This document is the District of Columbia Code Section 2-218.46 governing performance and subcontracting requirements for construction and non-construction contracts issued by District government agencies. The regulation applies to all government-assisted construction and non-construction contracts exceeding $250,000 and establishes mandatory subcontracting thresholds, beneficiary performance requirements, and compliance procedures. For contracts exceeding $250,000, contractors must subcontract at least 35% of the dollar volume to small business enterprises (SBEs) or, if insufficient qualified SBEs exist, to any qualified certified business enterprises (CBEs) while making reasonable efforts to ensure SBE participation. Certified business enterprises selected as beneficiaries and receiving points or price reductions must perform at least 35% of the contracting effort with their own organization and resources; for projects of $1 million or less, CBE beneficiaries must perform at least 50% of on-site work with their own workforce. Design-build projects are exempt from identifying specific subcontractors before preconstruction services but must submit detailed subcontracting plans before entering into guaranteed maximum price agreements. All beneficiaries must submit comprehensive subcontracting plans before bid acceptance, containing subcontractor names, addresses, certification numbers, scopes of work, and pricing information.
Subcontracting plans cannot be amended without Director consent, and any reduction in subcontracted dollar volume inures to the District's benefit. Beneficiaries must submit executed subcontracts to the contracting officer, project manager, and Director, with failure to do so rendering the underlying contract voidable. Quarterly reporting requirements mandate that beneficiaries provide the Department, contracting officer, and project manager with detailed information on subcontract pricing, goods/services descriptions, amounts paid, and copies of fully executed subcontracts. Annual meetings with the Department are required to review subcontracting plan updates, and beneficiaries must provide written notice of project initiation and completion. Small business enterprises, local business enterprises, and disadvantaged business enterprises certified by the District are exempt from subcontracting requirements themselves. Non-compliance with these requirements subjects beneficiaries to enforcement penalties under District Code Section 2-218.63, and multiyear or extended contracts that fail to comply are void and cannot be renewed or extended without achieving compliance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Code of the District of Columbia § 2–218.46. Performance and subcontracting requirements for construction and non-construction contracts; subcontracting plans.
*NOTE: This section includes amendments by temporary legislation that will expire on March 27, 2027. To view the text of this section after the expiration of all emergency and temporary legislation, click this link: Permanent Version.*
(a)(1) All construction contracts for government-assisted projects in excess of $250,000 shall include the following requirements unless a waiver has been approved in accordance with § 2-218.51:
(A) At least 35% of the dollar volume of the contract shall be subcontracted to small business enterprises; or
(B) If there are insufficient qualified small business enterprises to completely fulfill the requirement of subparagraph (A) of this paragraph, then the subcontracting requirement may be satisfied by subcontracting 35% of the dollar volume to any qualified certified business enterprises; provided, that all reasonable efforts shall be made to ensure that qualified small business enterprises are significant participants in the overall subcontracting work.
(2) All non-construction contracts for government-assisted projects in excess of $250,000 shall include the following requirements unless a waiver has been approved in accordance with § 2-218.51:
(A) At least 35% of the dollar volume of the contract shall be subcontracted to small business enterprises; or
(B) If there are insufficient qualified small business enterprises to completely fulfill the requirement of subparagraph (A) of this paragraph, then the subcontracting requirement may be satisfied by subcontracting 35% of the dollar volume to any qualified certified business enterprises; provided, that all reasonable efforts shall be made to
8/27/26, 11:18 AM § 2–218.46. Performance and subcontracting requirements for construction and non-construction contracts; subcontracting plans. |… https://code.dccouncil.gov/us/dc/council/code/sections/2-218.46 1/9 https://code.dccouncil.gov/ https://code.dccouncil.gov/us/dc/council/code/sections/2-218.46(Perm) https://code.dccouncil.gov/us/dc/council/code/sections/2-218.51 ensure that qualified small business enterprises are significant participants in the overall subcontracting work.
(3) For the purposes of this section, a business enterprise certified as a small business enterprise, local business enterprise, or disadvantaged business enterprise shall not have to comply with the requirements set forth in paragraphs (1) or (2) of this subsection.
(b)(1)(A) Each government-assisted construction and non-construction contract for which a certified business enterprise is selected as a beneficiary and is granted points or a price reduction pursuant to § 2-218.43 or is selected through a set-aside program under this subpart shall include a requirement that the certified business enterprise perform at least 35% of the contracting effort with its own organization and resources and, if it subcontracts, 35% of the subcontracted effort shall be with certified business enterprises.
(B) If the total contracting effort performed by the certified business enterprise is less than the amount required by subparagraph (A) of this paragraph, then the business enterprise shall be subject to enforcement pursuant to § 2-218.63.
(2)(A) Each government-assisted construction and non-construction contract for which a certified joint venture is selected as a beneficiary and is granted points or a price reduction pursuant to § 2-218.43 or is selected through a set-aside program under this subpart shall include a requirement that each certified business enterprise holding a majority or minority interest in the certified joint venture shall, with its own organization and resources, perform a percentage of the work equal to or greater than its percentage interest in the joint venture, and, if the certified joint venture subcontracts, at least 35% of the subcontracted effort shall be with certified business enterprises.
(B) If the total contracting effort performed by the certified business enterprise is less than the amount required by subparagraph (A) of this paragraph, then the business enterprise shall be subject to enforcement pursuant to § 2-218.63.
(b-1) Each government-assisted construction and non-construction project for which a certified business enterprise is utilized to meet the subcontracting requirements pursuant to subsections (a) and (b) of this subsection shall include a requirement that the certified business enterprise perform at least 35% of the contracting effort with its own organization and resources.
(c) Each government-assisted construction and non-construction project of $1 million or less for which a certified business enterprise is selected as a beneficiary and is granted
8/27/26, 11:18 AM § 2–218.46. Performance and subcontracting requirements for construction and non-construction contracts; subcontracting plans. |… https://code.dccouncil.gov/us/dc/council/code/sections/2-218.46 2/9 https://code.dccouncil.gov/us/dc/council/code/sections/2-218.43 https://code.dccouncil.gov/us/dc/council/code/sections/2-218.63 https://code.dccouncil.gov/us/dc/council/code/sections/2-218.43 https://code.dccouncil.gov/us/dc/council/code/sections/2-218.63 points or a price reduction pursuant to § 2-218.43 or is selected through a set-aside program under this subpart shall include a requirement that the certified business enterprise perform at least 50% of the on-site work with its own workforce.
(d)(1) Bids or proposals responding to a solicitation, including an open market solicitation, shall be deemed nonresponsive and shall be rejected if a subcontracting plan is required by law and the beneficiary fails to submit a plan that meets the criteria set forth in paragraph (2) of this subsection.
(2) A subcontracting plan shall include the following information:
(A) The name and address of each subcontractor;
(B) A current certification number of the small or certified business enterprise;
(C) The scope of work to be performed by each subcontractor; and
(D) The price to be paid by the beneficiary to each subcontractor.
(3) The subcontracting plan required by paragraph (2) of this subsection shall be provided before the District accepts the submission of the bid or proposal.
(d-1) Notwithstanding subsection (d) of this section, a design-build project shall not be required to identify specific subcontractors as a condition precedent to performing preconstruction services; provided, that a detailed subcontracting plan that meets the requirements of subsection (d) of this section shall be submitted before entering into a guaranteed maximum price or such other contractual action authorizing the contractor to commence construction.
(e) No beneficiary shall be allowed to amend the subcontracting plan filed as part of its bid or proposal except with the consent of the Director. Any reduction in the dollar volume of the subcontracted portion resulting from such amendment of the plan shall inure to the benefit of the District.
(f) No multiyear contracts or extended contracts which are not in compliance with this subchapter at the time of the contemplated exercise of the option or extension, shall be renewed or extended, and any such option or extension shall be void.
(g) The subcontracting requirements of this section may be waived pursuant to § 2-218.51.
8/27/26, 11:18 AM § 2–218.46. Performance and subcontracting requirements for construction and non-construction contracts; subcontracting plans. |… https://code.dccouncil.gov/us/dc/council/code/sections/2-218.46 3/9 https://code.dccouncil.gov/us/dc/council/code/sections/2-218.43
(h) A beneficiary shall submit to the agency contracting officer, project manager, and Director copies of the executed contracts with the subcontracts identified in the subcontracting plan. Failure to submit copies of the executed contracts shall render the underlying contract voidable by the District.
(i)(1) A beneficiary shall provide a quarterly report to the Department, agency contracting officer, and project manager. The quarterly report shall include the following information for each subcontract with a subcontractor identified in the subcontracting plan:
(A) The price to be paid by the beneficiary to the subcontractor under the subcontract;
(B) A description of the goods procured or the services subcontracted for;
(C) The amount paid by the beneficiary to the subcontractor under the subcontract; and
(D) A copy of the fully executed subcontract, if the fully executed subcontract was not provided in a prior quarterly report.
(2) If the fully executed subcontract is not included with a quarterly report, the beneficiary shall not receive credit toward the subcontracting requirements of this section for that subcontract.
(j)(1) The beneficiary shall meet on an annual basis with the Department, agency contracting officer, and project manager to provide an update of the subcontracting plan for utilization of small business enterprises and certified business enterprises.
(2) The beneficiary shall be given a 30-day written notice of the meeting by the Department.
(k) The beneficiary shall provide written notice to the Department upon the initiation and completion of a project.
(l) If a certified business enterprise or certified joint venture is the beneficiary and must meet the subcontracting requirements as set forth in this section, it shall fulfill the requirements of subsections (h), (i), (j), and (k) of this section.
8/27/26, 11:18 AM § 2–218.46. Performance and subcontracting requirements for construction and non-construction contracts; subcontracting plans. |… https://code.dccouncil.gov/us/dc/council/code/sections/2-218.46 4/9
(m) A beneficiary, certified business enterprise, or member of a certified joint venture that fails to meet the requirements of this section shall be subject to the penalties set forth in § 2-218.63.
(n) With regard to government-assisted projects, the obligations under this section shall expire upon completion of the development or other activity that serves as the basis for such activity qualifying as a government-assisted project; provided, that the Mayor shall have the authority to negotiate any extensions under this section in the transaction documents that qualify an activity as a government-assisted project.
(Oct. 20, 2005, D.C. Law 16-33, § 2346, 52 DCR 7503; Mar. 2, 2007, D.C. Law 16-192, §
2132(e), 53 DCR 6899; July 18, 2008, D.C. Law 17-207, § 2(i), 55 DCR 6107; Apr. 20, 2010, D.C.
Law 18-141, § 2(i), 57 DCR 1485; May 27, 2010, D.C. Law 18-159, § 2(b), 57 DCR 3006; Sept.
26, 2012, D.C. Law 19-171, § 12(c), 59 DCR 6190; June 10, 2014, D.C. Law 20-108, § 2(x), 61
DCR 3892; Dec. 13, 2017, D.C. Law 22-33, § 1103(a), 64 DCR 7652; Aug. 14, 2026, D.C. Law
26-162, § 2(c), 73 DCR 9206.)
Section References
This section is referenced in § 2-218.12, § 2-218.51, § 47-4652, and § 47-4656.
Effect of Amendments
D.C. Law 16-192, in the section heading, inserted “and non-construction” following
“construction”; added subsec. (a)(3); in subsec. (e), substituted “dollar volume” for “dollar value”; and added subsec. (h).
D.C. Law 17-207 rewrote subsec. (a); and, in subsecs. (b), (c), and (d), substituted
“certified” for “small, local, or disadvantaged”.
D.C. Law 18-141, in subsec. (a)(2), substituted “excess of $250, 000, unless a waiver has been approved by the Office of Contracting and Procurement,” for “which a portion of the work is subcontracted”; added subsec. (a)(3); in subsec. (d), substituted “the law requires subcontracting” for “the solicitation requires submission of a certified business enterprise subcontracting plan”; and added subsec. (i).
D.C. Law 18-159, in subsec. (i), substituted “each contractor or beneficiary shall provide a copy of the contract,” for “each developer or beneficiary shall provide a copy of the certified business agreement,”.
8/27/26, 11:18 AM § 2–218.46. Performance and subcontracting requirements for construction and non-construction contracts; subcontracting plans. |… https://code.dccouncil.gov/us/dc/council/code/sections/2-218.46 5/9 https://code.dccouncil.gov/us/dc/council/code/sections/2-218.63 https://code.dccouncil.gov/us/dc/council/laws/16-33#%C2%A72346 https://code.dccouncil.gov/us/dc/council/laws/16-192 https://code.dccouncil.gov/us/dc/council/laws/16-192 https://code.dccouncil.gov/us/dc/council/laws/17-207 https://code.dccouncil.gov/us/dc/council/laws/18-141 https://code.dccouncil.gov/us/dc/council/laws/18-141 https://code.dccouncil.gov/us/dc/council/laws/18-159 https://code.dccouncil.gov/us/dc/council/laws/19-171 https://code.dccouncil.gov/us/dc/council/laws/19-171 https://code.dccouncil.gov/us/dc/council/laws/20-108 https://code.dccouncil.gov/us/dc/council/laws/20-108 https://code.dccouncil.gov/us/dc/council/laws/22-33#%C2%A71103(a) https://code.dccouncil.gov/us/dc/council/laws/26-162#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/laws/26-162#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/code/sections/2-218.12 https://code.dccouncil.gov/us/dc/council/code/sections/2-218.51 https://code.dccouncil.gov/us/dc/council/code/sections/47-4652 https://code.dccouncil.gov/us/dc/council/code/sections/47-4656 https://code.dccouncil.gov/us/dc/council/laws/16-192 https://code.dccouncil.gov/us/dc/council/laws/17-207 https://code.dccouncil.gov/us/dc/council/laws/18-141 https://code.dccouncil.gov/us/dc/council/laws/18-159
The 2012 amendment by D.C. Law 19-171 substituted “contractor” for “developer” in the second sentence of the introductory language of (i).
The 2014 amendment by D.C. Law 20-108, in the introductory paragraph of (a)(1), substituted “contracts for government-assisted projects in” for “contracts in” and added
“unless a waiver has been approved in accordance with § 2-218.51”; rewrote (a)(1)(A);
substituted “qualified certified” for “certified” in (a)(1)(B); rewrote (a)(2), (b)(1)(A), (b)(1)
(B), (b)(2)(A) and (b)(2)(B); added (b-1); rewrote (c) and (d); added (d-1); in (e), substituted
“beneficiary” for “prime contractor” and deleted “the contracting officer and” preceding
“the Director”; deleted “in which the options or extensions exceed $1 million in value” following “extended contracts” in (f); substituted “beneficiary shall submit to the agency contracting officer, project manager, District of Columbia Auditor, and” for “prime contractor shall submit to the contracting officer and the” in (h); rewrote (i); and added (j), (k), (l), (m), and (n).
Emergency Legislation
For temporary (90 days) amendment of this section, see § 2(c) of Certified Business
Enterprise Program Compliance and Enforcement Support Congressional Review
Emergency Amendment Act of 2026 (D.C. Act 26-389, July 30, 2026, 73 DCR 11170).
For temporary (90 days) amendment of this section, see § 2(c) of Certified Business
Enterprise Program Compliance and Enforcement Support Emergency Amendment Act of
2026 (D.C. Act 26-334, May 29, 2026, 0 DCR 0).
For temporary (90 days) amendment of this section, see § 2 of Subcontracting
Requirements Exemption for Contracts for Health Benefits for District Employees
Emergency Amendment Act of 2025 (D.C. Act 26-83, June 25, 2025, 72 DCR 7523).
For temporary (90 days) amendment of this section, see § 2(c) of Certified Business
Enterprise Program Compliance and Enforcement Support Emergency Amendment Act of
2025 (D.C. Act 26-76, May 28, 2025, 72 DCR 6454).
For temporary (90 days) amendment of this section, see § 1103(a) of Fiscal Year 2018
Budget Support Congressional Review Emergency Act of 2017 (D.C. Act 22-167, Oct. 24, 2017, 64 DCR 10802).
For temporary (90 days) amendment of this section, see § 1103(a) of Fiscal Year 2018
Budget Support Emergency Act of 2017 (D.C. Act 22-104, July 20, 2017, 64 DCR 7032).
8/27/26, 11:18 AM § 2–218.46. Performance and subcontracting requirements for construction and non-construction contracts; subcontracting plans. |… https://code.dccouncil.gov/us/dc/council/code/sections/2-218.46 6/9 https://code.dccouncil.gov/us/dc/council/laws/19-171 https://code.dccouncil.gov/us/dc/council/laws/20-108 https://code.dccouncil.gov/us/dc/council/code/sections/2-218.51 https://code.dccouncil.gov/us/dc/council/acts/26-389#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/acts/26-389#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/acts/26-389#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/acts/26-389#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/acts/26-334#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/acts/26-334#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/acts/26-334#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/acts/26-334#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/acts/26-83#%C2%A72 https://code.dccouncil.gov/us/dc/council/acts/26-83#%C2%A72 https://code.dccouncil.gov/us/dc/council/acts/26-83#%C2%A72 https://code.dccouncil.gov/us/dc/council/acts/26-83#%C2%A72 https://code.dccouncil.gov/us/dc/council/acts/26-76#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/acts/26-76#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/acts/26-76#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/acts/26-76#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/acts/22-167#%C2%A71103(a) https://code.dccouncil.gov/us/dc/council/acts/22-167#%C2%A71103(a) https://code.dccouncil.gov/us/dc/council/acts/22-167#%C2%A71103(a) https://code.dccouncil.gov/us/dc/council/acts/22-167#%C2%A71103(a) https://code.dccouncil.gov/us/dc/council/acts/22-104#%C2%A71103(a) https://code.dccouncil.gov/us/dc/council/acts/22-104#%C2%A71103(a) https://code.dccouncil.gov/us/dc/council/acts/22-104#%C2%A71103(a)
For temporary (90 day) addition, see § 2346 of Fiscal Year 2006 Budget Support
Emergency Act of 2005 (D.C. Act 16-168, July 26, 2005, 52 DCR 7667).
For temporary (90 day) amendment of section, see § 2(a) of Department of Small and
Local Business Development Clarification Emergency Act of 2005 (D.C. Act 16-191, October
28, 2005, 52 DCR 10026).
For temporary (90 day) amendment of section, see § 2(a) of Department of Small and
Local Business Development Clarification Congressional Review Emergency Act of 2006
(D.C. Act 16-301, February 27, 2006, 53 DCR 1883).
For temporary (90 day) amendment of section, see § 2132(e) of Fiscal Year 2007 Budget
Support Emergency Act of 2006 (D.C. Act 16-477, August 8, 2006, 53 DCR 7068).
For temporary (90 day) amendment of section, see § 2132(e) of Fiscal Year 2007 Budget
Support Congressional Review Emergency Act of 2006 (D.C. Act 16-499, October 23, 2006, 53 DCR 8845).
For temporary (90 day) amendment of section, see § 2(d) of Department of Small and
Local Business Development Subcontracting Clarification Emergency Amendment Act of
2006 (D.C. Act 16-513, October 25, 2006, 53 DCR 9091).
For temporary (90 day) amendment of section, see § 2(d) of Department of Small and
Local Business Development Subcontracting Clarification Congressional Review
Emergency Amendment Act of 2006 (D.C. Act 16-575, December 19, 2006, 54 DCR 24).
For temporary (90 day) amendment of section, see § 2132(e) of Fiscal Year 2007 Budget
Support Congressional Review Emergency Act of 2007 (D.C. Act 17-1, January 16, 2007, 54
DCR 1165).
For temporary (90 day) amendment of section, see § 2(i) of Department of Small and
Local Business Development Subcontracting Clarification, Benefit Expansion, and Grant-making Authority Emergency Amendment Act of 2007 (D.C. Act 17-156, October 18, 2007, 54 DCR 10919).
For temporary (90 day) amendment of section, see § 2(i) of Department of Small and
Local Business Development Subcontracting Clarification, Benefit Expansion, and Grant-making Authority Congressional Review Emergency Amendment Act of 2008 (D.C. Act 17-
251, January 23, 2008, 55 DCR 1259).
8/27/26, 11:18 AM § 2–218.46. Performance and subcontracting requirements for construction and non-construction contracts; subcontracting plans. |… https://code.dccouncil.gov/us/dc/council/code/sections/2-218.46 7/9
For temporary (90 days) repeal of D.C. Law 20-108, § 4(c), see § 7005 of the Fiscal Year
2015 Budget Support Emergency Act of 2014 (D.C. Act 20-377, July 14, 2014, 61 DCR 7598, 20 STAT 3696).
For temporary (90 days) repeal of D.C. Law 20-108, § 4(c), see § 7005 of the Fiscal Year
2015 Budget Support Congressional Review Emergency Act of 2014 (D.C. Act 20-449, October 10, 2014, 61 DCR 10915, 20 STAT 4188).
For temporary (90 days) repeal of D.C. Law 20-108, § 4(c), see § 7005 of the Fiscal Year
2015 Budget Support Second Congressional Review Emergency Act of 2014 (D.C. Act 20-
566, January 9, 2015, 62 DCR 884, 21 STAT 541).
Temporary Legislation
For temporary (225 days) amendment of this section, see § 2(c) of Certified Business
Enterprise Program Compliance and Enforcement Support Temporary Amendment Act of
2026 (D.C. Law 26-162, Aug. 14, 2026, 73 DCR 9206).
For temporary (225 days) amendment of this section, see § 2 of Subcontracting
Requirements Exemption for Contracts for Health Benefits to District Employees
Temporary Amendment Act of 2025 (D.C. Law 26-31, Aug. 23, 2025, 72 DCR 7674).
For temporary (225 days) amendment of this section, see § 2(c) of Certified Business
Enterprise Program Compliance and Enforcement Support Temporary Amendment Act of
2025 (D.C. Law 26-25, Aug. 16, 2025, 72 DCR 7536).
For temporary (225 day) amendment of section, see § 2(a) of Department of Small and
Local Business Development Clarification Temporary Amendment Act of 2005 (D.C. Law
16-49, February. 9, 2006, law notification 53 DCR 1457).
For temporary (225 day) amendment of section, see § 2(d) of the Department of Small and Local Business Development Subcontracting Clarification Temporary Amendment Act of 2006 (D.C. Law 16-214, March 6, 2007, law notification 54 DCR 2761).
For temporary (225 day) amendment of section, see § 2(i) of the Department of Small and Local Business Development Subcontracting Clarification, Benefit Expansion, and
Grant-making Authority Temporary Amendment Act of 2007 (D.C. Law 17-96, January 29, 2008, law notification 55 DCR 3403).
8/27/26, 11:18 AM § 2–218.46. Performance and subcontracting requirements for construction and non-construction contracts; subcontracting plans. |… https://code.dccouncil.gov/us/dc/council/code/sections/2-218.46 8/9 https://code.dccouncil.gov/us/dc/council/laws/20-108 https://code.dccouncil.gov/us/dc/council/laws/20-108 https://code.dccouncil.gov/us/dc/council/laws/20-108 https://code.dccouncil.gov/us/dc/council/laws/26-162#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/laws/26-162#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/laws/26-162#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/laws/26-162#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/laws/26-31#%C2%A72 https://code.dccouncil.gov/us/dc/council/laws/26-31#%C2%A72 https://code.dccouncil.gov/us/dc/council/laws/26-31#%C2%A72 https://code.dccouncil.gov/us/dc/council/laws/26-31#%C2%A72 https://code.dccouncil.gov/us/dc/council/laws/26-25#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/laws/26-25#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/laws/26-25#%C2%A72(c) https://code.dccouncil.gov/us/dc/council/laws/26-25#%C2%A72(c)
Editor's Notes
Applicability of D.C. Law 20-108: Section 4(a) of D.C. Law 20-108 provided that applications pending as of June 10, 2014, shall not be subject to the provisions of the act.
Section 4(b) of D.C. Law 20-108 provided that, except as provided in § 2-218.46(f), contracts existing or pending as of June 10, 2014, shall not be affected by the provisions of the act.
Section 4(c) of D.C. Law 20-108 provided that the act shall apply upon the inclusion of its fiscal effect in an approved budget and financial plan, as certified by the Chief Financial
Officer to the Budget Director of the Council in a certification published by the Council in the District of Columbia Register.
Section 4(c) of D.C. Law 20-108 was repealed by D.C. Law 20-155, § 7005.
PUBLICATION INFORMATION
Current through
Aug. 14, 2026
Last codified D.C. Law:
Law 26-166 effective Aug. 14, 2026
Last codified Emergency Law:
Act 26-416 effective Aug. 13, 2026
Last codified Federal Law:
Public Law 115-334 approved Dec. 20, 2018
The codes and laws on this website are in the public domain.
Please do not scrape. Instead, bulk download the HTML [https://github.com/dccouncil/law-html] or
XML [https://github.com/dccouncil/law-xml].
Powered by the non-profit Open Law Library [https://www.openlawlib.org/].
8/27/26, 11:18 AM § 2–218.46. Performance and subcontracting requirements for construction and non-construction contracts; subcontracting plans. |… https://code.dccouncil.gov/us/dc/council/code/sections/2-218.46 9/9 https://code.dccouncil.gov/us/dc/council/laws/20-108 https://code.dccouncil.gov/us/dc/council/laws/20-108 https://code.dccouncil.gov/us/dc/council/laws/20-108 https://code.dccouncil.gov/us/dc/council/laws/20-108 https://code.dccouncil.gov/us/dc/council/laws/20-108 https://code.dccouncil.gov/us/dc/council/laws/20-155 https://code.dccouncil.gov/us/dc/council/laws/26-166 https://code.dccouncil.gov/us/dc/council/acts/26-416 https://code.dccouncil.gov/us/congress/laws/public/115-334 https://github.com/dccouncil/law-html https://github.com/dccouncil/law-xml https://www.openlawlib.org/
File details come from the government source that posted it. Updated .