E2329-01_Nov_11_24_solicitation_doc.pdf
PDF 18 KB Posted
- Solicitation number
- E2329-01
- Issued by
- Pemiscot County, Missouri
About this file
This document is a solicitation for an Invitation for Bid (IFB) issued by the State of Missouri Facilities Management, Design & Construction (OA - FMDC - Contracts Chapter 8) for the Foundation Stabilization & Waterproofing project at the E.W. Thompson State School in Sedalia, Missouri. The project consists of underpinning existing strip and spread footings, removing and replacing exterior sidewalks and paving, interior slabs-on-grade, interior floor finishes, re-pointing perimeter CMU walls, and re-caulking all openings. The solicitation period runs from April 24, 2024 to May 21, 2024. The estimated total value of the contract is unspecified. All vendors are eligible to respond to this bid.
The solicitation does not define any bid questions. The vendor is solely responsible for ensuring timely submission of their response. Payment terms are unspecified. This project does not appear to have any set-asides, and the current incumbent is not provided. Funding sources and requirements are also not specified in the document.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: E2329-01
Foundation Stabilization & Waterproofing E. W. Thompson
State School Sedalia
Invitation for Bid (IFB)
OA - FMDC - Contracts Chapter 8
April 24, 2024 - May 21, 2024
Page:2
General Header Information
E2329-01
No. E2329-01 Title: Foundation Stabilization & Waterproofing E. W. Thompson State School
Sedalia Start Date: April 24, 2024 at 8:00:00 AM CDT End Date: May 21, 2024 at 1:30:00 PM CDT Vendor Q&A Start Date:
Vendor Q&A End Date:
Estimated Total Value:
Who can respond to this bid? : All Vendors Description: The project consists of underpinning of existing strip and spread footings including excavation to bottom of footings, preparation and footings to receive underpinning and backfill. Also included is removal and replacement of exterior sidewalks and paving and interior slabs-on-grade along with removal and replacement or reinstallation of interior floor finishes as part of the underpinning work. The interior faces of the perimeter CMU walls are to the re-pointed where cracks are present. All openings, including but not limited to windows, doors, vents, conduit are to be re-caulked. **See "HOW TO ACQUIRE PLANS AND SPECIFICATIONS" below for a hyperlink to the view-only electronic specifications for this project.**
Delivery Terms: N/A: Not Applicable Payment Terms: Unspecified Contact Information: OA - FMDC - Contracts Chapter 8
Mandy Roberson State of Missouri Facilities Management, Design & Construction 301 W High St, Room 730 Jefferson City, MO 65101 Tel: (573) 522-0074 mandy.roberson@oa.mo.gov
Contact Details: If you have any questions, please contact:
Mandy Roberson State of Missouri Facilities Management, Design & Construction 301 W High St, Room 730 Jefferson City, MO 65101 Tel: (573) 522-0074 mandy.roberson@oa.mo.gov
Selected Categories:
Page:3
Header Custom Fields:
E2329-01
NOTICE
Vendor Responsibility
The vendor is solely responsible for ensuring timely submission of their solicitation response. Failure to allow adequate time prior to the solicitation end date to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the vendor and their response at risk of not being accepted on time.
The State of Missouri's Privacy Policy can be accessed here.
http://www.mo.gov/privacy-policy/
Page:4
Solicitation Requirements:
This bid has no questions defined.
E2329-01
REQUIREMENTS
Requirements:
To access the official solicitation document, which includes all applicable requirements, detailed specifications, and terms and conditions, the vendor must click on the Overview tab to view the solicitation. Under the Overview tab, the vendor must either: 1) print the solicitation document in order to submit a hard copy, if allowed by the solicitation, or 2) review and accept the solicitation documents under the Overview tab, and submit an electronic response to the solicitation through the MissouriBUYS system.
Page:5
Documents:
Very Important MissouriBUYS Instructions 12-1-20.pdf
003144_MBE WBE SDVE Directory page_OEO SDVE 11-6-23.pdf
E2329-01 - IFB.pdf
_E2329-01 - Final Bid Docs.pdf
E2329-01 Add 1.pdf
E2329-01 Add 2.pdf
Page:6
Item Specifications Solicitation has been designated as having no line items.
Page:7
File details come from the government source that posted it. Updated .