751-200116.JBB East Pipeline Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- RFQ - 171 - 220000000581
- Issued by
- Dickinson County, Michigan
About this file
This document appears to be a bidding package for the East Pipeline Culvert Replacement project in Felch Township, Dickinson County, Michigan. The project is being managed by the Michigan Department of Technology, Management, and Budget, State Facilities Administration, Design and Construction Division. The project involves the replacement of an existing 24-inch diameter culvert under East Pipeline Road with a new 102-inch culvert. The work includes demolition of the existing culvert, installation of the new culvert, associated site work such as excavation, backfill, grading, and restoration. Bids are due by 2:00 pm on a date not specified. Bidders are required to upload their bid attachments to the SIGMA VSS system and may email questions to the project contact.
The bid package provides detailed specifications and drawings for the culvert replacement project, including construction notes, traffic control, erosion and sediment control, and site restoration requirements. Acceptable materials for the new culvert, bedding, and backfill are specified. Unit price bid items are listed for the various components of work. No funding sources or set-asides are mentioned, and no information is provided about incumbents or the current environment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROBERTS, ISAAC W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\COVER SHEET.dwg - 9/27/2022
EAST PIPELINE CULVERT REPLACEMENT
DICKINSON COUNTY
FELCH TOWNSHIP
T43N, R29W, SECTION 33
STATE or COUNTY MAP
(NOT TO SCALE)
SITE LOCATION MAP
(NOT TO SCALE)
PREPARED FOR:
DEPARTMENT OF TECHNOLOGY,
MANAGEMENT, AND BUDGET
3111 WEST ST. JOSEPH ST
LANSING, MI 48917
(906) 643-6181
GEI PROJECT NO. 2104383
DTMB FILE NO. 751/20116.JBB
SITE
SOURCE:
2021 MICROSOFT AERIAL IMAGERY
SOURCE:
MICHIGAN ROAD MAP
For Bid Not For Construction
NO. DATE ISSUE/REVISION APP
A 9/30/2022 ISSUE FOR BID INR
GMM
Consultants
PREPARED BY:
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
DWG. NO.
SHEET NO.
G-001
G-001
SITE
GENERAL NOTES:
EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS AND SPECIFICATIONS CONTAINED THEREIN, ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE 2020 MICHIGAN DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR CONSTRUCTION, THE MICHIGAN MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.
46°04'59.5"N 87°56'46.2"W
LER
ZA R
D
COUNTY ROAD 569
LEEMAN RD
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
M -95
M -95
SAGOLA
RANDVILLE
SHEET INDEX
Sheet Number Sheet Title
G-001 COVER SHEET
G-002 GENERAL NOTES AND LEGEND
C-100 TRAFFIC CONTROL PLAN
C-110 EXISTING CONDITIONS & DEMOLITION PLAN
C-120 PROPOSED CONDITIONS
C-130 EXCESS SPOILS AREA
C-210 PIPE LINE RD PROFILE
C-220 RIVER PROFILE
C-310 STREAM CROSS SECTIONS
C-410 DETAILS (1 OF 2)
C-420 DETAILS (2 OF 2)
PIPELINE LINE RD
Number
C101
L101
C102
BEGIN STA
-0+00
1+00.22
1+65.46
END STA
1+00.22
1+65.46
2+24.27
LENGTH
99.17
65.24
58.72
BEGIN NORTHING
475345.17
475,438.73
475503.72
BEGIN EASTING
26,006,607.74
26,006,640.63
26,006,646.32
END NORTHING
475,438.73
475,503.72
475,561.44
END EASTING
26,006,640.63
26,006,646.32
26,006,657.15
DIRECTION
N33° 43' 05"E
N5° 00' 31"E
N5° 00' 31"E
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
P.E. No.: 64048
INR
GENERAL NOTES
AND LEGEND
G-002
LINE TYPES
SYMBOLS
DISCIPLINE IDENTIFIER
INSTRUMENTATION
DISCIPLINE
KEY PLAN
GENERAL
K
I
G
C-1.0
DISCIPLINE IDENTIFIER
INDICATES DETAIL NUMBER
INDICATES DRAWING NUMBER ON WHICH SECTION IS DRAWN
DETAIL
10-A-1
INDICATES SECTION DESIGNATION
20-A-2 A
SHEET REFERENCE NUMBER
DETAILS
PLUMBING
ELECTRICAL
ARCHITECTURAL
MECHANICAL/PROCESS
STRUCTURAL
CIVIL
D
P
E
A
M
C
S
SECTION LEGEND
DRAWING NUMBER DESIGNATION
INDICATES DRAWING NUMBER
ON WHICH DETAIL IS DRAWN
REMOVAL R
HATCH LEGEND
MATERIAL
DESCRIPTION
EXISTING
(DEMOLITION)
PATTERN
NEW
PROPOSED
PATTERN
DEMO EROSION BALES
GUARD POST/BOLLARD
SIGN POST
MISCELLANEOUS
PROPOSEDEXISTING DESCRIPTION
PK NAIL
DRAINAGE UTILITIES
PROPOSED DESCRIPTION
STM UG STORM MAINSTM
EROSION CONTROL
PROPOSED DESCRIPTION
SF SILT FENCE
EXISTING
EXISTING
EDGE OF WATER
LOC
MISCELLANEOUS
PROPOSED DESCRIPTION
GUARDRAIL
EXISTING
TREE LINE
LIMITS OF CONSTRUCTION
EDGE OF UNPAVED ROADWAY
ROW ROW RIGHT-OF-WAY
PARCEL LINE
TOPOGRAPHY
PROPOSED DESCRIPTION
MAJOR CONTOUR
EXISTING
MINOR CONTOUR
UTILITY REMOVALX
SURVEY BENCHMARK
SURVEY POINT
GENERAL NOTES:
1. ANY EXISTING UTILITIES, PAVEMENT, CURBS, SIDEWALKS, STRUCTURES, TREES,
ETC., NOT PLANNED FOR DEMOLITION OR REMOVAL THAT ARE DAMAGED OR
REMOVED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED AT THE
CONTRACTOR'S EXPENSE.
2. THE CONTRACTOR SHALL VERIFY ALL DEPTHS AND LOCATIONS OF EXISTING
UTILITIES PRIOR TO ANY CONSTRUCTION. ANY DISCREPANCIES WITH THE
CONSTRUCTION PLANS FOUND IN THE FIELD SHALL BE BROUGHT IMMEDIATELY
TO THE ATTENTION OF THE ENGINEER.
3. ALL AREAS DISTURBED OR EXPOSED DURING CONSTRUCTION SHALL BE
REVEGETATED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.
HOWEVER, THE TYPE OF REVEGETATION MUST EQUAL OR EXCEED THE TYPE OF
VEGETATION PRESENT BEFORE CONSTRUCTION UNLESS OTHERWISE
SPECIFIED.
4. PRIOR TO ANY CONSTRUCTION, A PRECONSTRUCTION CONFERENCE BETWEEN
THE OWNER, THE CONTRACTOR, UTILITY COMPANIES, ANY AFFECTED PARTIES,
AND ANY OTHER ENTITY THE OWNER MAY REQUIRE SHALL CONVENE.
5. THE CONTRACTOR OR HIS/HER DESIGNATED AGENT SHALL KEEP ACCURATE
RECORDS OF ALL CONSTRUCTION THAT DEVIATES FROM THE PLANS. THE
CONTRACTOR OR HIS/HER DESIGNATED AGENT SHALL FURNISH THE ENGINEER
ACCURATE "AS-BUILT" DRAWINGS FOLLOWING COMPLETION OF ALL
CONSTRUCTION. THESE "AS-BUILT" DRAWINGS SHALL MEET WITH THE
SATISFACTION OF THE OWNER PRIOR TO FINAL ACCEPTANCE. FINAL “AS-
BUILTS” DRAWINGS SHALL BE DELIVERED TO THE ENGINEER IN PDF FORM AND
ON A CD/DVD IN CAD.DWG FORMAT.
6. PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR OR HIS/HER DESIGNATED
AGENT SHALL APPLY FOR AND SECURE ALL PROPER PERMITS FROM THE
APPROPRIATE AUTHORITIES.
7. SURVEY CONDUCTED BY TRIMEDIA ENVIRONMENTAL & ENGINEERING, IN
DECEMBER OF 2021. CONTRACTOR TO FIELD VERIFY PRIOR TO CONSTRUCTION.
8. CONTRACTOR TO NOTIFY MDNR A MINIMUM OF TWO WEEKS PRIOR TO ANY
ROAD CLOSURES.
9. THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, IS AN
INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF GEI
CONSULTANTS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF GEI CONSULTANTS.
PROJECT SAFETY NOTES:
1. PROJECT SAFETY SHALL BE IN ACCORDANCE WITH THE LAWS OF THE STATE OF
MICHIGAN AND THE MICHIGAN OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION'S CURRENT REGULATIONS.
TRAFFIC CONTROL NOTES:
1. ANY METHODS, STREET MARKINGS AND SIGNAGE NECESSARY FOR WARNING
MOTORISTS, WARNING PEDESTRIANS OR DIVERTING TRAFFIC DURING
CONSTRUCTION SHALL CONFORM TO THE MICHIGAN MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, LATEST EDITION.
2. ALL MARKERS, TRAFFIC BUTTONS, TRAFFIC CONTROLS AND SIGNS SHALL BE
INSTALLED IN ACCORDANCE WITH THE MICHIGAN DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATIONS FOR CONSTRUCTION OF
HIGHWAYS, STREETS AND BRIDGES AND THE MICHIGAN MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, LATEST EDITIONS.
CONSTRUCTION NOTES (APPLICABLE TO ALL SHEETS):
1. ALL FITTINGS AND ASSOCIATED APPURTENANCES SHALL BE STOCKPILED SUCH
THAT THEY DO NOT INTERFERE WITH THE SAFE AND FREE MOVEMENT OF
TRAFFIC. IF EQUIPMENT USES OR OBSTRUCTS ANY PORTION OF PUBLIC
ROADWAYS DURING THE PERFORMANCE OF THE WORK, PROPER TRAFFIC
CONTROL (INCLUDING FLAG PERSONS) SHALL BE REQUIRED.
2. CONTRACTOR SHALL PROVIDE ADEQUATE SUPPORT AND BRACING DURING
EXCAVATION, DEWATERING, AND BACKFILLING OPERATIONS TO PROTECT THE
STRUCTURAL INTEGRITY OF ALL SHOULDERS AND UTILITIES LOCATED WITHIN
THE PUBLIC ROAD RIGHT-OF-WAY. SHEETING AND BRACING SHALL BE
REQUIRED WHEN ANY EXCAVATION IS LOCATED WITHIN THE 1-ON-1 SLOPE
FROM THE SHOULDER POINT TO THE BOTTOM OF ANY EXCAVATION.
3. SAFETY REQUIREMENTS SHALL BE CONFORMED TO AND ALL OPERATIONS
SHALL BE CONDUCTED SO AS NOT TO DAMAGE, DESTROY, OR ENDANGER THE
INTEGRITY OF THE ROADWAY STRUCTURE. ALL WORK WITHIN THE PUBLIC
RIGHT-OF-WAY SHALL BE CONDUCTED IN ACCORDANCE WITH MIOSHA SAFETY
RULES AND REGULATIONS.
4. THE CONTRACTOR SHALL NOT BE PERMITTED TO PERFORM SITE CLEARING AND
GRUBBING OUTSIDE OF THE LIMITS INDICATED ON THE DRAWINGS WITHOUT
PRIOR WRITTEN PERMISSION OF THE OWNER.
5. THE CONTRACTOR SHALL FIELD VERIFY EXACT LOCATIONS AND BURY DEPTHS
OF ALL UTILITY CROSSINGS. THE LOCATIONS AND DEPTHS SHOWN ON THE
PLAN SHEETS ARE APPROXIMATE.
6. CONTRACTOR TO SUBMIT SHOP DRAWINGS AND SPECIFICATIONS TO THE
ENGINEER FOR APPROVAL.
7. IF THE CONTRACTOR DESIREE'S ALTERNATE CONSTRUCTION METHOD, THEY
WILL RESPONSIBLE FOR PERMIT REVISIONS.
EROSION AND SEDIMENT CONTROL NOTES:
1. EROSION CONTROL MEASURES, SITE WORK AND RESTORATION WORK SHALL BE
IN ACCORDANCE WITH THE MICHIGAN DEPARTMENT OF TECHNOLOGY,
MANAGEMENT, AND BUDGET SOIL EROSION AND SEDIMENT CONTROL
GUIDEBOOK OF BEST MANAGEMENT PRACTICES FOR MICHIGAN WATERSHEDS.
2. ALL SLOPES SHALL BE MULCH BLANKETED, SODDED OR SEEDED WITH
APPROVED GRASS, GRASS MIXTURES OR GROUND COVER SUITABLE TO THE
AREA PER PROJECT TECHNICAL SPECIFICATIONS.
3. SILT FENCES, ROCK BERMS, SEDIMENTATION BASINS AND SIMILARLY
RECOGNIZED TECHNIQUES AND MATERIALS SHALL BE EMPLOYED DURING
CONSTRUCTION TO PREVENT POINT SOURCE SEDIMENTATION LOADING OF
DOWNSTREAM FACILITIES. SUCH INSTALLATION SHALL BE REGULARLY
INSPECTED BY THE CONTRACTORS CERTIFIED STORM WATER OPERATOR FOR
EFFECTIVENESS. ADDITIONAL MEASURES MAY BE REQUIRED IF, IN THE OPINION
OF THE ENGINEER OR FIELD REPRESENTATIVE, THEY ARE WARRANTED.
4. ALL MUD, DIRT, ROCKS, DEBRIS, ETC., SPILLED, TRACKED OR OTHERWISE
DEPOSITED ON EXISTING PAVED STREETS, DRIVES AND AREAS USED BY THE
PUBLIC SHALL BE CLEANED UP IMMEDIATELY.
5. A FEE OF $500 PER DAY WILL BE IMPLEMENTED FOR FAILURE TO IMPLEMENT
ADEQUATE SOIL EROSION AND SEDIMENT CONTROL MEASURES.
GUARDRAIL, GUARDRAIL APPROACH AND GUARDRAIL DEPARTURE NOTES:
1. DETAILS SPECIFIED ON THIS STANDARD ARE ACCORDING TO THE
AASHTO-AGC-ARTBA JOINT COMMITTEE. TASK FORCE 13 PUBLICATION TITLED "A
GUIDE TO STANDARDIZED HIGHWAY BARRIER HARDWARE."
2. WOOD POSTS WITH 12" BEVELS AT THE TOP. THE LENGTH, WIDTH AND DEPTH OF
THE POST SHALL BE AS SPECIFIED ON THIS STANDARD AND THE POST BOLT
HOLES SHALL BE LOCATED TO ENSURE PROPER RAIL HEIGHT.
3. WOOD OFFSET BLOCKS WITH 12" BEVELS AT THE TOP AND BOTTOM OR A 1"
BEVELED TOP MAY BE USED IN LIEU OF WOOD BLOCKS WITHOUT BEVELS
SPECIFIED. THE LENGTH (FRONT AND BACK FACE), WIDTH AND DEPTH OF THE
BLOCK SHALL BE AS SPECIFIED ON THIS STANDARD AND THE POST BOLT HOLES
SHALL BE LOCATED TO ENSURE PROPER RAIL HEIGHT AND COMPATIBILITY WITH
POST HOLES.
4. WHEN THE FACE OF GUARDRAIL IS PLACED FLUSH WITH FACE OF CURB, THE
RAIL HEIGHT SHOULD BE MEASURED FROM THE FRONT EDGE OF THE GUTTER
PAN, WHICH IS THE POINT ON THE GUTTER PAN THAT IS CLOSEST TO THE EDGE
OF THE TRAVELED LANE. WHEN THE FACE OF THE GUARDRAIL PANEL IS
LOCATED BEHIND THE CURB THE RAIL HEIGHT SHOULD BE MEASURED FROM
THE GROUND JUST IN FRONT OF THE GUARDRAIL.
UTILITY AND CONSTRUCTION IN RIGHTS OF WAY NOTES:
1. ALL UTILITY AND CONSTRUCTION WORK DONE IN PUBLIC RIGHTS OF WAY OR
EASEMENTS MUST BE DONE IN ACCORDANCE WITH MICHIGAN DEPARTMENT OF
TRANSPORTATION AND ALL LOCAL STANDARDS AND SPECIFICATIONS.
MDOT CLASS II
MDOT 23A
EXISTING GROUND
STONE
EXISTING
EMBANKMENT
SUMMARY OF HYDRAULIC ANALYSIS
FLOOD
DATA
DISCHARGE
(CFS)
PROPOSED
WATER SURFACE
ELEV. AT U/S FACE
OF STRUCTURE
VELOCITY IN
D/S CHANNEL
(FPS)
WATERWAY
AREA (SF)
AT D/S FACE
100-YEAR 270 1227.78 8.73 16.97
HYDRAULIC ANALYSIS NOTES
1. FLOOD AND DISCHARGE ESTIMATES WERE PERFORMED BY MICHIGAN'S DEPARTMENT OF ENVIRONMENT, GREAT LAKES, AND
ENERGY (EGLE) AND ISSUED TO GEI ON FEBRUARY 25, 2022.
2. THE DRAINAGE AREA CONTRIBUTING TO THIS CROSSING IS 2.1 SQUARE MILES.
3. THE WATER SURFACE AND/OR ENERGY GRADE ELEVATIONS SHOWN ON THE ABOVE HYDRAULIC TABLE ARE TO BE USED FOR
COMPARISON PURPOSES ONLY AND ARE NOT TO BE USED FOR ESTABLISHING A REGULATORY FLOODPLAIN.
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\GENERAL NOTES.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
SOIL BORINGB-1
ROAD
CLOSED
BRIDGE
CLOSED
AHEAD
TYPE III BARRICADES WITH LIGHTS
TYPE III BARRICADES WITH LIGHTS
TYPE III BARRICADES
BRIDGE
OUT
BRIDGE
OUT
ROAD
CLOSED
BRIDGE
CLOSED
AHEAD
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\TRAFFIC CONTROL.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
TRAFFIC
CONTROL PLAN
C-100
LEEMAN ROAD
EAST PIPELINE ROAD
LEEMAN ROAD
CULVERT REPLACEMENT LOCATION
TRAFFIC CONTROL NOTES:
1. CONTRACTOR TO NOTIFY THE MDNR A MINIMUM OF 2 WEEK PRIOR TO CLOSING EAST
PIPELINE ROAD.
2. CONTRACTOR SHALL PROVIDE AN ESTIMATE TO THE MDNR AND AFFECTED PROPERTY
OWNERS OF DURATION OF ROAD CLOSURE.
3. ALL TRAFFIC CONTROLS AND SIGNS SHALL BE INSTALLED IN ACCORDANCE WITH THE
MICHIGAN DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR
CONSTRUCTION OF HIGHWAYS, STREETS AND BRIDGES AND THE MICHIGAN MANUAL OF
UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, LATEST EDITIONS.
SCALE, FEET
200 400
© 2022 MICROSOFT CORPORATION © 2022 MAXAR ©CNES (2022) DISTRIBUTION AIRBUS DS
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
P.E. No.: 64048
INR
24" CMP
IE=1222.41
24" CMP
IE=1222.95
SAND AND GRAVEL
FLAT BOTTOM CREEK
B-1
EA
ST
P
IP
EL
IN
E R
D
SF
SF
1+
2+
-0+
2+
.27
REMOVE EXISTING CULVERT
SILT FENCE (TYP.)
SEE DETAIL 3 ON SHEET D-401.
1+00
2+00
3+00
4+00
SF
SF
SILT FENCE (TYP.)
SEE DETAIL 3 ON SHEET D-401.
SILT FENCE (TYP.)
SEE DETAIL 3 ON SHEET D-401.
SILT FENCE (TYP.)
SEE DETAIL 3 ON SHEET D-401.
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\EXISTING CONDITIONS.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
EXISTING
CONDITIONS &
DEMOLITION PLAN
C-100
SURVEY POINT INFORMATION
NO. NORTHING EASTING ELEVATION DESCRIPTION
BM2 475,535.75 26,006,657.87 1232.05 GPS SPIKE
BM3 475,316.44 26,006,607.42 1234.38 GPS SPIKE
EXISTING STRUCTURE:
THE EXISTING STRUCTURE IS A CMP CULVERT UNDERNEATH EAST PIPELINE ROAD THAT IS 24" IN DIAMETER
AND 31' IN LENGTH.
NOTES:
1. COORDINATES ARE MICHIGAN STATE PLANE COORDINATE SYSTEM NAD 83 (2011), NORTH ZONE, INTERNATIONAL FEET
2. VERTICAL DATUM BASED UPON NAVD 88 (GEOID18)
3. 2 FOOT CONTOUR INTERVAL
4. FIELD SURVEY CONDUCTED BY TRIMEDIA ENVIRONMENTAL & ENGINEERING WAS COMPLETED DECEMBER 8, 2021. CONTRACTOR TO FIELD VERIFY.
5. WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING AND
DETERMINATION OF WATER LEVELS THAT MAY EXIST DURING CONSTRUCTION AND APPROPRIATE
MANAGEMENT PLAN.
6. PRIOR TO CONSTRUCTION OF THE SANDBAG PLUG; CONTRACTOR SHALL VERIFY NO SIGNIFICANT RAINFALL
EVENTS ARE FORECASTED DURING STREAM DIVERSION.
7. APPROXIMATE FLOODPLAIN IMPACT: 0.15 AC 165 CUYD EXCAVATION.
8. CONTRACTOR TO USE SANDBAG FILL WITHIN LIMITS OF STREAM BED. CONTRACTOR MAY USE EXISTING
ONSITE MATERIAL TO FILL SANDBAGS.
9. BYPASS SYSTEM MUST BE CAPABLE OF SAFELY HANDLING THE 2-YR, 35 CFS RAIN EVENT.
10.CONTRACTOR TO SUBMIT BYPASS PLAN TO THE ENGINEER AND OWNER A MINIMUM OF 14 DAYS PRIOR TO
START OF WORK FOR APPROVAL.
SCALE:
20 40
1" = 20'
TRIBUTARY OF STURGEON RIVER
ENGINEERS ESTIMATE OF QUANTITIES
TOTAL UNIT DESCRIPTION
0.1 AC CLEARING AND GRUBBING
190 FT EROSION CONTROL, SILT FENCE
900 CYD EXCAVATION, EARTH
50 CYD EMBANKMENT, CL III
EARTHWORK:
FLOODPLAIN IMPACT: 0.17 AC, 850 CUYD EXCAVATION
WETLAND IMPACT: 0.05 AC, 50 CUYD FILL
SANDBAG PLUG, SEE NOTE 10.
SANDBAG PLUG, SEE NOTE 10.
REMOVE AND DISPOSE OF EXISTING VEGETATION
REMOVE AND DISPOSE OF EXISTING VEGETATION
REMOVE AND DISPOSE OF EXISTING VEGETATION
REMOVE AND DISPOSE OF EXISTING VEGETATION
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
B-1
EA
ST
P
IP
EL
IN
E R
D
2+00
3+00
1+
CL CULVERT
STA=2+31
CL CULVERT
STA=2+55
PIPELINE LINE RD
POB
STA=0+90
PIPELINE LINE RD
POE
STA=1+70
CENTER OF RIVER
POE
STA=3+16
CENTER OF RIVER
POB
STA=1+68
POB GUARDRAIL APPROACH
STA=1+42, OFF -10 LT
POE GUARDRAIL DEPARTURE
STA=0+95, OFF -10 LT
POB GUARDRAIL APPROACH
STA=0+97, OFF 10 RT
POE GUARDRAIL DEPARTURE
STA=1+44, OFF 10 RT
POB GUARDRAIL
STA=1+31, OFF -7 LT
1225 1225
2H:1V
???H:1V
2H:1V
2H:1V
8H:1V
6H:1V
4H:1V
L1
L3
L2
L4 L5 L6 L7 L8
L9
L1
L1
L1
L13
L14
L1 L2
L15
84°
POB GUARDRAIL
STA=1+08, OFF 7 RT
12'
2'
12.8'
CENTER OF RIVER
Number
L1
L2
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L16
START NORTHING
475,450.94
475,454.68
475,448.42
475,451.55
475,457.81
475,457.69
475,457.57
475,457.45
475,458.12
475,458.96
475,460.03
475,462.77
475,466.09
475,468.83
475,473.63
475,475.24
475,477.56
START EASTING
26,006,540.52
26,006,593.58
26,006,579.92
26,006,586.75
26,006,600.41
26,006,609.17
26,006,617.93
26,006,626.69
26,006,657.90
26,006,664.45
26,006,670.32
26,006,672.84
26,006,675.72
26,006,678.25
26,006,684.36
26,006,691.96
26,006,707.27
END NORTHING
475,448.42
475,457.81
475,451.55
475,454.68
475,457.69
475,457.57
475,457.45
475,458.12
475,458.96
475,460.03
475,462.77
475,466.09
475,468.83
475,473.63
475,475.24
475,477.56
475,476.09
END EASTING
26,006,579.92
26,006,600.41
26,006,586.75
26,006,593.58
26,006,609.17
26,006,617.93
26,006,626.69
26,006,657.90
26,006,664.45
26,006,670.32
26,006,672.84
26,006,675.72
26,006,678.25
26,006,684.36
26,006,691.96
26,006,707.27
26,006,720.04
Length
39.48
7.51
7.51
7.51
8.76
8.76
8.76
31.22
6.60
5.97
3.72
4.40
3.72
7.77
7.77
15.48
12.86
Line/Chord Direction
S86°20'25"E
N65°22'46"E
N65°22'46"E
N65°22'46"E
S89°12'55"E
S89°12'55"E
S89°12'55"E
N88°46'13"E
N82°40'14"E
N79°41'35"E
N42°41'47"E
N40°52'24"E
N42°41'47"E
N51°50'55"E
N78°04'06"E
N81°21'03"E
S83°23'26"E
Radius
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\PROPOSED CONDITIONS.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
PROPOSED
CONDITIONS
C-110
NOTE:
1. DO NOT RELY UPON ENGINEERS ESTIMATE OF QUANTITIES. CONTRACTOR MUST
CALCULATE QUANTITIES FOR BIDDING.
EARTHWORK:
FLOODPLAIN IMPACT: 0.09 AC, 350 CUYD FILL
WETLAND IMPACT: 0.05 AC, 50 CUYD FILL
ENGINEERS ESTIMATE OF QUANTITIES
TOTAL UNIT DESCRIPTION
24 FT 102 INCH CULVERT
130 SYD AGGREGATE SURFACE COURSE, 23A, 12 INCH
50 CYD SAND SUBBASE, CL II
20 CYD EMBANKMENT, CL II
600 CYD EMBANKMENT, CL III
40 SYD AGGREGATE BASE, 6A, 12 INCH
48 FT GUARDRAIL, MDOT TYPE B
24 FT GUARDRAIL APPROACH
24 FT GUARDRAIL DEPARTURE
10 SYD RIPRAP, MDOT, SPECIAL, 8" TO 24"
50 SYD TOPSOIL SURFACE, SALV, 4 INCH
50 SYD EROSION CONTROL, MULCH BANK, HIGH VELOCITY
10 LBS SEED, OTTAWA MIX
10 LBS FERTILIZER, MDOT CLASS A
TRIBUTARY OF STURGEON RIVER
CENTERLINE ALIGNMENT
EDGE OF EXISTING ROAD
PROPOSED 102 INCH CULVERT
SCALE:
5 10
1" = 5'
EAST PIPELINE RD CENTERLINE
GUARDRAIL APPROACH,
12 FT, SEE DETAIL ON
SHEET D-100
GUARDRAIL DEPARTURE, 12 FT,
SEE DETAIL ON SHEET D-100
GUARDRAIL DEPARTURE, 12 FT,
SEE DETAIL ON SHEET D-100
GUARDRAIL APPROACH, 12 FT,
SEE DETAIL ON SHEET D-100
GUARDRAIL MDOT TYPE B, 24 FT (EA)
WING WALL, 9FT
WING WALL, 9 FT
WING WALL, 9 FT
WING WALL, 9 FT
HEADWALL
HEADWALL
EDGE OF PROPOSED ROADWAY
PROPOSED STREAM FLOW CHANNEL
RIPRAP, MDOT SPECIAL
GEOTEXTILE FABRIC, 7 OZ/SYD
RIPRAP, MDOT SPECIAL
GEOTEXTILE FABRIC, 7 OZ/SYD
RIPRAP, MDOT SPECIAL
GEOTEXTILE FABRIC, 7 0Z/SYD
RIPRAP, MDOT SPECIAL
GEOTEXTILE FABRIC, 7 OZ/SYD
10'
14'
15°
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\TRAFFIC CONTROL.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
EXCESS
SPOILS AREA
C-130
LEEMAN ROAD
LEEMAN ROAD
EXCESS SPOILS AREA
46.088 N
-087.988 W
SCALE, FEET
500 1000
© 2022 MICROSOFT CORPORATION © 2022 MAXAR ©CNES (2022) DISTRIBUTION AIRBUS DS
PROJECT SITE
LE
R
ZA
R
O A
D
EL
EV
AT
IO
N
FE
ET
EL
EV
AT
IO
N
FE
ET
-0+00 0+25 0+50 0+75
.6
1+00
.7
1+25
.1
1+50 1+75 2+00 2+24
.7
-0+00
.6
0+25
.8
0+50
.7
0+75
.7
1+00
.7
1+25
.2
1+50
.9
1+75
.7
2+00
.6
2+24
EXISTING GRADE
100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR
PR 100-YR FLOOD EL. 1227.78'
PR. STREAMBED EL. 1222.35'
PR 102" CULVERT,
24FT, ALUMINUM OR CONCRETE, 1% SLOPE
PR GUARDRAIL
12.1'
1.5
BOTTOM OF EXCAVATION EL 1219'
PVI STA = 1+32.13
PVI ELEV = 1230.50
A.D. = 3.59% K = 20.03
72' VC
PV
C
: 0 +9
6.
EL
EV
: 1
0.
PV
T:
+6
8.
EL
EV
: 1
1.
LOW POINT ELEV = 1230.62
LOW POINT STA = 1+03.78
POB
STA: 0+90
ELEV: 1230.66
POE
STA: 1+70
ELEV: 1231.72
PR GUARDRAIL
DEPARTURE
PR GUARDRAIL
APPROACH
PR. CULVERT INVERT EL. 1220.35'
PR. TOP OF CULVERT EL. 1228.85'
PR. BOTTOM OF LINE POST EL. 1229.05'
EX 24" CMP CULVERT
MDOT 6A, OPEN GRADED AGGREGATE
CULVERT BEDDING MATERIAL,
SEE DETAIL ON SHEET C-110
HAZARD SIGN,
SEE DETAIL 7 ON SHEET C-100
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\PIPE LINE RD PROFILE.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
PIPELINE RD
PROFILE
C-210
VERTICAL SCALE, FEET
HORIZONTAL SCALE, FEET
100 20
NOTE: 5x VERTICAL EXAGGERATION
0 2 4
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
AT
IO
N
FE
ET
EL
EV
AT
IO
N
FE
ET
1+20 1+25 1+50
.5
1+75
.0
2+00
.4
2+25 2+50
.0
2+75
.0
3+00 3+25 3+50 3+70
.6
1+20
.6
1+25
.8
1+50
.6
1+75
.5
2+00
.0
2+25
.5
2+50
.2
2+75
.7
3+00
.8
3+25
.1
3+50
.6
3+70
EXISTING GRADE
1.5'
24'
6.5'
2'
~8
STA: 2+31
ELEV: 1222.35
STA: 2+55
ELEV: 1222.11
STA: 2+44
ELEV: 1230.69
STA: 2+31
ELEV: 1228.85
STA: 3+16
ELEV: 1221.97
100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR 100YR
PR 100-YR FLOOD EL. 1227.78'
PR STREAM PROFILE
HEADWALL
WING WALL
GUARDRAIL, MDOT TYPE B
STA: 1+68
ELEV: 1223.71
14'
MDOT 6A, OPEN GRADED AGGREGATE
CULVERT BEDDING MATERIAL,
SEE DETAIL ON SHEET C-110
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\RIVER PROFILE.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
RIVER PROFILE
C-220
VERTICAL SCALE, FEET
HORIZONTAL SCALE, FEET
100 20
NOTE: 5x VERTICAL EXAGGERATION
0 2 4
EXCAVATED STREAM MATERIAL PLACED
IN CULVERT, SEE DETAIL ON SHEET C-420
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
AT
IO
N
FE
ET
2+28
EL
EV
AT
IO
N
FE
ET
EL
EV
AT
IO
N
FE
ET
2+60
EL
EV
AT
IO
N
FE
ET
2+03
EL
EV
AT
IO
N
FE
ET
1+78
EL
EV
AT
IO
N
FE
ET
EL
EV
AT
IO
N
FE
ET
1+53
EL
EV
AT
IO
N
FE
ET
2+85
EL
EV
AT
IO
N
FE
ET
3+10
EL
EV
AT
IO
N
FE
ET
3+35
.9
.0
.0
.0
.9
.0
.7
.8
.4
.4
.0
.0
.7
.8
.2
.2
.0
.0
.0
.1
.4
.5
.4
.5
.1
.1
.7
.7
.2
.3
.6
.6
.9
.9
.4
.5
.9
.9
.8
.8
.9
.9
.3
.4
.1
.2
.6
.6
.9
.0
.2
.2
.6
.6
.6
.7
.7
.8
.5
.5
.5
.5
.3
.4
.3
.4
.3
.4
.9
.9
.5
.6
.5
.5
.6
.6
.7
.7
.7
.8
.1
.1
.3
.3
.5
.6
.3
.3
.5
.6
.2
.2
.1
.1
.6
.7
.5
.6
.6
.7
.1
.1
.9
.9
.5
.5
.8
.9
.1
.1
.2
.2
EXISTING GRADE EXISTING GRADE
EXISTING GRADE EXISTING GRADE
EXISTING GRADE EXISTING GRADE
EXISTING GRADE
EXISTING GRADE
PROPOSED GRADE
EL. 1223.48'
PROPOSED GRADE
EL. 1222.42'
PROPOSED GRADE
EL. 1222.10'
PROPOSED GRADE
EL. 1222.04'
PROPOSED GRADE
EL. 1221.98'
PROPOSED GRADE
EL. 1222.95'
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\STREAM CROSS SECTIONS.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
STREAM CROSS
SECTIONS
C-300
SCALE:
UPSTREAM SECTION AT 1+53
1"=10'1 SCALE:
UPSTREAM SECTION AT 1+78
1"=10'2 SCALE:
UPSTREAM SECTION AT 2+03
1"=10'3 SCALE:
UPSTREAM SECTION AT 2+28
1"=10'4
SCALE:
DOWNSTREAM SECTION AT 3+35
1"=10'8SCALE:
DOWNSTREAM SECTION AT 3+10
1"=10'7SCALE:
DOWNSTREAM SECTION AT 2+85
1"=10'6SCALE:
DOWNSTREAM SECTION AT 2+60
1"=10'5
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
2% LC 2%
4" TOPSOIL, SEED, FERTILIZER
AND MULCH BLANKET
SCALE: NTS
MDOT 23A, 12" (CIP)
MDOT CL II, GRANULAR
SUBBASE, 12" (CIP)
MAX 3H:1V SLOPE TO
EXISTING GRADE
14'
INSTALLATION WITH TRENCHING
NOTES:
1. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY.
2. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN
NECESSARY. 9" (225mm) MAXIMUM RECOMMENDED STORAGE HEIGHT.
3. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE
SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED.
EXTRA STRENGTH FILTER
FABRIC NEEDED WITHOUT
WIRE MESH SUPPORT
STEEL OR WOOD POST
ATTACH FILTER FABRIC
SECURELY TO UPSTREAM
SIDE OF POST
10' (3m) MAXIMUM SPACING WITH WIRE SUPPORT FENCE 6' (1.8m)
MAXIMUM SPACING WITHOUT
WIRE SUPPORT FENCE
FLOW
PONDING HEIGHT
8" (200 mm)
3/4" (20mm) MIN
DRAIN ROCK
FLOW
12" MIN
(300 MM)
9" MAX
(225 mm)
STORAGE HT
PONDING HEIGHT
FLOW
INSTALLATION WITHOUT TRENCHING
STEEL OR WOOD
POST
36" (1M) HIGH MAX
12" MIN
(300 mm)
4"x6" (100x150mm)
TRENCH WITH
COMPACTED BACKFILL
SILT FENCE
* 2 8"
6'- 3" TYPICAL
POST SPACING
12'- 6" EFFECTIVE
BEAN ELEMENT LENGTH
8" 8"
7"
** 5'- 0" OR AS SPECIFIED ON PLANS
SHOULDER HINGE POINT
EMBANKMENT
TOE NAIL WOOD BLOCK WOOD POST WITH A
MINIMUM 3" LONG HOT-DIP ZINC COATED NAIL
6" X 8" WOOD
LINE POST
POST BOLT WITH ROUND WASHER UNDER NUT
SPLICE BOLT (TYP.) 2'- 0" ***
3' -7
**6'
- 0
***IF THE OFFSET FROM THE FACE OF POST TO THE SHOULDER HINGE POINT
IS LESS THAN 2'- 0" AND THE EMBANKMENT (OR MEDIAN) SLOPE IS STEEPER
THAN 1:10. USE 8'- 0" POST WITH THE ADDITIONAL LENGTH EMBEDDED.
GRADE
ELEVATION SHOWING POST PACING
*SEE NOTES FOR GUARDRAIL IN CONJUNCTION WITH CURB
TERMINATION PLATETERMINATION PLATE
POST BOLT
CONNECTING STEEL
POST
TO WOOD OFFSET
BLOCK
4" DIA. HOLE
7" 7"
3"
8"
6"
3" 3"
TOP SIDEFRONT
FOR USE ON WOOD POSTS
SEE NOTES ON SHEET G-001
4" X 2 12"
POST BOLT SLOT
12" X 1 18"
SPLICE BOLT SLOT
(TYP.)
℄ POST BOLT SLOT AND
℄ WOOD POST
1' - 0 12" 2" 2"
0.3' 0.3'
4'
EXISTING GROUND
12'
8" DIA. GALVANIZED THROUGH BOLTS (TYP.)
6" X 6" X 6' PRESSURE TREATED BEVELED
WOOD POST (TYP.) INSTALLED 4' O.C.
3" X 8" PRESSURE TREATED
RUNNER (TYP.)
4'
8"
8"
HAZARD PANELS (TYP ALL POSTS)
3'
7'
36"x12" BLACK AND YELLOW HAZARD PANEL SIGN
12"
NOTES:
1. PLACE SIGN ON EACH SIDE OF ROAD.
2. THE ALTERNATING BLACK AND RETROREFLECTIVE YELLOW STRIPES (OM3-L
& OM3-R) SHALL BE SLOPED DOWN AT TAN ANGLE OF 45 DEGREES TOWARD
THE SIDE ON WHICH TRAFFIC IS TO PASS THE OBSTRUCTION. IF TRAFFIC
CAN PASS TO EITHER SIDE OF THE OBSTRUCTION THE ALTERNATING BLACK
AND RETROREFLECITVE YELLOW STRIPES (OM3-C) SHALL FORM CHEVRONS
THAT POINT UPWARDS.
TYPE 3
OBJECT MARKER SIGN
OM3-L & OM3-R
GALV. STEEL POST
6x6 WOOD POST
4'
ROAD SURFACE
8" DIA. GALVANIZED THROUGH BOLTS (TYP.)
DETAILS
(1 OF 2)
D-100
NOT TO SCALE
C-120 ROAD CROSS SECTION
DETAIL
NOT TO SCALE
C-110 SILT FENCE
DETAIL
NOT TO SCALE
C-120 GUARDRAIL
DETAIL
NOT TO SCALE
C-120 GUARDRAIL WOOD POST
DETAIL
NOT TO SCALE
C-120 WOOD OFFSET BLOCKS FOR GUARDRAIL
DETAIL
NOT TO SCALE
C-120 BEAM ELEMENT SPLICE DETAILS
DETAIL
NOT TO SCALE
C-120 GUARDRAIL APPROACH & DEPARTURE
DETAIL
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\DETAILS.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
NOT TO SCALE
C-120 GUARDRAIL APPROACH & DEPARTURE
DETAIL
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
Ø 8.
5'
10'
9'
2'
10'
9' 15°
8.5'
MIN. BURRY DETPTH
3.
5'
M
IN
1.5'
HEAD AND WING WALL FOUNDATION
NOTES:
1. CONTRACTOR TO SUBMIT SHOP DRAWINGS SEALED BY A LICENSED PROFESSIONAL ENGINEER IN
THE STATE OF MICHIGAN TO ENGINEER FOR APPROVAL.
2. HEAD AND WING WALL MATERIAL SHALL BE THE SAME AS THE CULVERT OR
PRE-CAST/CAST-IN-PLACE CONCRETE.
3. HEAD AND WING WALL SHALL USE TIE BACKS AS NECESSARY TO PREVENT LATERAL MOVEMENT.
4. ALL JOINTS AND OPENINGS SHALL BE SEALED AND WATER TIGHT.
CULVERT
2' OF EXCAVATED RIVER MATERIAL
PLACED IN BOTTOM OF CULVERT.
SUPPLEMENT RIVER MATERIAL
WITH MDOT 6A STONE, IF NEEDED.
EXCAVATE AND PROVIDE BASE MATERIAL
PER MANUFACTURERS RECOMMENDATION
HEADWALL/WING WALL FOUNDATION PER
MANUFACTURERS RECOMMENDATIONS
AGGREGRATE SURFACE COURSE
12" DEPTH MDOT 23A
2' OF EXCAVATED RIVER MATERIAL
PLACED IN BOTTOM OF CULVERT.
SUPPLEMENT RIVER MATERIAL
WITH MDOT 6A STONE, IF NEEDED.
MDOT CL II, MATCH EXISTING
EMBANKMENT GRADES
GEOTEXTILE FABRIC
102 INCH CULVERT
REUSE EXISTING
EMBANKMENT MATERIAL
1' DEPTH OF 6A STONE PLACED ON NATIVE
MATERIAL BELOW BOTTOM OF CULVERT
2' OF 6A STONE PLACED,
HAUNCH AROUND CULVERT
1.5 ±
0.5' 4' 2'
X X X X
NOTES:
1. MDOT 6A MATERIAL SHALL EXTEND 1.5' BEYOND ALL SIDES OF CULVERT AS SHOWN ABOVE.
2. GEOTEXTILE SHALL BE PLACED ON THE TOP AND SIDES OF MDOT 6A MATERIAL USED FOR
CULVERT BEDDING.
3. CULVERT STRUCTURE MUST BE DESIGNED TO SUPPORT HL-93 LOADING. DESIGN MUST BE
SEALED BY A LICENSED PROFESSIONAL ENGINEER IN THE STATE OF MICHIGAN. CONTRACTOR
TO SUBMIT DESIGN TO THE ENGINEER FOR APPROVAL.
4. UPSTREAM STONE INVERT ELEVATIONS = 1223.35 DOWNSTREAM STONE INVERT = 1223.11.
5. ALL JOINTS SHALL BE WRAPPED IN GEOTEXTILE FABRIC WITH A MIN. WEIGHT OF 7 OZ/SYD
1 MIN
SAND SUBBASE COURSE
12" DEPTH MDOT CL II
10.5' ±
NATIVE MATERIAL
DETAILS
(2 OF 2)
D-110
NOTES
GENERAL NOTES:
1. PRIOR TO CONSTRUCTION, CONTRACTOR MUST VERIFY ALL ELEVATIONS AND CONDITIONS.
2. ALTERNATE STRUCTURES MAY BE CONSIDERED, PROVIDED THAT THE ALTERNATE DESIGN DOES NOT REDUCE
THE HYDRAULIC OPENING OF THE STRUCTURE AS SHOWN ON THE DRAWINGS. AT A MINIMUM THE ALTERNATE STRUCTURE MUST PROVIDE THE SAME OR LARGER SPAN AND RISE AS THE STRUCTURE SHOWN ON THE
DRAWINGS.
DESIGN DATA
DESIGN LOADING:
BRIDGE UNITS: SELF WEIGHT, MAX FILL 12.5', AASHTO HL-93
HEADWALLS: SELF WEIGHT, MAX FILL 3', CAT CP 323C COMPACTOR
WINGWALLS: SELF WEIGHT, MAX FILL 3', CAT CP 323C COMPACTOR
DESIGN FILL HEIGHT: 2'
FROM TOP OF CROWN TO TOP OF CULVERT.
DESIGN METHOD: LOAD RESISTANCE FACTOR DESIGN PER HL-93 SPECIFICATION
ASSUMED ALLOWABLE BEARING CAPACITY: 2,000 PSF
A
C-120 ALUMINUM CULVERT
SECTION
\\MQT-PZCC-1\ W:\DTMB\2104383_East_Pipeline_Road_Culvert\00_CAD\Design\Sheets\DETAILS.dwg - 9/22/2022
GEI CONSULTANTS OF MICHIGAN, P.C.
109 W. BARAGA AVENUE
MARQUETTE, MI 49855
(906)451-4021
Consultants
Attention:
0 1"
NO. DATE ISSUE/REVISION APP
A 9/28/2022 ISSUE FOR BID GMM
If this scale bar does not measure 1" then drawing is not original scale.
SHEET NAME
SHEET NO.
MICHIGAN DEPARTMENT
OF TECHNOLOGY,
MANAGEMENT, AND
BUDGET
P.O. BOX 30026
LANSING, MI 48909
DRAFT
EA
ST
P
IP
EL
IN
E R
O A
D C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
D
IC
KI
N
SO
N
C O
U N
TY
, M
I
For Bid Not For Construction
B
C-120 HEAD AND WING WALLS
SECTION
Designed:
Checked:
Drawn:
GEI Project
Approved:
INR
GMM
ANC
2104383
| State of Michigan |
| Untitled |
| Department of Technology, Management and Budget |
| State Facilities Administration |
| Bidding and Contract Document |
| DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET |
| DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET |
| State Facilities Administration |
| Design & Construction Division |
| BID BOND |
| TABLE OF CONTENTS |
| CONTRACT FORMS |
| TABLE OF CONTENTS |
| SECTION TITLE PAGES THRU |
| APPENDIX I – GLOSSARY |
| APPENDIX II – SPECIAL WORKING CONDITIONS |
| APPENDIX III – SPECIAL PROJECT PROCEDURES |
| APPENDIX IV – REQUIRED PROJECT SIGN |
| APPENDIX V – PREVAILING WAGE |
| DIVISION 00 - BIDDING REQUIREMENTS AND CONTRACTO CONDITIONS |
| SECTION 00010 PRE-BID INFORMATION |
| SECTION 00100 INSTRUCTION TO BIDDERS |
| SECTION 00120 SUPPLEMENTARY INSTRUCTIONS |
| SECTION 00200 INFORMATION FOR BIDDERS |
| 1. The following conditions must supplement the general conditions: |
| a. Contractor is required to create a project specific COVID19 Preparedness and Response Plan complying with all Federal and State requirements and guidelines, including, but not limited to, the most recent State of Michigan Executive Orders, OSHA, MI... |
| If a project is funded in whole or in part by federal dollars, the Contractor and all Subcontractors must comply with the most recent version of Federal Provisions Addendum and all Laws pertaining to occupational classifications and wage requirements ... |
| SECTION 00700 - GENERAL CONDITIONS |
| SECTION 00750 SPECIAL WORKING CONDITIONS |
| SECTION 00800 SUPPLEMENTARY CONDITIONS |
| SECTION 00850 FEDERALLY FUNDED PROJECT REQUIREMENTS |
| SECTION 00900 - END OF SECTION |
| DIVISION 01 - GENERAL REQUIREMENTS |
| SECTION 01020 |
| SECTION 01025 MEASUREMENT AND PAYMENT |
| SECTION 01030 |
| SECTION 01040 |
| SECTION 01050 FIELD ENGINEERING |
| SECTION 01060 REGULATORY REQUIREMENTS |
| SECTION 01090 REFERENCES |
| SECTION 01100 PROJECT PROCEDURES |
| SECTION 01200 |
| SECTION 01300 SUBMITTALS |
| SECTION 01400 QUALITY CONTROL |
| SECTION 01500 |
| SECTION 01600 MATERIAL AND EQUIPMENT |
| SECTION 1650 FACILITY START-UO |
| SECTION 01700 CONTRACT CLOSE-OUT |
| SECTION 01800 MAINTENANCE |
| DIVISION 02 - SITE CONSTRUCTION |
| 02200_EROSION_AND_SEDIMENT_CONTROL_FINAL |
| 02220_MISC_DEMOLITION_FINAL |
| 02320_BACKFILL_FINAL |
| PART 1 GENERAL |
| 1.01 WORK INCLUDED |
| A. Site filling and backfilling. |
| B. Fill for peat excavation areas. |
| C. Consolidation and compaction. |
| D. Fill for over-excavation. |
| E. Compaction requirements 95 percent of 1.02D. |
| 1.02 REFERENCES |
| A. ANSI/ASTM C136: Sieve Analysis of Fine and Coarse Aggregates. |
| B. ANSI/ASTM D1557: Moisture-Density Relations of Soils and Soil-Aggregate Mixture Using 10 lb (4.54 kg) Rammer and 18-inch (457 mm) Drop. |
| C. ANSI/ASTM 2922: Density of Soil Aggregate in Place by Nuclear Methods (Shallow Depth). |
| D. Latest revision of the MDOT Standard Specifications for Construction Section; Definition of Maximum Unit Weight, Michigan Cone. |
| E. Latest revisions of the MDOT Standard Specifications for Construction Section. |
| 1.03 SUBMITTALS |
| A. Quality Control Submittals and Test Reports: |
| 1. Sieve Analysis Reports for pipe bedding materials, road sand subbase, and road aggregate base materials shall be submitted in accordance with Section 01330 and 01400. |
| 2. All tests will be done at the Contractor’s expense. |
| PART 2 PRODUCTS |
| 2.01 FILL MATERIALS |
| A. Trench Undercut and road surface: MDOT 23A Coarse Aggregate. |
| B. Coarse Stone: MDOT 6A Coarse Aggregate. |
| C. Granular material used for backfill shall be MDOT Class II material. |
| D. Granular material used for pipe bedding shall be MDOT Class IIIA material. |
| E. Sand Embankment: MDOT granular material Class III. |
| F. Existing excavated material may be used for embankment and trench backfill if approved by the Engineer in the field. |
| PART 3 EXECUTION |
| 3.01 QUALITY ASSURANCE |
| A. Prior to placement of any aggregate, Contractor shall supply sieve analysis test results for each aggregate material type to be incorporated into the Work. A minimum of two (2) samples shall be analyzed and test results submitted to the Engineer f... |
| B. If at any time during the performance of the Work, Contractor changes sources for aggregate materials, the Contractor shall be required to perform two (2) additional sieve analysis test results for each type of aggregate material and shall submit r... |
| C. The Engineer shall have the discretion to order additional testing of the aggregate materials, if the materials are of inconsistent quality. The costs of all aggregate materials testing shall by borne by the Contractor. |
| D. Verify pipe is in-place properly bedded and driven home pipe prior to backfilling. |
| E. Verify areas to be backfilled are free of debris, snow, ice, or water, and ground surfaces are not frozen. |
| 3.02 PREPARATION |
| A. Compact subgrade to density requirements for subsequent backfill material. |
| B. Cut out soft areas of subgrade not capable of insitu compaction. Backfill with MDOT Class IIIA fill and compact to density equal to or greater than requirements for subsequent backfill material. |
| C. Prior to placement of aggregate course material at gravel or paved areas, compact subsoil to 95 percent of its maximum dry density as determined by MDOT Michigan Cone Test. |
| 3.03 BACKFILLING |
| A. Backfill areas to contours and elevations. Use unfrozen materials. |
| B. Use MDOT Class III material as embankment up to the depth that either structural fill or subbase begins. |
| C. Use MDOT Class III material for all peat excavated areas. |
| D. Use existing excavated material for all areas to be landscaped (seed or sod). |
| E. Systematically backfill to allow maximum time for natural settlement. Do not backfill over porous, wet, frozen or spongy subgrade surfaces. |
| F. All fill material shall be placed and compacted. Place and compact materials in continuous layers not exceeding 12 inches loose depth in accordance with ASTM 1557 to a minimum of 95% maximum dry weight. |
| G. Maintain optimum moisture content of backfill materials to attain required compaction density. |
| H. Make grade changes gradual. Blend slopes into level areas. |
| I. Remove surplus backfill materials. |
| J. Materials for trench bedding and pipe embedment shall, at a minimum, be in accordance with ASTM D 2321. |
| 3.04 TOLERANCES |
| A. Top Surface of Backfilling (Subgrade) Under Paved Areas: Plus or minus 3/4 inch. |
| B. Top Surface of Backfilling (Subgrade) Under Lawn Areas: Plus or minus 3/4 inch. |
| 3.05 FIELD QUALITY CONTROL |
| A. Compaction tests will be made by an agent of the Contractor. |
| B. The Contractor/Contractor’s agent shall obtain appropriate tests as directed by the Engineer. |
| C. The Contractor shall provide all labor and equipment as necessary to excavate holes for compaction testing if necessary. |
| D. The Contractor shall schedule his work activities to provide adequate time for the Contractor’s agent to perform compaction testing without interference. |
| E. Compaction testing shall be performed by the nuclear method. |
| F. Maximum density shall be determined in accordance with the One-Point Michigan Cone Test or the One-Point T-99 Test as described in the MDOT Density Control Handbook. |
| G. If tests indicate work does not meet specified requirements, remove work, replace, and retest at no cost to Owner. |
| 3.06 PROTECTION OF FINISHED WORK |
| A. Protect finished work. |
| B. Recompact fills subject to vehicular traffic. |
| 3.07 SCHEDULE |
| A. Grading limits as shown on Drawings. |
| 02750_STONE_FINAL |
| 02950_TURF_AND_GRASSES_FINAL |
| PART 1 GENERAL |
| 1.01 WORK INCLUDES |
| A. Seeding. |
| 1.02 RELATED SPECIFICATIONS |
| A. Section 01 45 00 – Quality Assurance. |
| B. Section 02 31 50 – Excavation. |
| C. Section 02 22 00 – Erosion and Sediment Control. |
| 1.03 SUBMITTALS |
| A. Product Data: For each type of product. |
| 1. Certification of Grass Seed: From seed vendor for each grass-seed monostand or mixture stating the botanical and common name, percentage by weight of each species and variety and percentage of purity, germination, and weed seed. Include the year ... |
| 2. Product Certificates: For fertilizers and mulch blanket, from manufacturer. |
| 3. Pesticides and Herbicides: Product label and manufacturer’s application instructions specific to Project. |
B. Qualification Data: For landscape installer.
| 1.04 QUALITY ASSURANCE |
| A. Installer Qualifications: A qualified landscape installer whose work has resulted in successful turf establishment. |
| 1. Installer’s Field Supervision: Require installer to maintain an experienced full-time supervisor on Project site when work is in progress. |
| 2. Pesticide Applicator: State licensed, commercial. |
B. Warranty: The CONTRACTOR shall and hereby does warranty that all work in this section shall be free from defects of materials and workmanship, and that turf areas meet a green uniform standard of appearance, until the Contractor has maintained the...
| 1.05 DELIVERY, STORAGE, AND HANDLLING |
| A. Seed and Other Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of compliance with State and Federal laws, as applicable. |
| 1.06 FIELD CONDITIONS |
| A. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permit planting to be performed when beneficial and optimum results may be obtained. Apply projects during favorable weather conditions according to m... |
| B. The season for seeding shall be from workable ground conditions from approximately April 15 through June 30; and from August 15 to October 15. Seed shall be placed when the ground is in a workable condition and temperatures are less than 95 degree... |
| 1.07 DEFINITIONS |
| A. Finished Grade: Elevation of finished surface of planting soil. |
| B. Pesticide: A substance or mixture intended for preventing, destroying, repelling, or mitigating a pest. Pesticides include insecticides, miticides, herbicides, fungicides, rodenticides, and molluscicides. They also include substances or mixtures... |
| C. Pests: Living organisms that occur where they are not desired or that cause damage to plants, animals, or people. Pests include insects, mites, grubs, mollusks (snails and slugs), rodents (gophers, moles, and mice), unwanted plants (weeds), fungi... |
| D. Planting Soil: Existing, on-site soil; imported soil; or manufactured soil that has been modified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth. See Section 32 91 00 “Planting Preparation” for more d... |
| E. Subgrade: The surface or elevation of subsoil remaining after excavation is complete, or the top surface of a fill or backfill before planting soil is placed. |
| PART 2 PRODUCTS |
| 2.01 SEED |
| A. Grass Seed: Fresh, clean, dry, new-crop seed complying with AOSA’s “Rules for Testing Seeds” for purity and germination tolerances. |
| B. Seed Species: |
| 1. Quality: Seed of grass species as listed below for solar exposure, with not less than 85 percent germination, not less than 95 percent pure seed, and not more than 0.5 precent weed seed: |
| 2. Seed Mix: Proportioned by weight as follows: |
| 3. CONTRACTOR to confirm seed species are consistent with species grown for permanent lawns in the local and regional area. CONTRACTOR may make species substitutions based on local lawn compositions if approved in writing by ENGINEER. |
| 2.02 FERTILIZERS |
| A. No fertilizers will be used. |
| 2.03 MULCHES |
| A. Excelsior erosion control blanket, or approved equal, (standard weight) shall consist of a machine produced curled wood excelsior mat with at least 80 percent 6-inch or longer fiber and with even distribution and consistent thickness. Fiber diamet... |
| 2.04 WATER |
| A. Water used for mixing or curing shall be cleaned and free of oil, salt, acid, alkali, sugar, vegetable matter or other substances injurious to the finished product. |
| PART 3 EXECUTION |
| 3.01 GENERAL |
| A. Immediately after the finished grade has been approved, begin seeding and mulching to reduce excessive weed growth. |
| 3.02 EXAMINATION |
| A. Examine areas to be planted for compliance with requirements and other conditions affecting installation and performance of the Work. |
| 1. Verify that no foreign or deleterious material or liquid such as paint, paint washout, concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar roofing compound, or acid has been depos... |
| 2. Suspend planting operations during periods of excessive soil moisture until the moisture content reaches acceptable levels to attain the required results. |
| 3. Uniformly moisten excessively dry soil that is not workable, or which is dusty. |
| B. Proceed with installation only after unsatisfactory conditions have been corrected. |
| C. If contamination by foreign or deleterious material or liquid is present in soil within a planting area, remove the soil and contamination as directed by the ENGINEER and replace with new planting soil. |
| 3.03 PREPARATION |
| A. Protect structures; utilities; sidewalks; pavements; and other facilities, trees, shrubs, and plantings from damage caused by planting operations. |
| B. Protect grade stakes set by others until directed to remove them. |
| C. Install erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways. |
| D. Protect adjacent and adjoining areas from hydromulching overspray. |
| 3.04 TURF AREA PREPARATION |
| A. Place Planting Soil: Place and mix planting soil in places over exposed subgrade. |
| 1. In sod placement areas, reduce elevation of planting soil to allow for soil thickness of sod. |
| B. Moisten prepared area before planting if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil. |
| C. Before planting, obtain ENGINEER’s acceptance of finished grading; restore planting areas if eroded or otherwise disturbed after finished grading. |
| 3.05 SEEDING |
| A. Sow seed with spreader or seeding machine. Do not broadcast or drop seed when wind velocity exceeds 5 mph (8 km/h). |
| 1. Evenly distribute seed by sowing equal quantities in two directions at right angles to each other. |
| 2. Do not use wet seed or seed that is moldy or otherwise damaged. |
| 3. Do not seed against existing trees. Limit extent of seed to outside edge of planting saucer. |
| B. Sow seed at a total rate recommended by manufacturer. |
| C. Rake seed lightly into top 1/8 inch (3 mm) of soil, roll lightly, and water with fine spray. |
| 3.06 TURF MAINTENANCE |
| A. General: Maintain and establish turf by watering, replanting, and performing other operations as required to establish healthy, viable turf. Roll, regrade, and replant bare or eroded areas and remulch to produce a uniformly smooth turf. Provide mat... |
| 1. Fill in as necessary soil subsidence that may occur because of settling or other processes. Replace materials and turf damaged or lost in areas of subsidence. |
| 2. In areas where mulch has been disturbed by wind or maintenance operations, add new mulch and anchor as required to prevent displacement. |
| B. Watering: The Contractor shall be responsible for ensuring necessary watering for successful establishment of all turf areas. |
| C. Weed Control: Keep sod and seed areas free from weeds. If weeds or other undesirable vegetation threaten to smother the planted sod or seed, uproot manually, rake and remove from the site. |
| 3.07 SATISFACTORY TURF |
| A. Turf installations shall meet the following criteria as determined by ENGINEER: |
| 1. Satisfactory Turf: At end of maintenance period, a healthy, well-rooted, viable turf has been established, free of weeds, open joints, bare areas, and surface irregularities to a minimum of 80% ground coverage. |
B. Use specified materials to reestablish turf that does not comply with requirements and continue maintenance until turf is satisfactory.
| 3.08 PESTICIDE APPLICATION |
| A. No Pesticides will be applied |
| 3.09 CLEANUP AND PROTECTION |
| A. Promptly remove soil and debris created by turf work from road areas. Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas. |
| B. Remove surplus soil and waste material, including excess subsoil, unsuitable soil, trash, and debris, and legally dispose of them off Owner's property. |
| C. Remove nondegradable erosion-control measures after grass establishment period. |
| 3.10 MAINTENANCE SERVICE |
| A. Turf Maintenance Service: Begin maintenance immediately after each area is planted and continue until acceptable turf is established, but for not less than one year after Substantial Completion. |
End of SECTION 02 95 00
| 029000_SITE_RESTORATION_FINAL |
| PART 1 GENERAL |
| 1.01 WORK INCLUDES |
| A. Placing topsoil and mulching the embankment crest and slopes not designated to receive an aggregate surface treatment. |
| B. Restoring the CONTRACTOR staging and stockpile areas to their original condition or better. |
| C. Restoring all other disturbed areas to their original condition or better. |
| 1.02 RELATED SECTIONS |
| A. Section 01 33 00 – Submittal Procedures. |
| B. Section 01 50 00 – Temporary Facilities and Controls. |
| 1.03 SUBMITTALS |
| A. Seed Samples and Data showing the seed mix composition and guarantee of germination. |
| B. Manufacturer’s Product Data for mulch. |
| C. Information about placement method and timeline for seeding, mulching, and fertilizing. |
| PART 2 PRODUCTS |
| 2.01 GRASS SEEDS |
| A. Grass Seed: Fresh, clean, dry, new-crop seed complying with AOSA’s “Rules for Testing Seeds” for purity and germination tolerances. |
| B. Seed Species: |
| 1. Quality: Seed of grass species as listed below for solar exposure, with not less than 85 percent germination, not less than 95 percent pure seed, and not more than 0.5 precent weed seed: |
| 2. Seed Mix: Proportioned by weight as follows: |
| 3. CONTRACTOR to confirm seed species are consistent with species grown for permanent lawns in the local and regional area. CONTRACTOR may make species substitutions based on local lawn compositions if approved in writing by ENGINEER. |
| 2.02 WATER |
| A. Water free of wastewater effluent or other hazardous chemicals. |
| 2.03 TOPSOIL |
| A. Clean salvaged or imported material consisting of loam, sandy loam, silt loam, silty clay loam, or clay loam humus-bearing soils. |
| B. Material shall be free of rocks, gravel, wood, debris, and of noxious weeds and their seeds and capable of passing the 1” sieve. |
| C. Topsoil material shall meet the requirements of MDOT Specification 917.06. |
| 2.04 MULCH |
| A. Mulch blanket shall be certified weed free hay or straw mulch in accordance with MDOT Specification 917.14. |
| 2.05 EROSION CONTROL MATTING |
| A. Erosion control blanket shall be MDOT Specification 917.14, High-Velocity Mulch Blankets. |
| PART 3 EXECUTION |
| 3.01 PROTECTION |
| A. Areas outside the limits of site disturbance shall be protected from damage by the CONTRACTOR. Any disturbance of vegetation or native ground outside of the limits of site disturbance shown on the Drawings shall be restored by the CONTRACTOR at no... |
| 3.02 PREPARATION |
| A. All areas to be restored shall receive topsoil, grass seeds, fertilizer, and mulch. |
| B. Prior to restoring any disturbed areas, remove all CONTRACTOR's equipment, debris, construction materials, office facilities, temporary fences or gates, and all other CONTRACTOR's properties in accordance with Section 01 50 00 - Temporary Facilitie... |
| C. Remove all rocks, debris, and litter that will prevent compliance with topsoil and seeding specifications. |
| D. Final grade all disturbed areas with a smooth blade grader, bulldozer, or other approved equipment, to the lines and grades shown on the Drawings, or as directed by the ENGINEER. |