E2329-01_Sep_9_24_solicitation_doc.pdf
PDF 18 KB Posted
- Solicitation number
- E2329-01
- Issued by
- Pemiscot County, Missouri
About this file
This document is an Invitation for Bid (IFB) issued by the Missouri Facilities Management, Design & Construction (FMDC) for a foundation stabilization and waterproofing project at the E.W. Thompson State School in Sedalia, Missouri. The project involves underpinning of existing strip and spread footings, removal and replacement of exterior sidewalks, paving, and interior slabs-on-grade, as well as re-pointing of perimeter CMU walls and re-caulking of all openings. The bid solicitation period is from April 24, 2024 to May 21, 2024, and all vendors are eligible to respond. The estimated total value of the contract is unspecified.
The payment terms are unspecified, and there are no set-asides or incumbent contractors mentioned. The funding source and requirements are also not provided. Vendors must review the solicitation documents, which include detailed specifications and terms and conditions, and submit their bids electronically through the MissouriBUYS system or as a hard copy, if allowed by the solicitation.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: E2329-01
Foundation Stabilization & Waterproofing E. W. Thompson
State School Sedalia
Invitation for Bid (IFB)
OA - FMDC - Contracts Chapter 8
April 24, 2024 - May 21, 2024
Page:2
General Header Information
E2329-01
No. E2329-01 Title: Foundation Stabilization & Waterproofing E. W. Thompson State School
Sedalia Start Date: April 24, 2024 at 8:00:00 AM CDT End Date: May 21, 2024 at 1:30:00 PM CDT Vendor Q&A Start Date:
Vendor Q&A End Date:
Estimated Total Value:
Who can respond to this bid? : All Vendors Description: The project consists of underpinning of existing strip and spread footings including excavation to bottom of footings, preparation and footings to receive underpinning and backfill. Also included is removal and replacement of exterior sidewalks and paving and interior slabs-on-grade along with removal and replacement or reinstallation of interior floor finishes as part of the underpinning work. The interior faces of the perimeter CMU walls are to the re-pointed where cracks are present. All openings, including but not limited to windows, doors, vents, conduit are to be re-caulked. **See "HOW TO ACQUIRE PLANS AND SPECIFICATIONS" below for a hyperlink to the view-only electronic specifications for this project.**
Delivery Terms: N/A: Not Applicable Payment Terms: Unspecified Contact Information: OA - FMDC - Contracts Chapter 8
Mandy Roberson State of Missouri Facilities Management, Design & Construction 301 W High St, Room 730 Jefferson City, MO 65101 Tel: (573) 522-0074 mandy.roberson@oa.mo.gov
Contact Details: If you have any questions, please contact:
Mandy Roberson State of Missouri Facilities Management, Design & Construction 301 W High St, Room 730 Jefferson City, MO 65101 Tel: (573) 522-0074 mandy.roberson@oa.mo.gov
Selected Categories:
Page:3
Header Custom Fields:
E2329-01
NOTICE
Vendor Responsibility
The vendor is solely responsible for ensuring timely submission of their solicitation response. Failure to allow adequate time prior to the solicitation end date to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the vendor and their response at risk of not being accepted on time.
The State of Missouri's Privacy Policy can be accessed here.
http://www.mo.gov/privacy-policy/
Page:4
Solicitation Requirements:
This bid has no questions defined.
E2329-01
REQUIREMENTS
Requirements:
To access the official solicitation document, which includes all applicable requirements, detailed specifications, and terms and conditions, the vendor must click on the Overview tab to view the solicitation. Under the Overview tab, the vendor must either: 1) print the solicitation document in order to submit a hard copy, if allowed by the solicitation, or 2) review and accept the solicitation documents under the Overview tab, and submit an electronic response to the solicitation through the MissouriBUYS system.
Page:5
Documents:
Very Important MissouriBUYS Instructions 12-1-20.pdf
003144_MBE WBE SDVE Directory page_OEO SDVE 11-6-23.pdf
E2329-01 - IFB.pdf
_E2329-01 - Final Bid Docs.pdf
E2329-01 Add 1.pdf
E2329-01 Add 2.pdf
Page:6
Item Specifications Solicitation has been designated as having no line items.
Page:7
File details come from the government source that posted it. Updated .