NATIONAL OCEANIC AND
ATMOSPHERIC ADMINISTRATION
(NOAA)
EA133W-15-RP-0044
U.S. DEPARTMENT OF COMMERCE
NATIONAL OCEANIC AND ATMOSPHERIC
ADMINISTRATION
NATIONAL WEATHER SERVICE
THE ADVANCED WEATHER INTERACTIVE
PROCESSING SYSTEM
STATEMENT OF OBJECTIVES
JULY 08, 2015
ACQUISITION AND GRANTS OFFICE
EASTERN ACQUISITION DIVISION
NORFOLK, VIRGINIA
ATTACHMENT J.1 – STATEMENT OF OBJECTIVES
SECTION C: STATEMENT OF OBJECTIVES (SOO)
1. OBJECTIVE
The intent of this Statement of Objectives (SOO) is to support the acquisition of Operations and Maintenance (O&M) services, hardware, software, communications, and architecture improvement services for the Advanced Weather Interactive Processing System (AWIPS).
AWIPS supports the Department of Commerce (DOC), National Oceanic and Atmospheric
Administration (NOAA), and the National Weather Service (NWS) mission for the protection of life, property, and the enhancement of the national economy. It is not the intent of the Government to provide detailed requirements or to describe how the work is to be accomplished. The Offeror shall use the information contained herein to propose a technical solution that addresses the goals and objectives described in this SOO in a Performance
Work Statement (PWS). Innovative solutions that will improve NOAA’s ability to deliver services efficiently, effectively and economically is highly encouraged. The contractor shall also use this SOO to develop a Quality Assurance Plan (QAP). The QAP shall specify the performance measurements to be applied to the Contractor’s effort, along with positive and negative incentives associated with successful or unsuccessful performance, to support the
NWS in accomplishing its organizational mission and program objectives.
2. OVERVIEW
NOAA/NWS (hereinafter referred to as NWS) requires a performance based contract for the
O&M and Product Improvement services for AWIPS. It is fundamental to this effort that the contractor understands that the Information Technology (IT) and related services required under this contract provide an important role in AWIPS program business functions. In addition, the performance-based arrangement provides that the Contractor's payment and incentives are based on meeting service levels necessary to efficiently, effectively, and economically support the NWS in the execution of its responsibilities.
The Contractor shall bring a mission focus that provides highly effective, secure, reliable management, and IT services along with a solid understanding of NWS provided services.
These services include, but are not limited to, providing forecasts, observations for the water, land, all levels of the atmosphere, and the sun. These forecasts and observations are tailored for diversity (weather, population, demographics), and include traditional areas such as severe weather, winter weather, tropical weather, aviation, “routine” weather, space weather, and tsunami. The Contractor shall also continuously identify methods to improve AWIPS which translates to improving NWS’s ability to execute its mission. The Contractor shall also identify methods to improve the NWS's ability to execute its mission throughout the performance of the contract. The NWS will use a best-value approach for this procurement, emphasizing a stable cost environment while maintaining or reducing the amount of risk to the AWIPS program.
AWIPS is a complex system with many users and stakeholders, and has a Federal
Information Processing Standards (FIPS) 199 security categorization of “High.” As such, the
O&M, development, Information System Security, and IT services are of critical importance.
3. AWIPS BACKGROUND AND CONCEPT
The first AWIPS contract, which defined the development, deployment, operation, and maintenance of the AWIPS system, was awarded in 1992. The development of the original
AWIPS system was completed in June of 1999, and was capable of supporting operations and full deployment to 141 NWS offices. The AWIPS system was first base-lined in August
2000. The current AWIPS prime contract was awarded on August 17, 2005. The AWIPS system is currently deployed at one hundred twenty-two (122) Weather Forecast Offices
(WFOs), thirteen (13) River Forecast Centers (RFCs), six (6) NWS Regional Headquarters
(HQs), eight (8) National Centers (NCs), and at a small number of test and training locations.
In addition, an AWIPS workstation is provided to the twenty-one (21) Center Weather
Service Units (CWSUs) across the country. A complete listing of current AWIPS sites is accessible online at:
https://vlab.ncep.noaa.gov/web/awips-technical-library/home
The AWIPS program installed two (2) AWIPS installations (e.g., operational and developmental) at each of the Tsunami Warning Centers (TWC) and will be installing two (s) installations (e.g., operational and developmental) at the National Water Center (NWC).
The AWIPS system as a whole consists of several high performance graphics workstations and servers at each location, linked in a high-availability configuration with a hybrid satellite terrestrial communication network. The hardware baseline consists of three (3) unique configurations which support the WFOs, RFCs, and NCs. The RFC and NC configurations contain additional servers necessary to support the expanded domain of these field offices and in the case of the NC configuration the additional data processing needs. The NC configuration is also located at two (2) WFOs (Honolulu, HI and Anchorage, AK) to support the quasi-national center requirements at these two (2) locations. The WFO configuration is installed in support of the TWCs and the RFC configuration at the NWC.
AWIPS has an extensive architecture that implements highly available, secure data communications, processing, meteorological, and hydrologic display capabilities in an integrated environment that supports an integrated field structure to enable the operational missions of the NWS and NOAA. The AWIPS program support NWS mission goals as well as NOAA and DOC strategic goals. Consequently, the efficient and effective operation and continuous improvement of the AWIPS system are critical to meeting these goals.
In the current environment, each AWIPS installation ingests observation, sensor, model data input, and processes this data into weather products, allows forecaster interaction in product creation, and disseminates these products to the public and specific stakeholders. The concept of operations may vary from day-to-day, based on the active weather concerns, and AWIPS system status (normal, degraded, service backup [SvcBU]). The concept of operations may also vary between each AWIPS site due to specific local forecast concerns or organizational mission of each site where AWIPS is deployed, and due to the use of local applications at each location within the AWIPS framework.
https://vlab.ncep.noaa.gov/web/awips-technical-library/
AWIPS must maintain the highest level of availability, throughput, and data quality in order to effectively complete its mission. The principal components of AWIPS are:
3.1.Network Control Facility (NCF)
The NCF manages the operational usage of AWIPS across the nation. The NCF provides monitoring and corrective activities for the operational hardware, software, and communications. The NCF is staffed 24/7 and provides troubleshooting services via a help desk function to the forecasters throughout the NWS. The NCF also provides central computing necessary to support SvcBU, collaboration, data delivery, and other capabilities. In addition, the NCF provides support for site upgrades of hardware and software. The primary NCF is located in Silver Spring, MD with the backup facility located in Fairmont, WV.
3.2.Communications
3.2.1. NOAAPort/NOAA Weather Wire Service
Point-to-multipoint satellite broadcast network that provides communications from the NCF to all NOAAPort and NOAA Weather Wire Service (NWWS) users to distribute weather model, satellite imagery, and most other NWS observational, forecast, and warning information. NOAAPort, or the Satellite
Broadcast Network (SBN), provides a critical data feed to other Government and private sector customers. A separate channel supports NWWS distribution of forecast and warning information to the NWWS users.
3.2.2. Wide Area Network (WAN)
Terrestrial network designed to support the distribution of point-to-multipoint data among all AWIPS sites. This data includes products, messages and observation and forecast data generated or received by local AWIPS offices from systems external to AWIPS, such as the Automated Surface Observing System, Next Generation Doppler Radar, and Upper Air Observation Systems. The WAN provides an infrastructure for an AWIPS site to provide backup support for other
AWIPS sites if an operation failure occurs. AWIPS currently uses Government furnished terrestrial telecommunication services.
3.2.3. Very-small Aperture Terminal (VSAT) WAN Backup (Fly Away Kit)
This capability provides connectivity to the NCF during a major communications outage via a deployable VSAT. These kits must be pre-deployed to locations where there is a high risk of a major communications outage due to extreme weather conditions or other circumstances. Dedicated satellite space segment is provided for up to four (4) deployments during a given year. In addition, this capability supports the Radar Operations Center sending remote radar data to the
WFO.
3.2.4. Local Area Networks (LAN)
Establishing local communications at NOAA and NWS sites, the LAN provides concurrent transmission of data at 1000 Megabits per second (Mbps). The workstations, data servers, and applications servers utilize a 1000 Mbps environment. All other equipment (printer, communications processors, text displays, etc.) also concurrently utilize a 1000 Mbps environment.
3.3.Software
The current AWIPS software baseline contains approximately 8 million lines of code with over 2 million lines of code from legacy applications. The AWIPS software baseline has been developed within a Service Oriented Architecture (SOA). AWIPS software baseline has been designed to be reliable, efficient, maintainable, flexible, modular, and extensible. New capabilities are being added to the AWIPS software baseline multiple times each year. The baseline software release number is Software Version Document
(SVD) OB14.4.1. The entire contents -- listing, actual source code, development environment, installation instructions, etc. can be found on the AWIPS Technical
Library. AWIPS software runs on a RedHat Enterprise Linux platform while a portion of it, the Thin Client software, also runs on Windows operating system (OS). The software baseline does not include local applications developed by the operational units, which are the responsibility of the Government.
The NWS requires the AWIPS software baseline to remain essentially a non-proprietary software package for the following reasons:
a) It allows our partners, such as government laboratories, academia, and others, to use and add value to the software for scientific and technical improvements without concern for safeguarding any proprietary code.
b) It allows for the potential for other government users to utilize the software for their missions.
c) It allows open commerce for use in niche markets in need of this type of capability.
This requirement does not include existing third-party software platforms and applications needed to allow AWIPS to operate, such as the underlying operating system, or any capabilities used by AWIPS for NWS-specific architecture or infrastructure needs.
3.4.Hardware
Commodity hardware has enabled NWS to use the NOAA logistics infrastructure, including the National Logistics Support Center and National Reconditioning Center.
AWIPS hardware is warrantied and on a continuous (staggered) refresh cycle which is typically five (5) years depending on the hardware component.
AWIPS, as the cornerstone of a modernized NWS, must continue to evolve to accommodate new science and technology to meet NWS, NOAA, and DOC strategic goals. Continued improvements in the areas of hardware, software, and communications shall be required to avoid system obsolescence.
4. GOALS AND PERFORMANCE OBJECTIVES
Meeting the objectives of a system in a highly data-dynamic environment represents a substantial task. The NWS has made extensive investments in modeling techniques, satellite instrumentation, surface and upper air observation capabilities, and radar detection improvements to bring forecasters the data and information required to improve forecast accuracy and warning lead times.
The Government Performance and Results Act (GPRA) of 1993, (found at https://www.whitehouse.gov/omb/mgmt-gpra/gplaw2m) requires the NWS to improve
AWIPS throughput, add new and improved science and technologies, and exploit more accurate and higher resolution data and weather forecast model information. AWIPS must be enhanced in order to continue to meet or exceed the GPRA goals and objectives. In addition, AWIPS must continue to evolve to ensure alignment with other NWS and NOAA architectures and continue to be extensible to other potential missions in the Federal
Government.
4.1.AWIPS Program Objectives
4.1.1. Establish a stable (uniform and consistent) cost model that sustains high quality
O&M services while introducing new technology and capabilities to support evolving NWS needs and requirements.
4.1.2. Provide 24/7/365 O&M support to all NWS operational sites, including the one hundred twenty-two (122) WFOs, thirteen (13) RFCs, eight (8) NCs, two (2)
TWCs, twenty-one (21) CWSUs, the NWC, and six (6) regional HQs.
4.1.3. O&M and security support shall meet or exceed the Service Level Agreements
(SLAs) specified in Table – 1 Mandatory and Table – 2 Mandatory but subject to adjustment, below.
4.1.4. Provide IT solutions that are compliant with security requirements as defined in paragraph 4.3 below. In the event that any of the security requirements change over the period of performance of the contract, the solution shall also include identification, evaluation of impact on AWIPS and the proposed remediation.
4.1.5. Implement and maintain mechanisms to enhance, manage, and maintain AWIPS baseline software to meet or exceed the SLAs in Table – 1 Mandatory and Table –
2 Mandatory but subject to adjustment, below. Currently, the AWIPS baseline software includes all software and scripts necessary to build, execute and support the system including AWIPS specific applications, Commercial-Off-the-Shelf
(COTS), Free and Open-Source Software (FOSS), and Operating System (OS) software. All software furnished under the AWIPS contract must be extensible, so that it is readily expandable, well documented, and updated regularly through interactions with the larger research community. It is the Government’s intention https://www.whitehouse.gov/omb/mgmt-gpra/gplaw2m that the AWIPS baseline software will be made available to users on an “open source” basis, however it intends to exercise complete rights to the data, including ownership rights as stated below, to ensure the success of its program. Only certain commercial data and software currently used on the AWIPS system listed in the Request for Proposal clause H.21 Section 4 or expressly accepted by the
Contracting Officer (CO) in writing will be utilized by the Government subject to limited rights. The Government has unlimited rights and ownership to all data and associated documentation produced or delivered under this contract. All data and documentation includes but is not limited to the source code of any software produced under this contract, executables, related scripts needed to build, test, execute, and run the AWIPS software, utilities, documentation, deliverables, and reports, and shall be Government owned and the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the
Government. This software and related materials may not be used or sold by the
Contractor without written permission from the Government Contracting Officer
(CO). All materials supplied to the Government shall be the sole property of the
Government. These data rights are necessary to enable a smooth transition to another provider as necessary, to ensure continuity of service in the event of contract termination, or upon contract re-competition.
4.1.6. Maintain interoperability with other NWS and Government systems to support
AWIPS operations, including, but not limited to, communication systems, observation systems, satellite systems, radar systems, and modeling and data systems. A list of such known systems may be found in the AWIPS Technical
Library at https://vlab.ncep.noaa.gov/web/awips-technical-library/home.
4.1.7. Establish necessary governance, processes, work flows, and tools via NWS
Virtual Lab (VLab) (https://vlab.ncep.noaa.gov) as the integrator of AWIPS baseline software, and provide an AWIPS development and test environment that supports distributed and collaborative development and testing of AWIPS software amongst the contractor, NWS, Government and other Government organizations; such as Labs in NOAA’s Office of Oceanic and Atmospheric
Research, National Aeronautics and Space Administration, and collaborative partners including but not limited to academia. Any required and recommended changes to NWS VLab governance, processes, work flows, and tools shall be implemented via the AWIPS program and VLab management. Changes must be approved by the AWIPS Program Management Office (PMO).
4.1.8. Develop an implementation plan that reduces the AWIPS hardware footprint such that the proposed solution meets or exceeds the established SLAs in Table – 1
Mandatory and Table – 2 Mandatory but subject to adjustment, below, improves
SvcBU and Continuity of Operations, secures existing remote intra-AWIPS access, drives towards Government initiatives such as the 2010 Federal Data
Center Consolidation Initiative (available online at https://cio.gov/wp-content/uploads/downloads/2012/09/FAQ-May-2012-Update-V1.pdf), and https://vlab.ncep.noaa.gov/web/awips-technical-library/home https://vlab.ncep.noaa.gov/ https://cio.gov/wp-content/uploads/downloads/2012/09/FAQ-May-2012-Update-V1.pdf https://cio.gov/wp-content/uploads/downloads/2012/09/FAQ-May-2012-Update-V1.pdf reduces system downtime during installations, while minimizing operational risks, data latency, and required up-front investment.
4.1.9. Develop an implementation plan for the AWIPS architecture that allows the users to visualize data required for the mission that is anticipated to increase by a magnitude of at least 12 while meeting or exceeding the SLAs in in Table – 1
Mandatory and Table – 2 Mandatory but subject to adjustment, below. This would include, but is not limited to, gridded model data, radar data, satellite data, lightning data, the National Digital Forecast Database (NDFD), and locally ingested data.
4.1.10. Develop an implementation plan to significantly reduce the AWIPS Discrepancy
Report (DR) backlog without sacrificing the support for current operations and newly discovered DRs. The plan shall also detail how the Contractor plans to reduce the DR inventory. Current list of AWIPS DR backlog is located on the
AWIPS Technical Library at https://vlab.ncep.noaa.gov/web/awips-technical-library/home.
4.1.11. Maintain open source nature of AWIPS including, but not limited to, source code, executables, related scripts, utilities, documentation, deliverables, and reports by providing appropriate data rights and use agreements, as well as enable a smooth transition to another provider, to ensure continuity of service in the event of contract termination, or upon contract re-competition. These rights and agreements shall include language which allows the Federal Government to freely distribute AWIPS software and related materials described above to its partners and any other interested parties. The AWIPS full data rights shall be provided to include all scripts and software needed to build, test, configure, execute, and run the software. The incumbent contractor is responsible for AWIPS until phase-in is complete at which point system responsibility will be turned over to the incoming contractor. Only certain commercial data and software currently used on the
AWIPS system listed in the Request for Proposal clause H.21 Section 4 or expressly accepted by the Contracting Officer (CO) in writing will be utilized by the Government subject to limited rights.
4.1.12. Develop approach to continually enhance the AWIPS baseline (e.g., hardware and software) such that AWIPS evolves to meet the emerging requirement of the
NWS over the life of the contract.
4.1.13. Develop a Transition Plan that describes an approach to perform an orderly three
(3) month transition-in and an orderly three (3) month transition-out of the period of performance for this contract.
4.1.14. Utilize subcontract and teaming arrangements effectively under the Small
Business Program, Federal Acquisition Regulation (FAR) Part 19.
https://vlab.ncep.noaa.gov/web/awips-technical-library/home https://vlab.ncep.noaa.gov/web/awips-technical-library/home
4.2. DOC, NOAA, and NWS Strategic Goals and Objectives
NOAA/NWS has the responsibility to provide data and products that form a national information database used by other Government agencies, the private sector, the public, and the global community.
The successful Offeror shall not only exhibit the ability to meet or exceed the performance goals and objectives for the AWIPS program, but also design a solution that considers and supports the following higher level strategic goals and objectives:
4.2.1. DOC Strategic Objectives
The DOC’s strategic objectives may be accessed online at:
http://www.commerce.gov/sites/default/files/documents/2014/march/doc_fy2014-
2018_strategic_plan.pdf. They include:
4.2.1.1.Objective 3.1: Advanced the understanding and prediction of changes in the environment through world class science and observations.
4.2.1.2.Objective 3.2: Improve preparedness, response, and recovery from weather and water events by building a Weather-Ready Nation.
4.2.1.3.Objective 3.3: Strengthen the resiliency of communities and regions by delivering targeted services to build capacity.
4.2.1.4.Objective 4.1: Transform the Department’s data capacity to enhance the value, accessibility and usability of Commerce data for Government, business and the public.
4.2.1.5.Objective 4.3: Collaborate with the business community to provide more timely, accurate, and relevant data products and services for customers.
4.2.1.6.Objective 5.1: Strengthen organizational capabilities to drive customer-focused, outcomes-driven mission performance.
4.2.2. NOAA Strategic Objectives
The Agency’s strategic objectives may be accessed online at http://www.ppi.noaa.gov/, and include:
4.2.2.1.Reduce loss of life, property, and disruption from high-impact events
4.2.2.2. Evolve NOAA’s weather services to become more effective, efficient, and agile.
4.2.3. NWS Strategic Objectives
The NWS’s strategic objectives may be accessed online at http://www.nws.noaa.gov/com/weatherreadynation/, and include:
4.2.3.1.Improve weather decision services for events that threaten lives and livelihoods.
http://www.commerce.gov/sites/default/files/documents/2014/march/doc_fy2014-2018_strategic_plan.pdf http://www.commerce.gov/sites/default/files/documents/2014/march/doc_fy2014-2018_strategic_plan.pdf http://www.ppi.noaa.gov/ http://www.nws.noaa.gov/com/weatherreadynation/ http://www.nws.noaa.gov/com/weatherreadynation/
4.2.3.2.Improve sector-relevant information in support of economic productivity
4.2.3.3.Enable integrated environmental forecast services supporting healthy communities and ecosystems
4.2.3.4.Sustain a highly skilled, professional workforce equipped with the training, tools, and infrastructure to meet our mission.
4.3.AWIPS IT Security Requirements
The Contractor shall remain proactively vigilant throughout the life of the AWIPS contract with respect to existing, emerging, anticipated, and evolving threats, and shall alert AWIPS program management to any potential impact upon the AWIPS system or its components, providing proposed mitigation as well as the cost and projected schedule for implementation.
All current security requirements and specifications are delineated in Attachment J.3 -
Contract Document Requirements List dated July 08, 2015, which is provided in the solicitation/contract.
5. CONSTRAINTS
NOAA and NWS, and therefore the successful Contractor, are constrained by the following requirements:
5.1.For the purposes of this acquisition, the Government will provide terrestrial WAN telecommunications to the Offeror with constrained bandwidth. The typical WFO has 768 kbps or half of a T1 circuit dedicated to AWIPS.
5.2.For the purposes of this acquisition, the Offeror must separate the SBN from the other parts of the overall O&M contract, and track and cost it independently in the Work
Breakdown Structure, since the SBN component may transition to another contract during the period of performance of the AWIPS contract.
5.3.The Contractor shall adhere to NOAA/NWS configuration management and change request policies and procedures
5.4.The NWS will not be able to make accommodations for any additional facilities (e.g., IT equipment, office space, telephones, desk space, etc.) for the AWIPS contractor onsite at
Government-owned or Government-leased properties, beyond those already in use by the
24/7/365 help desk and maintenance support personnel at the AWIPS Network Control
Facility (ANCF), the Backup Network Control Facility (BNCF) and the Silver Spring, MD facility. See Attachment J.8 - Government Furnished Property for a list of all
Government furnished property.
5.5.ANCF is located on the 6th floor of the Silver Spring Metro Complex—Building 2 at
1325 East-West Highway, Silver Spring, MD. The BNCF facility is located at 100
University Drive, Fairmont, WV.
6. DATA AND DELIVERABLES
All deliverables are delineated in Attachment J.3 - Contract Document Requirements List dated July 08, 2015, which is provided in the solicitation/contract.
7. MEETINGS AND OTHER REQUIREMENTS
All Government-mandated meetings are delineated in Attachment J.3 - Contract Document
Requirements List dated July 08, 2015, which is provided in the solicitation/contract.
8. AWIPS SYSTEM PERFORMANCE REQUIREMENTS
The following are the System Requirements for the AWIPS. Table - 1 below shows which of these system performance requirements are mandatory to be included at the specified Acceptable Performance Level and those in Table – 2 that are mandatory, but subject to adjustment based on the Offeror’s proposed solution. Once these requirements are negotiated, and agreement reached between the Offeror and the
Government, these shall be incorporated into the contract as SLAs as part of the QASP. The solutions shall meet or exceed the requirements specified in in Table – 1 Mandatory and Table – 2 Mandatory but subject to adjustment, below.
Table – 1 Mandatory
Number Title Definition Acceptable Performance Level
On-Time delivery of Contract
Deliverables without any changes or modifications
Delivery of all contract deliverables on-time and accepted the first time by the Government
100% accepted on-time, first time each month
SBN and Master Ground
Station (MGS) Availability
SBN MGS availability is defined as uninterruptible access to the MGS capability 99.99% per month
3 SBN Data Availability
SBN Data Availability is the measure of the amount of data that is transmitted successfully across the
AWIPS SBN.
99.90% per month
Number Title Definition Acceptable Performance Level
Average Message Timeliness
Average Message Timeliness is defined as a performance metric to identify timeliness of weather products being delivered from a WFO to NWS customers via the SBN.
99.95% of Priority 1 messages delivered to WFO within ten (10) seconds after message is received at an NCF Message Handling System
(MHS), logged and time stamped per month.
99.95% of Priority 2 messages delivered to WFO within thirty (30) seconds after message is received at an NCF MHS, logged and time stamped per month.
99.85% of Priority 3 messages delivered to WFO within sixty (60) seconds after message is received at an NCF MHS, logged and time stamped per month.
Service Restoration (Response to Trouble Tickets)
A measure of the time required to restore services to the sites during a time of service interruption.
Level 1 (Sites in Critical Weather
Status): <3 minutes, 95% of the time per month.
Level 2 (Comparable to critical priority; but for sites not in Critical
Weather Status): <10 minutes 95% of the time per month.
6 System Performance (User
Experience)
Measures the system performance and data latency at the WFOs, RFCs and NCs. Table 3 contains specific performance metrics supporting this SLA.
Meet 98.00% performance objectives or better.
Vulnerability Scan to Inventory
Ratio
The ratio of devices scanned to total scanable devices in inventory 98% or better
Plan of Action and Milestones
(POA&M) Resolution Rate
The percentage of POA&Ms assigned to the contractor for resolution which are completed and closed by the due date
100%
Table – 2 Mandatory, but subject to adjustment based on the Offeror’s proposed solution
Implementation of new software capabilities into O&M
Ability to implement new capabilities into operations within cost, schedule, and performance.
Includes capabilities developed by AWIPS prime contractor as well as the integration of capabilities developed by other organizations. Large enhancement projects are defined to be projects that require the addition and modification of more than
12,500 Software Lines of Code (SLOC), Medium enhancement projects are defined to be projects that require addition and modification of more than
8,000 SLOC. Small enhancements projects are defined to be projects that require the addition and modification of 8,000 or less SLOC.
Incorporate each year:
2-4 large enhancements
5-10 medium enhancements
10-20 small enhancements
Message Distribution to
National Digital Forecast
Database (NDFD) for WFOs
Delivery time begins when the messages are received from the WFO through rsync to the
AWIPS WAN and stored on the NDFD Servers at the primary and backup NCFs.
Delivered within10 minutes on average per month.
3 WFO SvcBU (Site
Redundancy)
WFOs require other sites to be able to take over once a SvcBU has been declared for a site. Each site has a primary, secondary and third backup site identified.
Upon initiation of SvcBU, 10 minutes for backup site to be fully operational for the down site
Software Quality—Minimize
AWIPS Deficiency Reports
(DRs) Released to Operational
Sites
Measures software quality by minimizing DRs released to operational AWIPS sites taking into account the DRs priority and impact on operations.
This metric measures how many new DRs are introduced to operations by any release to operations, e.g., major content releases, emergency releases, patches, etc. It does not address backlog
DRs. The classification schema for AWIPS DRs is in the AWIPS Technical Library.
The maximum DR thresholds introduced into a release of AWIPS Software to the operational site is:
Critical-1 = 0
Critical-2 <= 2
High-2 <= 5
Critical-3 + High-3 +
Major-3 <= 20
Moderate-4 + Moderate-5 <= 25
5 AWIPS Software Upgrade
Time
Establishes the maximum time in minutes it takes to successfully install a release of AWIPS software returning an operational site to full operational status. The scope of this metric includes all AWIPS baseline supported software including AWIPS applications, COTS and FOSS packages and security patches. The metric addresses upgrades associated with new content or corrective releases and patches including those associated with required security updates. The scope does not include upgrades associated with major OS upgrades, e.g., Linux 6.x to 7.x.
30 minutes or less
Vulnerability Resolution Rate
The percentage of vulnerabilities detected by the previous scheduled vulnerability scan which were remediated by the current scheduled scan each month
Routine Patching: 100% of Critical and High vulnerabilities and 95% of
Medium and Low vulnerabilities as measured by Common Vulnerability
Scoring System (CVSS) remediated within 30 days of scan deadline (or patch availability if issued after detection)
Emergency patching: 100% of
Critical vulnerabilities determined by the Government to need immediate attention due to unacceptable risk to the system are remediated within two (2) days upon availability of patch by the vendor
7 Maximum Vulnerability
Resolution Duration
The longest length of time measured in days from detection that a vulnerability can remain unpatched once discovered, by severity (as measured by
CVSS)
30 days or less from the scan deadline date for all Critical and High vulnerabilities, 40 days or less for Medium and Low vulnerabilities.
8 POA&M Effectiveness Rate
The percentage of POA&Ms from the previous assessment which were deemed closed by the contractor, but whose weaknesses were found again in the next annual assessment
5% or less
TABLE 3 – SYSTEM PERFORMANCE AND DATA LATENCY
The test procedures associated with these Test Steps may be found on the AWIPS Technical
Library.
Table 3 – System Performance And Data Latency
Test Step Name
Acceptable
Performance Level
(ms)
D2DLoadStdEnvDataPackage 10,600
FFMPA Step01.1 12,600
FFMPA_Step01.2_ImageLoading 4,100
FFMPA_Step01.2_TableLoading 6,600
FFMPA_Step01.3_ImageLoading 4,100
FFMPA_Step01.3_TableLoading 6,600
FFMPA_Step06.2 5,976
FFMPA_Step06.3 4,100
FFMPA_Step06.4 4,100
FFMPA_Step07.1 4,100
FFMPA_Step07.2 4,100
FFMPA_Step07.3 2,500
FFMPA_Step08.2 5,100
FFMPA_Step08.3 4,100
FFMPA_Step08.4 4,100
FFMPA_Step08.7 4,100
FFMPA_Step09.3_SmallHeadWater 2,500
FFMPA_Step12.1 5,100
FFMPA_Step12.2 5,100
FFMPA_Step13.1 4,100
FFMPA_Step13.2 5,100
FFMPA_Step14.3 2,500
GFELoadingMaps 3,600
GFELoadGrids 4,600
GFEPopulateGrids 7,600
GFESmartTool_AdjustUp 9,600
GFEInterpolateGrids 32,600
GFESaveGrids 18,600
GFEPublishGrids 12,600
GFEZFPTextFormatter_19Zones 33,100
GFESmartTool_TCMWindTool 22,270
GFEISCLatency_ifpnetCDF 4,100
GFECheckTandTd 25,600
GFEISCLatency_iscMosaic 6,800
Acceptable
Performance Level
(ms)
GFEZFPTextFormatter_6Zones 25,600
GFEQPF_SnowAmt 61,600
Hydro—Time Series Table 2,500
Hydro—MPE Editor 16,600
Hydroview – View 2,500
Ingest_Latency_BINLIGHTNING 3,792
Ingest_Latency_BUFRNCWF 2,509
Ingest_Latency_BUFRUA 1,266
Ingest_Latency_GOESSOUNDING 10,430
Ingest_Latency_OBS 3,040
Ingest_Latency_REDBOOK 1,151
Ingest_Latency_SATELLITE 12,280
Ingest_Latency_SFCOBS 1,103
Ingest_Latency_GRIB1 1,476
Ingest_Latency_GRIB2 5,021
Ingest_Latency_RADAR_LOCAL 1,216
Ingest_Latency_RADAR_SBN 1,210
Ingest_Latency_SHEF 5,300
SCAN_Step01.1 4,100
SCAN_Step01.2 2,500
SCAN_Step03.3 6,600
SCAN_Step05 2,500
SCAN_Step06.1 2,500
SCAN_Step08.2 3,146
SCAN_Step08.3 3,249
SCAN_Step09.2 2,500
SCAN_Step09.4 2,500
SCAN_Step11.1a 2,500
SCAN_Step11.3a 3,912
SCAN_Step11.3b 3,913
SCAN_Step12.1a 2,500
SCAN_Step12.3a 3,911
SCAN_Step12.3b 3,919
SCAN_Step16.1 4,100
SCAN_Step16.2 4,100
SCAN_Step16.3 4,100
SCANDMD_Step01 2,500
SCANDMD_Step02.a 2,500
SCANDMD_Step02.b 2,500
Acceptable
Performance Level
(ms)
SCANDMD_Step03 2,500
SCANDMD_Step04.1 2,500
SCANDMD_Step04.2 2,500
SCANDMD_Step05.1 2,500
SCANDMD_Step06 2,500
SCANDMD_Step08.1 2,500
SCANDMD_Step09.1 2,500
SCANDMD_Step09.2 2,500
SCANDMD_Step10.1 2,500
SCANDMD_Step10.2 2,500
SCANDMD_Step11.1 2,500
SCANDMD_Step11.2 2,500
SCANDMD_Step12.1 2,500
SCANDMD_Step12.2 2,500
SCANDMD_Step13.2 2,500
SCANDMD_Step13.3 2,500
SCANDMD_Step13.4 2,500
WarnGenLightLoad_AddOrRemoveCounty 2,500
WarnGenLightLoad_DragToPolygonShown 2,500
WarnGenLightLoad_FollowUpActionCON 2,500
WarnGenLightLoad_TypeTornadoToSVS 2,500
WarnGenLightLoad_TypeSVRToTornado 2,500
WarnGenLightLoad_SendProductTOR 4,727
WarnGenLightLoad_SendProductSVS 4,167
WarnGenLightLoad_LocalCWAUpdate 12,600
WarnGenLightLoad_WarnGenButton (first run) 2,500
WarnGenLightLoad_WarnGenButton (subsequent run) 2,500
WarnGenLightLoad_CreateTextTOR (first run) 2,500
WarnGenLightLoad_CreateTextTOR (subsequent run) 2,500
WarnGenLightLoad_CreateTextSVS (first run) 2,500
WarnGenLightLoad_CreateTextSVS (subsequent run) 2,500
NCPLoadNHCEnvDataPackageMax_SPC_Step5 180,000
NCPLoadNHCEnvDataPackageMax_NHC_Step5 180,000
NCPLoadSoundingForPoint_Step7 100
CAVENCPSurfacePlot_Step5 2,000
CAVENCPSurfacePlot_Step6 2,000
CAVENCPSurfacePlot_Step7 2,000
CAVENCPSurfacePlot_Step8 2,000
CAVENCPSurfacePlot_Step9 2,000
Acceptable
Performance Level
(ms)
CAVENCPSurfacePlot_Step10 2,000
CAVENCPSurfacePlot_Step11 2,000
CAVENCPSurfacePlot_Step12 5,000
CAVENCPUpperAirPlot_Step5 2,000
CAVENCPUpperAirPlot_Step6 3,000
CAVENCPUpperAirPlot_Step7 3,000
CAVENCPUpperAirPlot_Step8 2,000
EDEXUGDIngest_Test_Procedure1_Step1 30,000
EDEXUGDIngest_Test_Procedure2_Step1 30,000
EDEXSatIngest_Test_Procedure1_Step1 1,000
EDEXSatIngest_Test_Procedure2_Step1 900,000