:
UPSTREAM SECTION AT 2+28
1"=10'4
SCALE:
DOWNSTREAM SECTION AT 3+35
1"=10'8SCALE:
DOWNSTREAM SECTION AT 3+10
1"=10'7SCALE:
DOWNSTREAM SECTION AT 2+85
1"=10'6SCALE:
DOWNSTREAM SECTION AT 2+60
1"=10'5
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
2% LC 2%
4" TOPSOIL, SEED AND
MULCH BLANKET
SCALE: NTS
MDOT 23A, 12" (CIP)
MDOT CL II, GRANULAR
SUBBASE, 12" (CIP)
MAX 3H:1V SLOPE TO
EXISTING GRADE
14'
INSTALLATION WITH TRENCHING
NOTES:
1. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY.
2. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN
NECESSARY. 9" (225mm) MAXIMUM RECOMMENDED STORAGE HEIGHT.
3. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE
SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED.
EXTRA STRENGTH FILTER
FABRIC NEEDED WITHOUT
WIRE MESH SUPPORT
STEEL OR WOOD POST
ATTACH FILTER FABRIC
SECURELY TO UPSTREAM
SIDE OF POST
10' (3m) MAXIMUM SPACING WITH WIRE SUPPORT FENCE 6' (1.8m)
MAXIMUM SPACING WITHOUT
WIRE SUPPORT FENCE
FLOW
PONDING HEIGHT
8" (200 mm)
3/4" (20mm) MIN
DRAIN ROCK
FLOW
12" MIN
(300 MM)
9" MAX
(225 mm)
STORAGE HT
PONDING HEIGHT
FLOW
INSTALLATION WITHOUT TRENCHING
STEEL OR WOOD
POST
36" (1M) HIGH MAX
12" MIN
(300 mm)
4"x6" (100x150mm)
TRENCH WITH
COMPACTED BACKFILL
SILT FENCE
* 2 8"
6'- 3" TYPICAL
POST SPACING
12'- 6" EFFECTIVE
BEAN ELEMENT LENGTH
8" 8"
7"
** 5'- 0" OR AS SPECIFIED ON PLANS
SHOULDER HINGE POINT
EMBANKMENT
TOE NAIL WOOD BLOCK WOOD POST WITH A
MINIMUM 3" LONG HOT-DIP ZINC COATED NAIL
6" X 8" WOOD
LINE POST
POST BOLT WITH ROUND WASHER UNDER NUT
SPLICE BOLT (TYP.) 2'- 0" ***
3' -7
**6'
- 0
***IF THE OFFSET FROM THE FACE OF POST TO THE SHOULDER HINGE POINT
IS LESS THAN 2'- 0" AND THE EMBANKMENT (OR MEDIAN) SLOPE IS STEEPER
THAN 1:10. USE 8'- 0" POST WITH THE ADDITIONAL LENGTH EMBEDDED.
GRADE
ELEVATION SHOWING POST PACING
*SEE NOTES FOR GUARDRAIL IN CONJUNCTION WITH CURB
TERMINATION PLATETERMINATION PLATE
POST BOLT
CONNECTING STEEL
POST
TO WOOD OFFSET
BLOCK
4" DIA. HOLE
7" 7"
3"
8"
6"
3" 3"
TOP SIDEFRONT
FOR USE ON WOOD POSTS
SEE NOTES ON SHEET G-001
4" X 2 12"
POST BOLT SLOT
12" X 1 18"
SPLICE BOLT SLOT
(TYP.)
℄ POST BOLT SLOT AND
℄ WOOD POST
1' - 0 12" 2" 2"
0.3' 0.3'
4'
EXISTING GROUND
12'
8" DIA. GALVANIZED THROUGH BOLTS (TYP.)
6" X 6" X 6' PRESSURE TREATED BEVELED
WOOD POST (TYP.) INSTALLED 4' O.C.
3" X 8" PRESSURE TREATED
RUNNER (TYP.)
4'
8"
8"
HAZARD PANELS (TYP ALL POSTS)
3'
7'
36"x12" BLACK AND YELLOW HAZARD PANEL SIGN
12"
NOTES:
1. PLACE SIGN ON EACH SIDE OF ROAD.
2. THE ALTERNATING BLACK AND RETROREFLECTIVE YELLOW STRIPES (OM3-L
& OM3-R) SHALL BE SLOPED DOWN AT TAN ANGLE OF 45 DEGREES TOWARD
THE SIDE ON WHICH TRAFFIC IS TO PASS THE OBSTRUCTION. IF TRAFFIC
CAN PASS TO EITHER SIDE OF THE OBSTRUCTION THE ALTERNATING BLACK
AND RETROREFLECITVE YELLOW STRIPES (OM3-C) SHALL FORM CHEVRONS
THAT POINT UPWARDS.
TYPE 3
OBJECT MARKER SIGN
OM3-L & OM3-R
GALV. STEEL POST
6x6 WOOD POST
4'
ROAD SURFACE
8" DIA. GALVANIZED THROUGH BOLTS (TYP.)
DETAILS
(1 OF 2)
D-100
NOT TO SCALE
C-120 ROAD CROSS SECTION
DETAIL
NOT TO SCALE
C-110 SILT FENCE
DETAIL
NOT TO SCALE
C-120 GUARDRAIL
DETAIL
NOT TO SCALE
C-120 GUARDRAIL WOOD POST
DETAIL
NOT TO SCALE
C-120 WOOD OFFSET BLOCKS FOR GUARDRAIL
DETAIL
NOT TO SCALE
C-120 BEAM ELEMENT SPLICE DETAILS
DETAIL
NOT TO SCALE
C-120 GUARDRAIL APPROACH & DEPARTURE
DETAIL
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\DETAILS.dwg - 9/27/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
NOT TO SCALE
C-120 GUARDRAIL APPROACH & DEPARTURE
DETAIL
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
P.E. No.: 64048
INR
B 10/14/2022 ADDENDUM 1 GMM
B
Ø 8.
5'
10'
9'
2'
10'
9' 15°
8.5'
MIN. BURRY DETPTH
3.
5'
M
IN
1.5'
HEAD AND WING WALL FOUNDATION
NOTES:
1. CONTRACTOR TO SUBMIT SHOP DRAWINGS SEALED BY A LICENSED PROFESSIONAL ENGINEER IN
THE STATE OF MICHIGAN TO ENGINEER FOR APPROVAL.
2. HEAD AND WING WALL MATERIAL SHALL BE THE SAME AS THE CULVERT OR
PRE-CAST/CAST-IN-PLACE CONCRETE.
3. HEAD AND WING WALL SHALL USE TIE BACKS AS NECESSARY TO PREVENT LATERAL MOVEMENT.
4. ALL JOINTS AND OPENINGS SHALL BE SEALED AND WATER TIGHT.
CULVERT
2' OF EXCAVATED RIVER MATERIAL
PLACED IN BOTTOM OF CULVERT.
SUPPLEMENT RIVER MATERIAL
WITH MDOT 6A STONE, IF NEEDED.
EXCAVATE AND PROVIDE BASE MATERIAL
PER MANUFACTURERS RECOMMENDATION
HEADWALL/WING WALL FOUNDATION PER
MANUFACTURERS RECOMMENDATIONS
AGGREGRATE SURFACE COURSE
12" DEPTH MDOT 23A
2' OF EXCAVATED RIVER MATERIAL
PLACED IN BOTTOM OF CULVERT.
SUPPLEMENT RIVER MATERIAL
WITH MDOT 6A STONE, IF NEEDED.
MDOT CL II, MATCH EXISTING
EMBANKMENT GRADES
GEOTEXTILE FABRIC
102 INCH CULVERT
REUSE EXISTING
EMBANKMENT MATERIAL
1' DEPTH OF 6A STONE PLACED ON NATIVE
MATERIAL BELOW BOTTOM OF CULVERT
2' OF 6A STONE PLACED,
HAUNCH AROUND CULVERT
1.5 ±
0.5' 4' 2'
X X X X
NOTES:
1. MDOT 6A MATERIAL SHALL EXTEND 1.5' BEYOND ALL SIDES OF CULVERT AS SHOWN ABOVE.
2. GEOTEXTILE SHALL BE PLACED ON THE TOP AND SIDES OF MDOT 6A MATERIAL USED FOR
CULVERT BEDDING.
3. CULVERT STRUCTURE MUST BE DESIGNED TO SUPPORT HL-93 LOADING. DESIGN MUST BE
SEALED BY A LICENSED PROFESSIONAL ENGINEER IN THE STATE OF MICHIGAN. CONTRACTOR
TO SUBMIT DESIGN TO THE ENGINEER FOR APPROVAL.
4. UPSTREAM STONE INVERT ELEVATIONS = 1223.35 DOWNSTREAM STONE INVERT = 1223.11.
5. ALL JOINTS SHALL BE WRAPPED IN GEOTEXTILE FABRIC WITH A MIN. WEIGHT OF 7 OZ/SYD
1 MIN
SAND SUBBASE COURSE
12" DEPTH MDOT CL II
10.5' ±
NATIVE MATERIAL
DETAILS
(2 OF 2)
D-110
NOTES
GENERAL NOTES:
1. PRIOR TO CONSTRUCTION, CONTRACTOR MUST VERIFY ALL ELEVATIONS AND CONDITIONS.
2. ALTERNATE STRUCTURES MAY BE CONSIDERED, PROVIDED THAT THE ALTERNATE DESIGN DOES NOT REDUCE
THE HYDRAULIC OPENING OF THE STRUCTURE AS SHOWN ON THE DRAWINGS. AT A MINIMUM THE ALTERNATE STRUCTURE MUST PROVIDE THE SAME OR LARGER SPAN AND RISE AS THE STRUCTURE SHOWN ON THE
DRAWINGS.
DESIGN DATA
DESIGN LOADING:
BRIDGE UNITS: SELF WEIGHT, MAX FILL 12.5', AASHTO HL-93
HEADWALLS: SELF WEIGHT, MAX FILL 3', CAT CP 323C COMPACTOR
WINGWALLS: SELF WEIGHT, MAX FILL 3', CAT CP 323C COMPACTOR
DESIGN FILL HEIGHT: 2'
FROM TOP OF CROWN TO TOP OF CULVERT.
DESIGN METHOD: LOAD RESISTANCE FACTOR DESIGN PER HL-93 SPECIFICATION
ASSUMED ALLOWABLE BEARING CAPACITY: 2,000 PSF
A
C-120 ALUMINUM CULVERT
SECTION
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\DETAILS.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
B
C-120 HEAD AND WING WALLS
SECTION
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
| Sheets and Views |
| G-001 COVER SHEET |
| G-002 GENERAL NOTES AND LEGEND |
| C-100 TRAFFIC CONTROL PLAN |
| C-110 EXISTING CONDITIONS & DEMOLITION PLAN |
| C-120 PROPOSED CONDITIONS |
| C-130 EXCESS SPOILS AREA |
| C-210 PIPELINE RD PROFILE |
| C-220 RIVER PROFILE |
| C-310 STREAM CROSS SECTIONS |
| C-410 DETAILS (1 OF 2) |
| C-420 DETAILS (2 OF 2) |
File details come from the government source that posted it. Updated .