DWGS 23403.pdf

PDF 2 MB Posted

Attached to
751/23403. CTS; Hartwick Pines SP - Flowmeter Install Proj.
Solicitation number
RFQ 171 260000000280 1
Issued by
Clinton County, Michigan

About this file

This file contains construction plans for the Michigan Department of Natural Resources and the Michigan Department of Technology, Management and Budget for the installation of effluent flowmeters and vaults at Hartwick Pines State Park in Grayling, Michigan. The project involves the installation of new effluent flowmeters with Badger Meter M2000 magnetic flow instruments, concrete vaults with casting and lids, approximately 80 to 104 linear feet of electrical conduit, electrical wiring and components, and comprehensive restoration of disturbed areas. Two project locations are specified: the Day Use Area, which includes a 6-foot diameter concrete manhole with one 3-inch diameter flowmeter, and the Visitors Center #2 location, which includes an 8-foot diameter concrete manhole with two 6-inch diameter flowmeters. The construction documents are dated for bidding as of May 1, 2026, with a preliminary issue date of March 13, 2026. Project contacts include Chris Schanbeck as MDTMB Project Director and Quinn Ridley, P.E. of Wade Trim, Inc. as the design engineer.

The contractor is responsible for obtaining all necessary permits, conducting utility locating through MISS DIG, managing soil erosion and sedimentation control in compliance with Michigan Part 91 regulations, dust control, tree protection, and restoration of all disturbed areas including drives, signs, landscaping, and plantings within one year of project completion. The contractor must submit shop drawings, maintain as-built drawings with exact dimensions and elevations for underground work, furnish two copies of operation and maintenance manuals in three-ring binders, arrange manufacturer startup services in the presence of the owner and engineer, and provide a one-year guarantee on all equipment, materials, and workmanship from the date of equipment startup or final project acceptance, whichever occurs first. All work is to be incidental to the construction contract except for specifically identified pay items. The existing 3-inch and 6-inch diameter PVC and ductile iron force mains must remain operational during construction until flowmeter installation, with owner notification required prior to any service interruption.

View the file

Other files

File Type Posted
Advertisment 23403.pdf PDF
Service Disabled Veteran Owned Business Info Sheet 2025.pdf PDF
SPECS 23403.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C :\P

W _W

O R

K2 \D

4\

PL

T-

TI

TL

E- D

AY

U

SE

A

R

EA

.D W

G P

LO

TT

ED

/3 0/

:5

PM

B Y

R

ID

LE

Y, Q U

IN

N

PR

O

JE

C

T M

AN

AG

ER

JOB NO.

SHEET

ISSUED FOR: DATE: BY:

W ad e

Tr im

G ro up , I nc

SEAL

REV# DATE BYDESCRIPTION

MICHIGAN DEPARTMENT OF NATURAL RESOURCES

AND THE

MICHIGAN DEPARTMENT OF TECHNOLOGY,

MANAGEMENT AND BUDGET

CONSTRUCTION PLANS FOR

HARTWICK PINES STATE PARK

Q U

IN

N

R

ID

LE

Y

DMB2048.01G

C0.0

BIDDING 05.01.26 QMR

H

AR

TW

IC

K

PI

N

ES

S

TA

TE

P

AR

K

- E

FF

LU

EN

T

FL

O W

M

ET

ER

S

AN

D

V

AU

LT

S

WORK INCLUDES: INSTALLATION OF NEW EFFLUENT FLOWMETERS AND VAULTS

WITH CASTING AND LIDS, ELECTRICAL WORK, AND RESTORATION.

KEY MAP

NOT TO SCALE

HARTWICK PINES STATE PARK

DAY USE AREA AND

PROJECT CONTACTS

CHRIS SCHANBECK, MDTMB PROJECT DIRECTOR

Design and Construction Division 3111 West St. Joseph Street Lansing, MI 48909 Phone: (989) 415-4077

KEN DAO, MDTMB FIELD REPRESENTATIVE

Design and Construction Division 3111 West St. Joseph Street Lansing, MI 48909 Phone: (517) 242-2268

SCOTT COOK

Michigan Department of Natural Resources Regional Planner 8717 N Roscommon Rd Roscommon, MI 48653 Phone: (989) 439-5164

MICHAEL SIGNORELLO

Michigan Department of Natural Resources Unit Supervisor Hartwick Pines State Park Phone: (989) 348-5293

QUINN RIDLEY, P.E.

WADE TRIM, INC.

4241 Old US 27 South, Suite 1 Gaylord, MI 49734 Phone: (989) 732-3584

P L U R I B U E

S U N U M

C I R C U M S P I C E

SI QU EREI S PENI NSUL AM AMOENA M

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE OF MICHIGAN

ADAM P. LACH, RA, DIRECTOR

STATE FACILITIES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

LOCATION MAP

NW PART GRAYLING TWP,

CRAWFORD COUNTY

NO SCALE

N

EFFLUENT FLOWMETERS AND VAULTS INSTALLATION

Wade Trim, Inc.

4241 Old US 27 S, Suite 1 PO Box 618 Gaylord, MI 49734

989.732.3584 | www.wadetrim.com

Know what's below.

before you dig.Call

R

CRAWFORD COUNTY, MICHIGAN

FILE NO. 751/23403.CTS

SHEET INDEX

GENERAL SHEETS SHEET NO.

COVER SHEET C0.0

LEGEND AND CONSTRUCTION NOTES C1.0

PROPOSED SITE PLAN AND DETAILS (DAY USE AREA) C2.0

PROPOSED SITE PLAN AND DETAILS (VISITORS CENTER #2) C2.1

ELECTRICAL ONE LINE DIAGRAM (DAY USE AREA) E1.0

ELECTRICAL ONE LINE DIAGRAM (VISITORS CENTER #2) E1.1

VISITORS CENTER #2

CRAWFORD COUNTY, MICHIGAN

SIGN POST

UNDERGROUND UTILITY MARKER

ELECTRIC HAND HOLE

GUY ANCHOR

GUY POLE

POWER POLE

PROPERTY CORNER (AS NOTED)

LIGHT POLE

BUILDING LINE

FENCE

EXISTING

LEGEND

PROPOSED

MINOR CONTOUR

MAJOR CONTOUR

ELECTRIC

TREE LINE

GATE VALVE

SECTION CORNER

SANITARY MANHOLE

SANITARY FORCE MAIN

BENCHMARK

RIGHT-OF-WAY LINE

GENERAL PLAN NOTES

SOIL EROSION AND SEDIMENTATION CONTROL NOTES

SOIL EROSION AND SEDIMENTATION CONTROL SHALL BE IN COMPLIANCE WITH PART 91 OF 1994 PA 451 (AS AMENDED) AND THE ASSOCIATED

PART 17 RULES.

EROSION AND ANY SEDIMENTATION FROM WORK ON THIS SITE SHALL BE CONTAINED ON THE SITE AND NOT ALLOWED TO COLLECT ON ANY OFF-SITE AREAS OR IN WATERWAYS. WATERWAYS INCLUDE BOTH NATURAL AND MANMADE OPEN DITCHES, STREAMS, STORM DRAINS, LAKES AND PONDS.

CONTRACTOR SHALL APPLY TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES WHEN REQUIRED AND/OR AS DIRECTED ON THESE PLANS. THE CONTRACTOR SHALL REMOVE TEMPORARY MEASURES AS SOON AS PERMANENT STABILIZATION OF SLOPES, DITCHES

AND OTHER EARTH CHANGES HAVE BEEN ACCOMPLISHED.

STAGING OF THE WORK SHALL BE DONE BY THE CONTRACTOR AS REQUIRED TO ENSURE PROGRESSIVE STABILIZATION OF DISTURBED

EARTH.

ALL MUD/DIRT TRACKED ONTO PAVED DRIVEWAYS/PARKING AREAS, OR STATE/COUNTY ROADS FROM THIS PROJECT DUE TO CONSTRUCTION, SHALL BE PROMPTLY REMOVED BY THE CONTRACTOR.

ALL DIRT STOCKPILED ON SITE FOR MORE THAN THIRTY DAYS SHALL BE SEEDED AND MULCHED.

PERMANENT SOIL EROSION CONTROL MEASURES FOR ALL SLOPES, CHANNELS, DITCHES, OR ANY DISTURBED LAND AREA SHALL BE COMPLETED WITHIN 5 CALENDAR DAYS AFTER FINAL GRADING OR THE FINAL EARTH CHANGE HAS BEEN COMPLETED.

WHEN IT IS NOT POSSIBLE TO PERMANENTLY STABILIZE A DISRUPTED AREA AFTER AN EARTH CHANGE HAS BEEN COMPLETED, OR WHERE SIGNIFICANT EARTH CHANGE ACTIVITY CEASES, TEMPORARY SOIL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED WITHIN 5

CALENDAR DAYS.

VEGETATION ON SLOPES GREATER THAN 3:1 AND DITCH BOTTOMS SHALL BE RESTORED WITH EROSION CONTROL BLANKETS AS INDICATED ON THE PLANS, OR AS REQUIRED BY THE ENGINEER. PAYMENT SHALL BE INCLUDED UNDER "SOIL EROSION AND SEDIMENTATION CONTROL."

THE CONTRACTOR SHALL CONTROL THE DUST IN THE CONSTRUCTION AREA DURING THE LIFE OF THE CONTRACT. THIS DUST CONTROL SHALL BE ACCOMPLISHED BY THE APPLICATION OF DUST CONTROL MATERIALS AND METHODS OF APPLICATION WHICH ARE IN ACCORDANCE WITH THE SPECIFICATIONS AND THE REQUIREMENTS OF THE MDNR. SUCH DUST CONTROL MATERIALS SHALL BE APPLIED AS OFTEN AS IS NECESSARY TO CONTROL THE DUST. PAYMENT FOR THE USE OF DUST CONTROL MATERIALS SHALL BE INCLUDED IN "SOIL EROSION AND

SEDIMENTATION CONTROL".

THIS CONTRACT CONSISTS OF INSTALLATION OF NEW EFFLUENT FLOWMETERS, CONCRETE VAULTS, ELECTRICAL CONDUIT AND WIRING, ELECTRICAL COMPONENTS, AND ALL ASSOCIATED RESTORATION.

PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL ATTEND A PRE-CONSTRUCTION MEETING, AT A TIME AND PLACE AS ARRANGED BY THE ENGINEER. THE CONTRACTOR SHALL DESIGNATE A REPRESENTATIVE CAPABLE OF, AND AUTHORIZED TO COMMUNICATE WITH THE OWNER AND REPRESENTATIVE(S) RELATIVE TO THE WORK QUALITY AND SCHEDULING. THE CONTRACTOR'S REPRESENTATIVE SHALL BE

ON-SITE AT ALL TIMES WHILE WORK IS IN PROGRESS.

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FAMILIARIZE HIMSELF WITH THE PROJECT AREA. THE CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED DURING THE WORK INCLUDING, BUT NOT LIMITED TO, DRIVES AND SIGNS TO ORIGINAL CONDITION WHETHER OR

NOT SHOWN ON PLANS.

UPON COMPLETION OF FINAL RESTORATION, PLACING OF TOPSOIL AND SOD, OR HYDROSEED, THE CONTRACTOR SHALL DISPOSE OF ALL CONSTRUCTION DEBRIS. THIS WORK WILL BE INCLUDED IN THE PAY ITEM "PROJECT RESTORATION".

ALL AREAS MAINTAINED AS LAWN AREAS, WHICH HAVE BEEN DISTURBED AND WHICH DO NOT HAVE AN IMPROVED TYPE OF SURFACE (CONCRETE, GRAVEL, ETC.), SHALL BE RESTORED WITH 3-INCHES OF TOPSOIL AND SEEDED WITH A TDS OR CLASS A LAWN MIX, UNLESS

OTHERWISE MARKED.

ALL PLANTINGS AND LANDSCAPING FEATURES DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE REPLACED IN KIND AT THE CONTRACTOR'S EXPENSE. CONTRACTOR SHALL MAINTAIN, REPAIR AND/OR REPLACE ALL PLANTINGS IF THEY FAIL TO SURVIVE FOR THE PERIOD ENDING ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OF THE PROJECT. COST TO BE INCLUDED IN "PROJECT RESTORATION".

RESTORATION AND/OR REPLACEMENT OF SIGNS, UTILITIES, STRUCTURES, LAWN AREAS, PLANTINGS, AND ANY OTHER FEATURES NOT SPECIFICALLY INDICATED ON THE PLANS THAT HAVE BEEN DAMAGED BY THE CONTRACTOR SHALL BE INCLUDED IN "PROJECT

RESTORATION."

RESTORATION NOTES

UTILITY NOTES

ALL EXISTING ELECTRICAL LINES SHOWN ON THE PLANS ARE APPROXIMATE ONLY AND ARE LOCATED BASED UPON INFORMATION FURNISHED BY THE CORRESPONDING UTILITY COMPANIES. THERE IS NO GUARANTEE AS TO THE COMPLETENESS OR ACCURACY OF THE LOCATION OF THESE UTILITIES. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR VERIFYING THE ACTUAL LOCATION, RESOLVING ANY CONFLICTS, AND THEIR PROTECTION DURING CONSTRUCTION AT NO ADDITIONAL COST. MISS DIG SHALL BE CONTACTED 3 FULL WORKING DAYS EXCLUDING HOLIDAYS AND WEEKENDS PRIOR TO ALL EXCAVATION AND CONSTRUCTION (800-482-7171).

ALL EXISTING ELECTRICAL LINES WHETHER SHOWN ON THE PLANS OR NOT, SHALL BE SUPPORTED BY THE CONTRACTOR IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNERS OF THE UTILITIES. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE INTEGRITY OF EXISTING UTILITIES AT ALL TIMES. ALL WORK REQUIRED TO MAINTAIN THE INTEGRITY OF EXISTING UTILITIES SHALL BE INCIDENTAL TO THE PROJECT UNLESS OTHERWISE NOTED ON THE PLANS OR IN THE SPECIFICATIONS. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPORTED IMMEDIATELY TO THE APPROPRIATE UTILITY OWNER AND SHALL BE REPAIRED IMMEDIATELY AT THE CONTRACTOR'S EXPENSE.

THE CONTRACTOR SHALL MAKE ANY NECESSARY ARRANGEMENTS WITH UTILITY COMPANIES FOR RELOCATION OF EXISTING UTILITIES IF NECESSARY. THESE ARRANGEMENTS SHALL BE MADE IN SUFFICIENT TIME TO ALLOW THE RELOCATION WORK TO BE COMPLETED WITHOUT INTERFERING WITH OR DELAYING THE PROJECT SUBSTANTIAL COMPLETION OR FINAL COMPLETION DATES.

PERMITS

THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND PAYING FOR ANY PERMITS REQUIRED AND FOR PERFORMING CONSTRUCTION IN

ACCORDANCE WITH THE PERMITS AT NO ADDITIONAL COST TO THE OWNER.

TREE PROTECTION

DURING THE DURATION OF THE PROJECT, THE CONTRACTOR SHALL PROTECT ALL TREES AND BUSHES, UNLESS OTHERWISE INDICATED ON THE PLANS. EXCAVATION AND GRADING NEAR TREES SHALL BE KEPT TO A MINIMUM. CONTRACTOR SHALL NOT CUT TREES NOR DISRUPT ROOT SYSTEMS OF TREES EXCEPT WHERE SPECIFICALLY AUTHORIZED AND MARKED IN THE FIELD BY THE ENGINEER.

THE CONTRACTOR SHALL BACKFILL EXPOSED ROOT ENDS AS SOON AS POSSIBLE, AND WHEN NECESSARY, CUT ROOTS AND BRANCHES CLEANLY. THE CONTRACTOR SHALL NOT TEAR ROOTS OR BRANCHES, PARK OR OPERATE MACHINERY WITHIN THE ROOT ZONE, OR STORE

MATERIALS WITHIN THE ROOT ZONE.

SIGN RELOCATION

ANY SIGNS REQUIRING RELOCATION DUE TO CONSTRUCTION OPERATIONS SHALL BE SALVAGED AND RESET BY THE CONTRACTOR AT LOCATIONS DESIGNATED BY THE ENGINEER. PAYMENT FOR THIS WORK SHALL BE INCLUDED IN "PROJECT RESTORATION".

BASIS FOR PAYMENT

ONLY THOSE ITEMS SPECIFICALLY IDENTIFIED ON THE PROPOSAL AS PAY ITEMS SHALL BE USED AS THE BASIS FOR PAYMENT. ALL OTHER

ITEMS OF WORK SHALL BE INCIDENTAL TO CONSTRUCTION.

STEWARDSHIP/ARTIFACT NOTE

IF ANY ARTIFACTS ARE DISCOVERED DURING THE CONSTRUCTION PROCESS, ALL WORK IS TO STOP AND THE OWNER'S REPRESENTATIVE/PROJECT MANAGER SHALL BE NOTIFIED. ARTIFACTS OR ARCHEOLOGICAL MATERIALS ARE DEFINED AS: ABORIGINAL ANTIQUITIES AND OTHER RECORDS ON ANTIQUITY, INCLUDING MOUNDS, MINES, EARTHWORKS, VILLAGE SITES, CAMP SITE, BURIALS, HUMAN OR OTHER BONES, SHELLS, STONE IMPLEMENTS, BONE OR COPPER IMPLEMENTS, POTTERY OR SHARDS OF POTTERY, OR OTHER OBJECTS RELATING TO NATIVE AMERICAN OCCUPATION; AND MODERN ARTIFACTS, SUCH A FORTS, RELICS, AND OTHER ARTIFACTS RELATING TO THE

HISTORIC, COLONIAL TERRITORIAL AND EARLY STATEHOOD PERIODS.

SEWER VENT

SHOP DRAWINGS

SUBMIT COMPLETE PDF ELECTRONIC COPIES OF ALL EQUIPMENT AND MATERIALS TO THE ENGINEER FOR APPROVAL BEFORE FABRICATION OF WORK OR ORDERING OF EQUIPMENT. ALL SHOP DRAWINGS NOT APPROVED SHALL BE REVISED OR CORRECTED AND RESUBMITTED TO THE

ENGINEER FOR APPROVAL BEFORE ORDERING EQUIPMENT.

CONTRACTOR'S RECORD/AS-BUILT DRAWINGS

CONTRACTOR SHALL MAINTAIN AND KEEP AN UP-TO-DATE, NEAT AND LEGIBLE SET OF DRAWINGS REFLECTING "AS-BUILT" CONDITIONS OF THEIR WORK AS IS REQUIRED BY THIS CONTRACT. CONTRACTOR SHALL INDICATE EXACT DIMENSIONS AND ELEVATIONS FOR ALL UNDERGROUND WORK. UPON COMPLETION OF THIS PROJECT, THE CONTRACTOR SHALL DELIVER TO THE ENGINEER THE AS-BUILT DRAWINGS.

OPERATION AND MAINTENANCE MANUALS

CONTRACTOR SHALL FURNISH TO THE ENGINEER TWO (2) COPIES OF THREE RING BINDER BOOKS WITH TABS FOR SECTIONS COVERING EACH ITEM OF EQUIPMENT. NOTEBOOKS SHALL INCLUDE SHOP DRAWINGS, MAINTENANCE MANUALS, OPERATING MANUALS AND PARTS LISTS AS NECESSARY TO INSTRUCT OWNER ON PROPER OPERATION AND MAINTENANCE OF EQUIPMENT FOR THIS PROJECT. THESE MANUALS SHALL BE HARDBOUND N BEST QUALITY BINDERS AND SUBMITTED TO THE ENGINEER FOR APPROVAL AT THE SUBSTANTIAL COMPLETION OF THE

PROJECT.

START-UP SERVICES

CONTRACTOR SHALL ARRANGE WITH EQUIPMENT MANUFACTURERS FOR PROVIDING COMPLETE STARTUP SERVICES FOR ALL EQUIPMENT ON THIS PROJECT. ALL START-UP SERVICES SHALL BE PERFORMED IN THE PRESENCE OF THE OWNER AND ENGINEER. A WRITTEN REPORT SHALL BE SUBMITTED TO THE ENGINEER STATING DATE OF START-UP SERVICES AND MANUFACTURER'S APPROVAL OF SYSTEM OPERATION AND

INSTALLATION .

GUARANTEE

CONTRACTOR SHALL GUARANTEE EQUIPMENT, MATERIALS AND WORKMANSHIP IN THIS CONTRACT AND SHALL MAKE GOOD AT THE CONTRACTOR SOLE EXPENSE ANY DEFECTS WHICH MAY DEVELOP WITHIN ONE (1) YEAR AFTER START-UP OF EACH PIECE OF EQUIPMENT OR

FINAL ACCEPTANCE OF THE JOB, WHICH EVER OCCURS FIRST.

LE

G

EN

D

A N

D C

O N

ST

R

U C

TI

O

N N

O

TE

S

JOB NO.

SHEET

ISSUED FOR: DATE:

R

EV

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

BY:

W ad e

Tr im

G ro up , I nc

C :\P

W _W

O R

K2 \D

4\

SH

T-

C D

P-

LE

G

EN

D A

N D

C O

N

ST

R U

C

TI

O N

N O

TE

S.

D W

G P

LO

TT

ED

/3 0/

:0

PM

B Y

R

ID

LE

Y, Q U

IN

N

PR

O

JE

C

T M

AN

AG

ER

DMB2048.01G

D

EP

AR

TM

EN

T

O F

N

AT

U R

AL

R

ES

O

U R

C

ES

H

AR

TW

IC

K

PI

N

ES

S

TA

TE

P

AR

K

G R

AY

LI

N G

, M I 4

EF

FL

U

EN

T

FL

O W

M

ET

ER

A

N D

V

AU

LT

PRELIM 03.13.26 QMR

BIDDING 05.01.26 QMR

H

AR

TW

IC

K

PI

N

ES

S

TA

TE

P

AR

K

- E

FF

LU

EN

T

FL

O W

M

ET

ER

A

N D

V

AU

LT

Q U

IN

N

M R

ID

LE

Y, P

E

O ld

U S

S

Su ite

9.

2.

G ay lo rd

, M I 4 w w w .w ad et rim .c om

PO

B ox

PROPOSED ELECTRICAL

CONDUIT, EST. 80 LFT

PROPOSED 3-INCH DIA

MAGNETIC FLOWMETER IN

6-FT DIA CONCRETE MANHOLE

E

E

E

E

E

E

E

E

E

E E

S

CONNECT TO EX ELECTRICAL PANEL

LOCATED IN UTILITY ROOM, SEE

ELECTRICAL PLAN ON E1.0. INSTALL

METER READOUT IN UTILITY ROOM.

EXISTING SEPTIC TANKS, DOSING

TANK AND VALVE CHAMBER, TO

REMAIN IN PLACE

DAY USE

PAVILION

EXISTING 3-INCH DIA PVC FORCE MAIN.

FORCE MAIN SHALL REMAIN IN OPERATION

DURING COURSE OF CONSTRUCTION UNTIL

FLOWMETER INSTALLATION. NOTIFY OWNER

PRIOR TO ANY INTERRUPTION IN SERVICE.

JOB NO.

SHEET

ISSUED FOR: DATE:

R

EV

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

BY:

W ad e

Tr im

G ro up , I nc

C :\P

W _W

O R

K2 \D

4\

SH

T-

C

SP

-S

IT

E

PL

AN

.D

W G

P

LO

TT

ED

/3

0/

:5

PM

B

Y R

ID

LE

Y, Q

U

IN

N

PR

O

JE

C T

M

AN

AG

ER

DMB2048.01G

D

EP

AR

TM

EN

T

O F

N

AT

U R

AL

R

ES

O

U R

C

ES

H

AR

TW

IC

K

PI

N

ES

S

TA

TE

P

AR

K

G R

AY

LI

N G

, M I 4

EF

FL

U

EN

T

FL

O W

M

ET

ER

A

N D

V

AU

LT

PRELIM 03.13.26 QMR

BIDDING 05.01.26 QMR

H

AR

TW

IC

K

PI

N

ES

S

TA

TE

P

AR

K

- E

FF

LU

EN

T

FL

O W

M

ET

ER

A

N D

V

AU

LT

Q U

IN

N

M R

ID

LE

Y, P

E

O ld

U S

S

Su ite

9.

2.

G ay lo rd

, M I 4 w w w .w ad et rim .c om

PO

B ox

D

AY

U

SE

A R

EA

SI

TE

P

LA

N

A N

D D

ET

AI

LS

PROPOSED SITE PLAN

SCALE: 1''=10'

N

HORIZONTAL SCALE IN FEET

10 5 10 20

EFFLUENT FLOWMETER AND VAULT DETAIL

SCALE: 1''=2'

100% GRANULAR MATERIAL

BACKFILL ALL AROUND

STRUCTURE

EMBED CASTING IN

1" MORTAR BED

3-INCH DIA MAGNETIC FLOWMETER,

BADGER METER M2000 (OR

APPROVED EQUIVALENT)

PROVIDE WATERTIGHT

RUBBER GASKET AT

EACH JOINT

12" CRUSHED STONE

3-INCH DIA PVC EFFLUENT

FORCE MAIN

3-INCH DIA MAGNETIC

FLOWMETER, BADGER METER

M2000 (OR APPROVED

EQUIVALENT)

3-INCH DIA PVC EFFLUENT

FORCE MAIN (TYP)

6-FT DIA CONCRETE

MANHOLE6'-0"

M

IN

8-INCH PRECAST CONCRETE

BASE SLAB WITH 24" DIA

SUMP HOLE.

24" DIA

HOLE

NON-SHRINK GROUT PERIMETER

OF BASE AND AROUND EXISTING

SEWER MAIN AT "DOGHOUSE" OPENINGS,

PLACE BRICK OR BLOCK UNDER PIPE AND

WHERE NECESSARY

STAINLESS STEEL PIPE

SUPPORT, TYP OF 2

COMPACTED SAND

SUBGRADE

STAINLESS STEEL PIPE

SUPPORT, TYP OF 2

PLACE FRAME AND FLAT

TOP COVER (1040A SAN)

24" DIA

CLEAR OPENING

CONCRETE

GRADE RINGS

FINISHED GRADE. SLOPE

GROUND AWAY FROM CASTING

S

E

E

PROPOSED ELECTRICAL

CONDUIT, EST. 24 LFT

PROPOSED 6-INCH DIA

MAGNETIC FLOWMETER(S) IN

8-FT DIA CONCRETE MANHOLE

INSTALL METER/SENSOR

READOUTS INSIDE EX

CONTROL PANEL

EXISTING 6-INCH DIA DI FORCE MAINS. A

MINIMUM OF ONE OF THE FORCE MAINS

SHALL REMAIN IN OPERATION FOR

UNINTERRUPTED SERVICE AT ALL TIMES.

COORDINATE WITH OWNER TO ALTERNATE

FLOWS/FIELD ZONES AS NECESSARY. NOTIFY

OWNER PRIOR TO ANY INTERRUPTION IN

SERVICE.

EXISTING SEPTIC TANKS, DOSING

TANK AND VALVE CHAMBER, TO

REMAIN IN PLACE

JOB NO.

SHEET

ISSUED FOR: DATE:

R

EV

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

BY:

W ad e

Tr im

G ro up , I nc

C :\P

W _W

O R

K2 \D

4\

SH

T-

C

SP

-S

IT

E

PL

AN

.D

W G

P

LO

TT

ED

/3

0/

:5

PM

B

Y R

ID

LE

Y, Q

U

IN

N

PR

O

JE

C T

M

AN

AG

ER

DMB2048.01G

D

EP

AR

TM

EN

T

O F

N

AT

U R

AL

R

ES

O

U R

C

ES

H

AR

TW

IC

K

PI

N

ES

S

TA

TE

P

AR

K

G R

AY

LI

N G

, M I 4

EF

FL

U

EN

T

FL

O W

M

ET

ER

A

N D

V

AU

LT

PRELIM 03.13.26 QMR

BIDDING 05.01.26 QMR

H

AR

TW

IC

K

PI

N

ES

S

TA

TE

P

AR

K

- E

FF

LU

EN

T

FL

O W

M

ET

ER

A

N D

V

AU

LT

Q U

IN

N

M R

ID

LE

Y, P

E

O ld

U S

S

Su ite

9.

2.

G ay lo rd

, M I 4 w w w .w ad et rim .c om

PO

B ox

VI

SI

TO

R

S C

EN

TE

R

SI

TE

P

LA

N

A N

D D

ET

AI

LS

PROPOSED SITE PLAN

SCALE: 1''=10'

N

HORIZONTAL SCALE IN FEET

10 5 10 20

EFFLUENT FLOWMETER AND VAULT DETAIL

SCALE: 1''=2'

6-INCH DIA MAGNETIC

FLOWMETER, BADGER METER

M2000 (OR APPROVED

EQUIVALENT), TYP OF 2

6-INCH DIA DUCTILE IRON

EFFLUENT FORCE MAIN (TYP)

8'-0"

8-FT DIA CONCRETE

MANHOLE

PROVIDE WATERTIGHT

RUBBER GASKET AT

EACH JOINT

8'-0"

M

IN

24" DIA

CLEAR OPENING

6-INCH DIA MAGNETIC FLOWMETER,

BADGER METER M2000 (OR

APPROVED EQUIVALENT, TYP OF 2)

6-INCH DIA DUCTILE IRON

EFFLUENT FORCE MAIN

8-INCH PRECAST CONCRETE

BASE SLAB WITH 24" DIA

SUMP HOLE.

STAINLESS STEEL PIPE

SUPPORT, TYP OF 2

100% GRANULAR MATERIAL

BACKFILL ALL AROUND

STRUCTURE

12" CRUSHED STONE

COMPACTED SAND

SUBGRADE

EMBED CASTING IN

1" MORTAR BED

PLACE FRAME AND FLAT

TOP COVER (1040A SAN)

CONCRETE

GRADE RINGS

FINISHED GRADE. SLOPE

GROUND AWAY FROM CASTING

NON-SHRINK GROUT PERIMETER

OF BASE AND AROUND EXISTING

SEWER MAIN AT "DOGHOUSE" OPENINGS,

PLACE BRICK OR BLOCK UNDER PIPE AND

WHERE NECESSARY

24" DIA

HOLE

JOB NO.

SHEET

ISSUED FOR: DATE:

R

EV

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

BY:

W ad e

Tr im

G ro up , I nc

C :\P

W _W

O R

K2 \D

4\

SH

T-

C

SP

-S

IT

E

PL

AN

.D

W G

P

LO

TT

ED

/2

8/

:5

AM

B

Y R

ID

LE

Y, Q

U

IN

N

PR

O

JE

C T

M

AN

AG

ER

DMB2048.01G

D

EP

AR

TM

EN

T

O F

N

AT

U R

AL

R

ES

O

U R

C

ES

H

AR

TW

IC

K

PI

N

ES

S

TA

TE

P

AR

K

G R

AY

LI

N G

, M I 4

EF

FL

U

EN

T

FL

O W

M

ET

ER

A

N D

V

AU

LT

PRELIM 03.13.26 QMR

BIDDING 05.01.26 QMR

H

AR

TW

IC

K

PI

N

ES

S

TA

TE

P

AR

K

- E

FF

LU

EN

T

FL

O W

M

ET

ER

A

N D

V

AU

LT

Q U

IN

N

M R

ID

LE

Y, P

E

O ld

U S

S

Su ite

9.

2.

G ay lo rd

, M I 4 w w w .w ad et rim .c om

PO

B ox

D

AY

U

SE

A R

EA

SI

TE

P

LA

N

A N

D D

ET

AI

LS

N

HORIZONTAL SCALE IN FEET

10 5 10 20

EXISTING LOAD CENTER

NOTES

EXISTING 240/120V

EXISTING MECHANICAL BUILDING

1. ALL POWER CONDUCTORS TO BE COPPER, THWN-2 INSULATION

2. ALL 4-20mA SIGNAL CONDUCTORS SHALL BE TIN-PLATED COPPER, STRANDED 16AWG, PVC INSULATION, AND SHIELDED, BELDEN 9316

3. DIRECT BURY CONDUITS MINIMUM 24" BELOW GRADE

4. JUNCTION BOXES WITHIN METER VAULT SHALL BE NEMA 4X

STAINLESS STEEL.

5. JUNCTION BOXES WITHIN MECHANICAL BUILDING SHALL BE NEMA 12

GALVANIZED STEEL.

6. PVC COATED RIGID STEEL CONDUIT SHALL CONFORM TO UL-6, ANSI

C80.1 AND ETL PVC-001

1/2"C, 2#14+1#14GND

15A 1P

15A 1P

INSTALL TWO

CIRCUIT BREAKERS

LED DISPLAY

L N G

4-m A

L N G

1"C, 1#16 SHIELDED

TWISTED PAIR

1"C, 2#12, 1#12GND

MAG METER

3/4"C, 1#16 SHIELDED

TWISTED PAIR

3/4"C, 2#12, 1#12GND

METER VAULT

PVC SCHEDULE 80

CONDUIT

PVC COATED RGS

CONDUIT

PVC SCHEDULE 80

CONDUIT

12" SEPARATION

JB JB

JB JB

1/2"C, 2#12, 1#12GND

1/2"C, 1#16 SHIELDED

TWISTED PAIR

EMT CONDUIT

EMT CONDUIT EMT CONDUIT

PVC COATED RGS

CONDUIT

JOB NO.

SHEET

ISSUED FOR: DATE:

R

EV

D

AT

E

BY

D

ES

C

R

IP

TI

O

N

BY:

W ad e

Tr im

G ro up , I nc

C :\P

W _W

O R

K2 \D

4\

SH

T-

C

SP

-S

IT

E

PL

AN

.D

W G

P

LO

TT

ED

/2

8/

:5

AM

B

Y R

ID

LE

Y, Q

U

IN

N

PR

O

JE

C T

M

AN

AG

ER

DMB2048.01G

D

EP

AR

TM

EN

T

O F

N

AT

U R

AL

R

ES

O

U R

C

ES

H

AR

TW

IC

K

PI

N

ES

S

TA

TE

P

AR

K

G R

AY

LI

N G

, M I 4

EF

FL

U

EN

T

FL

O W

M

ET

ER

A

N D

V

AU

LT

PRELIM 03.13.26 QMR

BIDDING 05.01.26 QMR

H

AR

TW

IC

K

PI

N

ES

S

TA

TE

P

AR

K

- E

FF

LU

EN

T

FL

O W

M

ET

ER

A

N D

V

AU

LT

Q U

IN

N

M R

ID

LE

Y, P

E

O ld

U S

S

Su ite

9.

2.

G ay lo rd

, M I 4 w w w .w ad et rim .c om

PO

B ox

VI

SI

TO

R

S C

EN

TE

R

SI

TE

P

LA

N

A N

D D

ET

AI

LS

N

HORIZONTAL SCALE IN FEET

10 5 10 20

EXISTING PUMP CONTROL PANEL

NOTES

EXISTING 240/120V

EXISTING CONTROL PANEL

1. ALL POWER CONDUCTORS TO BE COPPER, THWN-2 INSULATION

2. ALL 4-20mA SIGNAL CONDUCTORS SHALL BE TIN-PLATED COPPER, STRANDED 16AWG, PVC INSULATION, AND SHIELDED, BELDEN 9316

3. DIRECT BURY CONDUITS MINIMUM 24" BELOW GRADE

4. JUNCTION BOXES WITHIN METER VAULT SHALL BE NEMA 4X

STAINLESS STEEL.

5. JUNCTION BOXES WITHIN CONTROL PANEL SHALL BE NEMA 12

GALVANIZED STEEL.

6. PVC COATED RIGID STEEL CONDUIT SHALL CONFORM TO UL-6, ANSI

C80.1 AND ETL PVC-001

60A 2P

1/2"C, 2#14+1#14GND

15A 1P

15A 1P

15A 1P

INSTALL THREE

CIRCUIT BREAKERS

LED DISPLAY

L N G LNG

LED DISPLAY

4-m A

L N G

1"C, 2#16 SHIELDED

TWISTED PAIR

MAG METER

L N G

1"C, 4#12, 1#12GND

MAG METER

1/2"C, 1#16 SHIELDED

TWISTED PAIR

1/2"C, 1#16 SHIELDED

TWISTED PAIR

4-m A

3/4"C, 1#16 SHIELDED

TWISTED PAIR

3/4"C, 1#16 SHIELDED

TWISTED PAIR

3/4"C, 2#12, 1#12GND

3/4"C, 2#12, 1#12GND

METER VAULT

PVC SCHEDULE 80

CONDUIT

PVC COATED RGS

CONDUIT

PVC SCHEDULE 80

CONDUIT

12" SEPARATION

JB JB

JB JB

1/2"C, 4#12+1#12GND

EMT CONDUIT EMT CONDUIT

EMT CONDUITEMT CONDUIT

PVC COATED RGS

CONDUIT

PVC COATED RGS

CONDUIT

PVC COATED RGS

CONDUIT