DWGs 2017 CMCF West Admin.pdf

PDF 5 MB Posted

Attached to
472/25362. CTS; Central MI CF - Various HVAC Imprvmnt
Solicitation number
RFP-171-250000002855-2
Issued by
Gogebic County, Michigan

About this file

The document is a set of architectural and engineering design drawings for the Administration Building HVAC System Repair/Replace project at the Central Michigan Correctional Facility located at 320 N. Hubbard in St. Louis, Michigan. The project is being managed by WTA Architects and MacLellan Associates, with detailed mechanical and electrical plans for comprehensive HVAC system renovations. The drawings include floor plans, mechanical room demolition and reconstruction plans, mechanical details, and electrical demolition and revision documents, with a project number of 2016094 dated May 12, 2016.

The technical drawings provide extensive details for replacing and upgrading the facility's HVAC infrastructure, including specific plans for condenser boiler heating, hot water systems, base-mounted pump piping, circulation pumps, volume box ducting, and electrical system modifications. The drawings include comprehensive schedules for volume boxes, mechanical equipment, and electrical components, with notations detailing specific installation requirements, equipment specifications, and technical considerations for the renovation project. The plans appear to be a complete technical package for a systematic replacement and upgrade of the existing HVAC and electrical systems within the correctional facility's administration building.

View the file

Other files

File Type Posted
DWG CMCF overall.pdf PDF
RFP Billable Rate 25362 (1).pdf PDF
LEIN Request 25362.pdf PDF
Addendum 1 - 25362.pdf PDF
DWGs 2017 CMCF East FS.pdf PDF
SAMPLE Billable Rate Contract (Rev 04-25).pdf PDF
DWGs 1989 St Louis Temp.pdf PDF
Proj State 25362.pdf PDF
DWGs 1999 St Louis LVL1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TS-2016094 cd

5-11-17-2016-1558 Visitor Center Renovations MECH SET
5-11-17-2016-1558-M1.01-HVAC-NEW Model (1)
5-11-17-2016-1558-M1.02-MECH RM-DEMO-NEW Model (1)
5-11-17-2016-1558-M1.03-MECH RM-DET Model (1)
5-11-17-2016-1558-M1.04-MECH SCHED Model (1)

05 11 17 Visitor Center Renovations, Central Michigan MDOC Facility ELEC E1.01

File details come from the government source that posted it. Updated .