E-101 CG development.pdf
PDF 5 MB Posted
- Solicitation number
- RFP-171-190000003008-2
- Issued by
- Michigan
About this file
These are construction plans from the Michigan Department of Natural Resources for campground development at Bewabic State Park, Project No. 24-1459. The plans detail comprehensive site development including entrance roads, campground layouts, water supply systems, sewage disposal, and electrical infrastructure across multiple campground areas (A, B, and C). The project encompasses road construction, installation of water lines and sewage systems, boat launch facilities, and campsite development around Fortune Lake and First Lake.
The plans specify quantities including 8000 cubic yards of excavation/embankment, 23000 square yards of grading, and extensive utility infrastructure including water lines, sewage disposal systems, and electrical distribution systems with transformers and outlet boxes throughout the campgrounds. Technical specifications show detailed designs for drinking fountains, sanitation stations, underground electrical systems, and road construction with cross-sections and grading requirements. The plans include precise measurements, elevations, and construction details for all facilities and infrastructure components to be installed across the park development area.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E-101 page 1 of 9
| E-101 page 2 of 9 |
| E-101 page 3 of 9 |
| E-101 page 4 of 9 |
| E-101 page 5 of 9 |
| E-101 page 6 of 9 |
| E-101 page 7 of 9 |
| E-101 page 8 of 9 |
| E-101 page 9 of 9 |
File details come from the government source that posted it. Updated .