DWGS - 25355.pdf

PDF 24 MB Posted

Attached to
472/25355. CTS; Saginaw C. F. - Sewer Screening Improvements
Solicitation number
RFQ 171 260000000232 2
Issued by
Saginaw County, Flint City, Michigan

About this file

Contract Opportunity Summary

This is a construction design and bid document set for the State of Michigan Department of Technology, Management and Budget, specifically for sewer screening improvements at the Saginaw Correctional Facility located in Tittabassee Township, Saginaw County, Michigan. The project encompasses comprehensive mechanical, electrical, and plumbing (MEP) improvements to the bar screen building and associated infrastructure, including installation of new sewer screening and washing equipment, muffin monster units, bar screens, control systems, HVAC equipment, and electrical systems rated for Class 1, Division 1 hazardous environments. The project is structured in multiple phases: Phase 300 at 50% completion dated December 11, 2025; Phase 300 at 100% completion dated January 13, 2026; Phase 500 at 50% completion dated March 2, 2026; and Phase 500 at 90% completion dated March 18, 2026, with bid documents due March 30, 2026. The design incorporates coordination requirements with the Michigan Department of Corrections (MDOC), including mandatory 10-day advance notice for system shutdowns and safety approvals, single facility escort requirements, and specialized equipment for hazardous location compliance.

The project specifications require extensive compliance with Michigan Plumbing Code, Michigan Mechanical Code, 2023 Michigan Electrical Code, and MDOC standards, with particular emphasis on tamper-proof fasteners, security hardware, and Class 1 Division 1 hazardous location equipment throughout the screening room. Contractors must address demolition and removal of existing equipment while maintaining system integrity, patch and seal all wall and floor penetrations to maintain fire ratings, and coordinate with the existing JCI DDC building automation control system. The work includes integration of new gas monitoring systems, sewage flow monitoring systems, and various control panels into the existing infrastructure, with all electrical outages limited to two-hour windows unless portable generator backup is provided. Professional site coordination, 24-month post-construction warranty with 6-month and 11-month review meetings, material recycling documentation, and adherence to MDOC security requirements including prohibition of exposed fasteners accessible to inmates are mandatory contract conditions.

View the file

Other files

File Type Posted
EX DWGS for ref - 25355.pdf PDF
Bid Addenda - One.pdf PDF
LEIN Request Form.pdf PDF
Advertisment - 25355.pdf PDF
Service Disabled Veteran Owned Business Info Sheet 2025.pdf PDF
SPECS - 25355.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TI

TL

E

SH

EE

T

T

JC

/E N

G B

Y

PR

O

JE

C

T N

O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

R ev ie w

D

AT

E

SW

S

-0

KA

R

KA

R

2/

5.

C

TS

PR

O

JE

C T

D

ES

C R

IP

TI

O N

PH

AS

E

- 5

0%

-1 1-

SA

G

IN

AW

C O

R R

EC

TI

O N

AL

F

AC

IL

IT

Y

SE

W

ER

S

C R

EE

N

IN

G

IM

PR

O

VE

M

EN

TS

TI

TT

AB

AW

AS

SE

E

TW

P.

, S

AG

IN

AW

C O

U N

TY

, M

I

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

PH

AS

E

- 1

-1 3-

PH

AS

E

- 5

0%

-0 2-

PH

AS

E

- 9

0%

-1 8-

BI

D

D O

C U

M

EN

TS

-3 0-

CONSTRUCTION PLANS FOR

MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT & BUDGET

9625 PIERCE RD., FREELAND, MICHIGAN

VICINITY MAP

N.T.S.

TITLE

SHEET INDEX

NO.

SHEET

LOCATION MAP

3 WORKING DAYS

BEFORE YOU DIG

CALL MISS DIG

1-(800)-482-7171

For free location of public utility lines

R

OR R

Know what's below.

Call before you dig.

FILE NO.: 472/25355.CTS

TOPOGRAPHIC SURVEY C1

T TITLE SHEET

OVERALL IMPROVEMENTS PLANC2

SAGINAW CORRECTIONAL FACILITY

SEWER SCREENING IMPROVEMENTS

TITTAWABESSEE TWP.

SAGINAW COUNTY, MI

PROJECT PERMITS

Site

NF

N

M A T R I X

CIVIL ENGINEER NFE Project #P019

NF

ENGINEERS

Civil Engineers Land Surveyors Land Planners

46777 Woodward Avenue Pontiac, MI 48342-5032

Tel. (248) 332-7931 Fax. (248) 332-8257

ELECTRICAL ENGINEER

BID DOCUMENTS

SEWER SCREENING/WASHING AND MUFFIN MONSTER C3

SANITARY IMPROVEMENTS INFORMATIONC4

MECHANICAL SYMBOLS, NOTES, AND ABBREVIATIONSM-100

BAR SCREEN BUILDING/WEST, PUMP HOUSE - FIRST FLOOR, M-400

E-100

E-200

ELECTRICAL SYMBOLS, NOTES & ABBREVIATIONS

PARTIAL ELECTRICAL SITE PLAN, MUFFIN MONSTER WELL, DEMO & NEW

EQUIPMENT DETAILS

E-500 BAR SCREEN FIRST FLOOR PLAN - ELECTRICAL DEMOLITION & NEW

E-900 ELECTRICAL PANEL SCHEDULES

PLUMBING SYMBOLS, NOTES & ABBREVIATIONSP-100

BAR SCREEN - BUILDING FIRST FLOOR PLAN - PLUMBING NEWP-400

MECHANICAL FIRST FLOOR PLAN - MECHANICAL DEMOLITION & NEW

M-900 MECHANICAL DETAILS AND SCHEDULES

E-600 PARTIAL ELECTRICAL RISER DIAGRAM

BENCHMARK

PIERCE ROAD

CAUTION!!

TO

PO

G R

AP

H

IC

S

U R

VE

Y/

BU

IL

D

IN

G F

LO

O

R P

LA

N

C1

JC

/E N

G B

Y

PR

O

JE

C

T N

O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

R ev ie w

D

AT

E

SW

S

-0

KA

R

KA

R

2/

5.

C

TS

PR

O

JE

C T

D

ES

C R

IP

TI

O N

PH

AS

E

- 5

0%

-1 1-

SA

G

IN

AW

C O

R R

EC

TI

O N

AL

F

AC

IL

IT

Y

SE

W

ER

S

C R

EE

N

IN

G

IM

PR

O

VE

M

EN

TS

TI

TT

AB

AW

AS

SE

E

TW

P.

, S

AG

IN

AW

C O

U N

TY

, M

I

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

PH

AS

E

- 1

-1 3-

PH

AS

E

- 5

0%

-0 2-

PH

AS

E

- 9

0%

-1 8-

BI

D

D O

C U

M

EN

TS

-3 0-

3 WORKING DAYS

BEFORE YOU DIG

CALL MISS DIG

1-(800)-482-7171

For free location of public utility lines

R

OR R

Know what's below.

Call before you dig.

LEGEND

TOPOGRAPHIC SURVEY NOTES

NF

N

SCALE: 1" = 10'

0510 5 10 5

N

FE

P ro je ct

P0

N F

E N

G

IN

E E

R S

C iv il E ng in ee rs

L an d Su rv ey or s

L an d Pl an ne rs

W oo dw ar d

A ve nu e

Po nt ia c, M I

2-

T el

8)

-7

F ax

8)

-8

EX. DIVERSION MANHOLE

EX. MUFFIN MONSTER/WET WELL

EXISTING SEWER INFORMATION

SOIL EROSION CONTROL SOIL EROSION NOTE

SILTFENCE DETAIL

SECTION A-A

FRONT VIEW

PLAN VIEW

SECTION B-B

BENCHMARK

PIERCE ROAD

CAUTION!!

O

VE

R

AL

L

IM

PR

O

VE

M

EN

TS

P

LA

N C2

JC

/E

N G

B Y

PR

O

JE

C

T N

O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

R ev ie w

D

AT

E

SW

S

-0

KA

R

KA

R

2/

5.

C

TS

PR

O

JE

C T

D

ES

C R

IP

TI

O N

PH

AS

E

- 5

0%

-1 1-

SA

G

IN

AW

C O

R R

EC

TI

O N

AL

F

AC

IL

IT

Y

SE

W

ER

S

C R

EE

N

IN

G

IM

PR

O

VE

M

EN

TS

TI

TT

AB

AW

AS

SE

E

TW

P.

, S

AG

IN

AW

C O

U N

TY

, M

I

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

PH

AS

E

- 1

-1 3-

PH

AS

E

- 5

0%

-0 2-

PH

AS

E

- 9

0%

-1 8-

BI

D

D O

C U

M

EN

TS

-3 0-

3 WORKING DAYS

BEFORE YOU DIG

CALL MISS DIG

1-(800)-482-7171

For free location of public utility lines

R

OR R

Know what's below.

Call before you dig.

LEGEND

TOPOGRAPHIC SURVEY NOTES

NF

N

SCALE: 1" = 10'

0510 5 10 5

N

FE

P ro je ct

P0

N F

E N

G

IN

E E

R S

C iv il E ng in ee rs

L an d Su rv ey or s

L an d Pl an ne rs

W oo dw ar d

A ve nu e

Po nt ia c, M I

2-

T el

8)

-7

F ax

8)

-8

CONSTRUCTION PLAN NOTE - SEWER

BYPASS REQUIREMENTS

HYDRO VAC INVESTIGATION

PROJECT PHASING

CONFINED SPACE

GPR SURVEY

LEGEND - PAVING

EXTERNAL POWERED SEWER FLOW

MONITORING SYSTEM

SAGINAW HISTORICAL UTILITY PLAN

SE

W

ER

S

C R

EE

N

IN

G

/W

AS

H

IN

G

AN

D M

U

FF

IN

M

O N

ST

ER

EQ

U

IP

M

EN

TS

D

ET

AI

LS

C3

JC

/E N

G B

Y

PR

O

JE

C

T N

O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

R ev ie w

D

AT

E

SW

S

-0

KA

R

KA

R

2/

5.

C

TS

PR

O

JE

C T

D

ES

C R

IP

TI

O N

PH

AS

E

- 5

0%

-1 1-

SA

G

IN

AW

C O

R R

EC

TI

O N

AL

F

AC

IL

IT

Y

SE

W

ER

S

C R

EE

N

IN

G

IM

PR

O

VE

M

EN

TS

TI

TT

AB

AW

AS

SE

E

TW

P.

, S

AG

IN

AW

C O

U N

TY

, M

I

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

PH

AS

E

- 1

-1 3-

PH

AS

E

- 5

0%

-0 2-

PH

AS

E

- 9

0%

-1 8-

BI

D

D O

C U

M

EN

TS

-3 0-

N

FE

P ro je ct

P0

N F

E N

G

IN

E E

R S

C iv il E ng in ee rs

L an d Su rv ey or s

L an d Pl an ne rs

W oo dw ar d

A ve nu e

Po nt ia c, M I

2-

T el

8)

-7

F ax

8)

-8

MUFFIN MONSTER SPECIFICATIONS

BAR SCREEN AND COMPACTOR LAYOUT/INSTALLATION

TYPICAL SCREENING/WASHER UNIT ASSEMBLY

SA

N

IT

AR

Y

IM

PR

O

VE

M

EN

TS

IN

FO

R M

AT

IO

N C4

JC

/E

N G

B Y

PR

O

JE

C

T N

O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

R ev ie w

D

AT

E

SW

S

-0

KA

R

KA

R

2/

5.

C

TS

PR

O

JE

C T

D

ES

C R

IP

TI

O N

PH

AS

E

- 5

0%

-1 1-

SA

G

IN

AW

C O

R R

EC

TI

O N

AL

F

AC

IL

IT

Y

SE

W

ER

S

C R

EE

N

IN

G

IM

PR

O

VE

M

EN

TS

TI

TT

AB

AW

AS

SE

E

TW

P.

, S

AG

IN

AW

C O

U N

TY

, M

I

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

PH

AS

E

- 1

-1 3-

PH

AS

E

- 5

0%

-0 2-

PH

AS

E

- 9

0%

-1 8-

BI

D

D O

C U

M

EN

TS

-3 0-

N

FE

P ro je ct

P0

N F

E N

G

IN

E E

R S

C iv il E ng in ee rs

L an d Su rv ey or s

L an d Pl an ne rs

W oo dw ar d

A ve nu e

Po nt ia c, M I

2-

T el

8)

-7

F ax

8)

-8

BYPASS GRINDER STATION REPLACEMENT

DIVERSION MANHOLE REPLACEMENT

BAR SCREEN SEQUENCE OF CONSTRUCTION

DIVERSION VAULT DETAIL

DIVERSION MANHOLE REPLACEMENT

SLUICE GATE W/NUT AND THREADED ROD IN D-BOX

SLUICE GATE BASIS OF DESIGN:

LEGEND - PAVING

PLUMBING ABBREVIATIONS

PLUMBING SYMBOLS LEGEND

PLUMBING PIPING PLUMBING EQUIPMENT

1. ALL PLUMBING WORK SHALL CONFORM TO MICHIGAN

PLUMBING CODE, LATEST APPLICABLE EDITION, AND ALL

APPLICABLE LOCAL CODES.

2. INSTALL ALL EQUIPMENT, MATERIALS, AND

ACCESSORIES PER MANUFACTURERS WRITTEN

INSTRUCTIONS.

3. INSTALL ISOLATION BALL VALVES @ ALL FIXTURE WATER

SUPPLY LINES.

4. SITE CONTRACTOR TO RUN UTILITIES TO 5'-0" FROM

BUILDING LINE.

5. ALL PIPE SIZES SHOWN ARE SERVICE SIZE. SIZE

SLEEVES FOR 1" CLEAR SPACE BETWEEN PIPE AND

SLEEVE FOR INSTALLATION OF MECHANICAL SEAL.

6. CONTRACTOR SHALL DEMOLISH & REMOVE EXISTING

PIPING, FITTINGS, & EQUIPMENT AS REQUIRED FOR NEW

INSTALLATIONS. VALVE & CAP PIPING TO REMAIN.

7. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY

CONFLICT WITH NEW CONSTRUCTION AND RELOCATE

AS NEEDED.

8. NOTIFY OWNER OF ANY PIPING DEMOLITION THAT MAY

AFFECT NORMAL OPERATION OF OTHER AREAS.

9. MECHANICAL SEALS REQUIRED FOR BELOW GRADE

WALL PENETRATIONS. ALL WALL AND SLAB

PENETRATIONS OF MASONRY OR CONCRETE

CONSTRUCTION SHALL BE SLEEVED.

10. 2% SLOPE FOR ALL SANITARY PIPING 2-1/2" OR LESS IN

DIAMETER. 1% SLOPE FOR ALL SANITARY PIPING 3" OR

MORE IN DIAMETER.

11. PROVIDE SHOCK STOPS FOR EVERY PLUMBING GROUP.

PROVIDE SHOCK ABSORBER IN THE DOMESTIC COLD

AND HOT WATER PIPING. SHOCK ABSORBERS TO BE

LOCATED IN AN ACCESSIBLE LOCATION.

12. PROVIDE AIR ELIMINATION DEVICES FOR EACH

PLUMBING SYSTEM.

13. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES,

LOCATION, ELEVATIONS, AND DETAILS OF ALL EXISTING

CONDITIONS THAT MAY AFFECT THE WORK.

14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

MAINTAINING THE INTEGRITY OF ALL EQUIPMENT AND

MATERIALS IN A "NEW" CONDITION DURING

CONSTRUCTION.

15. ALL WORK SHALL BE PERFORMED BY LICENSED

CONTRACTORS AND SUBCONTRACTORS AS REQUIRED

BY LAW.

16. DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE

WITH THE CODES AND REGULATIONS ENFORCED BY

LOCAL BUILDING OFFICIALS.

17. IF THERE IS CONFLICTING INFORMATION IN THE PLANS

OR SPECIFICATIONS THE MORE STRINGENT AND

GREATER COST ITEM SHALL BE USED.

18. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF

TERMINATION OF PIPES AND SUGGESTED ROUTES. IT IS

NOT INTENTION OF DRAWINGS TO INDICATE ALL

NECESSARY OFFSETS. INSTALL WORK IN MANNER TO

CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS,

PRESERVE HEADROOM AND KEEP OPENINGS AND

PASSAGEWAYS CLEAR. DO NOT SCALE FROM

DRAWINGS.

19. ANY INFORMATION FOUND ON THE DRAWINGS AND NOT

IN THE SPECIFICATIONS, OR FOUND IN SPECIFICATIONS

AND NOT IN THE DRAWINGS, SHALL BE CONSTRUED AS

TO BE INCLUDED IN BOTH THE SPECIFICATIONS AND THE

DRAWINGS. ANY CONFLICT BETWEEN THE PLANS AND

THE SPECIFICATIONS WILL BE INTERPRETED BY THE

ARCHITECT. IN THE EVENT OF CONFLICT, FOR THE

PURPOSE OF BIDDING, THE CONTRACTOR SHALL

PRESUME THE MOST EXPENSIVE COMBINATION OF

QUALITY AND QUANTITY OF WORK SHALL PREVAIL.

20. UNLESS OTHERWISE NOTED, ALL PIPING SHALL BE

CONCEALED WHEREVER POSSIBLE. PROVIDE CHROME

ESCUTCHEON AT EACH PENETRATION OF A FINISHED

SURFACE.

21. PLUMBING UTILITY PIPING SHALL NOT BE RUN ABOVE

ELECTRICAL GEAR OR IN THE SERVICE SPACE

REQUIRED BY THE NATIONAL ELECTRICAL CODE.

22. PROVIDE ISOLATION SEPARATORS FOR COPPER PIPING

RUNNING THROUGH METAL STUDS.

23. PROVIDE FIRE STOPPING AT ALL PENETRATIONS OF FIRE

RATED ENCLOSURES.

28. CONTRACTOR TO PATCH, PRIME, AND PAINT EXISTING

WALLS/CEILINGS AS NEEDED TO MATCH EXISTING

WHERE DEMOLITION AND/OR NEW WORK IS COMPLETED.

29. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH

POST CONSTRUCTION MEETING WITH THE ENGINEER

AND OWNER TO REVIEW AND FIX ISSUES DURING THE

WARRANTY PERIOD.

30. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO

OWNER OF THE AMOUNT OF MATERIAL BEING RECYCLED

THROUGHOUT THE PROJECT.

31. CONTRACTOR WILL HAVE 1 ESCORT TO WORK WITH

THROUGH AT THE PROJECT.

32. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY

IN ADVANCE FOR ANY HOT WORK TO ALLOW THE

OWNER TO DISABLE THE FIRE ALARM.

33. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES

SHALL USE TAMPERPROOF SCREWS.

34. ALL COORDINATION ITEMS AND/OR REQUIRED SYSTEM

SHUTDOWNS MUST BE COORDINATED AND APPROVED

BY MDOC 10 DAYS IN ADVANCE. CONTRACTOR TO

PROVIDE DETAILED SCHEDULE OF WHAT IS GOING TO

OCCUR AND WHAT WILL BE AFFECTED. CONTRACTOR TO

ALSO PROVIDE MDOC WITH SAFETY AND BACKUP PLANS

IF AN UNEXPECTED EVENT WERE TO OCCUR DURING

THE COORDINATION ITEMS AND/OR REQUIRED SYSTEM

SHUTDOWNS.

35. ALL WORK IN THE SCREEN ROOM SHALL BE COMPLETED

WITH PROPER PRECAUTIONS FOR A CLASS 1, DIVISION 1

HAZARDOUS ENVIRONMENT.

36. ALL MATERIALS SHALL BE RATED FOR USE IN A CLASS 1,

DIVISION 1 HAZARDOUS ENVIRONMENT.

GENERAL PLUMBING NOTES

MISCELLANEOUS NOTES

PLUMBING VALVES

POINT OF CONNECTION BETWEEN NEW AND

EXISTING

POINT OF EXISTING TO REMAIN AND EXISTING

TO BE REMOVED

INDICATES PLAN NOTE

INDICATES DEMOLITION NOTE

DETAIL BUBBLE

DETAIL NUMBER

PAGE LOCATION INDICATES

DIRECTION OF DETAIL SECTION

AD AREA DRAIN

ASR AUTOMATIC SPRINKLER RISER

BFS BELOW FLOOR SLAB

BWV BACK WATER VALVE

CB CATCH BASIN

CI CAST IRON

CO CLEAN OUT

CV CONTROL VALVE

DF DRINKING FOUNTAIN

DIA DIAMETER

DN DOWN

DWH DOMESTIC WATER HEATER

E.T.C. ELECTRICAL TRADES CONTRACTOR

EWC ELECTRIC WATER COOLER

EXIST EXISTING

FD FLOOR DRAIN

FC FINAL CONNECTIONS

FDC FIRE DEPT. CONNECTION

FF FINISH FLOOR

FHV FIRE HOSE VALVE

FT FEET

GAL GALLON

GD GARBAGE DISPOSAL

GI GREASE INTERCEPTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HB HOSE BIB

HD HEAD (FT)

HP HORSE POWER

ID INSIDE DIAMETER

I.E. INVERT ELEVATION

LAV LAVATORY

LT LAUNDRY TRAY

MA MEDICAL AIR

MAX MAXIMUM

MGC MEDICAL GAS CONSOLE

MH MAN HOLE

MIN MINIMUM

MS MOP SINK

M.T.C. MECHANICAL TRADES CONTRACTOR

NTS NOT TO SCALE

ORD OVERFLOW ROOF DRAIN

OXY OXYGEN

P PUMP

PD PRESSURE DROP

PVC POLY-VINYL-CHLORIDE

RC RAIN CONDUCTOR

RD ROOF DRAIN

RI ROUGH-IN

REQ'D REQUIRED

SAN SANITARY

SHWR SHOWER

SK SINK

SP STAND PIPE

SQ. FT. SQUARE FEET

SS SERVICE SINK

ST STORM

S&W STOP & WASTE

STR STRAINER

SV STACKED VENT

TYP. TYPICAL

UR URINAL

VB VACUUM BREAKER

VS VENT STACK

V.F.D VARIABLE FREQUENCY DRIVE

VTR VENT THRU ROOF

W WASTE

WB WET BULB

WC WATER CLOSET

WH WALL HYDRANT

WS WASTE STACK

W&V WASTE AND VENT

X-CW EXIST. CW PIPING

ITEM

EXISTING

COLD WATER

COLD WATER BELOW FINISH SLAB

HOT WATER

HOT WATER BELOW FINISH SLAB

HOT WATER RETURN

HOT WATER RETURN BELOW FINISH SLAB

SOFTENED WATER

SOFTENED WATER BELOW FINISH SLAB

SOFTENED WATER RETURN

SOFTENED WATER RETURN BELOW FINISH

SLAB

TEMPERED WATER

TEMPERED WATER BELOW FINISH SLAB

TEMPERED WATER RETURN

TEMPERED WATER RETURN BELOW FINISH

SLAB

DEIONIZED WATER

DEIONIZED WATER BELOW FINISH SLAB

REVERSE OSMOSIS WATER

REVERSE OSMOSIS WATER RETURN BELOW

FINISH SLAB

FIRE PROTECTION

GAS (NATURAL)

GAS (LIQUID PETROLEUM)

ACID RESISTANT

VENT ACID RESISTANT WASTE

ACID RESISTANT WASTE BELOW FINISH SLAB

RAIN CONDUCTOR

STORM BELOW FINISH SLAB

OVERFLOW RAIN CONDUCTOR

OVERFLOW RAIN CONDUCTOR BELOW FINISH

SLAB

SANITARY WASTE

SANITARY WASTE BELOW FINISH SLAB

VENT PIPING

VENT PIPING BELOW FINISH SLAB

COMPRESSED AIR

OXYGEN

NITROUS OXIDE

NITROGEN

MEDICAL AIR

VACUUM

DEMOLITION

GATE VALVE

GAS COCK

CHECK VALVE

BALANCE COCK

CIRCUIT SETTER

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

GLOBE VALVE

BALL VALVE

OS&Y VALVE

SOLENOID VALVE

EXPANSION VALVE WITH THERMOSTATIC BULB

PLUG VALVE

BUTTERFLY VALVE

RELIEF VALVE

HOSE & DRAIN END VALVE

PRESSURE RELIEF VALVE

PRESSURE REDUCING VALVE

TRIPLE DUTY VALVE

GAS PRESSURE REGULATOR

STRAINER (BLOW-OFF)

FLOW DIRECTION

PIPING DROP

PIPING RISE

FLOOR CLEANOUT

INLINE PIPING DROP

INLINE PIPING RISE

PIPING TEE

PIPING ELBOW

INLINE CLEANOUT

PLUMBING TRAP

THERMOMETER

CONNECTION

PUMP

UNION

PIPE ANCHOR

PIPE GUIDE

FLOOR DRAIN & FLOOR SINK

BACK FLOW PREVENTER

FLANGE END CONNECTION

WALL HYDRANT & HOSE BIBB

REGULAR & OVERFLOW ROOF DRAIN

PIPE CAP

PIPE BREAK

WATER METER

GAS METER

PRESSURE GAUGE

FIRE HYDRANT

SPRINKLER HEAD (PENDANT)

SPRINKLER HEAD (UPRIGHT)

SPRINKLER HEAD (SIDEWALL)

FIRE DEPARTMENT CONNECTION

PIPING FLEXIBLE CONNECTOR

SIGHT GLASS

PIPE EXPANSION

COMPENSATOR FLOW SENSOR DEVICE

FLOW METER

FLOW SWITCH

PRESSURE SWITCH

SUPERVISORY SWITCH INVERTED

BUCKET TRAP

FLOAT & THERMOSTATIC TRAP

X

X

XX

XXXX

XX

XXXX

CW

CW

HW

HW

HWR

HWR

SW

SW

SWR

SWR

TW

TW

TWR

TWR

DI

DI

RO

RO

FP

G

LP

ARV

ARW

ARW

RC

ST

ORC

ORC

SAN

SAN

V

V

CA

NO

N2

MA

VAC

M

M

P

FS

FT

BT

PS

SS JC

/E

N G

B Y

PR

O

JE

C

T N

O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

R ev ie w

D

AT

E

-0

1/

5.

C

TS .

PR

O

JE

C T

D

ES

C R

IP

TI

O N

BI

D

D O

C U

M

EN

TS

3/

/2

SA

G

IN

AW

C O

R R

EC

TI

O N

AL

F

AC

IL

IT

Y

BA

R

S C

R

EE

N B

U

IL

D

IN

G

IM

PR

O

VE

M

EN

TS

TI

TT

AB

AW

AS

SE

E

TW

P.

, S

AG

IN

AW

C

O U

N

TY

, M I

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

M A

T R

I X

P-

C

ATTA

T

TA

T

PL

U

M

BI

N G

S

YM

BO

LS

, N O

TE

S, AN

D

A

BB

R

EV

IA

TI

O

S

X-FD

X-FD

X-CW

X-3/4" CW DN TO

WELL HOUSE

X-

CW

X-

CW

X-HB

X-3/4"

X-3/4"

BAR SCREEN

(REFER TO

CIVIL)

3/4" CW

CW

3/4"

3/4" CW DN TO

BAR SCREEN

SOLENOID VALVE (PROVIDED

BY COMPACTOR MANU., TYP. 2)

4" DRAIN FROM

BAR SCREEN DN

TO EXISTING PIT

SCREEN ROOM

ELECTRICAL ROOM

BFP

INSTALL NEW COLD WATER PIPING, VALVES, FITTINGS, HANGERS,

SUPPORTS, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION

SHOWN. CONTRACTOR TO REFER TO BARSCREEN MANUFACTURER

INSTALLATION INSTRUCTIONS FOR FINAL CONNECTIONS. CONTRACTOR

TO MODIFY EXISTING DOMESTIC COLD WATER PIPING AS REQUIRED TO

MAKE NEW CONNECTION.

CONTRACTOR TO INSTALL NEW SOLENOID VALVES PROVIDED BY

BARSCREEN/COMPACTOR MANUFACTURER. CONTRACTOR TO INSTALL

NEW SOLENOID VALVES, CONTROLS, CONTROL WIRING, AND ALL

ASSOCIATED ACCESSORIES PER THE MANUFACTURER'S INSTALLATION

INSTRUCTIONS AND CONNECT THEM TO THE NEW

BARSCREEN/COMPACTER CONTROL PANEL. CONTRACTOR TO

COORDINATE THE CONNECTION OF THE SOLENOID VALVES TO THE

BARSCREEN/COMPACTER CONTROL PANEL WITH THE MANUFACTURER.

PLUMBING KEY NOTES

GENERAL PLUMBING NOTES

1. ALL WORK AND MATERIAL IN SCREEN ROOM SHALL BE FOR CLASS 1,

DIVISION 1 HAZARDOUS ENVIRONMENT.

2. NEW COLD WATER PIPING IN THE ELECTRICAL ROOM SHALL NOT BE

ROUTED OVER ELECTRICAL GEAR AND/OR PANELS.

3. CONTRACTOR TO INSTALL NEW NIRON (OR PRE-APPROVED

EQUIVALENT) POLYPROPYLENE PIPING, VALVES, FITTINGS, AND ALL

ASSOCIATED ACCESSORIES PER THE MANUFACTURER'S INSTALLATION

INSTRUCTIONS. CONTRACTOR TO HANG/SUPPORT NEW NIRON (OR

PRE-APPROVED EQUIVALENT) POLYPROPYLENE PER THE PROJECT

SPECIFICATIONS AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.

CONTRACTORS TO PROVIDE ALL REQUIRED ADDITIONAL PIPE

RACKING, SUPPORTS, HANGERS, AND ALL ASSOCIATED EQUIPMENT TO

ENSURE THE NEW NIRON (OR PRE-APPROVED EQUIVALENT)

POLYPROPYLENE PIPING IS PROPERLY INSTALLED.

JC

/E

N G

B Y

PR

O

JE

C

T N

O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

R ev ie w

D

AT

E

-0

1/

5.

C

TS .

PR

O

JE

C T

D

ES

C R

IP

TI

O N

BI

D

D O

C U

M

EN

TS

3/

/2

SA

G

IN

AW

C O

R R

EC

TI

O N

AL

F

AC

IL

IT

Y

BA

R

S C

R

EE

N B

U

IL

D

IN

G

IM

PR

O

VE

M

EN

TS

TI

TT

AB

AW

AS

SE

E

TW

P.

, S

AG

IN

AW

C

O U

N

TY

, M I

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

M A

T R

I X

KEY PLAN

SCALE: NTS

N

BAR SCREEN

WEST PUMP HOUSE

P-

BA

R S

C R

EE

N

B U

IL

D

IN

G

FI

R

ST

FL

O

O R

P

LA

N

PL

U

M

BI

N G

N

EW

N BAR SCREEN BUILDING - FIRST FLOOR PLAN - PLUMBING NEW

SCALE: 1/4" = 1'-0"

0 1 5

C

ATTA

T

TA

T

GENERAL HVAC NOTES

1. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE, LATEST

APPLICABLE EDITION.

2. LOCATE EXHAUST OUTLETS OF VENTILATION SYSTEMS AT LEAST 10 FEET FROM

OUTDOOR AIR INTAKES.

3. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES PER

MANUFACTURERS WRITTEN INSTRUCTIONS.

4. BOTTOM OF EQUIPMENT ON ROOF SHALL BE A MINIMUM OF 12" ABOVE ROOF

MEMBRANE. CONTRACTOR SHALL COORDINATE ASSOCIATED ROOF CURB

HEIGHT AS REQUIRED.

5. ALL EXISTING SYSTEMS THAT SERVE AREAS BEING RENOVATED SHALL BE

REBALANCED AS REQUIRED.

6. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION THAT MAY AFFECT

NORMAL OPERATION OF OTHER AREAS.

7. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY CONFLICT WITH NEW

CONSTRUCTION AND RELOCATE AS NEEDED.

8. LOCATIONS OF THE THERMOSTATS TO BE VERIFIED IN FIELD.

9. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER DISCIPLINES PRIOR

TO CONSTRUCTION TO AVOID CONFLICTS.

10. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.

11. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION, ELEVATIONS,

AND DETAILS OF ALL EXISTING CONDITIONS THAT MAY AFFECT THE WORK.

12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY

OF ALL EQUIPMENT AND MATERIALS IN A "NEW" CONDITION DURING

CONSTRUCTION.

13. ALL WORK SHALL BE PERFORMED BY LICENSED CONTRACTORS AND

SUBCONTRACTORS AS REQUIRED BY LAW.

14. CONTRACTOR SHALL USE LOW PRESSURE LOSS DUCT FITTINGS IN

ACCORDANCE WITH SMACNA. (WYES, RADIUSED OR VANED TEES, ETC.)

DUCTWORK SHALL BE STAINLESS STEEL OR ALLUMINUM.

15. ALL EXTERNALLY ISOLATED HVAC EQUIPMENT SHALL HAVE FLEXIBLE DUCT

CONNECTORS.

16. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF TERMINATION OF PIPES

AND DUCTS AND SUGGESTED ROUTES. IT IS NOT INTENTION OF DRAWINGS TO

INDICATE ALL NECESSARY OFFSETS. INSTALL WORK IN MANNER TO CONFORM

TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM AND KEEP

OPENINGS AND PASSAGEWAYS CLEAR. DO NOT SCALE FROM DRAWINGS.

17. ANY INFORMATION FOUND ON THE DRAWINGS AND NOT IN THE SPECIFICATIONS,

OR FOUND IN SPECIFICATIONS AND NOT IN THE DRAWINGS, SHALL BE

CONSTRUED AS TO BE INCLUDED IN BOTH THE SPECIFICATIONS AND THE

DRAWINGS. ANY CONFLICT BETWEEN THE PLANS AND THE SPECIFICATIONS

WILL BE INTERPRETED BY THE ARCHITECT. IN THE EVENT OF CONFLICT, FOR

THE PURPOSE OF BIDDING, THE CONTRACTOR SHALL PRESUME THE MOST

EXPENSIVE COMBINATION OF QUALITY AND QUANTITY OF WORK SHALL PREVAIL.

18. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,

AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,

CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES

HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.

19. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,

UNDERWRITERS, LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,

STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS, THESE

STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE

DRAWING AND SPECIFICATIONS.

20. DUCTWORK SHALL BE ACOUSTICALLY LINED WITHIN 10 FT OF THE INTAKE

AND/OR DISCHARGE OF A FAN.

21. DUCT/PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF DUCT/PIPING AND

EQUIPMENT SHALL BE COORDINATED WITH BUILDING STRUCTURE, EQUIPMENT

FURNISHED, ARCHITECTURAL DRAWINGS, AND ALL OTHER TRADES PRIOR TO

INSTALLATION. ANY CONTRACTOR INSTALLING WORK WITHOUT PRIOR

COORDINATION SHALL RELOCATE HIS WORK AT HIS EXPENSE TO ALLOW

PROPER INSTALLATION OF ANY AND ALL TRADES WORK.

22. UNLESS OTHERWISE NOTED, ALL DUCT/PIPING SHALL BE CONCEALED

WHEREVER POSSIBLE. PROVIDE CHROME ESCUTCHEON OR ALUMINUM DUCT

COLLAR AT EACH PENETRATION OF A FINISHED SURFACE.

23. DUCT/PIPING SHALL NOT BE RUN ABOVE ELECTRICAL GEAR IN THE SERVICE

SPACE REQUIRED BY THE NATIONAL ELECTRICAL CODE.

24. ANY ADDITIONAL LOW VOLTAGE CONTROL WIRING THAT IS REQUIRED SHALL BE

PROVIDED BY THE HVAC CONTRACTOR. CONTROL WIRING SHALL BE RUN IN

CONDUIT IF REQUIRED BY LOCAL CODES OR THE SPECIFICATIONS. POWER

SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR.

25. PROVIDE VIBRATION ISOLATION AT EACH CONNECTION TO A MOTORIZED PIECE

OF EQUIPMENT BY THE HVAC CONTRACTOR.

26. MOUNT THERMOSTAT/SENSORS AT 48" AFF UNLESS NOTED OTHERWISE.

27. CONTRACTOR TO PATCH, PRIME, AND PAINT EXISTING WALLS/CEILINGS AS

NEEDED TO MATCH EXISTING WHERE DEMOLITION AND/OR NEW WORK IS

COMPLETED.

28. CONTRACTOR TO PATCH EXISTING ROOF AS REQUIRED TO MATCH EXISTING,

SEAL WATER TIGHT, AND MAINTAIN EXISTING ROOF WARRANTIES AFTER

DEMOLITION/NEW WORK IS COMPETED.

29. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH POST CONSTRUCTION

MEETING WITH THE ENGINEER AND OWNER TO REVIEW AND FIX ISSUES DURING

THE WARRANTY PERIOD.

30. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO OWNER OF THE

AMOUNT OF MATERIAL BEING RECYCLED THROUGHOUT THE PROJECT.

31. CONTRACTOR WILL HAVE 1 ESCORT TO WORK WITH THROUGH AT THE PROJECT.

32. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY IN ADVANCE FOR ANY

HOT WORK TO ALLOW THE OWNER TO DISABLE THE FIRE ALARM.

33. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES SHALL USE

TAMPERPROOF SCREWS.

34. CONTRACTOR TO PROVIDE ALL REQUIRED CONTROL WIRING, CONTROLS

DEVICES/EQUIPMENT, AND ALL ASSOCIATED ACCESSORIES TO CONNECT NEW

EQUIPMENT TO THE EXISTING JCI DDC CONTROL SYSTEM. AND BE INTEGRATED

ONTO THE EXISTING FRONT-END GRAPHICS.

35. ALL COORDINATION ITEMS AND/OR REQUIRED SYSTEM SHUTDOWNS MUST BE

COORDINATED AND APPROVED BY MDOC 10 DAYS IN ADVANCE. CONTRACTOR

TO PROVIDE DETAILED SCHEDULE OF WHAT IS GOING TO OCCUR AND WHAT

WILL BE AFFECTED. CONTRACTOR TO ALSO PROVIDE MDOC WITH SAFETY AND

BACKUP PLANS IF AN UNEXPECTED EVENT WERE TO OCCUR DURING THE

COORDINATION ITEMS AND/OR REQUIRED SYSTEM SHUTDOWNS.

36. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ALL 24 VOLT

CONTROL WIRING AS REQUIRED TO CONTROL ALL HVAC EQUIPMENT PER THE

SEQUENCE OF OPERATIONS. REFER TO MECHANICAL SPECIFICATIONS AND

COORDINATE WITH MECHANICAL CONTRACTOR. ELECTRICAL CONTRACTOR IS

RESPONSIBLE FOR INSTALLING WIRING AND RACEWAY PER ELECTRICAL

SPECIFICATIONS.

37. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL OTHER HARDWARE

REQUIRED FOR WIRING THE HVAC EQUIPMENT PER THE SEQUENCE OF

OPERATIONS.

38. CONTRACTOR TO REFER TO ALL ELECTRICAL CONSTRUCTION DOCUMENTS AND

DIVISION 26 SPECIFICATIONS FOR CONTROL WIRING RACEWAYS. ALL CONTROL

WIRING RACEWAYS ARE TO MEET MDOC REQUIREMENTS.

39. ALL WORK IN THE SCREEN ROOM SHALL BE COMPLETED WITH PROPER

PRECAUTIONS FOR A CLASS 1, DIVISION 1 HAZARDOUS ENVIRONMENT.

40. ALL MATERIALS SHALL BE RATED FOR USE IN A CLASS 1, DIVISION 1 HAZARDOUS

ENVIRONMENT.

MECHANICAL SYMBOLS LEGEND

HVAC PIPING SYMBOLSHVAC PIPING HVAC DUCTWORKTEMPERATURE CONTROL SYMBOLS

MISCELLANEOUS NOTES

HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS HVAC PIPING VALVES

MECHANICAL ABBREVIATIONS

AFF ABOVE FINISH FLOOR

AC AIR COMPRESSOR

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

A.T.C. ARCHITECTURAL TRADES CONTRACTOR

B BOILER

B.A.S. BUILDING AUTOMATION SYSTEM

CAF COMBUSTION AIR FAN

CC COOLING COIL

CFM CUBIC FEET PER MINUTE

CHLR CHILLER

CHP CONSOLE HEAT PUMP

CONV CONVECTOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONTROL VALVE

CWP CHILLED WATER PUMP

DB DRY BULB

DFU DUCT FURNACE

DIA DIAMETER

DN DOWN

DPR DAMPER

DS DUCT SILENCER

EAT ENTERING AIR TEMPERATURE

EF EXHAUST FAN

EG EXHAUST GRILLE

E.T.C. ELECTRICAL TRADES CONTRACTOR

EVR EVAPORATOR

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EXIST EXISTING

FF FINISH FLOOR

FPM FEET PER MINUTE

FT FEET

FTR FINNED TUBE RADIATION

FU FURNACE

GAL GALLON

GFRH GAS FIRED RADIANT HEATER

GR GRILLE

H HUMIDIFIER

HC HEATING COIL

HD HEAD (FT)

HP HORSE POWER

HHP HORIZONTAL HEAT PUMP

HTG HEATING

HVAC HEATING, VENTILATION, & AIR CONDITIONING

HWP HEATING WATER PUMP

HX HEAT EXCHANGER

ID INSIDE DIAMETER

I.E. INVERT ELEVATION

IAH INTAKE HOOD

LAT LEAVING AIR TEMPERATURE

LH LATENT HEAT (MBH)

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH BTU PER HOUR (THOUSAND)

MIN MINIMUM

M.T.C. MECHANICAL TRADES CONTRACTOR

N.C. NOISE CRITERIA

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NTS NOT TO SCALE

P PUMP

PCR PUMPED CONDENSATE RETURN

PD PRESSURE DROP

RCP RADIANT CEILING PANEL

REQ'D REQUIRED

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RLH RELIEF HOOD

RTU ROOF TOP UNIT

SD SUPPLY DIFFUSER

SF SUPPLY FAN

SG SUPPLY GRILLE

SH SENSIBLE HEAT (MBH)

SM SHEET METAL

SQ. FT. SQUARE FEET

SST SATURATED SUCTION TEMPERATURE

STR STRAINER

TC TOTAL COOLING (MBH)

TCL TEMPERATURE CONTROL

T&P TEMPERATURE & PRESSURE RELIEF VALVE

TYP TYPICAL

UH UNIT HEATER

VAV VARIABLE AIR VOLUME BOX

VRH VARIABLE AIR VOLUME REHEAT BOX

FPVAV FAN POWERED VARIABLE AIR VOLUME BOX

V.F.D VARIABLE FREQUENCY DRIVE

ZD ZONE DAMPER

X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)

ITEM

EXISTING

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CONDENSATE DRAIN

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

COOLING TOWER WATER SUPPLY

COOLING TOWER WATER RETURN

DIRECT EXPANSION

HEAT PUMP WATER SUPPLY

HEAT PUMP WATER RETURN

HEATING WATER SUPPLY

HEATING WATER RETURN

SUCTION (REFRIGERANT)

LIQUID (REFRIGERANT)

SUCTION (DIRECT EXPANSION)

LIQUID (DIRECT EXPANSION)

LOW PRESSURE STEAM (0-20 LBS.)

MEDIUM PRESSURE STEAM (21-75 LBS.)

HIGH PRESSURE STEAM (76 LBS. & ABV.)

STEAM CONDENSATE (GRAVITY)

PUMPED STEAM CONDENSATE

STEAM CONDENSATE BOILER FEED

GATE VALVE

GAS COCK

CHECK VALVE

BALANCE COCK

CIRCUIT SETTER

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

GLOBE VALVE

BALL VALVE

SOLENOID VALVE

EXPANSION VALVE WITH

THERMOSTATIC BULB

PLUG VALVE

BUTTERFLY VALVE

RELIEF VALVE

HOSE & DRAIN END VALVE

PRESSURE RELIEF VALVE

PRESSURE REDUCING VALVE

TRIPLE DUTY VALVE

GAS PRESSURE REGULATOR

STRAINER (BLOW-OFF)

FLOW DIRECTION

PIPING DROP

PIPING RISE

INLINE PIPING DROP

INLINE PIPING RISE

PIPING TEE

PIPING ELBOW

THERMOMETER

PUMP

UNION

PIPE ANCHOR

PIPE GUIDE

BACK FLOW PREVENTER

PIPE CAP

PIPE BREAK

THERMOMETER WELL

EXPANSION LOOP

EXPANSION COMPENSATOR

FLOAT & THERMOSTATIC STEAM TRAP

INVERTED BUCKET STEAM TRAP

THERMOSTAT

PROGRAMMABLE THERMOSTAT

THERMOSTAT (W/ NIGHT SETBACK)

ROOM SENSOR

HUMIDISTAT

PRESSURE GAUGE

DAMPER (ELECTRIC OPERATION)

DAMPER (PNEUMATIC OPERATION)

DAMPER BLADES

SUPPLY AIR DUCT

EXIST SUPPLY AIR DUCT

RETURN AIR DUCT

EXIST RETURN AIR DUCT

OUTSIDE AIR DUCT

EXIST OUTSIDE AIR DUCT

EXHAUST AIR DUCT

EXIST EXHAUST AIR DUCT

SUPPLY AIR DUCT RISER

RETURN AIR DUCT RISER

OUTSIDE AIR DUCT RISER (AS NOTED)

EXHAUST AIR DUCT

INSULATED DUCTWORK (AS NOTED)

SUPPLY AIR DIFFUSER (SQUARE)

SUPPLY AIR DIFFUSER (INLINE)

TURNING VANES

SURFACE MTD. GRILLE

SUPPLY AIR DIFFUSER (ROUND)

90° TEE W/45° APPROACH

CONICAL TAKE-OFF

CONICAL TAKE-OFF W/ DAMPER

BALANCE DAMPER

RETURN AIR DUCT BOOT

ECCENTRIC REDUCER

CONCENTRIC REDUCER

UNIT HEATER

CEILING EXHAUST FAN

ROOF MOUNTED EXHAUST FAN

DEMOLITION

POINT OF CONNECTION BETWEEN NEW AND

EXISTING

POINT OF EXISTING TO REMAIN AND EXISTING

TO BE REMOVED

INDICATES PLAN NOTE

INDICATES DEMOLITION NOTE

DETAIL BUBBLE

DETAIL NUMBER

PAGE LOCATION INDICATES

DIRECTION OF DETAIL SECTION

X

X

XX

XXXX

XX

XXXX

SA

OA

X-OA

X-EA

EA

X-SA

X-RA

RA

SCP

SC

DXS

DXL

HR

CR

CD

CS

DX

CTR

HPR

HS

HPS

CTS

CWR

CWS

S

L

LPS

MPS

HPS

SC (BF)

TAG CFM

NECK REMARKS

SIZE

BT

FT

SD-1 250

8"ø ---

P

H

S

T

T P

T N

M

M

1. EXISTING EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATION OF EXISTING

DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH BUILDING

STRUCTURE, EQUIPMENT FURNISHED, AND ALL OTHER TRADES PRIOR TO

DEMOLITION.

2. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,

AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,

CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES

HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.

3. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,

UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,

STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS. THESE

STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE

DRAWING AND SPECIFICATIONS.

4. COORDINATE CUTTING AND PATCHING WITH GENERAL CONTRACTOR.

5. ALL BOLD DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS NOTED BY

KEYNOTE. ALL OTHER EXISTING SYSTEMS SHOWN FOR REFERENCE ONLY.

6. PATCH AND REPAIR ALL FLOOR/CEILING/WALL SURFACES LEFT DAMAGED OR

INCOMPLETE FROM REMOVAL OF FIXED ACCESSORIES AND EQUIPMENT WITH

MATERIALS TO MATCH EXISTING, AS ACCEPTABLE TO THE OWNER.

7. NOTATIONS ARE MADE IN VARIOUS PLACES ON THE DRAWINGS TO CALL

ATTENTION TO DEMOLITION WHICH IS REQUIRED. HOWEVER, THESE

DRAWINGS ARE NOT INTENDED TO SHOW EACH AND EVERY ITEM TO BE

REMOVED. CONTRACTOR SHALL REMOVE ALL MATERIALS RELATED TO THEIR

RESPECTIVE TRADES AS REQUIRED TO PERMIT THE CONSTRUCTION OF THE

NEW WORK AS SHOWN.

8. THE GENERAL CONTRACTOR SHALL COORDINATE THE EXTENT OF THE

REQUIRED DEMOLITION OF THE EXISTING BUILDING AS REQUIRED TO

FACILITATE THE CONSTRUCTION OF THE PROJECT AS SHOWN AS PART OF

THIS WORK.

9. ALL DEMOLITION SHALL BE APPROVED BY THE OWNER/TENANT PRIOR TO

COMMENCEMENT AND SHALL BE PERFORMED UNDER REQUIREMENTS AND

APPROVAL OF THE LOCAL CODE JURISDICTIONS.

10. PROTECT ALL EXISTING WORK WHICH IS TO REMAIN AND RESTORE IN AN

APPROVED MANNER ANY SUCH WORK WHICH BECOMES DAMAGED.

11. RUBBISH AND DEBRIS RESULTING FROM THE WORK SHALL BE REMOVED

IMMEDIATELY FROM THE SITE IN A SAFE AND LEGAL MANNER BY THE

CONTRACTOR.

12. DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT BUILDING

REPRESENTATIVE TO CLARIFY ANY ITEMS NOT SHOWN ON THESE

DOCUMENTS OR SHOWN NOT MATCHING FIELD CONDITIONS.

GENERAL DEMOLITION NOTES

JC

/E

N G

B Y

PR

O

JE

C

T N

O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y R ev ie w D

AT

E

-0

1/

5.

C

TS .

PR

O

JE

C T

D

ES

C R

IP

TI

O N

BI

D

D O

C U

M

EN

TS

3/

/2

SA

G

IN

AW

C O

R R

EC

TI

O N

AL

F

AC

IL

IT

Y

BA

R

S C

R

EE

N B

U

IL

D

IN

G

IM

PR

O

VE

M

EN

TS

TI

TT

AB

AW

AS

SE

E

TW

P.

, S

AG

IN

AW

C

O U

N

TY

, M I

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

M A

T R

I X

M-

C

ATTA

T

TA

T

M

EC

H

AN

IC

AL

S

YM

BO

LS

N

O

TE

S, A

N D

A

BB

R

EV

IA

TI

O

X-EF

X-24x6

EA DN

X-UH

X-14x6 SA

X-26x26 SA

X-L (40x32)

X-UH

X-OVERHEAD

DOOR

X-L (40x32)

X-FD

X-FD

X-EF (ON

ROOF)

X-14x6 SA

DN

X-SF

X-18x6

SA

X-24x6 SA

X-26x26 EA X-26x26 EA

X-EF (ON

ROOF)

X-EG ---

18x6 ---

X-EG ---

24x6 ---

X-SD ---

24x6 ---

X-SD ---

24x6 ---

X-GAS DETECTION

CONTROL PANEL

X-BARSCREEN

CONTROL PANEL T

S

X-GAS SENSOR

T

X-HS

X-HR

X-

HR

X-

HS

X-HR

X-HS

X-HR

X-HS

X-HR

X-HS

X-1-1/4"X-1-1/2"

X-1-1/4"

X-1-1/4"

X-1-1/4" HS & HR TO

WEST PUMP HOUSE

(TYP.3)

2 2

2 1

X-CONTROL

PANEL

X-L (40x32)

X-OVERHEAD

DOOR

X-L (40x32)

X-FD

X-FD

X-CONTROL

PANEL

EF-2

EF-1

3GAS MONITORING

CONTROL PANEL

DDC TOUCHSCREEN

CONTROL PANEL

BAR SCREEN

(REFER TO

CIVIL PLANS)

T3

BARSCREEN CONTROL

PANEL(S) (REFER TO

CIVIL PLANS)

S S

METHANE SENSOR

H2S

SENSOR

AUDIO/VISUAL

ALARM

AUDIO/VISUAL

ALARM

MAU-1

18x16 EA

18x16 EA

20x10

EA DN

EG-1 1050

18x12 ---

18x16 EA

SD-1 825

18x12 TYP.2

18"Ø SA

CONCRETE PAD1

14x10 EA

24x6 EA 20x10 EA

18"Ø SA

24x6 EA

DN

1 2

2 2

EG-1 600

12x12 ---

2 13 14

EUH-1

12 8 1-1/4" G (BELOW

GRADE)

T

MAU-1

18"Ø SA1

SEWAGE FLOW

MONITORING SYSTEM

CONTROL PANEL

DISCONNECT, REMOVE, AND DEMO EXISTING INLINE SUPPLY FAN, SUPPLY DUCTWORK,

DIFFUSERS, CONTROLS, CONTROL WIRING, HANGERS, SUPPORTS, AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY. EXISTING LOUVER TO REMAIN AND BE RE-USED AS

SHOWN ON NEW DRAWINGS.

DISCONNECT, REMOVE, AND DEMO EXISTING INLINE EXHAUST FAN, EXHAUST

DUCTWORK, GRILLES, CONTROLS, CONTROL WIRING, HANGERS, SUPPORTS, AND ALL

ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND DEMO EXISTING ROOF MOUNTED EXHAUST FAN, EXHAUST

DUCTWORK, CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN

THEIR ENTIRETY. EXISTING ROOF CURB IS TO REMAIN AND MODIFIED AS REQUIRED TO

BE RE-USED AS SHOWN IN NEW DRAWINGS.

DISCONNECT, REMOVE, AND DEMO EXISTING ROOF MOUNTED EXHAUST FAN, EXHAUST

DUCTWORK, ROOF CURB, CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO PATCH EXISTING ROOF

PENETRATION AS REQUIRED TO MATCH EXISTING, MAINTAIN ANY EXISTING WARRANTIES,

AND SEAL WATERTIGHT.

DISCONNECT, REMOVE, AND DEMO EXISTING UNIT HEATER, HEATING SUPPLY PIPING,

HEATING RETURN PIPING, THERMOSTAT, CONTROL WIRING, CONTROLS, HANGERS

SUPPORTS, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND DEMO EXISTING ABANDONED GAS DETECTION SYSTEM

CONTROL PANEL, CONTROLS, CONTROL WIRING, GAS SENSORS, AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY. AFTER DEMOLITION WORK IS COMPLETED,

CONTRACTOR TO PATCH, PRIME, AND PANT EXISTING WALL AS REQUIRED AFTER TO

MATCH THE EXISTING WALL.

DISCONNECT, REMOVE, AND DEMO EXISTING BARSCREEN CONTROL PANEL, CONTROLS,

CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. AFTER

DEMOLITION WORK IS COMPLETED, CONTRACTOR TO PATCH, PRIME, AND PANT EXISTING

WALL AS REQUIRED AFTER TO MATCH THE EXISTING WALL.

DISCONNECT, REMOVE, AND DEMO EXISTING BOILER, FLUE, WALL CAP, CONTROLS,

CONTROL WIRING, PUMP, HEATING SUPPLY PIPING, HEATING RETURN PIPING, GAS

PIPING, VALVES, FITTINGS, SUPPORTS, CONCRETE PAD, AND ALL ASSOCIATED

ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO PATCH EXTERIOR BRICK WALL TO

MATCH EXISTING AND SEAL WATER TIGHT. BRICK AND BLOCK WALL TO BE TOOTHED IN

WITH MATCHING BRICK AND BLOCK. PRIME AND PAINT BLOCK TO MATCH EXISTING.

DISCONNECT, REMOVE, AND DEMO EXISTING INLINE PUMP, SUPPORTS, CONTROLS,

CONTROL WIRING, PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN

THEIR ENTIRETY.

DISCONNECT, REMOVE, AND DEMO EXISTING EXPANSION TANK, PIPING, VALVES,

FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.

DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING, HEATING RETURN

PIPING, MAKEUP COLD WATER PIPING, VALVES, FITTINGS, HANGERS, SUPPORTS, AND ALL

ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN.

CONTRACTOR TO DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING,

HEATING RETURN PIPING, VALVES, FITTINGS, HANGERS, SUPPORTS, AND ALL

ASSOCIATED ACCESSORIES DOWN TO THE LOWER LEVEL AND CAP. PIPE CAPS ARE TO

BE INSTALLED AS CLOSE AS POSSIBLE TO EXISTING CONCRETE FOUNDATION WALL IN

THE LOWER LEVEL. CONTRACTOR TO PATCH AND SEAL EXISTING CONCRETE FLOOR TO

BE FLUSH AND MATCH EXISTING.

EXISTING GAS METER TO REMAIN AND BE RE-USED AS SHOWN ON NEW DRAWINGS.

CONTRACTOR TO DISCONNECT, REMOVE, AND DEMO EXISTING GAS PIPING, VALVES,

FITTINGS, SUPPORTS, AND ALL ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN.

CONTRACTOR TO PATCH EXTERIOR BRICK WALL WITH GROUT AND SEAL WATER TIGHT.

CONTRACTOR TO DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING,

HEATING RETURN PIPING, VALVES, FITTINGS, HANGERS, SUPPORTS, AND ALL

ASSOCIATED ACCESSORIES DOWN BELOW CONCRETE FLOOR AND CAP. PIPE CAPS ARE

TO BE INSTALLED BELOW EXISTING CONCRETE FLOOR. CONTRACTOR TO PATCH AND

SEAL EXISTING CONCRETE FLOOR TO BE FLUSH AND MATCH EXISTING.

EXISTING LOUVER TO REMAIN. DISCONNECT, REMOVE, AND DEMO EXISTING DUCTWORK

AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO BLANK OFF

EXISTING LOUVER AND INSULATE WITH 2" THICK MINERAL FIBERBOARD INSULATION

WRAPPED WITH STAINLESS STEEL. EXISTING LOUVER TO BE SEALED AIR TIGHT.

DEMOLITION NOTES

GENERAL DEMOLITION NOTES

1. ALL EXISTING DUCTWORK, GRILLES, DIFFUSERS, LOUVERS, DAMPERS, AND ALL

ASSOCIATED ACCESSORIES TO BE DISCONNECTED, REMOVED, AND DEMOLISHED

UNLESS NOTED OTHERWISE.

2. EXISTING EQUIPMENT AND ALL ASSOCIATED ACCESSORIES TO REMAIN UNLESS

OTHERWISE NOTED.

3. CONTRACTOR TO MODIFY EXISTING WALLS/CEILINGS/FLOORS AS REQUIRED TO

COMPLETE THEIR WORK. CONTRACTOR TO PATCH, PRIME, AND PAINT

WALLS/CEILINGS/FLOORS AS REQUIRED TO MATCH EXISTING WHEN ALL

DEMOLITION/NEW WORK IS COMPLETED.

4. CONTRACTOR TO PATCH ROOF PENETRATIONS AS REQUIRED TO MATCH EXISTING, SEAL

WATERTIGHT, AND MAINTAIN EXISTING ROOF WARRANTIES. EXISTING ROOF WARRANTY

IS HELD BY FIRESTONE.

INSTALL NEW VERTICAL MAKEUP AIR UNIT, SUPPLY DUCTWORK, FITTINGS, SUPPORTS,

SUPPLY DIFFUSERS, CONTROLS, CONTROL WIRING, THERMOSTAT, GAS PIPING,

VALVES, FITTINGS, CONCRETE PAD, AND ALL ASSOCIATED ACCESSORIES IN THE

LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALL

NEW VERTICAL MAKEUP AIR UNIT ON MANUFACTURER PROVIDED METAL STAND

FASTENED TO NEW 12" THICK CONCRETE PAD WITH 4" OVERLAP IN ALL DIRECTIONS

AND EXTEND PAD TO BUILDING AS SHOWN. ROUTE NEW SUPPLY AIR DUCTWORK UP

EXTERIOR WALL AND PENETRATE EXTERIOR WALL IN LOCATION SHOWN AS HIGH AS

POSSIBLE IN THE ASSOCIATED SPACE. CONTRACTOR TO SIZE AND PROVIDE LINTEL AS

REQUIRED TO ROUTE NEW SUPPLY AIR DUCTWORK THROUGH EXISTING EXTERIOR

WALL. PATCH DUCTWORK WALL PENETRATION AS REQUIRED TO MATCH EXISTING

BLOCK EXTERIOR WALL AND SEAL WATER TIGHT. CONTRACTOR TO CONNECT MAKEUP

AIR UNIT TO NEW JCI DDC CONTROL PANEL. CONTRACTOR TO PROVIDE ALL REQUIRED

CONTROL WIRING AND CONTROLS EQUIPMENT/DEVICES AS REQUIRED TO CONNECT

TO THE JCI DDC CONTROL PANEL AND BE INTEGRATED ONTO THE EXISTING FRONT

END GRAPHICS.

INSTALL NEW INLINE EXHAUST FAN, BACKDRAFT DAMPER, EXHAUST DUCTWORK,

EXHAUST GRILLES, CONTROLS, CONTROL WIRING, HANGERS, SUPPORTS, AND ALL

ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S

INSTALLATION INSTRUCTIONS. MODIFY EXISTING LOUVER AS REQUIRED TO MAKE NEW

CONNECTION IN LOCATION SHOWN. CONTRACTOR TO RE-USE EXISTING FLOOR

PENETRATIONS TO INSTALL NEW DUCTWORK IN LOCATION SHOWN. CONNECT NEW

EXHAUST FAN, CONTROLS, AND ALL ASSOCIATED ACCESSORIES TO NEW JCI DDC

CONTROL PANEL. INTEGRATE NEW EXHAUST FAN ONTO THE EXISTING FRONT-END

GRAPHICS.

INSTALL NEW ROOF MOUNTED EXHAUST FAN, BACKDRAFT DAMPER CONTROLS,

CONTROL WIRING, THERMOSTAT, AND ALL ASSOCIATED ACCESSORIES IN THE

LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.

CONTRACTOR TO REUSE EXISTING ROOF PENETRATION AND EXISTING ROOF CURB

FOR THE INSTALLATION OF NEW ROOF MOUNTED EXHAUST FAN. CONTRACTOR TO

PROVIDE NEW CURB ADAPTOR FOR NEW ROOF MOUNTED EXHAUST FAN. CONNECT

NEW EXHAUST FAN, CONTROLS, AND ALL ASSOCIATED ACCESSORIES TO NEW JCI DDC

CONTROL PANEL. INTEGRATE NEW EXHAUST FAN ONTO THE EXISTING FRONT-END

GRAPHICS.

INSTALL NEW JCI DDC TOUCHSCREEN CONTROL PANEL, CONTROLS, CONTROL WIRING,

AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE

MANUFACTURER'S INSTALLATION INSTRUCTIONS. CONTRACTOR TO PROVIDE ALL

REQUIRED CONTROL WIRING AND CONTROLS DEVICES/EQUIPMENT TO CONNECT THE

NEW JCI DDC CONTROL PANEL TO THE EXISTING JCI DDC CONTROL PANEL WITH AN

ENGINE CONTROLLER LOCATED IN THE WEST PUMP HOUSE. CONTRACTOR TO INSTALL

NEW CONTROL WIRING IN EXISTING BURIED RACEWAYS BETWEEN THE BARSCREEN

BUILDING AND WEST PUMP HOUSE. CONTRACTOR TO CONNECT THE NEW DDC

CONTROL PANEL TO THE EXISTING STARNET 2.0 SYSTEM. CONTRACTOR TO HIRE AND

COORDINATE CONNECTION TO DARK NETWORK IT RACK AND EXISTING STARNET 2.0

SYSTEM WITH BRET EMERSON FROM COMMTECH DESIGN ( PHONE 616-446-4545).

CONTRACTOR TO CONNECT NEW GAS MONITORING CONTROL SYSTEM/PANEL (BASED

ON ARMSTRONG MODEL: AMC-1B24-T-T OR PRE-APPROVED EQUIVALENT), SENSORS,

CONTROLS, AND ALL ASSOCIATED ACCESSORIES TO THE NEW JCI DDC CONTROL

PANEL. CONTRACTOR TO PROVIDE ALL REQUIRED CONTROL WIRING AND CONTROLS

DEVICES/EQUIPMENT TO CONNECT THE GAS MONITORING CONTROL PANEL TO THE

NEW JCI DDC CONTROL PANEL AND INTEGRATE ONTO THE EXISTING FRONT-END

GRAPHICS.

CONTRACTOR TO CONNECT NEW BARSCREEN/COMPACTOR, BARSCREEN/COMPACTOR

CONTROL PANEL(S) (REFER TO CIVIL) AND ALL ASSOCIATED ACCESSORIES TO THE

NEW JCI DDC CONTROL PANEL. CONTRACTOR TO PROVIDE ALL REQUIRED CONTROL

WIRING AND CONTROLS DEVICES/EQUIPMENT TO CONNECT THE

BARSCREEN/COMPACTOR CONTROL PANEL(S) TO THE NEW JCI DDC CONTROL PANEL

AND INTEGRATE ONTO THE EXISTING FRONT-END GRAPHICS.

INSTALL NEW ELECTRIC UNIT HEATER, SUPPORTS, CONTROLS, CONTROL WIRING,

THERMOSTAT, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE

MANUFACTURER'S INSTALLATION INSTRUCTIONS. CONTRACTOR TO MOUNT ELECTRIC

UNIT HEATER 10' AFF. CONNECT THE NEW UNIT HEATER TO THE NEW JCI DDC

CONTROL PANEL AND INTEGRATE ONTO THE EXISTING FRONT-END GRAPHICS.

REFER TO CIVIL DRAWINGS FOR PIPING CONTINUATION.

NEW H2S SENSOR TO BE ARMSTRONG MODEL: AMC-282BA1 (OR PRE-APPROVED

EQUIVALENT). H2S SENSOR IS TO BE INSTALLED IN THE LOCATION SHOWN SHOWN PER

THE MANUFACTURER'S INSTALLATION INSTRUCTIONS 8'-10' AFF.

NEW METHANE SENSOR TO BE ARMSTRONG MODEL: AMC-CSA-CAT (OR

PRE-APPROVED EQUIVALENT). METHANE SENSOR IS TO BE INSTALLED IN THE

LOCATION SHOWN SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS

AS HIGH AS POSSIBLE IN THE SPACE.

NEW AUDIO/VISUAL ALARM TO BE ARMSTRONG MODEL: AMC-RAM-3 (OR

PRE-APPROVED EQUIVALENT). NEW AUDIO/VISUAL ALARM TO BE INSTALLED IN THE

LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.

INSTALL NEW GAS PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN

THE LOCATION SHOWN. MODIFY EXISTING GAS METER AS REQUIRED TO INSTALL NEW

GAS PIPING. REFER TO CIVIL DRAWINGS FOR COMPLETE ROUTING OF DIRECT BURIED

GAS PIPING.

CONTRACTOR TO INSTALL NEW EXHAUST DUCTWORK AND ALL ASSOCIATED

ACCESSORIES IN THE LOCATION SHOWN. CONTRACTOR TO RE-USE EXISTING FLOOR

PENETRATION TO ROUTE NEW DUCTWORK 5' AFF OF BAR SCREEN PIT AND SURFACE

MOUNT EXHAUST GRILLE VERTICALLY ON EXHAUST DUCTWORK AS LOW AS POSSIBLE.

CONTRACTOR TO ENSURE EXISTING ACCESS HATCH IS TO REMAIN FULLY OPERATION.

CONTRACTOR TO INSTALL NEW EXHAUST DUCTWORK AND ALL ASSOCIATED

ACCESSORIES IN THE LOCATION SHOWN. CONTRACTOR TO RE-USE EXISTING FLOOR

PENETRATION TO ROUTE NEW DUCTWORK 5' AFF OF BAR SCREEN PIT AND SURFACE

MOUNT EXHAUST GRILLE VERTICALLY ON EXHAUST DUCTWORK AS LOW AS POSSIBLE.

CONTRACTOR TO MODIFY EXISTING STEEL GRATING AS REQUIRED TO INSTALL NEW

DUCTWORK IN LOCATION SHOWN.

CONTRACTOR TO CONNECT NEW MUFFIN MONSTER, MUFFIN MONSTER CONTROL

PANEL(S) (REFER TO CIVIL) AND ALL ASSOCIATED ACCESSORIES TO THE EXISTING JCI

DDC CONTROL PANEL. CONTRACTOR TO PROVIDE ALL REQUIRED CONTROL WIRING

AND CONTROLS DEVICES/EQUIPMENT TO CONNECT THE MUFFIN MONSTER CONTROL

PANEL(S) TO THE EXISTING JCI DDC CONTROL PANEL AND INTEGRATE ONTO THE

EXISTING FRONT-END GRAPHICS.

CONTRACTOR TO CONNECT NEW SEWAGE FLOW MONITORING SYSTEM, SEWAGE

FLOW MONITORING SYSTEM CONTROL PANEL(S) (REFER TO CIVIL) AND ALL

ASSOCIATED ACCESSORIES TO THE NEW JCI DDC CONTROL PANEL. CONTRACTOR TO

PROVIDE ALL REQUIRED CONTROL WIRING AND CONTROLS DEVICES/EQUIPMENT TO

CONNECT THE SEWAGE FLOW MONITORING SYSTEM CONTROL PANEL(S) TO THE NEW

JCI DDC CONTROL PANEL AND INTEGRATE ONTO THE EXISTING FRONT-END GRAPHICS.

REFER TO CIVIL DRAWINGS FOR LOCATION OF SEWAGE FLOW MONITORING SYSTEM

DEVICES.

MECHANICAL KEY NOTES

GENERAL MECHANICAL NOTES

1. CONTRACTOR TO PATCH, PRIME, AND PAINT EXISTING CEILING/WALLS/FLOORS AS

REQUIRED TO MATCH EXISTING WHERE DEMOLITION AND/OR NEW WORK IS

COMPLETED.

2. CONTRACTOR TO PATCH ROOF PENETRATIONS AS REQUIRED TO MATCH EXISTING,

SEAL WATERTIGHT, AND MAINTAIN EXISTING ROOF WARRANTIES. EXISTING ROOF

WARRANTY IS HELD BY FIRESTONE.

3. CONTRACTOR TO PROVIDE ALL NEW CONTROL WIRING, CONTROLS

DEVICES/EQUIPMENT, AND ALL ASSOCIATED ACCESSORIES AS REQUIRED TO

CONNECT EQUIPMENT TO THE EXISTING CAMPUS JCI DDC CONTROL SYSTEM AND

INTEGRATE EQUIPMENT ONTO THE EXISTING FRONT-END GRAPHICS.

4. CONTRACTOR TO COORDINATE WITH OTHER TRADES FOR FINAL LOCATIONS OF

EQUIPMENT, CONTROL PANELS, SENSORS, AND ALL ASSOCIATED ACCESSORIES

PROVIDED BY OTHERS. CONTRACTOR TO PROVIDE ALL REQUIRED CONTROL WIRING,

CONTROLS, DEVICES, AND ALL ASSOCIATED ACCESSORIES TO CONNECT THE

EQUIPMENT PROVIDED BY OTHERS TO THE EXISTING JCI DDC CONTROL SYSTEM AND

INTEGRATE EQUIPMENT ONTO THE EXISTING FRONT-END GRAPHICS.

5. CONTRACTOR TO INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURER'S

INSTALLATION INSTRUCTIONS AND ENSURE ALL REQUIRED CLEARANCES ARE MET.

6. ALL WORK AND MATERIALS IN SCREEN ROOM SHALL BE RATED FOR CLASS 1, DIVISION

1 HAZARDOUS ENVIRONMENT.

X-B

X-XT

X-UH

X-EF

X-HS

X-

HR

X-1-1/4"

X-1-1/4" HS & HR TO BAR

SCREEN BUILDING

(TYP.3)

X-1/2"

X-

CW

X-CW

X-3/4"

X-

CW

X-3/4"

X-P

M X-G

X-GAS METER

X-3/4"

X-V

X-WALL

CAP

X-CONCRETE

PAD

8 X-3" 8

X-JCI CONTROL

PANEL

X-G DN13

X-UH

X-EF

X-CW

X-3/4"

X-

CW

X-3/4"

M

X-GAS METER

X-JCI CONTROL

PANEL

X-G DN

1-1/4" G (BELOW

GRADE)

MUFFIN MONSTER

CONTROL PANEL

JC

/E

N G

B Y

PR

O

JE

C

T N

O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

R ev ie w

D

AT

E

-0

1/

5.

C

TS .

PR

O

JE

C T

D

ES

C R

IP

TI

O N

BI

D

D O

C U

M

EN

TS

3/

/2

SA

G

IN

AW

C O

R R

EC

TI

O N

AL

F

AC

IL

IT

Y

BA

R

S C

R

EE

N B

U

IL

D

IN

G

IM

PR

O

VE

M

EN

TS

TI

TT

AB

AW

AS

SE

E

TW

P.

, S

AG

IN

AW

C

O U

N

TY

, M I

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

M A

T R

I X

KEY PLAN

SCALE: NTS

N

BAR SCREEN

WEST PUMP HOUSE

M-

BA

R S

C R

EE

N

B U

IL

D

IN

G

/W

ES

T

PU

M P

H O

U

SE

FI

R

ST

F

LO

O R

PL

AN

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O N

N

EW

N BAR SCREEN BUILDING - FIRST FLOOR PLAN - MECHANICAL DEMOLITION

SCALE: 1/4" = 1'-0"

0 1 5N BAR SCREEN BUILDING - FIRST FLOOR PLAN - MECHANICAL NEW

SCALE: 1/4" = 1'-0"

0 1 5

C

ATTA

T

TA

T

N WEST PUMP HOUSE - FIRST FLOOR PLAN - MECHANICAL DEMOLITION

SCALE: 1/4" = 1'-0"

0 1 5

N WEST PUMP HOUSE - FIRST FLOOR PLAN - MECHANICAL NEW

SCALE: 1/4" = 1'-0"

0 1 5

W

W DETAIL NOTE:

90° ELBOW SHOWN

SIMILAR RADIUS

CONSTRUCTION FOR

ALL ANGLES

W

R

R

OFFSET ELBOW

FULL RADIUS

(R=W)

15°

AIR

FLOW

15°

FLOW

AIR

TRANSITION - CONTRACTION FLOWTRANSITION - DIVERGING FLOW

R = 1 1/2 W

OFFSETS, ELBOWS, & TRANSITIONS FOR RECTANGULAR

DUCTWORK

SCALE: NTS

"Ø

S A

1ST FLOOR

MAU-1

CONCRETE

PAD

5 MAU DUCTWORK ELEVATION

SCALE: NTS

ROOF

45°

3/8"~ THREADED

ROD. SUSPENDED

FROM STRUCTURE.

OPPOSED BLADE

VOLUME DAMPER.

SUPPLY GRILLE,

REFER TO SCHEDULE FOR SIZE

SUSPENSION RODS TO

BE AT 8'-0" O.C. (MAX)

SPIRAL DUCT.

SIZE AS INDICATED

ON DRAWINGS.

1" WIDE, 20-GAUGE ALUMINUM

SUPPORT BAND STRAP

LOAD RATED EYE HOOK FASTENER

LOAD RATED FASTENERS

1 EXPOSED SUPPLY SPIRAL DUCT DETAIL

SCALE: NTSSCALE: NTSSCALE: NTS

4 DUCT TRANSITION DETAIL

SCALE: NTS

NOTES:

1. "ALTERNATE" FITTINGS SHALL BE

ACCEPTABLE ONLY WHEN DUCT HEIGHT

DOES NOT PERMIT THE USE OF

"PERMITTED" FULL SIZE BELLMOUTH

CONNECTION

2. THIS DETAIL APPLIES TO SINGLE TAKEOFFS

TO DIFFUSER AS WELL AS BRANCH

TAKEOFFS. IT ALSO APPLIES TO TAKEOFFS

IN THE HORIZONTAL AS WELL AS THE

VERTICAL DIRECTION.

DUCT SIZE:

(SEE PLANS)

ALTERNATE 1

TAKE-OFF DETAIL

ALTERNATE 2

TAKE-OFF DETAIL

(WHEN OTHERS DO NOT FIT)

RECTANGULAR TO ROUND

BOOT CONNECTIONMINI-BELLMOUTH CONNECTION

MANUAL VOLUME

DAMPER TYPICAL AT

ALL DUCT

TAKE-OFFS

VDVD

MAIN DUCT

AIR FLOW

6" min.

2 DUCT TRANSITION DETAIL

SCALE: NTS

L

W

SA FLOW

EA FLOW

MAIN AIR DUCT

BALANCING DAMPER IN ALL

SA AND RA BRANCHES TO

AIR OUTLETS

BRANCH AIR DUCT

(TYPICAL)

NOTE:

L=1/4 W (4" MIN.)

45°

18"Ø SA

LINTEL

UNISTRUCT DUCT

SUPPORT FRAME, TYP

18"Ø SA

DUCT SUPPORT, TYP. BASED ON

MIRO 8-DS OR APPROVED EQUAL

JC

/E

N G

B Y

PR

O

JE

C

T N

O

IN

D

EX

PC

A

D R

AW

N

B Y

D

ES

IG

N

ED

B

Y

R ev ie w

D

AT

E

-0

1/

5.

C

TS .

PR

O

JE

C T

D

ES

C R

IP

TI

O N

BI

D

D O

C U

M

EN

TS

3/

/2

SA

G

IN

AW

C O

R R

EC

TI

O N

AL

F

AC

IL

IT

Y

BA

R

S C

R

EE

N B

U

IL

D

IN

G

IM

PR

O

VE

M

EN

TS

TI

TT

AB

AW

AS

SE

E

TW

P.

, S

AG

IN

AW

C

O U

N

TY

, M I

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

M A

T R

I X

M-

C

ATTA

T

TA

T

M

EC

H

AN

IC

AL

D

ET

AI

LS

A N

D

SC

H

ED

U

LE

VI

AV

B

C

DC

M

B

KP

SSCP

CR

SS

AS

TS

G

X

X

X

TVSS

VFD

TRANSIENT VOLTAGE SURGE SUPPRESSION

VARIABLE FREQUENCY DRIVE

GLASS BREAK

DUPLEX RECEPTACLE

TEACHER STATION

ADMINISTRATION STATION

STUDENT STATION

CARD READER

DOCK LIGHT FIXTURE

TELEPHONE / DATA OUTLET

ADDENDUM NOTE

PLAN NOTE

DEMOLITION NOTE

THREE PHASE MOTOR

BELL

AUDIO / VIDEO INPUT

VIDEO INPUT

WALL MOUNTED SPEAKER / CLOCK COMBO

WALL MOUNTED SPEAKERS

DUAL FACE CLOCK

CCTV CONTROL PANELCCTV

SECURITY SYSTEM CONTROL PANEL

KEY PAD

BEAM DETECTOR

MOTION DETECTOR

DOOR CONTACT

CAMERA

ELECTRICAL SYMBOLS LEGEND

V

S

C

M

I

J

SINGLE RECEPTACLE (120 VOLT)

EMERGENCY RECEPTACLE

DOUBLE DUPLEX RECEPTACLE

SINGLE FACE CLOCK

FLUSH FLOOR BOX

SURFACE FLOOR BOX

SPECIAL EQUIPMENT RECEPTACLE

TELEPHONE OUTLET

DATA OUTLET

POWER POLE

JUNCTION BOX

WALL JUNCTION BOX

PULL (JUNCTION) BOX

UNDERFLOOR JUNCTION BOX

OUTLETS

LIGHT FIXTURE

STRIP FIXTURE

IN-GRADE LIGHT FIXTURE

SPOTLIGHT (number of heads shown) EXIT SIGN (face & direction as shown)

WALL MOUNT LIGHT FIXTURE

CEILING LIGHT FIXTURE

TRACK & FIXTURE

STREET TYPE POLE FIXTURE

POLE MOUNTED LIGHT FIXTURE

EXTERIOR WALL MOUNT LIGHT FIXTURE

WALLPACK LIGHT FIXTURE

SPECIAL PURPOSE LIGHT FIXTURE

HIGH BAY LIGHT FIXTURE

EMERGENCY EGRESS LIGHT FIXTURE

(number of heads shown)

EMERGENCY LIGHT FIXTURE

FIXTURES

SWITCHES

SINGLE-POLE SWITCH

DIMMER SWITCH

TIME SWITCH

KEY SWITCH

MANUAL MOTOR SWITCH

THERMAL OVERLOAD SWITCH

SWITCH WITH PILOT LIGHT

FOUR-WAY SWITCH

THREE-WAY SWITCH

CIRCUITRY and RACEWAYS

UNDERFLOOR DUCT

BUS DUCT

PLUGMOLD AS SPECIFIED

WIREMOLD AS SPECIFIED

FLEXIBLE PIGTAILS/CONNECTIONS

"CONDUIT RUN CONTINUES" INDICATION

END OF CONDUIT RUN, CAP AND STAKE

END OF CONDUIT RUN

HOME RUN (with circuit numbers)

CONDUIT STUB DOWN

CONDUIT STUB UP

CONDUIT INSTALLED

CONDUIT INSTALLED

MECHANICAL

ELECTRIC WATER HEATER

ELECTRIC UNIT HEATER

PIPE TRACE HEATER

RESISTANCE HEATER, KW SHOWN

SINGLE PHASE MOTOR

SOUND and SIGNAL

INTERCOM OUTLET

MICROPHONE OUTLET

TELEVISION OUTLET

CHIME

BUZZER

VOLUME CONTROL

SPEAKER

SERVICE and EQUIPMENT

THERMOSTAT

CAPACITOR

ENCLOSED CIRCUIT BREAKER

TRANSFER SWITCH

WIREWAY

GROUND CONNECTION PER N.E.C.

TELEPHONE TERMINAL BOARD

GENERATOR, KW SHOWN

CURRENT TRANSFORMERS

UTILITY METER, AS REQUIRED

WEATHERHEAD

PANELBOARD, FLUSH MOUNTED

PANELBOARD, SURFACE MOUNTED

COMB. STARTER

MAGNETIC STARTER

DISCONNECT SWITCH

TRANSFORMER

CONTROL

xxVA connection by x/C) IRRIGATION CONTROLLER (120 volt

LIGHTING CONTACTOR

CONTROL TRANSFORMER

buttons indicated) PUSHBUTTON STATION (number of TIME CLOCK (24 hour U.O.N.)

PHOTOCELL (voltage as required)

HUMIDISTAT

DESIGNATIONS

(by E.C.)

(by others)

TT

G

WW

PC

CT

TS

T

H

TC

IC

T

1,3

OR

PM

WM

BD

UFD

B

F S

J

J

D

WH

PP

J

SWITCH STYLE OCCUPANCY SENSOROC

DIGITAL TIME SWITCH

POWER PACK

DUAL TECHNOLOGY SENSOR - 360° - 500 SQ FT

DUAL TECHNOLOGY SENSOR - 360° - 1000 SQ FT

ULTRASONIC SENSOR - 360° - 2 CIRCUIT

OCCUPANCY SENSOR / PHOTOCELL

WALL MOUNT DUAL TECHNOLOGY SENSOR

OS5

OS4

T

OS2

OS3

OS1

PP

CEILING MOUNTED WIFI

DIGITAL EQUIPMENT METER, AS REQUIRED

POLE

PUMP

PANEL

P

PNL

PVC

PRV-

P-

PB

POLY VINYL CLORIDE

POWER ROOF VENTILATOR

PULL BOX

GENERAL CONTRACTOR

GROUND

HUMIDIFIERH-

GND

GFI

GC

GROUND FAULT INTERUPTER

ABBREVIATIONS LEGEND

POWER

SWITCH

RECEPT

SF-

SWBD

TCC

SPEC

SW

RGC

RTU-

PWR

VOLTS

WATTS

UF

V

W

UL

VL

UNO

UH-

TS

TYP

TR

ROOF TOP UNIT

RECEPTACLE

SWITCHBOARD

UNDER FLOOR

SPECIFICATIONS

RIGID GALVANIZED STEEL CONDUIT

UNLESS NOTED OTHERWISE

UNDERWRITERS' LABORATORIES, INC.

TAMPER PROOF RECEPTACLE

TAMPER PROOF SWITCH

TEMPERATURE CONTROL CONTRACTOR

VERIFY LOCATION WITH OWNER

TYPICAL

UNIT HEATER

SUPPLY FAN

WITH

WITHOUT

W/

XFMR

W/O

WP

TRANSFORMER

WEATHER PROOF

HOUR

LIGHT

JUNCTION BOX

LIGHT CONTROL

ISOLATED GROUND

HORSEPOWER

MINIMUM

MOUNT

MAKE-UP AIR UNIT

MOTOR CONTROL CENTER

MAIN LUG ONLY

MOUNTED

MOUNTING

MAXIMUM

LIGHTING

LT FLEX

MTD

MUAU-

MTG

MLO

MIN

MT

MC

MAX

MCC

LTG

IG

LC

LT

IMC

JB

HR

HVAC

HOA

HP

NORMALLY CLOSED

NOT IN CONTRACT

NORMALLY OPEN

NOT TO SCALE

NIGHT LIGHTNL

NTS

NO

NIC

NC

HAND-OFF-AUTO SELECTOR SWITCH

HEATING/VENTILATING/AIR CONDITIONING

INTERMEDIATE METAL CONDUIT

LIQUID TIGHT FLEXIBLE METAL CONDUIT

MECHANICAL CONTRACTOR

HID HIGH INTENSITY DISCHARGE

A

AC

AFF

ACU-

AHJ

AHU-

AS

B-

BC

AIC

ATS

BLDG

CHLR-

CND (C)

CKT BKR

CKT

CUH-

CU-

DISC

DFU-

EF-

EC

DWH-

EBB-

DWG

CT-

EXIST (E)

EWC

FLEX

FLA

FLR

FSES

FLUOR

EMT

ABOVE FINISHED FLOOR

AIR CONDITIONING UNIT

AMPS

ABOVE COUNTER

AIR HANDLING UNIT

AUTOMATIC TRANSFER SWITCH

AMPS INTERUPTING CAPACITY

AUTHORITY HAVING JURISDICTION

ABOVE SHELF

BOILER

BUILDING

BELOW COUNTER

CHILLER

DOMESTIC WATER HEATER

CABINET UNIT HEATER

CIRCUIT

CIRCUIT BREAKER

CONDUIT

CONDENSING UNIT

COOLING TOWER

DUCT FURNACE

DRAWING

DISCONNECT

FOOD SERVICE EQUIP. SUPPLIER

ELECTRIC WATER COOLER

ELECTRICAL CONTRACTOR

ELECTRIC BASEBOARD

ELECTRICAL METALLIC TUBING

EXISTING

EXHAUST FAN

FLOOR

FLUORESCENT

FLEXIBLE CONDUIT

FULL LOAD AMPS

EM EMERGENCY

F/S FIRE/SMOKE

F…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .