DWGS - 25355.pdf
PDF 24 MB Posted
- Solicitation number
- RFQ 171 260000000232 2
- Issued by
- Saginaw County, Flint City, Michigan
About this file
Contract Opportunity Summary
This is a construction design and bid document set for the State of Michigan Department of Technology, Management and Budget, specifically for sewer screening improvements at the Saginaw Correctional Facility located in Tittabassee Township, Saginaw County, Michigan. The project encompasses comprehensive mechanical, electrical, and plumbing (MEP) improvements to the bar screen building and associated infrastructure, including installation of new sewer screening and washing equipment, muffin monster units, bar screens, control systems, HVAC equipment, and electrical systems rated for Class 1, Division 1 hazardous environments. The project is structured in multiple phases: Phase 300 at 50% completion dated December 11, 2025; Phase 300 at 100% completion dated January 13, 2026; Phase 500 at 50% completion dated March 2, 2026; and Phase 500 at 90% completion dated March 18, 2026, with bid documents due March 30, 2026. The design incorporates coordination requirements with the Michigan Department of Corrections (MDOC), including mandatory 10-day advance notice for system shutdowns and safety approvals, single facility escort requirements, and specialized equipment for hazardous location compliance.
The project specifications require extensive compliance with Michigan Plumbing Code, Michigan Mechanical Code, 2023 Michigan Electrical Code, and MDOC standards, with particular emphasis on tamper-proof fasteners, security hardware, and Class 1 Division 1 hazardous location equipment throughout the screening room. Contractors must address demolition and removal of existing equipment while maintaining system integrity, patch and seal all wall and floor penetrations to maintain fire ratings, and coordinate with the existing JCI DDC building automation control system. The work includes integration of new gas monitoring systems, sewage flow monitoring systems, and various control panels into the existing infrastructure, with all electrical outages limited to two-hour windows unless portable generator backup is provided. Professional site coordination, 24-month post-construction warranty with 6-month and 11-month review meetings, material recycling documentation, and adherence to MDOC security requirements including prohibition of exposed fasteners accessible to inmates are mandatory contract conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EX DWGS for ref - 25355.pdf | ||
| Bid Addenda - One.pdf | ||
| LEIN Request Form.pdf | ||
| Advertisment - 25355.pdf | ||
| Service Disabled Veteran Owned Business Info Sheet 2025.pdf | ||
| SPECS - 25355.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TI
TL
E
SH
EE
T
T
JC
/E N
G B
Y
PR
O
JE
C
T N
O
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
R ev ie w
D
AT
E
SW
S
-0
KA
R
KA
R
2/
5.
C
TS
PR
O
JE
C T
D
ES
C R
IP
TI
O N
PH
AS
E
- 5
0%
-1 1-
SA
G
IN
AW
C O
R R
EC
TI
O N
AL
F
AC
IL
IT
Y
SE
W
ER
S
C R
EE
N
IN
G
IM
PR
O
VE
M
EN
TS
TI
TT
AB
AW
AS
SE
E
TW
P.
, S
AG
IN
AW
C O
U N
TY
, M
I
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
PH
AS
E
- 1
-1 3-
PH
AS
E
- 5
0%
-0 2-
PH
AS
E
- 9
0%
-1 8-
BI
D
D O
C U
M
EN
TS
-3 0-
CONSTRUCTION PLANS FOR
MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT & BUDGET
9625 PIERCE RD., FREELAND, MICHIGAN
VICINITY MAP
N.T.S.
TITLE
SHEET INDEX
NO.
SHEET
LOCATION MAP
3 WORKING DAYS
BEFORE YOU DIG
CALL MISS DIG
1-(800)-482-7171
For free location of public utility lines
R
OR R
Know what's below.
Call before you dig.
FILE NO.: 472/25355.CTS
TOPOGRAPHIC SURVEY C1
T TITLE SHEET
OVERALL IMPROVEMENTS PLANC2
SAGINAW CORRECTIONAL FACILITY
SEWER SCREENING IMPROVEMENTS
TITTAWABESSEE TWP.
SAGINAW COUNTY, MI
PROJECT PERMITS
Site
NF
N
M A T R I X
CIVIL ENGINEER NFE Project #P019
NF
ENGINEERS
Civil Engineers Land Surveyors Land Planners
46777 Woodward Avenue Pontiac, MI 48342-5032
Tel. (248) 332-7931 Fax. (248) 332-8257
ELECTRICAL ENGINEER
BID DOCUMENTS
SEWER SCREENING/WASHING AND MUFFIN MONSTER C3
SANITARY IMPROVEMENTS INFORMATIONC4
MECHANICAL SYMBOLS, NOTES, AND ABBREVIATIONSM-100
BAR SCREEN BUILDING/WEST, PUMP HOUSE - FIRST FLOOR, M-400
E-100
E-200
ELECTRICAL SYMBOLS, NOTES & ABBREVIATIONS
PARTIAL ELECTRICAL SITE PLAN, MUFFIN MONSTER WELL, DEMO & NEW
EQUIPMENT DETAILS
E-500 BAR SCREEN FIRST FLOOR PLAN - ELECTRICAL DEMOLITION & NEW
E-900 ELECTRICAL PANEL SCHEDULES
PLUMBING SYMBOLS, NOTES & ABBREVIATIONSP-100
BAR SCREEN - BUILDING FIRST FLOOR PLAN - PLUMBING NEWP-400
MECHANICAL FIRST FLOOR PLAN - MECHANICAL DEMOLITION & NEW
M-900 MECHANICAL DETAILS AND SCHEDULES
E-600 PARTIAL ELECTRICAL RISER DIAGRAM
BENCHMARK
PIERCE ROAD
CAUTION!!
TO
PO
G R
AP
H
IC
S
U R
VE
Y/
BU
IL
D
IN
G F
LO
O
R P
LA
N
C1
JC
/E N
G B
Y
PR
O
JE
C
T N
O
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
R ev ie w
D
AT
E
SW
S
-0
KA
R
KA
R
2/
5.
C
TS
PR
O
JE
C T
D
ES
C R
IP
TI
O N
PH
AS
E
- 5
0%
-1 1-
SA
G
IN
AW
C O
R R
EC
TI
O N
AL
F
AC
IL
IT
Y
SE
W
ER
S
C R
EE
N
IN
G
IM
PR
O
VE
M
EN
TS
TI
TT
AB
AW
AS
SE
E
TW
P.
, S
AG
IN
AW
C O
U N
TY
, M
I
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
PH
AS
E
- 1
-1 3-
PH
AS
E
- 5
0%
-0 2-
PH
AS
E
- 9
0%
-1 8-
BI
D
D O
C U
M
EN
TS
-3 0-
3 WORKING DAYS
BEFORE YOU DIG
CALL MISS DIG
1-(800)-482-7171
For free location of public utility lines
R
OR R
Know what's below.
Call before you dig.
LEGEND
TOPOGRAPHIC SURVEY NOTES
NF
N
SCALE: 1" = 10'
0510 5 10 5
N
FE
P ro je ct
P0
N F
E N
G
IN
E E
R S
C iv il E ng in ee rs
L an d Su rv ey or s
L an d Pl an ne rs
W oo dw ar d
A ve nu e
Po nt ia c, M I
2-
T el
8)
-7
F ax
8)
-8
EX. DIVERSION MANHOLE
EX. MUFFIN MONSTER/WET WELL
EXISTING SEWER INFORMATION
SOIL EROSION CONTROL SOIL EROSION NOTE
SILTFENCE DETAIL
SECTION A-A
FRONT VIEW
PLAN VIEW
SECTION B-B
BENCHMARK
PIERCE ROAD
CAUTION!!
O
VE
R
AL
L
IM
PR
O
VE
M
EN
TS
P
LA
N C2
JC
/E
N G
B Y
PR
O
JE
C
T N
O
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
R ev ie w
D
AT
E
SW
S
-0
KA
R
KA
R
2/
5.
C
TS
PR
O
JE
C T
D
ES
C R
IP
TI
O N
PH
AS
E
- 5
0%
-1 1-
SA
G
IN
AW
C O
R R
EC
TI
O N
AL
F
AC
IL
IT
Y
SE
W
ER
S
C R
EE
N
IN
G
IM
PR
O
VE
M
EN
TS
TI
TT
AB
AW
AS
SE
E
TW
P.
, S
AG
IN
AW
C O
U N
TY
, M
I
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
PH
AS
E
- 1
-1 3-
PH
AS
E
- 5
0%
-0 2-
PH
AS
E
- 9
0%
-1 8-
BI
D
D O
C U
M
EN
TS
-3 0-
3 WORKING DAYS
BEFORE YOU DIG
CALL MISS DIG
1-(800)-482-7171
For free location of public utility lines
R
OR R
Know what's below.
Call before you dig.
LEGEND
TOPOGRAPHIC SURVEY NOTES
NF
N
SCALE: 1" = 10'
0510 5 10 5
N
FE
P ro je ct
P0
N F
E N
G
IN
E E
R S
C iv il E ng in ee rs
L an d Su rv ey or s
L an d Pl an ne rs
W oo dw ar d
A ve nu e
Po nt ia c, M I
2-
T el
8)
-7
F ax
8)
-8
CONSTRUCTION PLAN NOTE - SEWER
BYPASS REQUIREMENTS
HYDRO VAC INVESTIGATION
PROJECT PHASING
CONFINED SPACE
GPR SURVEY
LEGEND - PAVING
EXTERNAL POWERED SEWER FLOW
MONITORING SYSTEM
SAGINAW HISTORICAL UTILITY PLAN
SE
W
ER
S
C R
EE
N
IN
G
/W
AS
H
IN
G
AN
D M
U
FF
IN
M
O N
ST
ER
EQ
U
IP
M
EN
TS
D
ET
AI
LS
C3
JC
/E N
G B
Y
PR
O
JE
C
T N
O
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
R ev ie w
D
AT
E
SW
S
-0
KA
R
KA
R
2/
5.
C
TS
PR
O
JE
C T
D
ES
C R
IP
TI
O N
PH
AS
E
- 5
0%
-1 1-
SA
G
IN
AW
C O
R R
EC
TI
O N
AL
F
AC
IL
IT
Y
SE
W
ER
S
C R
EE
N
IN
G
IM
PR
O
VE
M
EN
TS
TI
TT
AB
AW
AS
SE
E
TW
P.
, S
AG
IN
AW
C O
U N
TY
, M
I
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
PH
AS
E
- 1
-1 3-
PH
AS
E
- 5
0%
-0 2-
PH
AS
E
- 9
0%
-1 8-
BI
D
D O
C U
M
EN
TS
-3 0-
N
FE
P ro je ct
P0
N F
E N
G
IN
E E
R S
C iv il E ng in ee rs
L an d Su rv ey or s
L an d Pl an ne rs
W oo dw ar d
A ve nu e
Po nt ia c, M I
2-
T el
8)
-7
F ax
8)
-8
MUFFIN MONSTER SPECIFICATIONS
BAR SCREEN AND COMPACTOR LAYOUT/INSTALLATION
TYPICAL SCREENING/WASHER UNIT ASSEMBLY
SA
N
IT
AR
Y
IM
PR
O
VE
M
EN
TS
IN
FO
R M
AT
IO
N C4
JC
/E
N G
B Y
PR
O
JE
C
T N
O
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
R ev ie w
D
AT
E
SW
S
-0
KA
R
KA
R
2/
5.
C
TS
PR
O
JE
C T
D
ES
C R
IP
TI
O N
PH
AS
E
- 5
0%
-1 1-
SA
G
IN
AW
C O
R R
EC
TI
O N
AL
F
AC
IL
IT
Y
SE
W
ER
S
C R
EE
N
IN
G
IM
PR
O
VE
M
EN
TS
TI
TT
AB
AW
AS
SE
E
TW
P.
, S
AG
IN
AW
C O
U N
TY
, M
I
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
PH
AS
E
- 1
-1 3-
PH
AS
E
- 5
0%
-0 2-
PH
AS
E
- 9
0%
-1 8-
BI
D
D O
C U
M
EN
TS
-3 0-
N
FE
P ro je ct
P0
N F
E N
G
IN
E E
R S
C iv il E ng in ee rs
L an d Su rv ey or s
L an d Pl an ne rs
W oo dw ar d
A ve nu e
Po nt ia c, M I
2-
T el
8)
-7
F ax
8)
-8
BYPASS GRINDER STATION REPLACEMENT
DIVERSION MANHOLE REPLACEMENT
BAR SCREEN SEQUENCE OF CONSTRUCTION
DIVERSION VAULT DETAIL
DIVERSION MANHOLE REPLACEMENT
SLUICE GATE W/NUT AND THREADED ROD IN D-BOX
SLUICE GATE BASIS OF DESIGN:
LEGEND - PAVING
PLUMBING ABBREVIATIONS
PLUMBING SYMBOLS LEGEND
PLUMBING PIPING PLUMBING EQUIPMENT
1. ALL PLUMBING WORK SHALL CONFORM TO MICHIGAN
PLUMBING CODE, LATEST APPLICABLE EDITION, AND ALL
APPLICABLE LOCAL CODES.
2. INSTALL ALL EQUIPMENT, MATERIALS, AND
ACCESSORIES PER MANUFACTURERS WRITTEN
INSTRUCTIONS.
3. INSTALL ISOLATION BALL VALVES @ ALL FIXTURE WATER
SUPPLY LINES.
4. SITE CONTRACTOR TO RUN UTILITIES TO 5'-0" FROM
BUILDING LINE.
5. ALL PIPE SIZES SHOWN ARE SERVICE SIZE. SIZE
SLEEVES FOR 1" CLEAR SPACE BETWEEN PIPE AND
SLEEVE FOR INSTALLATION OF MECHANICAL SEAL.
6. CONTRACTOR SHALL DEMOLISH & REMOVE EXISTING
PIPING, FITTINGS, & EQUIPMENT AS REQUIRED FOR NEW
INSTALLATIONS. VALVE & CAP PIPING TO REMAIN.
7. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY
CONFLICT WITH NEW CONSTRUCTION AND RELOCATE
AS NEEDED.
8. NOTIFY OWNER OF ANY PIPING DEMOLITION THAT MAY
AFFECT NORMAL OPERATION OF OTHER AREAS.
9. MECHANICAL SEALS REQUIRED FOR BELOW GRADE
WALL PENETRATIONS. ALL WALL AND SLAB
PENETRATIONS OF MASONRY OR CONCRETE
CONSTRUCTION SHALL BE SLEEVED.
10. 2% SLOPE FOR ALL SANITARY PIPING 2-1/2" OR LESS IN
DIAMETER. 1% SLOPE FOR ALL SANITARY PIPING 3" OR
MORE IN DIAMETER.
11. PROVIDE SHOCK STOPS FOR EVERY PLUMBING GROUP.
PROVIDE SHOCK ABSORBER IN THE DOMESTIC COLD
AND HOT WATER PIPING. SHOCK ABSORBERS TO BE
LOCATED IN AN ACCESSIBLE LOCATION.
12. PROVIDE AIR ELIMINATION DEVICES FOR EACH
PLUMBING SYSTEM.
13. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES,
LOCATION, ELEVATIONS, AND DETAILS OF ALL EXISTING
CONDITIONS THAT MAY AFFECT THE WORK.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING THE INTEGRITY OF ALL EQUIPMENT AND
MATERIALS IN A "NEW" CONDITION DURING
CONSTRUCTION.
15. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED
BY LAW.
16. DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE
WITH THE CODES AND REGULATIONS ENFORCED BY
LOCAL BUILDING OFFICIALS.
17. IF THERE IS CONFLICTING INFORMATION IN THE PLANS
OR SPECIFICATIONS THE MORE STRINGENT AND
GREATER COST ITEM SHALL BE USED.
18. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND SUGGESTED ROUTES. IT IS
NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS,
PRESERVE HEADROOM AND KEEP OPENINGS AND
PASSAGEWAYS CLEAR. DO NOT SCALE FROM
DRAWINGS.
19. ANY INFORMATION FOUND ON THE DRAWINGS AND NOT
IN THE SPECIFICATIONS, OR FOUND IN SPECIFICATIONS
AND NOT IN THE DRAWINGS, SHALL BE CONSTRUED AS
TO BE INCLUDED IN BOTH THE SPECIFICATIONS AND THE
DRAWINGS. ANY CONFLICT BETWEEN THE PLANS AND
THE SPECIFICATIONS WILL BE INTERPRETED BY THE
ARCHITECT. IN THE EVENT OF CONFLICT, FOR THE
PURPOSE OF BIDDING, THE CONTRACTOR SHALL
PRESUME THE MOST EXPENSIVE COMBINATION OF
QUALITY AND QUANTITY OF WORK SHALL PREVAIL.
20. UNLESS OTHERWISE NOTED, ALL PIPING SHALL BE
CONCEALED WHEREVER POSSIBLE. PROVIDE CHROME
ESCUTCHEON AT EACH PENETRATION OF A FINISHED
SURFACE.
21. PLUMBING UTILITY PIPING SHALL NOT BE RUN ABOVE
ELECTRICAL GEAR OR IN THE SERVICE SPACE
REQUIRED BY THE NATIONAL ELECTRICAL CODE.
22. PROVIDE ISOLATION SEPARATORS FOR COPPER PIPING
RUNNING THROUGH METAL STUDS.
23. PROVIDE FIRE STOPPING AT ALL PENETRATIONS OF FIRE
RATED ENCLOSURES.
28. CONTRACTOR TO PATCH, PRIME, AND PAINT EXISTING
WALLS/CEILINGS AS NEEDED TO MATCH EXISTING
WHERE DEMOLITION AND/OR NEW WORK IS COMPLETED.
29. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH
POST CONSTRUCTION MEETING WITH THE ENGINEER
AND OWNER TO REVIEW AND FIX ISSUES DURING THE
WARRANTY PERIOD.
30. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO
OWNER OF THE AMOUNT OF MATERIAL BEING RECYCLED
THROUGHOUT THE PROJECT.
31. CONTRACTOR WILL HAVE 1 ESCORT TO WORK WITH
THROUGH AT THE PROJECT.
32. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY
IN ADVANCE FOR ANY HOT WORK TO ALLOW THE
OWNER TO DISABLE THE FIRE ALARM.
33. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES
SHALL USE TAMPERPROOF SCREWS.
34. ALL COORDINATION ITEMS AND/OR REQUIRED SYSTEM
SHUTDOWNS MUST BE COORDINATED AND APPROVED
BY MDOC 10 DAYS IN ADVANCE. CONTRACTOR TO
PROVIDE DETAILED SCHEDULE OF WHAT IS GOING TO
OCCUR AND WHAT WILL BE AFFECTED. CONTRACTOR TO
ALSO PROVIDE MDOC WITH SAFETY AND BACKUP PLANS
IF AN UNEXPECTED EVENT WERE TO OCCUR DURING
THE COORDINATION ITEMS AND/OR REQUIRED SYSTEM
SHUTDOWNS.
35. ALL WORK IN THE SCREEN ROOM SHALL BE COMPLETED
WITH PROPER PRECAUTIONS FOR A CLASS 1, DIVISION 1
HAZARDOUS ENVIRONMENT.
36. ALL MATERIALS SHALL BE RATED FOR USE IN A CLASS 1,
DIVISION 1 HAZARDOUS ENVIRONMENT.
GENERAL PLUMBING NOTES
MISCELLANEOUS NOTES
PLUMBING VALVES
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
AD AREA DRAIN
ASR AUTOMATIC SPRINKLER RISER
BFS BELOW FLOOR SLAB
BWV BACK WATER VALVE
CB CATCH BASIN
CI CAST IRON
CO CLEAN OUT
CV CONTROL VALVE
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DWH DOMESTIC WATER HEATER
E.T.C. ELECTRICAL TRADES CONTRACTOR
EWC ELECTRIC WATER COOLER
EXIST EXISTING
FD FLOOR DRAIN
FC FINAL CONNECTIONS
FDC FIRE DEPT. CONNECTION
FF FINISH FLOOR
FHV FIRE HOSE VALVE
FT FEET
GAL GALLON
GD GARBAGE DISPOSAL
GI GREASE INTERCEPTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIB
HD HEAD (FT)
HP HORSE POWER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
LAV LAVATORY
LT LAUNDRY TRAY
MA MEDICAL AIR
MAX MAXIMUM
MGC MEDICAL GAS CONSOLE
MH MAN HOLE
MIN MINIMUM
MS MOP SINK
M.T.C. MECHANICAL TRADES CONTRACTOR
NTS NOT TO SCALE
ORD OVERFLOW ROOF DRAIN
OXY OXYGEN
P PUMP
PD PRESSURE DROP
PVC POLY-VINYL-CHLORIDE
RC RAIN CONDUCTOR
RD ROOF DRAIN
RI ROUGH-IN
REQ'D REQUIRED
SAN SANITARY
SHWR SHOWER
SK SINK
SP STAND PIPE
SQ. FT. SQUARE FEET
SS SERVICE SINK
ST STORM
S&W STOP & WASTE
STR STRAINER
SV STACKED VENT
TYP. TYPICAL
UR URINAL
VB VACUUM BREAKER
VS VENT STACK
V.F.D VARIABLE FREQUENCY DRIVE
VTR VENT THRU ROOF
W WASTE
WB WET BULB
WC WATER CLOSET
WH WALL HYDRANT
WS WASTE STACK
W&V WASTE AND VENT
X-CW EXIST. CW PIPING
ITEM
EXISTING
COLD WATER
COLD WATER BELOW FINISH SLAB
HOT WATER
HOT WATER BELOW FINISH SLAB
HOT WATER RETURN
HOT WATER RETURN BELOW FINISH SLAB
SOFTENED WATER
SOFTENED WATER BELOW FINISH SLAB
SOFTENED WATER RETURN
SOFTENED WATER RETURN BELOW FINISH
SLAB
TEMPERED WATER
TEMPERED WATER BELOW FINISH SLAB
TEMPERED WATER RETURN
TEMPERED WATER RETURN BELOW FINISH
SLAB
DEIONIZED WATER
DEIONIZED WATER BELOW FINISH SLAB
REVERSE OSMOSIS WATER
REVERSE OSMOSIS WATER RETURN BELOW
FINISH SLAB
FIRE PROTECTION
GAS (NATURAL)
GAS (LIQUID PETROLEUM)
ACID RESISTANT
VENT ACID RESISTANT WASTE
ACID RESISTANT WASTE BELOW FINISH SLAB
RAIN CONDUCTOR
STORM BELOW FINISH SLAB
OVERFLOW RAIN CONDUCTOR
OVERFLOW RAIN CONDUCTOR BELOW FINISH
SLAB
SANITARY WASTE
SANITARY WASTE BELOW FINISH SLAB
VENT PIPING
VENT PIPING BELOW FINISH SLAB
COMPRESSED AIR
OXYGEN
NITROUS OXIDE
NITROGEN
MEDICAL AIR
VACUUM
DEMOLITION
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
OS&Y VALVE
SOLENOID VALVE
EXPANSION VALVE WITH THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
FLOOR CLEANOUT
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
INLINE CLEANOUT
PLUMBING TRAP
THERMOMETER
CONNECTION
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
FLOOR DRAIN & FLOOR SINK
BACK FLOW PREVENTER
FLANGE END CONNECTION
WALL HYDRANT & HOSE BIBB
REGULAR & OVERFLOW ROOF DRAIN
PIPE CAP
PIPE BREAK
WATER METER
GAS METER
PRESSURE GAUGE
FIRE HYDRANT
SPRINKLER HEAD (PENDANT)
SPRINKLER HEAD (UPRIGHT)
SPRINKLER HEAD (SIDEWALL)
FIRE DEPARTMENT CONNECTION
PIPING FLEXIBLE CONNECTOR
SIGHT GLASS
PIPE EXPANSION
COMPENSATOR FLOW SENSOR DEVICE
FLOW METER
FLOW SWITCH
PRESSURE SWITCH
SUPERVISORY SWITCH INVERTED
BUCKET TRAP
FLOAT & THERMOSTATIC TRAP
X
X
XX
XXXX
XX
XXXX
CW
CW
HW
HW
HWR
HWR
SW
SW
SWR
SWR
TW
TW
TWR
TWR
DI
DI
RO
RO
FP
G
LP
ARV
ARW
ARW
RC
ST
ORC
ORC
SAN
SAN
V
V
CA
NO
N2
MA
VAC
M
M
P
FS
FT
BT
PS
SS JC
/E
N G
B Y
PR
O
JE
C
T N
O
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
R ev ie w
D
AT
E
-0
1/
5.
C
TS .
PR
O
JE
C T
D
ES
C R
IP
TI
O N
BI
D
D O
C U
M
EN
TS
3/
/2
SA
G
IN
AW
C O
R R
EC
TI
O N
AL
F
AC
IL
IT
Y
BA
R
S C
R
EE
N B
U
IL
D
IN
G
IM
PR
O
VE
M
EN
TS
TI
TT
AB
AW
AS
SE
E
TW
P.
, S
AG
IN
AW
C
O U
N
TY
, M I
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
M A
T R
I X
P-
C
ATTA
T
TA
T
PL
U
M
BI
N G
S
YM
BO
LS
, N O
TE
S, AN
D
A
BB
R
EV
IA
TI
O
S
X-FD
X-FD
X-CW
X-3/4" CW DN TO
WELL HOUSE
X-
CW
X-
CW
X-HB
X-3/4"
X-3/4"
BAR SCREEN
(REFER TO
CIVIL)
3/4" CW
CW
3/4"
3/4" CW DN TO
BAR SCREEN
SOLENOID VALVE (PROVIDED
BY COMPACTOR MANU., TYP. 2)
4" DRAIN FROM
BAR SCREEN DN
TO EXISTING PIT
SCREEN ROOM
ELECTRICAL ROOM
BFP
INSTALL NEW COLD WATER PIPING, VALVES, FITTINGS, HANGERS,
SUPPORTS, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION
SHOWN. CONTRACTOR TO REFER TO BARSCREEN MANUFACTURER
INSTALLATION INSTRUCTIONS FOR FINAL CONNECTIONS. CONTRACTOR
TO MODIFY EXISTING DOMESTIC COLD WATER PIPING AS REQUIRED TO
MAKE NEW CONNECTION.
CONTRACTOR TO INSTALL NEW SOLENOID VALVES PROVIDED BY
BARSCREEN/COMPACTOR MANUFACTURER. CONTRACTOR TO INSTALL
NEW SOLENOID VALVES, CONTROLS, CONTROL WIRING, AND ALL
ASSOCIATED ACCESSORIES PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND CONNECT THEM TO THE NEW
BARSCREEN/COMPACTER CONTROL PANEL. CONTRACTOR TO
COORDINATE THE CONNECTION OF THE SOLENOID VALVES TO THE
BARSCREEN/COMPACTER CONTROL PANEL WITH THE MANUFACTURER.
PLUMBING KEY NOTES
GENERAL PLUMBING NOTES
1. ALL WORK AND MATERIAL IN SCREEN ROOM SHALL BE FOR CLASS 1,
DIVISION 1 HAZARDOUS ENVIRONMENT.
2. NEW COLD WATER PIPING IN THE ELECTRICAL ROOM SHALL NOT BE
ROUTED OVER ELECTRICAL GEAR AND/OR PANELS.
3. CONTRACTOR TO INSTALL NEW NIRON (OR PRE-APPROVED
EQUIVALENT) POLYPROPYLENE PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. CONTRACTOR TO HANG/SUPPORT NEW NIRON (OR
PRE-APPROVED EQUIVALENT) POLYPROPYLENE PER THE PROJECT
SPECIFICATIONS AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.
CONTRACTORS TO PROVIDE ALL REQUIRED ADDITIONAL PIPE
RACKING, SUPPORTS, HANGERS, AND ALL ASSOCIATED EQUIPMENT TO
ENSURE THE NEW NIRON (OR PRE-APPROVED EQUIVALENT)
POLYPROPYLENE PIPING IS PROPERLY INSTALLED.
JC
/E
N G
B Y
PR
O
JE
C
T N
O
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
R ev ie w
D
AT
E
-0
1/
5.
C
TS .
PR
O
JE
C T
D
ES
C R
IP
TI
O N
BI
D
D O
C U
M
EN
TS
3/
/2
SA
G
IN
AW
C O
R R
EC
TI
O N
AL
F
AC
IL
IT
Y
BA
R
S C
R
EE
N B
U
IL
D
IN
G
IM
PR
O
VE
M
EN
TS
TI
TT
AB
AW
AS
SE
E
TW
P.
, S
AG
IN
AW
C
O U
N
TY
, M I
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
M A
T R
I X
KEY PLAN
SCALE: NTS
N
BAR SCREEN
WEST PUMP HOUSE
P-
BA
R S
C R
EE
N
B U
IL
D
IN
G
FI
R
ST
FL
O
O R
P
LA
N
PL
U
M
BI
N G
N
EW
N BAR SCREEN BUILDING - FIRST FLOOR PLAN - PLUMBING NEW
SCALE: 1/4" = 1'-0"
0 1 5
C
ATTA
T
TA
T
GENERAL HVAC NOTES
1. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE, LATEST
APPLICABLE EDITION.
2. LOCATE EXHAUST OUTLETS OF VENTILATION SYSTEMS AT LEAST 10 FEET FROM
OUTDOOR AIR INTAKES.
3. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES PER
MANUFACTURERS WRITTEN INSTRUCTIONS.
4. BOTTOM OF EQUIPMENT ON ROOF SHALL BE A MINIMUM OF 12" ABOVE ROOF
MEMBRANE. CONTRACTOR SHALL COORDINATE ASSOCIATED ROOF CURB
HEIGHT AS REQUIRED.
5. ALL EXISTING SYSTEMS THAT SERVE AREAS BEING RENOVATED SHALL BE
REBALANCED AS REQUIRED.
6. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION THAT MAY AFFECT
NORMAL OPERATION OF OTHER AREAS.
7. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY CONFLICT WITH NEW
CONSTRUCTION AND RELOCATE AS NEEDED.
8. LOCATIONS OF THE THERMOSTATS TO BE VERIFIED IN FIELD.
9. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER DISCIPLINES PRIOR
TO CONSTRUCTION TO AVOID CONFLICTS.
10. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.
11. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION, ELEVATIONS,
AND DETAILS OF ALL EXISTING CONDITIONS THAT MAY AFFECT THE WORK.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY
OF ALL EQUIPMENT AND MATERIALS IN A "NEW" CONDITION DURING
CONSTRUCTION.
13. ALL WORK SHALL BE PERFORMED BY LICENSED CONTRACTORS AND
SUBCONTRACTORS AS REQUIRED BY LAW.
14. CONTRACTOR SHALL USE LOW PRESSURE LOSS DUCT FITTINGS IN
ACCORDANCE WITH SMACNA. (WYES, RADIUSED OR VANED TEES, ETC.)
DUCTWORK SHALL BE STAINLESS STEEL OR ALLUMINUM.
15. ALL EXTERNALLY ISOLATED HVAC EQUIPMENT SHALL HAVE FLEXIBLE DUCT
CONNECTORS.
16. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF TERMINATION OF PIPES
AND DUCTS AND SUGGESTED ROUTES. IT IS NOT INTENTION OF DRAWINGS TO
INDICATE ALL NECESSARY OFFSETS. INSTALL WORK IN MANNER TO CONFORM
TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM AND KEEP
OPENINGS AND PASSAGEWAYS CLEAR. DO NOT SCALE FROM DRAWINGS.
17. ANY INFORMATION FOUND ON THE DRAWINGS AND NOT IN THE SPECIFICATIONS,
OR FOUND IN SPECIFICATIONS AND NOT IN THE DRAWINGS, SHALL BE
CONSTRUED AS TO BE INCLUDED IN BOTH THE SPECIFICATIONS AND THE
DRAWINGS. ANY CONFLICT BETWEEN THE PLANS AND THE SPECIFICATIONS
WILL BE INTERPRETED BY THE ARCHITECT. IN THE EVENT OF CONFLICT, FOR
THE PURPOSE OF BIDDING, THE CONTRACTOR SHALL PRESUME THE MOST
EXPENSIVE COMBINATION OF QUALITY AND QUANTITY OF WORK SHALL PREVAIL.
18. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,
AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,
CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES
HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
19. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,
UNDERWRITERS, LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,
STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS, THESE
STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE
DRAWING AND SPECIFICATIONS.
20. DUCTWORK SHALL BE ACOUSTICALLY LINED WITHIN 10 FT OF THE INTAKE
AND/OR DISCHARGE OF A FAN.
21. DUCT/PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF DUCT/PIPING AND
EQUIPMENT SHALL BE COORDINATED WITH BUILDING STRUCTURE, EQUIPMENT
FURNISHED, ARCHITECTURAL DRAWINGS, AND ALL OTHER TRADES PRIOR TO
INSTALLATION. ANY CONTRACTOR INSTALLING WORK WITHOUT PRIOR
COORDINATION SHALL RELOCATE HIS WORK AT HIS EXPENSE TO ALLOW
PROPER INSTALLATION OF ANY AND ALL TRADES WORK.
22. UNLESS OTHERWISE NOTED, ALL DUCT/PIPING SHALL BE CONCEALED
WHEREVER POSSIBLE. PROVIDE CHROME ESCUTCHEON OR ALUMINUM DUCT
COLLAR AT EACH PENETRATION OF A FINISHED SURFACE.
23. DUCT/PIPING SHALL NOT BE RUN ABOVE ELECTRICAL GEAR IN THE SERVICE
SPACE REQUIRED BY THE NATIONAL ELECTRICAL CODE.
24. ANY ADDITIONAL LOW VOLTAGE CONTROL WIRING THAT IS REQUIRED SHALL BE
PROVIDED BY THE HVAC CONTRACTOR. CONTROL WIRING SHALL BE RUN IN
CONDUIT IF REQUIRED BY LOCAL CODES OR THE SPECIFICATIONS. POWER
SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR.
25. PROVIDE VIBRATION ISOLATION AT EACH CONNECTION TO A MOTORIZED PIECE
OF EQUIPMENT BY THE HVAC CONTRACTOR.
26. MOUNT THERMOSTAT/SENSORS AT 48" AFF UNLESS NOTED OTHERWISE.
27. CONTRACTOR TO PATCH, PRIME, AND PAINT EXISTING WALLS/CEILINGS AS
NEEDED TO MATCH EXISTING WHERE DEMOLITION AND/OR NEW WORK IS
COMPLETED.
28. CONTRACTOR TO PATCH EXISTING ROOF AS REQUIRED TO MATCH EXISTING,
SEAL WATER TIGHT, AND MAINTAIN EXISTING ROOF WARRANTIES AFTER
DEMOLITION/NEW WORK IS COMPETED.
29. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH POST CONSTRUCTION
MEETING WITH THE ENGINEER AND OWNER TO REVIEW AND FIX ISSUES DURING
THE WARRANTY PERIOD.
30. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO OWNER OF THE
AMOUNT OF MATERIAL BEING RECYCLED THROUGHOUT THE PROJECT.
31. CONTRACTOR WILL HAVE 1 ESCORT TO WORK WITH THROUGH AT THE PROJECT.
32. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY IN ADVANCE FOR ANY
HOT WORK TO ALLOW THE OWNER TO DISABLE THE FIRE ALARM.
33. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES SHALL USE
TAMPERPROOF SCREWS.
34. CONTRACTOR TO PROVIDE ALL REQUIRED CONTROL WIRING, CONTROLS
DEVICES/EQUIPMENT, AND ALL ASSOCIATED ACCESSORIES TO CONNECT NEW
EQUIPMENT TO THE EXISTING JCI DDC CONTROL SYSTEM. AND BE INTEGRATED
ONTO THE EXISTING FRONT-END GRAPHICS.
35. ALL COORDINATION ITEMS AND/OR REQUIRED SYSTEM SHUTDOWNS MUST BE
COORDINATED AND APPROVED BY MDOC 10 DAYS IN ADVANCE. CONTRACTOR
TO PROVIDE DETAILED SCHEDULE OF WHAT IS GOING TO OCCUR AND WHAT
WILL BE AFFECTED. CONTRACTOR TO ALSO PROVIDE MDOC WITH SAFETY AND
BACKUP PLANS IF AN UNEXPECTED EVENT WERE TO OCCUR DURING THE
COORDINATION ITEMS AND/OR REQUIRED SYSTEM SHUTDOWNS.
36. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ALL 24 VOLT
CONTROL WIRING AS REQUIRED TO CONTROL ALL HVAC EQUIPMENT PER THE
SEQUENCE OF OPERATIONS. REFER TO MECHANICAL SPECIFICATIONS AND
COORDINATE WITH MECHANICAL CONTRACTOR. ELECTRICAL CONTRACTOR IS
RESPONSIBLE FOR INSTALLING WIRING AND RACEWAY PER ELECTRICAL
SPECIFICATIONS.
37. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL OTHER HARDWARE
REQUIRED FOR WIRING THE HVAC EQUIPMENT PER THE SEQUENCE OF
OPERATIONS.
38. CONTRACTOR TO REFER TO ALL ELECTRICAL CONSTRUCTION DOCUMENTS AND
DIVISION 26 SPECIFICATIONS FOR CONTROL WIRING RACEWAYS. ALL CONTROL
WIRING RACEWAYS ARE TO MEET MDOC REQUIREMENTS.
39. ALL WORK IN THE SCREEN ROOM SHALL BE COMPLETED WITH PROPER
PRECAUTIONS FOR A CLASS 1, DIVISION 1 HAZARDOUS ENVIRONMENT.
40. ALL MATERIALS SHALL BE RATED FOR USE IN A CLASS 1, DIVISION 1 HAZARDOUS
ENVIRONMENT.
MECHANICAL SYMBOLS LEGEND
HVAC PIPING SYMBOLSHVAC PIPING HVAC DUCTWORKTEMPERATURE CONTROL SYMBOLS
MISCELLANEOUS NOTES
HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS HVAC PIPING VALVES
MECHANICAL ABBREVIATIONS
AFF ABOVE FINISH FLOOR
AC AIR COMPRESSOR
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
A.T.C. ARCHITECTURAL TRADES CONTRACTOR
B BOILER
B.A.S. BUILDING AUTOMATION SYSTEM
CAF COMBUSTION AIR FAN
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CHLR CHILLER
CHP CONSOLE HEAT PUMP
CONV CONVECTOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONTROL VALVE
CWP CHILLED WATER PUMP
DB DRY BULB
DFU DUCT FURNACE
DIA DIAMETER
DN DOWN
DPR DAMPER
DS DUCT SILENCER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
E.T.C. ELECTRICAL TRADES CONTRACTOR
EVR EVAPORATOR
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST EXISTING
FF FINISH FLOOR
FPM FEET PER MINUTE
FT FEET
FTR FINNED TUBE RADIATION
FU FURNACE
GAL GALLON
GFRH GAS FIRED RADIANT HEATER
GR GRILLE
H HUMIDIFIER
HC HEATING COIL
HD HEAD (FT)
HP HORSE POWER
HHP HORIZONTAL HEAT PUMP
HTG HEATING
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IAH INTAKE HOOD
LAT LEAVING AIR TEMPERATURE
LH LATENT HEAT (MBH)
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MIN MINIMUM
M.T.C. MECHANICAL TRADES CONTRACTOR
N.C. NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
P PUMP
PCR PUMPED CONDENSATE RETURN
PD PRESSURE DROP
RCP RADIANT CEILING PANEL
REQ'D REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RLH RELIEF HOOD
RTU ROOF TOP UNIT
SD SUPPLY DIFFUSER
SF SUPPLY FAN
SG SUPPLY GRILLE
SH SENSIBLE HEAT (MBH)
SM SHEET METAL
SQ. FT. SQUARE FEET
SST SATURATED SUCTION TEMPERATURE
STR STRAINER
TC TOTAL COOLING (MBH)
TCL TEMPERATURE CONTROL
T&P TEMPERATURE & PRESSURE RELIEF VALVE
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VRH VARIABLE AIR VOLUME REHEAT BOX
FPVAV FAN POWERED VARIABLE AIR VOLUME BOX
V.F.D VARIABLE FREQUENCY DRIVE
ZD ZONE DAMPER
X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)
ITEM
EXISTING
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
COOLING TOWER WATER SUPPLY
COOLING TOWER WATER RETURN
DIRECT EXPANSION
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
SUCTION (REFRIGERANT)
LIQUID (REFRIGERANT)
SUCTION (DIRECT EXPANSION)
LIQUID (DIRECT EXPANSION)
LOW PRESSURE STEAM (0-20 LBS.)
MEDIUM PRESSURE STEAM (21-75 LBS.)
HIGH PRESSURE STEAM (76 LBS. & ABV.)
STEAM CONDENSATE (GRAVITY)
PUMPED STEAM CONDENSATE
STEAM CONDENSATE BOILER FEED
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
SOLENOID VALVE
EXPANSION VALVE WITH
THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
THERMOMETER
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
BACK FLOW PREVENTER
PIPE CAP
PIPE BREAK
THERMOMETER WELL
EXPANSION LOOP
EXPANSION COMPENSATOR
FLOAT & THERMOSTATIC STEAM TRAP
INVERTED BUCKET STEAM TRAP
THERMOSTAT
PROGRAMMABLE THERMOSTAT
THERMOSTAT (W/ NIGHT SETBACK)
ROOM SENSOR
HUMIDISTAT
PRESSURE GAUGE
DAMPER (ELECTRIC OPERATION)
DAMPER (PNEUMATIC OPERATION)
DAMPER BLADES
SUPPLY AIR DUCT
EXIST SUPPLY AIR DUCT
RETURN AIR DUCT
EXIST RETURN AIR DUCT
OUTSIDE AIR DUCT
EXIST OUTSIDE AIR DUCT
EXHAUST AIR DUCT
EXIST EXHAUST AIR DUCT
SUPPLY AIR DUCT RISER
RETURN AIR DUCT RISER
OUTSIDE AIR DUCT RISER (AS NOTED)
EXHAUST AIR DUCT
INSULATED DUCTWORK (AS NOTED)
SUPPLY AIR DIFFUSER (SQUARE)
SUPPLY AIR DIFFUSER (INLINE)
TURNING VANES
SURFACE MTD. GRILLE
SUPPLY AIR DIFFUSER (ROUND)
90° TEE W/45° APPROACH
CONICAL TAKE-OFF
CONICAL TAKE-OFF W/ DAMPER
BALANCE DAMPER
RETURN AIR DUCT BOOT
ECCENTRIC REDUCER
CONCENTRIC REDUCER
UNIT HEATER
CEILING EXHAUST FAN
ROOF MOUNTED EXHAUST FAN
DEMOLITION
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
X
X
XX
XXXX
XX
XXXX
SA
OA
X-OA
X-EA
EA
X-SA
X-RA
RA
SCP
SC
DXS
DXL
HR
CR
CD
CS
DX
CTR
HPR
HS
HPS
CTS
CWR
CWS
S
L
LPS
MPS
HPS
SC (BF)
TAG CFM
NECK REMARKS
SIZE
BT
FT
SD-1 250
8"ø ---
P
H
S
T
T P
T N
M
M
1. EXISTING EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATION OF EXISTING
DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH BUILDING
STRUCTURE, EQUIPMENT FURNISHED, AND ALL OTHER TRADES PRIOR TO
DEMOLITION.
2. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,
AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,
CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES
HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
3. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,
UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,
STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS. THESE
STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE
DRAWING AND SPECIFICATIONS.
4. COORDINATE CUTTING AND PATCHING WITH GENERAL CONTRACTOR.
5. ALL BOLD DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS NOTED BY
KEYNOTE. ALL OTHER EXISTING SYSTEMS SHOWN FOR REFERENCE ONLY.
6. PATCH AND REPAIR ALL FLOOR/CEILING/WALL SURFACES LEFT DAMAGED OR
INCOMPLETE FROM REMOVAL OF FIXED ACCESSORIES AND EQUIPMENT WITH
MATERIALS TO MATCH EXISTING, AS ACCEPTABLE TO THE OWNER.
7. NOTATIONS ARE MADE IN VARIOUS PLACES ON THE DRAWINGS TO CALL
ATTENTION TO DEMOLITION WHICH IS REQUIRED. HOWEVER, THESE
DRAWINGS ARE NOT INTENDED TO SHOW EACH AND EVERY ITEM TO BE
REMOVED. CONTRACTOR SHALL REMOVE ALL MATERIALS RELATED TO THEIR
RESPECTIVE TRADES AS REQUIRED TO PERMIT THE CONSTRUCTION OF THE
NEW WORK AS SHOWN.
8. THE GENERAL CONTRACTOR SHALL COORDINATE THE EXTENT OF THE
REQUIRED DEMOLITION OF THE EXISTING BUILDING AS REQUIRED TO
FACILITATE THE CONSTRUCTION OF THE PROJECT AS SHOWN AS PART OF
THIS WORK.
9. ALL DEMOLITION SHALL BE APPROVED BY THE OWNER/TENANT PRIOR TO
COMMENCEMENT AND SHALL BE PERFORMED UNDER REQUIREMENTS AND
APPROVAL OF THE LOCAL CODE JURISDICTIONS.
10. PROTECT ALL EXISTING WORK WHICH IS TO REMAIN AND RESTORE IN AN
APPROVED MANNER ANY SUCH WORK WHICH BECOMES DAMAGED.
11. RUBBISH AND DEBRIS RESULTING FROM THE WORK SHALL BE REMOVED
IMMEDIATELY FROM THE SITE IN A SAFE AND LEGAL MANNER BY THE
CONTRACTOR.
12. DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT BUILDING
REPRESENTATIVE TO CLARIFY ANY ITEMS NOT SHOWN ON THESE
DOCUMENTS OR SHOWN NOT MATCHING FIELD CONDITIONS.
GENERAL DEMOLITION NOTES
JC
/E
N G
B Y
PR
O
JE
C
T N
O
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y R ev ie w D
AT
E
-0
1/
5.
C
TS .
PR
O
JE
C T
D
ES
C R
IP
TI
O N
BI
D
D O
C U
M
EN
TS
3/
/2
SA
G
IN
AW
C O
R R
EC
TI
O N
AL
F
AC
IL
IT
Y
BA
R
S C
R
EE
N B
U
IL
D
IN
G
IM
PR
O
VE
M
EN
TS
TI
TT
AB
AW
AS
SE
E
TW
P.
, S
AG
IN
AW
C
O U
N
TY
, M I
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
M A
T R
I X
M-
C
ATTA
T
TA
T
M
EC
H
AN
IC
AL
S
YM
BO
LS
N
O
TE
S, A
N D
A
BB
R
EV
IA
TI
O
X-EF
X-24x6
EA DN
X-UH
X-14x6 SA
X-26x26 SA
X-L (40x32)
X-UH
X-OVERHEAD
DOOR
X-L (40x32)
X-FD
X-FD
X-EF (ON
ROOF)
X-14x6 SA
DN
X-SF
X-18x6
SA
X-24x6 SA
X-26x26 EA X-26x26 EA
X-EF (ON
ROOF)
X-EG ---
18x6 ---
X-EG ---
24x6 ---
X-SD ---
24x6 ---
X-SD ---
24x6 ---
X-GAS DETECTION
CONTROL PANEL
X-BARSCREEN
CONTROL PANEL T
S
X-GAS SENSOR
T
X-HS
X-HR
X-
HR
X-
HS
X-HR
X-HS
X-HR
X-HS
X-HR
X-HS
X-1-1/4"X-1-1/2"
X-1-1/4"
X-1-1/4"
X-1-1/4" HS & HR TO
WEST PUMP HOUSE
(TYP.3)
2 2
2 1
X-CONTROL
PANEL
X-L (40x32)
X-OVERHEAD
DOOR
X-L (40x32)
X-FD
X-FD
X-CONTROL
PANEL
EF-2
EF-1
3GAS MONITORING
CONTROL PANEL
DDC TOUCHSCREEN
CONTROL PANEL
BAR SCREEN
(REFER TO
CIVIL PLANS)
T3
BARSCREEN CONTROL
PANEL(S) (REFER TO
CIVIL PLANS)
S S
METHANE SENSOR
H2S
SENSOR
AUDIO/VISUAL
ALARM
AUDIO/VISUAL
ALARM
MAU-1
18x16 EA
18x16 EA
20x10
EA DN
EG-1 1050
18x12 ---
18x16 EA
SD-1 825
18x12 TYP.2
18"Ø SA
CONCRETE PAD1
14x10 EA
24x6 EA 20x10 EA
18"Ø SA
24x6 EA
DN
1 2
2 2
EG-1 600
12x12 ---
2 13 14
EUH-1
12 8 1-1/4" G (BELOW
GRADE)
T
MAU-1
18"Ø SA1
SEWAGE FLOW
MONITORING SYSTEM
CONTROL PANEL
DISCONNECT, REMOVE, AND DEMO EXISTING INLINE SUPPLY FAN, SUPPLY DUCTWORK,
DIFFUSERS, CONTROLS, CONTROL WIRING, HANGERS, SUPPORTS, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY. EXISTING LOUVER TO REMAIN AND BE RE-USED AS
SHOWN ON NEW DRAWINGS.
DISCONNECT, REMOVE, AND DEMO EXISTING INLINE EXHAUST FAN, EXHAUST
DUCTWORK, GRILLES, CONTROLS, CONTROL WIRING, HANGERS, SUPPORTS, AND ALL
ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING ROOF MOUNTED EXHAUST FAN, EXHAUST
DUCTWORK, CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN
THEIR ENTIRETY. EXISTING ROOF CURB IS TO REMAIN AND MODIFIED AS REQUIRED TO
BE RE-USED AS SHOWN IN NEW DRAWINGS.
DISCONNECT, REMOVE, AND DEMO EXISTING ROOF MOUNTED EXHAUST FAN, EXHAUST
DUCTWORK, ROOF CURB, CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO PATCH EXISTING ROOF
PENETRATION AS REQUIRED TO MATCH EXISTING, MAINTAIN ANY EXISTING WARRANTIES,
AND SEAL WATERTIGHT.
DISCONNECT, REMOVE, AND DEMO EXISTING UNIT HEATER, HEATING SUPPLY PIPING,
HEATING RETURN PIPING, THERMOSTAT, CONTROL WIRING, CONTROLS, HANGERS
SUPPORTS, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING ABANDONED GAS DETECTION SYSTEM
CONTROL PANEL, CONTROLS, CONTROL WIRING, GAS SENSORS, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY. AFTER DEMOLITION WORK IS COMPLETED,
CONTRACTOR TO PATCH, PRIME, AND PANT EXISTING WALL AS REQUIRED AFTER TO
MATCH THE EXISTING WALL.
DISCONNECT, REMOVE, AND DEMO EXISTING BARSCREEN CONTROL PANEL, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. AFTER
DEMOLITION WORK IS COMPLETED, CONTRACTOR TO PATCH, PRIME, AND PANT EXISTING
WALL AS REQUIRED AFTER TO MATCH THE EXISTING WALL.
DISCONNECT, REMOVE, AND DEMO EXISTING BOILER, FLUE, WALL CAP, CONTROLS,
CONTROL WIRING, PUMP, HEATING SUPPLY PIPING, HEATING RETURN PIPING, GAS
PIPING, VALVES, FITTINGS, SUPPORTS, CONCRETE PAD, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO PATCH EXTERIOR BRICK WALL TO
MATCH EXISTING AND SEAL WATER TIGHT. BRICK AND BLOCK WALL TO BE TOOTHED IN
WITH MATCHING BRICK AND BLOCK. PRIME AND PAINT BLOCK TO MATCH EXISTING.
DISCONNECT, REMOVE, AND DEMO EXISTING INLINE PUMP, SUPPORTS, CONTROLS,
CONTROL WIRING, PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN
THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING EXPANSION TANK, PIPING, VALVES,
FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING, HEATING RETURN
PIPING, MAKEUP COLD WATER PIPING, VALVES, FITTINGS, HANGERS, SUPPORTS, AND ALL
ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN.
CONTRACTOR TO DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING,
HEATING RETURN PIPING, VALVES, FITTINGS, HANGERS, SUPPORTS, AND ALL
ASSOCIATED ACCESSORIES DOWN TO THE LOWER LEVEL AND CAP. PIPE CAPS ARE TO
BE INSTALLED AS CLOSE AS POSSIBLE TO EXISTING CONCRETE FOUNDATION WALL IN
THE LOWER LEVEL. CONTRACTOR TO PATCH AND SEAL EXISTING CONCRETE FLOOR TO
BE FLUSH AND MATCH EXISTING.
EXISTING GAS METER TO REMAIN AND BE RE-USED AS SHOWN ON NEW DRAWINGS.
CONTRACTOR TO DISCONNECT, REMOVE, AND DEMO EXISTING GAS PIPING, VALVES,
FITTINGS, SUPPORTS, AND ALL ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN.
CONTRACTOR TO PATCH EXTERIOR BRICK WALL WITH GROUT AND SEAL WATER TIGHT.
CONTRACTOR TO DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING,
HEATING RETURN PIPING, VALVES, FITTINGS, HANGERS, SUPPORTS, AND ALL
ASSOCIATED ACCESSORIES DOWN BELOW CONCRETE FLOOR AND CAP. PIPE CAPS ARE
TO BE INSTALLED BELOW EXISTING CONCRETE FLOOR. CONTRACTOR TO PATCH AND
SEAL EXISTING CONCRETE FLOOR TO BE FLUSH AND MATCH EXISTING.
EXISTING LOUVER TO REMAIN. DISCONNECT, REMOVE, AND DEMO EXISTING DUCTWORK
AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO BLANK OFF
EXISTING LOUVER AND INSULATE WITH 2" THICK MINERAL FIBERBOARD INSULATION
WRAPPED WITH STAINLESS STEEL. EXISTING LOUVER TO BE SEALED AIR TIGHT.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. ALL EXISTING DUCTWORK, GRILLES, DIFFUSERS, LOUVERS, DAMPERS, AND ALL
ASSOCIATED ACCESSORIES TO BE DISCONNECTED, REMOVED, AND DEMOLISHED
UNLESS NOTED OTHERWISE.
2. EXISTING EQUIPMENT AND ALL ASSOCIATED ACCESSORIES TO REMAIN UNLESS
OTHERWISE NOTED.
3. CONTRACTOR TO MODIFY EXISTING WALLS/CEILINGS/FLOORS AS REQUIRED TO
COMPLETE THEIR WORK. CONTRACTOR TO PATCH, PRIME, AND PAINT
WALLS/CEILINGS/FLOORS AS REQUIRED TO MATCH EXISTING WHEN ALL
DEMOLITION/NEW WORK IS COMPLETED.
4. CONTRACTOR TO PATCH ROOF PENETRATIONS AS REQUIRED TO MATCH EXISTING, SEAL
WATERTIGHT, AND MAINTAIN EXISTING ROOF WARRANTIES. EXISTING ROOF WARRANTY
IS HELD BY FIRESTONE.
INSTALL NEW VERTICAL MAKEUP AIR UNIT, SUPPLY DUCTWORK, FITTINGS, SUPPORTS,
SUPPLY DIFFUSERS, CONTROLS, CONTROL WIRING, THERMOSTAT, GAS PIPING,
VALVES, FITTINGS, CONCRETE PAD, AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALL
NEW VERTICAL MAKEUP AIR UNIT ON MANUFACTURER PROVIDED METAL STAND
FASTENED TO NEW 12" THICK CONCRETE PAD WITH 4" OVERLAP IN ALL DIRECTIONS
AND EXTEND PAD TO BUILDING AS SHOWN. ROUTE NEW SUPPLY AIR DUCTWORK UP
EXTERIOR WALL AND PENETRATE EXTERIOR WALL IN LOCATION SHOWN AS HIGH AS
POSSIBLE IN THE ASSOCIATED SPACE. CONTRACTOR TO SIZE AND PROVIDE LINTEL AS
REQUIRED TO ROUTE NEW SUPPLY AIR DUCTWORK THROUGH EXISTING EXTERIOR
WALL. PATCH DUCTWORK WALL PENETRATION AS REQUIRED TO MATCH EXISTING
BLOCK EXTERIOR WALL AND SEAL WATER TIGHT. CONTRACTOR TO CONNECT MAKEUP
AIR UNIT TO NEW JCI DDC CONTROL PANEL. CONTRACTOR TO PROVIDE ALL REQUIRED
CONTROL WIRING AND CONTROLS EQUIPMENT/DEVICES AS REQUIRED TO CONNECT
TO THE JCI DDC CONTROL PANEL AND BE INTEGRATED ONTO THE EXISTING FRONT
END GRAPHICS.
INSTALL NEW INLINE EXHAUST FAN, BACKDRAFT DAMPER, EXHAUST DUCTWORK,
EXHAUST GRILLES, CONTROLS, CONTROL WIRING, HANGERS, SUPPORTS, AND ALL
ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. MODIFY EXISTING LOUVER AS REQUIRED TO MAKE NEW
CONNECTION IN LOCATION SHOWN. CONTRACTOR TO RE-USE EXISTING FLOOR
PENETRATIONS TO INSTALL NEW DUCTWORK IN LOCATION SHOWN. CONNECT NEW
EXHAUST FAN, CONTROLS, AND ALL ASSOCIATED ACCESSORIES TO NEW JCI DDC
CONTROL PANEL. INTEGRATE NEW EXHAUST FAN ONTO THE EXISTING FRONT-END
GRAPHICS.
INSTALL NEW ROOF MOUNTED EXHAUST FAN, BACKDRAFT DAMPER CONTROLS,
CONTROL WIRING, THERMOSTAT, AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
CONTRACTOR TO REUSE EXISTING ROOF PENETRATION AND EXISTING ROOF CURB
FOR THE INSTALLATION OF NEW ROOF MOUNTED EXHAUST FAN. CONTRACTOR TO
PROVIDE NEW CURB ADAPTOR FOR NEW ROOF MOUNTED EXHAUST FAN. CONNECT
NEW EXHAUST FAN, CONTROLS, AND ALL ASSOCIATED ACCESSORIES TO NEW JCI DDC
CONTROL PANEL. INTEGRATE NEW EXHAUST FAN ONTO THE EXISTING FRONT-END
GRAPHICS.
INSTALL NEW JCI DDC TOUCHSCREEN CONTROL PANEL, CONTROLS, CONTROL WIRING,
AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS. CONTRACTOR TO PROVIDE ALL
REQUIRED CONTROL WIRING AND CONTROLS DEVICES/EQUIPMENT TO CONNECT THE
NEW JCI DDC CONTROL PANEL TO THE EXISTING JCI DDC CONTROL PANEL WITH AN
ENGINE CONTROLLER LOCATED IN THE WEST PUMP HOUSE. CONTRACTOR TO INSTALL
NEW CONTROL WIRING IN EXISTING BURIED RACEWAYS BETWEEN THE BARSCREEN
BUILDING AND WEST PUMP HOUSE. CONTRACTOR TO CONNECT THE NEW DDC
CONTROL PANEL TO THE EXISTING STARNET 2.0 SYSTEM. CONTRACTOR TO HIRE AND
COORDINATE CONNECTION TO DARK NETWORK IT RACK AND EXISTING STARNET 2.0
SYSTEM WITH BRET EMERSON FROM COMMTECH DESIGN ( PHONE 616-446-4545).
CONTRACTOR TO CONNECT NEW GAS MONITORING CONTROL SYSTEM/PANEL (BASED
ON ARMSTRONG MODEL: AMC-1B24-T-T OR PRE-APPROVED EQUIVALENT), SENSORS,
CONTROLS, AND ALL ASSOCIATED ACCESSORIES TO THE NEW JCI DDC CONTROL
PANEL. CONTRACTOR TO PROVIDE ALL REQUIRED CONTROL WIRING AND CONTROLS
DEVICES/EQUIPMENT TO CONNECT THE GAS MONITORING CONTROL PANEL TO THE
NEW JCI DDC CONTROL PANEL AND INTEGRATE ONTO THE EXISTING FRONT-END
GRAPHICS.
CONTRACTOR TO CONNECT NEW BARSCREEN/COMPACTOR, BARSCREEN/COMPACTOR
CONTROL PANEL(S) (REFER TO CIVIL) AND ALL ASSOCIATED ACCESSORIES TO THE
NEW JCI DDC CONTROL PANEL. CONTRACTOR TO PROVIDE ALL REQUIRED CONTROL
WIRING AND CONTROLS DEVICES/EQUIPMENT TO CONNECT THE
BARSCREEN/COMPACTOR CONTROL PANEL(S) TO THE NEW JCI DDC CONTROL PANEL
AND INTEGRATE ONTO THE EXISTING FRONT-END GRAPHICS.
INSTALL NEW ELECTRIC UNIT HEATER, SUPPORTS, CONTROLS, CONTROL WIRING,
THERMOSTAT, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS. CONTRACTOR TO MOUNT ELECTRIC
UNIT HEATER 10' AFF. CONNECT THE NEW UNIT HEATER TO THE NEW JCI DDC
CONTROL PANEL AND INTEGRATE ONTO THE EXISTING FRONT-END GRAPHICS.
REFER TO CIVIL DRAWINGS FOR PIPING CONTINUATION.
NEW H2S SENSOR TO BE ARMSTRONG MODEL: AMC-282BA1 (OR PRE-APPROVED
EQUIVALENT). H2S SENSOR IS TO BE INSTALLED IN THE LOCATION SHOWN SHOWN PER
THE MANUFACTURER'S INSTALLATION INSTRUCTIONS 8'-10' AFF.
NEW METHANE SENSOR TO BE ARMSTRONG MODEL: AMC-CSA-CAT (OR
PRE-APPROVED EQUIVALENT). METHANE SENSOR IS TO BE INSTALLED IN THE
LOCATION SHOWN SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS
AS HIGH AS POSSIBLE IN THE SPACE.
NEW AUDIO/VISUAL ALARM TO BE ARMSTRONG MODEL: AMC-RAM-3 (OR
PRE-APPROVED EQUIVALENT). NEW AUDIO/VISUAL ALARM TO BE INSTALLED IN THE
LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW GAS PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN
THE LOCATION SHOWN. MODIFY EXISTING GAS METER AS REQUIRED TO INSTALL NEW
GAS PIPING. REFER TO CIVIL DRAWINGS FOR COMPLETE ROUTING OF DIRECT BURIED
GAS PIPING.
CONTRACTOR TO INSTALL NEW EXHAUST DUCTWORK AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN. CONTRACTOR TO RE-USE EXISTING FLOOR
PENETRATION TO ROUTE NEW DUCTWORK 5' AFF OF BAR SCREEN PIT AND SURFACE
MOUNT EXHAUST GRILLE VERTICALLY ON EXHAUST DUCTWORK AS LOW AS POSSIBLE.
CONTRACTOR TO ENSURE EXISTING ACCESS HATCH IS TO REMAIN FULLY OPERATION.
CONTRACTOR TO INSTALL NEW EXHAUST DUCTWORK AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN. CONTRACTOR TO RE-USE EXISTING FLOOR
PENETRATION TO ROUTE NEW DUCTWORK 5' AFF OF BAR SCREEN PIT AND SURFACE
MOUNT EXHAUST GRILLE VERTICALLY ON EXHAUST DUCTWORK AS LOW AS POSSIBLE.
CONTRACTOR TO MODIFY EXISTING STEEL GRATING AS REQUIRED TO INSTALL NEW
DUCTWORK IN LOCATION SHOWN.
CONTRACTOR TO CONNECT NEW MUFFIN MONSTER, MUFFIN MONSTER CONTROL
PANEL(S) (REFER TO CIVIL) AND ALL ASSOCIATED ACCESSORIES TO THE EXISTING JCI
DDC CONTROL PANEL. CONTRACTOR TO PROVIDE ALL REQUIRED CONTROL WIRING
AND CONTROLS DEVICES/EQUIPMENT TO CONNECT THE MUFFIN MONSTER CONTROL
PANEL(S) TO THE EXISTING JCI DDC CONTROL PANEL AND INTEGRATE ONTO THE
EXISTING FRONT-END GRAPHICS.
CONTRACTOR TO CONNECT NEW SEWAGE FLOW MONITORING SYSTEM, SEWAGE
FLOW MONITORING SYSTEM CONTROL PANEL(S) (REFER TO CIVIL) AND ALL
ASSOCIATED ACCESSORIES TO THE NEW JCI DDC CONTROL PANEL. CONTRACTOR TO
PROVIDE ALL REQUIRED CONTROL WIRING AND CONTROLS DEVICES/EQUIPMENT TO
CONNECT THE SEWAGE FLOW MONITORING SYSTEM CONTROL PANEL(S) TO THE NEW
JCI DDC CONTROL PANEL AND INTEGRATE ONTO THE EXISTING FRONT-END GRAPHICS.
REFER TO CIVIL DRAWINGS FOR LOCATION OF SEWAGE FLOW MONITORING SYSTEM
DEVICES.
MECHANICAL KEY NOTES
GENERAL MECHANICAL NOTES
1. CONTRACTOR TO PATCH, PRIME, AND PAINT EXISTING CEILING/WALLS/FLOORS AS
REQUIRED TO MATCH EXISTING WHERE DEMOLITION AND/OR NEW WORK IS
COMPLETED.
2. CONTRACTOR TO PATCH ROOF PENETRATIONS AS REQUIRED TO MATCH EXISTING,
SEAL WATERTIGHT, AND MAINTAIN EXISTING ROOF WARRANTIES. EXISTING ROOF
WARRANTY IS HELD BY FIRESTONE.
3. CONTRACTOR TO PROVIDE ALL NEW CONTROL WIRING, CONTROLS
DEVICES/EQUIPMENT, AND ALL ASSOCIATED ACCESSORIES AS REQUIRED TO
CONNECT EQUIPMENT TO THE EXISTING CAMPUS JCI DDC CONTROL SYSTEM AND
INTEGRATE EQUIPMENT ONTO THE EXISTING FRONT-END GRAPHICS.
4. CONTRACTOR TO COORDINATE WITH OTHER TRADES FOR FINAL LOCATIONS OF
EQUIPMENT, CONTROL PANELS, SENSORS, AND ALL ASSOCIATED ACCESSORIES
PROVIDED BY OTHERS. CONTRACTOR TO PROVIDE ALL REQUIRED CONTROL WIRING,
CONTROLS, DEVICES, AND ALL ASSOCIATED ACCESSORIES TO CONNECT THE
EQUIPMENT PROVIDED BY OTHERS TO THE EXISTING JCI DDC CONTROL SYSTEM AND
INTEGRATE EQUIPMENT ONTO THE EXISTING FRONT-END GRAPHICS.
5. CONTRACTOR TO INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS AND ENSURE ALL REQUIRED CLEARANCES ARE MET.
6. ALL WORK AND MATERIALS IN SCREEN ROOM SHALL BE RATED FOR CLASS 1, DIVISION
1 HAZARDOUS ENVIRONMENT.
X-B
X-XT
X-UH
X-EF
X-HS
X-
HR
X-1-1/4"
X-1-1/4" HS & HR TO BAR
SCREEN BUILDING
(TYP.3)
X-1/2"
X-
CW
X-CW
X-3/4"
X-
CW
X-3/4"
X-P
M X-G
X-GAS METER
X-3/4"
X-V
X-WALL
CAP
X-CONCRETE
PAD
8 X-3" 8
X-JCI CONTROL
PANEL
X-G DN13
X-UH
X-EF
X-CW
X-3/4"
X-
CW
X-3/4"
M
X-GAS METER
X-JCI CONTROL
PANEL
X-G DN
1-1/4" G (BELOW
GRADE)
MUFFIN MONSTER
CONTROL PANEL
JC
/E
N G
B Y
PR
O
JE
C
T N
O
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
R ev ie w
D
AT
E
-0
1/
5.
C
TS .
PR
O
JE
C T
D
ES
C R
IP
TI
O N
BI
D
D O
C U
M
EN
TS
3/
/2
SA
G
IN
AW
C O
R R
EC
TI
O N
AL
F
AC
IL
IT
Y
BA
R
S C
R
EE
N B
U
IL
D
IN
G
IM
PR
O
VE
M
EN
TS
TI
TT
AB
AW
AS
SE
E
TW
P.
, S
AG
IN
AW
C
O U
N
TY
, M I
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
M A
T R
I X
KEY PLAN
SCALE: NTS
N
BAR SCREEN
WEST PUMP HOUSE
M-
BA
R S
C R
EE
N
B U
IL
D
IN
G
/W
ES
T
PU
M P
H O
U
SE
FI
R
ST
F
LO
O R
PL
AN
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O N
N
EW
N BAR SCREEN BUILDING - FIRST FLOOR PLAN - MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"
0 1 5N BAR SCREEN BUILDING - FIRST FLOOR PLAN - MECHANICAL NEW
SCALE: 1/4" = 1'-0"
0 1 5
C
ATTA
T
TA
T
N WEST PUMP HOUSE - FIRST FLOOR PLAN - MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"
0 1 5
N WEST PUMP HOUSE - FIRST FLOOR PLAN - MECHANICAL NEW
SCALE: 1/4" = 1'-0"
0 1 5
W
W DETAIL NOTE:
90° ELBOW SHOWN
SIMILAR RADIUS
CONSTRUCTION FOR
ALL ANGLES
W
R
R
OFFSET ELBOW
FULL RADIUS
(R=W)
15°
AIR
FLOW
15°
FLOW
AIR
TRANSITION - CONTRACTION FLOWTRANSITION - DIVERGING FLOW
R = 1 1/2 W
OFFSETS, ELBOWS, & TRANSITIONS FOR RECTANGULAR
DUCTWORK
SCALE: NTS
"Ø
S A
1ST FLOOR
MAU-1
CONCRETE
PAD
5 MAU DUCTWORK ELEVATION
SCALE: NTS
ROOF
45°
3/8"~ THREADED
ROD. SUSPENDED
FROM STRUCTURE.
OPPOSED BLADE
VOLUME DAMPER.
SUPPLY GRILLE,
REFER TO SCHEDULE FOR SIZE
SUSPENSION RODS TO
BE AT 8'-0" O.C. (MAX)
SPIRAL DUCT.
SIZE AS INDICATED
ON DRAWINGS.
1" WIDE, 20-GAUGE ALUMINUM
SUPPORT BAND STRAP
LOAD RATED EYE HOOK FASTENER
LOAD RATED FASTENERS
1 EXPOSED SUPPLY SPIRAL DUCT DETAIL
SCALE: NTSSCALE: NTSSCALE: NTS
4 DUCT TRANSITION DETAIL
SCALE: NTS
NOTES:
1. "ALTERNATE" FITTINGS SHALL BE
ACCEPTABLE ONLY WHEN DUCT HEIGHT
DOES NOT PERMIT THE USE OF
"PERMITTED" FULL SIZE BELLMOUTH
CONNECTION
2. THIS DETAIL APPLIES TO SINGLE TAKEOFFS
TO DIFFUSER AS WELL AS BRANCH
TAKEOFFS. IT ALSO APPLIES TO TAKEOFFS
IN THE HORIZONTAL AS WELL AS THE
VERTICAL DIRECTION.
DUCT SIZE:
(SEE PLANS)
ALTERNATE 1
TAKE-OFF DETAIL
ALTERNATE 2
TAKE-OFF DETAIL
(WHEN OTHERS DO NOT FIT)
RECTANGULAR TO ROUND
BOOT CONNECTIONMINI-BELLMOUTH CONNECTION
MANUAL VOLUME
DAMPER TYPICAL AT
ALL DUCT
TAKE-OFFS
VDVD
MAIN DUCT
AIR FLOW
6" min.
2 DUCT TRANSITION DETAIL
SCALE: NTS
L
W
SA FLOW
EA FLOW
MAIN AIR DUCT
BALANCING DAMPER IN ALL
SA AND RA BRANCHES TO
AIR OUTLETS
BRANCH AIR DUCT
(TYPICAL)
NOTE:
L=1/4 W (4" MIN.)
45°
18"Ø SA
LINTEL
UNISTRUCT DUCT
SUPPORT FRAME, TYP
18"Ø SA
DUCT SUPPORT, TYP. BASED ON
MIRO 8-DS OR APPROVED EQUAL
JC
/E
N G
B Y
PR
O
JE
C
T N
O
IN
D
EX
PC
A
D R
AW
N
B Y
D
ES
IG
N
ED
B
Y
R ev ie w
D
AT
E
-0
1/
5.
C
TS .
PR
O
JE
C T
D
ES
C R
IP
TI
O N
BI
D
D O
C U
M
EN
TS
3/
/2
SA
G
IN
AW
C O
R R
EC
TI
O N
AL
F
AC
IL
IT
Y
BA
R
S C
R
EE
N B
U
IL
D
IN
G
IM
PR
O
VE
M
EN
TS
TI
TT
AB
AW
AS
SE
E
TW
P.
, S
AG
IN
AW
C
O U
N
TY
, M I
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A
CI
LI
TI
ES
A
D M
IN
IS
TR
A
TI
O
N D
ES
IG
N A
N D
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
M A
T R
I X
M-
C
ATTA
T
TA
T
M
EC
H
AN
IC
AL
D
ET
AI
LS
A N
D
SC
H
ED
U
LE
VI
AV
B
C
DC
M
B
KP
SSCP
CR
SS
AS
TS
G
X
X
X
TVSS
VFD
TRANSIENT VOLTAGE SURGE SUPPRESSION
VARIABLE FREQUENCY DRIVE
GLASS BREAK
DUPLEX RECEPTACLE
TEACHER STATION
ADMINISTRATION STATION
STUDENT STATION
CARD READER
DOCK LIGHT FIXTURE
TELEPHONE / DATA OUTLET
ADDENDUM NOTE
PLAN NOTE
DEMOLITION NOTE
THREE PHASE MOTOR
BELL
AUDIO / VIDEO INPUT
VIDEO INPUT
WALL MOUNTED SPEAKER / CLOCK COMBO
WALL MOUNTED SPEAKERS
DUAL FACE CLOCK
CCTV CONTROL PANELCCTV
SECURITY SYSTEM CONTROL PANEL
KEY PAD
BEAM DETECTOR
MOTION DETECTOR
DOOR CONTACT
CAMERA
ELECTRICAL SYMBOLS LEGEND
V
S
C
M
I
J
SINGLE RECEPTACLE (120 VOLT)
EMERGENCY RECEPTACLE
DOUBLE DUPLEX RECEPTACLE
SINGLE FACE CLOCK
FLUSH FLOOR BOX
SURFACE FLOOR BOX
SPECIAL EQUIPMENT RECEPTACLE
TELEPHONE OUTLET
DATA OUTLET
POWER POLE
JUNCTION BOX
WALL JUNCTION BOX
PULL (JUNCTION) BOX
UNDERFLOOR JUNCTION BOX
OUTLETS
LIGHT FIXTURE
STRIP FIXTURE
IN-GRADE LIGHT FIXTURE
SPOTLIGHT (number of heads shown) EXIT SIGN (face & direction as shown)
WALL MOUNT LIGHT FIXTURE
CEILING LIGHT FIXTURE
TRACK & FIXTURE
STREET TYPE POLE FIXTURE
POLE MOUNTED LIGHT FIXTURE
EXTERIOR WALL MOUNT LIGHT FIXTURE
WALLPACK LIGHT FIXTURE
SPECIAL PURPOSE LIGHT FIXTURE
HIGH BAY LIGHT FIXTURE
EMERGENCY EGRESS LIGHT FIXTURE
(number of heads shown)
EMERGENCY LIGHT FIXTURE
FIXTURES
SWITCHES
SINGLE-POLE SWITCH
DIMMER SWITCH
TIME SWITCH
KEY SWITCH
MANUAL MOTOR SWITCH
THERMAL OVERLOAD SWITCH
SWITCH WITH PILOT LIGHT
FOUR-WAY SWITCH
THREE-WAY SWITCH
CIRCUITRY and RACEWAYS
UNDERFLOOR DUCT
BUS DUCT
PLUGMOLD AS SPECIFIED
WIREMOLD AS SPECIFIED
FLEXIBLE PIGTAILS/CONNECTIONS
"CONDUIT RUN CONTINUES" INDICATION
END OF CONDUIT RUN, CAP AND STAKE
END OF CONDUIT RUN
HOME RUN (with circuit numbers)
CONDUIT STUB DOWN
CONDUIT STUB UP
CONDUIT INSTALLED
CONDUIT INSTALLED
MECHANICAL
ELECTRIC WATER HEATER
ELECTRIC UNIT HEATER
PIPE TRACE HEATER
RESISTANCE HEATER, KW SHOWN
SINGLE PHASE MOTOR
SOUND and SIGNAL
INTERCOM OUTLET
MICROPHONE OUTLET
TELEVISION OUTLET
CHIME
BUZZER
VOLUME CONTROL
SPEAKER
SERVICE and EQUIPMENT
THERMOSTAT
CAPACITOR
ENCLOSED CIRCUIT BREAKER
TRANSFER SWITCH
WIREWAY
GROUND CONNECTION PER N.E.C.
TELEPHONE TERMINAL BOARD
GENERATOR, KW SHOWN
CURRENT TRANSFORMERS
UTILITY METER, AS REQUIRED
WEATHERHEAD
PANELBOARD, FLUSH MOUNTED
PANELBOARD, SURFACE MOUNTED
COMB. STARTER
MAGNETIC STARTER
DISCONNECT SWITCH
TRANSFORMER
CONTROL
xxVA connection by x/C) IRRIGATION CONTROLLER (120 volt
LIGHTING CONTACTOR
CONTROL TRANSFORMER
buttons indicated) PUSHBUTTON STATION (number of TIME CLOCK (24 hour U.O.N.)
PHOTOCELL (voltage as required)
HUMIDISTAT
DESIGNATIONS
(by E.C.)
(by others)
TT
G
WW
PC
CT
TS
T
H
TC
IC
T
1,3
OR
PM
WM
BD
UFD
B
F S
J
J
D
WH
PP
J
SWITCH STYLE OCCUPANCY SENSOROC
DIGITAL TIME SWITCH
POWER PACK
DUAL TECHNOLOGY SENSOR - 360° - 500 SQ FT
DUAL TECHNOLOGY SENSOR - 360° - 1000 SQ FT
ULTRASONIC SENSOR - 360° - 2 CIRCUIT
OCCUPANCY SENSOR / PHOTOCELL
WALL MOUNT DUAL TECHNOLOGY SENSOR
OS5
OS4
T
OS2
OS3
OS1
PP
CEILING MOUNTED WIFI
DIGITAL EQUIPMENT METER, AS REQUIRED
POLE
PUMP
PANEL
P
PNL
PVC
PRV-
P-
PB
POLY VINYL CLORIDE
POWER ROOF VENTILATOR
PULL BOX
GENERAL CONTRACTOR
GROUND
HUMIDIFIERH-
GND
GFI
GC
GROUND FAULT INTERUPTER
ABBREVIATIONS LEGEND
POWER
SWITCH
RECEPT
SF-
SWBD
TCC
SPEC
SW
RGC
RTU-
PWR
VOLTS
WATTS
UF
V
W
UL
VL
UNO
UH-
TS
TYP
TR
ROOF TOP UNIT
RECEPTACLE
SWITCHBOARD
UNDER FLOOR
SPECIFICATIONS
RIGID GALVANIZED STEEL CONDUIT
UNLESS NOTED OTHERWISE
UNDERWRITERS' LABORATORIES, INC.
TAMPER PROOF RECEPTACLE
TAMPER PROOF SWITCH
TEMPERATURE CONTROL CONTRACTOR
VERIFY LOCATION WITH OWNER
TYPICAL
UNIT HEATER
SUPPLY FAN
WITH
WITHOUT
W/
XFMR
W/O
WP
TRANSFORMER
WEATHER PROOF
HOUR
LIGHT
JUNCTION BOX
LIGHT CONTROL
ISOLATED GROUND
HORSEPOWER
MINIMUM
MOUNT
MAKE-UP AIR UNIT
MOTOR CONTROL CENTER
MAIN LUG ONLY
MOUNTED
MOUNTING
MAXIMUM
LIGHTING
LT FLEX
MTD
MUAU-
MTG
MLO
MIN
MT
MC
MAX
MCC
LTG
IG
LC
LT
IMC
JB
HR
HVAC
HOA
HP
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
NIGHT LIGHTNL
NTS
NO
NIC
NC
HAND-OFF-AUTO SELECTOR SWITCH
HEATING/VENTILATING/AIR CONDITIONING
INTERMEDIATE METAL CONDUIT
LIQUID TIGHT FLEXIBLE METAL CONDUIT
MECHANICAL CONTRACTOR
HID HIGH INTENSITY DISCHARGE
A
AC
AFF
ACU-
AHJ
AHU-
AS
B-
BC
AIC
ATS
BLDG
CHLR-
CND (C)
CKT BKR
CKT
CUH-
CU-
DISC
DFU-
EF-
EC
DWH-
EBB-
DWG
CT-
EXIST (E)
EWC
FLEX
FLA
FLR
FSES
FLUOR
EMT
ABOVE FINISHED FLOOR
AIR CONDITIONING UNIT
AMPS
ABOVE COUNTER
AIR HANDLING UNIT
AUTOMATIC TRANSFER SWITCH
AMPS INTERUPTING CAPACITY
AUTHORITY HAVING JURISDICTION
ABOVE SHELF
BOILER
BUILDING
BELOW COUNTER
CHILLER
DOMESTIC WATER HEATER
CABINET UNIT HEATER
CIRCUIT
CIRCUIT BREAKER
CONDUIT
CONDENSING UNIT
COOLING TOWER
DUCT FURNACE
DRAWING
DISCONNECT
FOOD SERVICE EQUIP. SUPPLIER
ELECTRIC WATER COOLER
ELECTRICAL CONTRACTOR
ELECTRIC BASEBOARD
ELECTRICAL METALLIC TUBING
EXISTING
EXHAUST FAN
FLOOR
FLUORESCENT
FLEXIBLE CONDUIT
FULL LOAD AMPS
EM EMERGENCY
F/S FIRE/SMOKE
F…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .