(E) NAVFAC RFI form.pdf
PDF 168 KB Posted
- Attached to
- Building 17 Replace Elevator and Associated Electrical Work Federal contract opportunity
- Solicitation number
- N4008520R3015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4008520R3015AMEND03.pdf | ||
| 20-R-3015 -0002 Amend.pdf | ||
| 2016-R-0149.pdf | ||
| ip06-35_Building_Contractors_Guide_to_Taxes.pdf | ||
| cert-141.pdf | ||
| 20R3015 Amendment 0001.pdf | ||
| Revised B17 Elevator Drawings.pdf | ||
| (F) 01 31 23.13 20 ECMS Spec.pdf | ||
| (C) CT20200024 Rev. 3.pdf | ||
| (I) BASE MAP BLDG 135.pdf | ||
| (H) B17 Elevator Drawings.pdf | ||
| (D) Base Access Pass Request.pdf | ||
| (B) Price Proposal Form.pdf | ||
| (A) B17 Elevator Specs.pdf | ||
| N4008520R3015 RFP.pdf | ||
| (G) General Req Revised -9 2018.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NUMBER:
N40085-20-R-3015
REQUEST FOR INFORMATION RFI NUMBER:
CONTRACT TITLE:
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY NUMBER:
COST EFFECT: INCREASE: DECREASE: NONE:
INFORMATION REQUESTED & RECOMMENDED SOLUTION:
Date Response Required By: Date: Signature:
From:
To: Field Office Code
RECOMMENDATION:
Date: Signature:
From: Field Office To: Prime Contractor
REPLY:
Date: Signature:
This reply is given with the expressed understanding that it does not constitute basis for change in the amount or time of subject contract. If you do not concur, DO NOT PROCEED, and notify this office immediately.
Please assign PC # to this change. It is requested that a proposal be forwarded by . THIS DOES NOT
CONSTITUTE AUTHORIZATION TO PROCEED.
copy to: File 2L
Supv Civil Engineer Construction Representative
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days.
DISTRIBUTION: Original to File via REICC PL/DM ET A/E PC # via AROICC/CONTRACT OFFICER