DWGs 1 - 24257.pdf
PDF 23 MB Posted
- Solicitation number
- RFQ-171-250000000574-2
- Issued by
- Wayne County, Flint City, Michigan
About this file
This document is a comprehensive set of mechanical and plumbing design drawings for a Department of Technology, Management and Budget project at the Saginaw Correctional Facility (SRF). The project involves domestic hot water and HVAC upgrades across multiple buildings (Buildings 100, 200, 400, 500, 600, 700, 800, 900, and 1200). The scope includes demolishing existing domestic water heaters, expansion tanks, piping, and associated accessories, and installing new indirect domestic water heaters, expansion tanks, piping, valves, and control components. The project is designed to integrate new equipment with existing DDC control panels and BAS systems, with careful phasing to maintain operational continuity throughout the construction process.
The project requires precise coordination, with contractors mandated to ensure continuous domestic hot water systems during construction and to perform work only during pre-approved short shutdowns. Specific requirements include installing new 24-volt combination fire/smoke damper actuators, connecting new equipment to existing control systems, and re-certifying the fire alarm system post-construction. The drawings provide detailed mechanical and plumbing symbols, notes, schedules for dampers, gas regulators, pumps, and boilers, and include specific installation instructions for concrete pad preparations, piping connections, and control integrations. The project emphasizes maintaining facility operations, safety protocols, and existing system functionality throughout the upgrade process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9625 PIERCE ROAD,
FREELAND, MI 48623
FILE NUMBER: 472/24257.CTS
MATRIX PROJECT NUMBER: 24314.00MECHANICAL/ELECTRICAL ENGINEER
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
FOR DEPARTMENT OF CORRECTIONS
SAGINAW CORRECTIONAL FACILITY (SRF) - DOMESTIC HOT WATER AND HVAC UPGRADES
N SITE MAP
ELECTRICAL DRAWING INDEXPLUMBING DRAWING INDEX MECHANICAL DRAWING INDEX
P-000
TITLE SHEET
DBP
CAT
24314.00
472/24257.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
7/28/2025 CD SET
PLUMBING ABBREVIATIONS
PLUMBING SYMBOLS LEGEND
PLUMBING PIPING PLUMBING EQUIPMENT
1. ALL PLUMBING WORK SHALL CONFORM TO MICHIGAN
PLUMBING CODE, LATEST APPLICABLE EDITION, AND ALL
APPLICABLE LOCAL CODES.
2. INSTALL ALL EQUIPMENT, MATERIALS, AND
ACCESSORIES PER MANUFACTURERS WRITTEN
INSTRUCTIONS.
3. INSTALL ISOLATION BALL VALVES @ ALL FIXTURE WATER
SUPPLY LINES.
4. CONTRACTOR SHALL DEMOLISH & REMOVE EXISTING
PIPING, FITTINGS, & EQUIPMENT AS REQUIRED FOR NEW
INSTALLATIONS. VALVE & CAP PIPING TO REMAIN.
5. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY
CONFLICT WITH NEW CONSTRUCTION AND RELOCATE
AS NEEDED.
6. NOTIFY OWNER OF ANY PIPING DEMOLITION THAT MAY
AFFECT NORMAL OPERATION OF OTHER AREAS.
7. PROVIDE AIR ELIMINATION DEVICES FOR EACH
PLUMBING SYSTEM.
8. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES,
LOCATION, ELEVATIONS, AND DETAILS OF ALL EXISTING
CONDITIONS THAT MAY AFFECT THE WORK.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING THE INTEGRITY OF ALL EQUIPMENT AND
MATERIALS IN A "NEW" CONDITION DURING
CONSTRUCTION.
10. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED
BY LAW.
11. DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE
WITH THE CODES AND REGULATIONS ENFORCED BY
LOCAL BUILDING OFFICIALS.
12. IF THERE IS CONFLICTING INFORMATION IN THE PLANS
OR SPECIFICATIONS THE MORE STRINGENT AND
GREATER COST ITEM SHALL BE USED.
13. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND SUGGESTED ROUTES. IT IS
NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS,
PRESERVE HEADROOM AND KEEP OPENINGS AND
PASSAGEWAYS CLEAR. DO NOT SCALE FROM
DRAWINGS.
14. PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF
PIPING AND EQUIPMENT SHALL BE COORDINATED WITH
BUILDING STRUCTURE, EQUIPMENT FURNISHED, AND
ALL OTHER TRADES PRIOR TO INSTALLATION. ANY
CONTRACTOR INSTALLING WORK WITHOUT PRIOR
COORDINATION SHALL RELOCATE HIS WORK AT HIS
EXPENSE TO ALLOW PROPER INSTALLATION OF ANY
AND ALL TRADES WORK.
15. PROVIDE ISOLATION SEPARATORS FOR COPPER PIPING
RUNNING THROUGH METAL STUDS.
16. PROVIDE FIRE STOPPING AT ALL PENETRATIONS OF FIRE
RATED ENCLOSURES.
17. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH
POST CONSTRUCTION MEETING WITH THE ENGINEER
AND OWNER TO REVIEW AND FIX ISSUES DURING THE
WARRANTY PERIOD.
18. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO
OWNER OF THE AMOUNT OF MATERIAL BEING RECYCLED
THROUGHOUT THE PROJECT.
19. CONTRACTOR WILL HAVE 1 ESCORT TO WORK WITH
THROUGHOUT THE PROJECT.
20. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY
IN ADVANCE FOR ANY HOT WORK TO ALLOW THE
OWNER TO DISABLE THE FIRE ALARM.
21. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES
SHALL USE TAMPERPROOF SCREWS.
22. CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS
REQUIRED TO CONNECT NEW EQUIPMENT TO THE
EXISTING DDC CONTROL PANEL AND JCI METASYS BAS.
CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS
REQUIRED TO INTEGRATE ALL NEW EQUIPMENT INTO
THE EXISTING FRONT-END GRAPHICS.
GENERAL PLUMBING NOTES
MISCELLANEOUS NOTES
PLUMBING VALVES
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
AD AREA DRAIN
ASR AUTOMATIC SPRINKLER RISER
BFS BELOW FLOOR SLAB
BWV BACK WATER VALVE
CB CATCH BASIN
CI CAST IRON
CO CLEAN OUT
CV CONTROL VALVE
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DWH DOMESTIC WATER HEATER
E.T.C. ELECTRICAL TRADES CONTRACTOR
EWC ELECTRIC WATER COOLER
EXIST EXISTING
FD FLOOR DRAIN
FC FINAL CONNECTIONS
FDC FIRE DEPT. CONNECTION
FF FINISH FLOOR
FHV FIRE HOSE VALVE
FT FEET
GAL GALLON
GD GARBAGE DISPOSAL
GI GREASE INTERCEPTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIB
HD HEAD (FT)
HP HORSE POWER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
LAV LAVATORY
LT LAUNDRY TRAY
MA MEDICAL AIR
MAX MAXIMUM
MGC MEDICAL GAS CONSOLE
MH MAN HOLE
MIN MINIMUM
MS MOP SINK
M.T.C. MECHANICAL TRADES CONTRACTOR
NTS NOT TO SCALE
ORD OVERFLOW ROOF DRAIN
OXY OXYGEN
P PUMP
PD PRESSURE DROP
PVC POLY-VINYL-CHLORIDE
RC RAIN CONDUCTOR
RD ROOF DRAIN
RI ROUGH-IN
REQ'D REQUIRED
SAN SANITARY
SHWR SHOWER
SK SINK
SP STAND PIPE
SQ. FT. SQUARE FEET
SS SERVICE SINK
ST STORM
S&W STOP & WASTE
STR STRAINER
SV STACKED VENT
TYP. TYPICAL
UR URINAL
VB VACUUM BREAKER
VS VENT STACK
V.F.D VARIABLE FREQUENCY DRIVE
VTR VENT THRU ROOF
W WASTE
WB WET BULB
WC WATER CLOSET
WH WALL HYDRANT
WS WASTE STACK
W&V WASTE AND VENT
X-CW EXIST. CW PIPING
ITEM
EXISTING
COLD WATER
COLD WATER BELOW FINISH SLAB
HOT WATER
HOT WATER BELOW FINISH SLAB
HOT WATER RETURN
HOT WATER RETURN BELOW FINISH SLAB
SOFTENED WATER
SOFTENED WATER BELOW FINISH SLAB
SOFTENED WATER RETURN
SOFTENED WATER RETURN BELOW FINISH
SLAB
TEMPERED WATER
TEMPERED WATER BELOW FINISH SLAB
TEMPERED WATER RETURN
TEMPERED WATER RETURN BELOW FINISH
SLAB
DEIONIZED WATER
DEIONIZED WATER BELOW FINISH SLAB
REVERSE OSMOSIS WATER
REVERSE OSMOSIS WATER RETURN BELOW
FINISH SLAB
FIRE PROTECTION
GAS (NATURAL)
GAS (LIQUID PETROLEUM)
ACID RESISTANT
VENT ACID RESISTANT WASTE
ACID RESISTANT WASTE BELOW FINISH SLAB
RAIN CONDUCTOR
STORM BELOW FINISH SLAB
OVERFLOW RAIN CONDUCTOR
OVERFLOW RAIN CONDUCTOR BELOW FINISH
SLAB
SANITARY WASTE
SANITARY WASTE BELOW FINISH SLAB
VENT PIPING
VENT PIPING BELOW FINISH SLAB
COMPRESSED AIR
OXYGEN
NITROUS OXIDE
NITROGEN
MEDICAL AIR
VACUUM
DEMOLITION
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
OS&Y VALVE
SOLENOID VALVE
EXPANSION VALVE WITH THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
FLOOR CLEANOUT
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
INLINE CLEANOUT
PLUMBING TRAP
THERMOMETER
CONNECTION
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
FLOOR DRAIN & FLOOR SINK
BACK FLOW PREVENTER
FLANGE END CONNECTION
WALL HYDRANT & HOSE BIBB
REGULAR & OVERFLOW ROOF DRAIN
PIPE CAP
PIPE BREAK
WATER METER
GAS METER
PRESSURE GAUGE
FIRE HYDRANT
SPRINKLER HEAD (PENDANT)
SPRINKLER HEAD (UPRIGHT)
SPRINKLER HEAD (SIDEWALL)
FIRE DEPARTMENT CONNECTION
PIPING FLEXIBLE CONNECTOR
SIGHT GLASS
PIPE EXPANSION
COMPENSATOR FLOW SENSOR DEVICE
FLOW METER
FLOW SWITCH
PRESSURE SWITCH
SUPERVISORY SWITCH INVERTED
BUCKET TRAP
FLOAT & THERMOSTATIC TRAP
X
X
XX
XXXX
XX
XXXX
CW
CW
HW
HW
HWR
HWR
SW
SW
SWR
SWR
TW
TW
TWR
TWR
DI
DI
RO
RO
FP
G
LP
ARV
ARW
ARW
RC
ST
ORC
ORC
SAN
SAN
V
V
CA
NO
N2
MA
VAC
M M
P
FS
FT
BT
PS
SS
1. EXISTING EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATION OF EXISTING
DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH BUILDING
STRUCTURE, EQUIPMENT FURNISHED, ARCHITECTURAL DRAWINGS AND ALL
OTHER TRADES PRIOR TO DEMOLITION.
2. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,
AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,
CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES
HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
3. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,
UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,
STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS. THESE
STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE
DRAWING AND SPECIFICATIONS.
4. COORDINATE CUTTING AND PATCHING WITH GENERAL CONTRACTOR.
5. ALL BOLD DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS NOTED BY
KEYNOTE. ALL OTHER EXISTING SYSTEMS SHOWN FOR REFERENCE ONLY.
6. PATCH AND REPAIR ALL FLOOR AND WALL SURFACES LEFT DAMAGED OR
INCOMPLETE FROM REMOVAL OF EXISTING EQUIPMENT OR PIPING, OR OTHER
FIXED ACCESSORIES AND EQUIPMENT WITH MATERIALS TO MATCH EXISTING.
7. NOTATIONS ARE MADE IN VARIOUS PLACES ON THE DRAWINGS TO CALL
ATTENTION TO DEMOLITION WHICH IS REQUIRED. HOWEVER, THESE
DRAWINGS ARE NOT INTENDED TO SHOW EACH AND EVERY ITEM TO BE
REMOVED. CONTRACTOR SHALL REMOVE ALL MATERIALS RELATED TO THEIR
RESPECTIVE TRADES AS REQUIRED TO PERMIT THE CONSTRUCTION OF THE
NEW WORK AS SHOWN.
8. THE GENERAL CONTRACTOR SHALL COORDINATE THE EXTENT OF THE
REQUIRED DEMOLITION OF THE EXISTING BUILDING AS REQUIRED TO
FACILITATE THE CONSTRUCTION OF THE PROJECT AS SHOWN AS PART OF
THIS WORK.
9. ALL DEMOLITION SHALL BE APPROVED BY THE OWNER/TENANT PRIOR TO
COMMENCEMENT AND SHALL BE PERFORMED UNDER REQUIREMENTS AND
APPROVAL OF THE LOCAL CODE JURISDICTIONS.
10. PROTECT ALL EXISTING WORK WHICH IS TO REMAIN AND RESTORE IN AN
APPROVED MANNER ANY SUCH WORK WHICH BECOMES DAMAGED.
11. RUBBISH AND DEBRIS RESULTING FROM THE WORK SHALL BE REMOVED
IMMEDIATELY FROM THE SITE IN A SAFE AND LEGAL MANNER BY THE
CONTRACTOR.
12. DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT BUILDING
REPRESENTATIVE TO CLARIFY ANY ITEMS NOT SHOWN ON THESE
DOCUMENTS OR SHOWN NOT MATCHING FIELD CONDITIONS.
GENERAL DEMOLITION NOTES
1 INSULATION HANGER DETAIL
SCALE: NTS
14 GAUGE ZINC
COATED SHEET
STEEL SADDLE, AT
LEAST 12" LONG
PIPE
INSULATION
THERMAL HANGERS
SHIELD INSERTS
(360-DEG)
1. CONTRACTOR TO ENSURE THAT THE DOMESTIC HOT WATER SYSTEMS FOR EACH
BUILDING ARE OPERATIONAL THROUGHOUT THE DURATION OF THE PROJECT ASIDE FROM
MDOC PRE-APPROVED SHORT SHUTDOWNS FOR TIE-INS.
1.1. BUILDING 200:
1.1.1. CONTRACTOR TO DEMOLISH THE (2) EXISTING GAS-FIRED DOMESTIC WATER
HEATERS, DOMESTIC WATER PUMP, DOMESTIC COLD WATER PIPING,
DOMESTIC HOT WATER PIPING, AND ALL ASSOCIATED ACCESSORIES THAT ARE
IN THE LOCATION WHERE NEW DWH-200-1 AND DWH-200-2 ARE SHOWN TO BE
INSTALLED ON THE EXISTING CONCRETE PAD. THE OTHER (2) GAS-FIRED
DOMESTIC WATER HEATERS, DOMESTIC WATER PUMP, STORAGE TANK,
ASSOCIATED DOMESTIC COLD WATER PIPING, ASSOCIATED DOMESTIC HOT
WATER PIPING, AND ALL ASSOCIATED ACCESSORIES ARE TO REMAIN ACTIVE
AND SERVE THE DOMESTIC HOT WATER SYSTEM WHILE DWH-200-1 AND
DWH-200-2 AND ALL ASSOCIATED ACCESSORIES ARE INSTALLED AND BROUGHT
ONLINE TO SERVE THE DOMESTIC HOT WATER SYSTEM.
1.1.2. ONCE DWH-200-1, DWH-200-2, XT-200, PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES ARE INSTALLED AND SERVING THE DOMESTIC HOT
WATER SYSTEM, THE REMAINING (2) GAS-FIRED DOMESTIC WATER HEATERS,
STORAGE TANK, DOMESTIC WATER PUMP, ASSOCIATED PIPING, VALVES,
FITTINGS, AND ALL ASSOCIATED ACCESSORIES CAN BE REMOVED IN THEIR
ENTIRETY AS SHOWN ON THE DEMOLITION DRAWINGS.
1.1.3. AFTER THE REMAINING (2) GAS-FIRED DOMESTIC WATER HEATERS AND ALL
ASSOCIATED ACCESSORIES ARE REMOVED, THE NEW HYDRONIC BOILER
(B-200-5), HEATING PIPING, GAS, PIPING, VALVES, FITTINGS AND ALL
ASSOCIATED ACCESSORIES CAN BE INSTALLED IN THE LOCATION SHOWN ON
THE NEW DRAWINGS.
1.2. BUILDING 600:
1.2.1. CONTRACTOR TO DEMOLISH THE (1) EXISTING GAS-FIRED DOMESTIC WATER
HEATERS, DOMESTIC WATER PUMP, DOMESTIC COLD WATER PIPING,
DOMESTIC HOT WATER PIPING, AND ALL ASSOCIATED ACCESSORIES THAT ARE
IN THE LOCATION WHERE NEW DWH-600-1 IS SHOWN TO BE INSTALLED ON THE
EXISTING CONCRETE PAD. THE OTHER GAS-FIRED DOMESTIC WATER HEATER,
ASSOCIATED DOMESTIC COLD WATER PIPING, ASSOCIATED DOMESTIC HOT
WATER PIPING, AND ALL ASSOCIATED ACCESSORIES ARE TO REMAIN ACTIVE
AND SERVE THE DOMESTIC HOT WATER SYSTEM WHILE DWH-600-1 AND ALL
ASSOCIATED ACCESSORIES ARE INSTALLED AND BROUGHT ONLINE TO SERVE
THE DOMESTIC HOT WATER SYSTEM.
1.2.2. ONCE DWH-600-1, XT-600, PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES ARE INSTALLED AND SERVING THE DOMESTIC HOT WATER
SYSTEM, THE REMAINING GAS-FIRED DOMESTIC WATER HEATER, ASSOCIATED
PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES CAN BE
REMOVED IN THEIR ENTIRETY AS SHOWN ON THE DEMOLITION DRAWINGS.
1.2.3. AFTER THE REMAINING GAS-FIRED DOMESTIC WATER HEATER AND ALL
ASSOCIATED ACCESSORIES ARE REMOVED, THE NEW DWH-600-2, PIPING,
VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES ASSOCIATED CAN BE
INSTALL AS SHOWN ON THE NEW DRAWINGS ON THE EXISTING CONCRETE PAD.
1.2.4. INSTALL NEW HYDRONIC BOILER (B-600-3), HEATING PIPING, GAS, PIPING,
VALVES, FITTINGS AND ALL ASSOCIATED ACCESSORIES CAN BE INSTALLED IN
THE LOCATION SHOWN ON THE NEW DRAWINGS.
1.3. BUILDING 400, 500, 700, 800, 900, AND 1200:
1.3.1. CONTRACTOR TO DEMOLISH (1) EXISTING GAS-FIRED DOMESTIC WATER
HEATER, DOMESTIC COLD WATER PIPING, DOMESTIC HOT WATER PIPING, AND
ALL ASSOCIATED ACCESSORIES THAT ARE IN THE LOCATION WHERE NEW
DWH-X00-1 (REFER TO DRAWINGS FOR DOMESTIC WATER HEATER TAG) IS
SHOWN TO BE INSTALLED ON THE EXISTING CONCRETE PAD. THE OTHER
GAS-FIRED DOMESTIC WATER HEATER(S), ASSOCIATED DOMESTIC COLD
WATER PIPING, ASSOCIATED DOMESTIC HOT WATER PIPING, AND ALL
ASSOCIATED ACCESSORIES ARE TO REMAIN ACTIVE AND SERVE THE
DOMESTIC HOT WATER SYSTEM WHILE DWH-X00-1 (REFER TO DRAWINGS FOR
DOMESTIC WATER HEATER TAG) AND ALL ASSOCIATED ACCESSORIES ARE
INSTALLED AND BROUGHT ONLINE TO SERVE THE DOMESTIC HOT WATER
SYSTEM.
1.3.2. ONCE DWH-X00-1 (REFER TO DRAWINGS FOR DOMESTIC WATER HEATER TAG),
XT-X00 (REFER TO DRAWINGS FOR EXPANSION TANK TAG), PIPING, VALVES,
FITTINGS, AND ALL ASSOCIATED ACCESSORIES ARE INSTALLED AND SERVING
THE DOMESTIC HOT WATER SYSTEM, THE REMAINING GAS-FIRED DOMESTIC
WATER HEATER(S), ASSOCIATED PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES CAN BE REMOVED IN THEIR ENTIRETY AS SHOWN
ON THE DEMOLITION DRAWINGS.
1.3.3. AFTER THE REMAINING GAS FIRED DOMESTIC WATER HEATER(S) AND ALL
ASSOCIATED ACCESSORIES ARE REMOVED, THE NEW HYDRONIC BOILER
(B-X00-3; REFER TO DRAWINGS FOR EXPANSION TANK TAG), HEATING PIPING,
GAS, PIPING, VALVES, FITTINGS AND ALL ASSOCIATED ACCESSORIES CAN BE
INSTALLED IN THE LOCATION SHOWN ON THE NEW DRAWINGS.
CONSTRUCTION PHASING SEQUENCE
P-100
PLUMBING SYMBOLS,
NOTES, ABBREVIATIONS,
AND SCHEDULES
DBP
CAT
24314.00
472/24257.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
UPUP
X-WS X-BT X-WS
X-DWH-1X-DWH-2X-DWH-3X-DWH-4
X-MV X-P-6
X-HWX-HW
TO X-WS
X-ST
X-CW
X-CW
X-
HW
R
X-HW (140°)
X-P (TYP. 2)
1 111
X-2-1/2"
X-1-1/2" HW
DN (TYP.)
X- 1-1/2" CW
DN (TYP.)
X-3"
X-1"
X-TW
X-TWR
X-HW (140°)
X-HWR (140°)
X-CW
X-2-1/2"
X-3/4"
X-MV
X-3"
X-2-1/2"
X-2"
X-2"
X-XT 1
X-CW
PLUMBING KEY NOTES
INSTALL NEW INDIRECT DOMESTIC WATER HEATER, PIPING, VALVES, FITTINGS,
AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW EXPANSION TANK, PIPING, AND ALL ASSOCIATED ACCESSORIES
IN LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. INSTALL NEW EXPANSION TANK ON EXISTING CONCRETE PAD.
INSTALL NEW DOMESTIC HOT WATER PIPING, DOMESTIC HOT WATER RETURN
PIPING, DOMESTIC COLD WATER PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN. MODIFY EXISTING
PIPING AS REQUIRED TO MAKE NEW CONNECTION.
GENERAL PLUMBING NOTES
1. CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS REQUIRED TO
CONNECT NEW EQUIPMENT TO THE EXISTING DDC CONTROL PANEL AND
JCI METASYS BAS. CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS
REQUIRED TO INTEGRATE ALL NEW EQUIPMENT INTO THE EXISTING
FRONT-END GRAPHICS.
2. NEW DOMESTIC HOT WATER SYSTEM TO BE INSTALLED NEAR WALL ON
EXISTING CONCRETE PAD. NEW DOMESTIC WATER HEATER SYSTEM
SHOWN OFF WALL FOR CLARITY. CONTRACTOR TO INSTALL ALL NEW
EQUIPMENT PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND
MAINTAIN ALL REQUIRED SERVICE CLEARANCES.
UPUP
P-400
DEMONEW
P-400
X-2"X-3/4"X-3/4" X-3/4"
X-3" X-3"
X-2"
2-1/2" X-TW
TO WASH
X-HW
TO BUILDING
X-CWX-CW
X-HW
X-TW
X-HW
X-MV
X-MV
X-TWR
X-HWR (140°)
X-P
X-P
X-FLOOR
X-
CW
X-CONCRETE PAD
X-2"
X-2"
X-
HW
DWH-200-1 DWH-200-2
P
XT-200
HW
2-1/2"
CW
3/4"
HW
R
3/4"
2-1/2"
AUTOMATIC
AIR VENT
PRESSURE
GAUGE
(TYP.)
CHECK VALVE (TYP.)
CW
1-1/2" DRAIN VALVE PIPE
TO FLOOR DRAIN (TYP.)
UNION (TYP.)
SHUTOFF
VALVE (TYP.)
2"
P
CW
P
P/T (TYP.)
P
PIPE TO
FLOOR
DRAIN
(TYP)
CW
2"2"
2"
2"
THERMOMETER
(TYP.)
SHUT OFF
VALVE (TYP.)
BAS
SENSOR
3/4"
2-1/2"
2-1/2"
BALANCE VALVE
2-1/2"
P
2"
HW
CW
DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC HOT WATER
HEATER, STORAGE TANK, EXPANSION TANK, COMBUSTION AIR INLET, VENT,
PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THEIR
ENTIRETY.
DISCONNECT, REMOVE AND DEMO EXISTING DOMESTIC HOT WATER PIPING,
DOMESTIC HOT WATER RETURN PIPING, DOMESTIC COLD WATER PIPING,
VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES TO THE EXTENTS
SHOWN.
DISCONNECT, REMOVE, AND DEMO EXISTING PUMP, CONTROLS, CONTROL
WIRING, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
EXISTING MIXING VALVE, PIPING, AND ALL ASSOCIATED ACCESSORIES TO
REMAIN.
EXISTING PUMPS, PIPING CONTROLS, AND ALL ASSOCIATED ACCESSORIES
TO REMAIN.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. EXISTING PLUMBING EQUIPMENT AND ALL ASSOCIATED ACCESSORIES TO REMAIN UNLESS
OTHERWISE NOTED.
2. DEMOLITION OF EXISTING DOMESTIC HOT WATER SYSTEM MUST BE COORDINATED/APPROVED BY
THE FACILITY BEFORE ANY DEMOLITION WORK CAN BEGIN.
3. EXISTING HOT WATER SYSTEM IS LOCATED NEAR EXTERIOR WALL. EXISTING DOMESTIC HOT
WATER SYSTEM SHOWN AWAY FROM WALL FOR CLARITY.
UPUP
X-WS X-BT X-WS
X-MV X-P-6
X-HWX-HW
TO X-WS
X-2-1/2"
X-3"
X-1"
X-TW
X-TWR
X-HW (140°)
X-HWR (140°)
X-CW
X-2-1/2"
X-3/4"
X-MV
X-3"
X-2-1/2"
X-2"
X-2"
DWH-200-1
2-1/2"
XT-200
CWCW
HW
HWR (140)º
TW
R3/4"3/4"
2-1/2"
2"
3/4"
3DWH-200-2
CW
1 1
2"
2-1/2"
2"
X-DWH-4X-DWH-3X-DWH-2X-DWH-1X-ST
X-2"
X-3" X-3"
X-2"
X-3"
X-2"X-3/4"X-3/4"
X-3"X-3"
X-3"
X-2"
X-1-1/2" X-1-1/2" X-1-1/2" X-1-1/2"
X-3/4"
X-3/4"
X-3" X-3"
X-2" X-1-1/4"
2-1/2" X-TW
TO WASH
X-HW
TO BUILDING
X-CW
X-CWX-CW
X-TWR
X-HW
X-HW
X-HW
X-HW
X-TW
X-HW
X-MV
X-MV
X-TWR
X-HWR (140°)
X-P
X-P
X-P
X-FLOOR
X-
CW
X-3/4"
X-HWR
X-3"
1 1 1 1 1
X-CONCRETE PAD 1
X-HWR (140°)
NC
X-2"
X-2"4
NC
X-1-1/2"X-1-1/2"
X-XT
X-2"
X-P
X-
HW
3 3
P-400
BUILDING 200 -
SECOND FLOOR PLAN -
PLUMBING DEMOLITION/NEW
DBP
CAT
24314.00
472/24257.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
7/28/2025 CD SET
KEY PLAN
SCALE: NTS
N
N BUILDING 200 SECOND FLOOR PLAN
SCALE: 1/16" = 1'-0"
10510 40201 BUILDING 200 MECHANICAL ROOM ENLARGED - PLUMBING DEMOLITION
SCALE: 1/4" = 1' - 0"
3 BUILDING 200 DOMESTIC WATER HEATER - PLUMBING DEMOLITION
SCALE: NTS4 BUILDING 200 DOMESTIC WATER HEATER - PLUMBING NEW
SCALE: NTS
2 BUILDING 200 MECHANICAL ROOM ENLARGED - PLUMBING NEW
SCALE: 1/4" = 1' - 0"
M
X-WATER METER
X-
CW
X-
CW
X-
CW
X-
HW
X-
TW
X-
HW
R
X-
TW
R
X-P
(TYP. 2)
X-1-1/2'' (140°) X-2'' (100°)
X-3/4'' (140°)X-3/4'' (100°) X-3''
X-
TW
X-
HW
X-2''
X-3''
X-3/4''
X-MV X-
CW
XT-400
3/4"
HW
CW
3/4"
2"
2"
3/4"
DWH-400-1
2"
HW
2"
2" 2"
UP
UP
UP
UP
P-401
DEMONEW
P-401
DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC HOT WATER HEATER, PIPING,
VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE AND DEMO EXISTING DOMESTIC HOT WATER PIPING, DOMESTIC HOT
WATER RETURN PIPING, DOMESTIC COLD WATER PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN.
EXISTING MIXING VALVE, PIPING, AND ALL ASSOCIATED ACCESSORIES TO REMAIN.
EXISTING PUMPS, PIPING, CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES TO REMAIN.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. EXISTING MECHANICAL/PLUMBING EQUIPMENT AND ALL ASSOCIATED ACCESSORIES TO REMAIN UNLESS
OTHERWISE NOTED.
2. DEMOLITION OF EXISTING DOMESTIC HOT WATER SYSTEM MUST BE COORDINATED/APPROVED BY THE
FACILITY BEFORE ANY DEMOLITION WORK CAN BEGIN.
3. EXISTING HOT WATER SYSTEM IS LOCATED NEAR EXTERIOR WALL. EXISTING DOMESTIC HOT WATER
SYSTEM SHOWN AWAY FROM WALL FOR CLARITY.
X-MV
X-HW
X-TW
X-CW
X-HWR
X-TWR
X-2"
X-3"
X-2"
X-2"
X-1-1/2"
X-P
X-P
X-FLOOR X-CONCRETE PAD
2" X-TW TO
BUILDING HW
2"
2"
XT-400
P
HWR
3/4"
3/4"
CW
PRESSURE
GAUGE
(TYP.)
AUTOMATIC
AIR VENT
DWH-400-1
CW
1-1/2" DRAIN VALVE PIPE
TO FLOOR DRAIN (TYP.)
UNION (TYP.)
PIPE TO
FLOOR
DRAIN
HW
3/4"
CW
2"
SHUTOFF
VALVE (TYP.)
P/T
2"
CHECK VALVE
2"
P
P
THERMOMETER
(TYP.)PRESSURE
RELIEF
VALVEBAS
SENSOR
3/4"
TWR
X-DWH-2
X-DWH-1
M
X-WATER METER
X-
CW
X-
CW
X-
CW
X-
HW
X-
TW
X-
HW
R
X-
TW
R
X-P
(TYP. 2)
X-1-1/2'' (140°) X-2'' (100°)
X-3/4'' (140°)X-3/4'' (100°) X-3''
X-
TW
X-
HW
X-2''
X-3''
X-3/4''
X-MV X-
CW
X-CW DN
(TYP. 2)
X-HW DN
(TYP. 2)
PLUMBING KEY NOTES
INSTALL NEW INDIRECT DOMESTIC WATER HEATER, PIPING, VALVES,
FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION
SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW EXPANSION TANK, PIPING, AND ALL ASSOCIATED
ACCESSORIES IN LOCATION SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. INSTALL NEW EXPANSION TANK ON
EXISTING CONCRETE PAD.
INSTALL NEW DOMESTIC HOT WATER PIPING, DOMESTIC HOT WATER
RETURN PIPING, DOMESTIC COLD WATER PIPING, VALVES, FITTINGS,
AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN. MODIFY
EXISTING PIPING AS REQUIRED TO MAKE NEW CONNECTION.
GENERAL PLUMBING NOTES
1. CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS REQUIRED TO
CONNECT NEW EQUIPMENT TO THE EXISTING DDC CONTROL PANEL AND
JCI METASYS BAS. CONTRACTOR TO PROVIDE ALL CONTROL
COMPONENTS REQUIRED TO INTEGRATE ALL NEW EQUIPMENT INTO THE
EXISTING FRONT-END GRAPHICS.
2. NEW DOMESTIC HOT WATER SYSTEM TO BE INSTALLED NEAR EXTERIOR
WALL ON EXISTING CONCRETE PAD. NEW DOMESTIC WATER HEATER
SYSTEM SHOWN OFF EXTERIOR WALL FOR CLARITY. CONTRACTOR TO
INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND MAINTAIN ALL REQUIRED SERVICE CLEARANCES.
X-MV
X-HW X-HW
X-TW
X-CW
X-HWR
X-TWR
X-CW
X-2"
X-3"
X-2"
X-3/4"
X-2"
X-1-1/2" X-1-1/2"
X-DWH-2
X-P
X-P
X-FLOOR
X-DWH-1
X-CONCRETE PAD
2" X-TW TO
BUILDING
X-1-1/2"
X-1-1/2"
P-401
BUILDING 400 -
UPPER LEVEL FLOOR PLAN -
PLUMBING DEMOLITION/NEW
DBP
CAT
24314.00
472/24257.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
7/28/2025 CD SET
KEY PLAN
SCALE: NTS
N
N BUILDING 400 UPPER LEVEL FLOOR PLAN
SCALE: 1/16" = 1'-0"
10510 4020
2 BUILDING 400 MECHANICAL ROOM ENLARGED - PLUMBING NEW
SCALE: 1/2" = 1' - 0"
4 BUILDING 400 DOMESTIC WATER HEATER - PLUMBING NEW
SCALE: NTS
1 BUILDING 400 MECHANICAL ROOM ENLARGED - PLUMBING DEMOLITION
SCALE: 1/2" = 1' - 0"
3 BUILDING 400 DOMESTIC WATER HEATER - PLUMBING DEMOLITION
SCALE: NTS
UP
UP
UPUP
UP
P-402
P-402
NEWDEMO
PLUMBING KEY NOTES
INSTALL NEW INDIRECT DOMESTIC WATER HEATER, PIPING, VALVES, FITTINGS, AND
ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW EXPANSION TANK, PIPING, AND ALL ASSOCIATED ACCESSORIES IN
THE LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW EXPANSION TANK ON EXISTING CONCRETE PAD.
INSTALL NEW DOMESTIC HOT WATER PIPING, DOMESTIC HOT WATER RETURN
PIPING, DOMESTIC COLD WATER PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN. MODIFY EXISTING PIPING AS REQUIRED
TO MAKE NEW CONNECTION.
GENERAL PLUMBING NOTES
1. CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS REQUIRED TO CONNECT
NEW EQUIPMENT TO THE EXISTING DDC CONTROL PANEL AND JCI METASYS BAS.
CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS REQUIRED TO INTEGRATE
ALL NEW EQUIPMENT INTO THE EXISTING FRONT-END GRAPHICS.
2. NEW DOMESTIC HOT WATER SYSTEM TO BE INSTALLED NEAR EXTERIOR WALL ON
EXISTING CONCRETE PAD. NEW DOMESTIC WATER HEATER SYSTEM SHOWN OFF
EXTERIOR WALL FOR CLARITY. CONTRACTOR TO INSTALL ALL NEW EQUIPMENT
PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND MAINTAIN ALL
REQUIRED SERVICE CLEARANCES.
X-DWH-1
X-DWH-2
X-P-4
X-MV
M
X-WATER METER
X-3/4''
X-
TW
R
X-
TW
X-
CW
X-
CW
X-2''
X-2''
X-3/4''
X-
TW
X-2''
X-2''
X-
TW
R
X-HW DN
(TYP. 2)
X-CW DN
(TYP. 2)
X-2"
X-2''2
DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC HOT WATER HEATER, PIPING,
VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE AND DEMO EXISTING DOMESTIC HOT WATER PIPING,
DOMESTIC HOT WATER RETURN PIPING, DOMESTIC COLD WATER PIPING, VALVES,
FITTINGS, AND ALL ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN.
EXISTING MIXING VALVE, PIPING, AND ALL ASSOCIATED ACCESSORIES TO REMAIN.
EXISTING PUMPS, PIPING, CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES TO REMAIN.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. EXISTING MECHANICAL/PLUMBING EQUIPMENT AND ALL ASSOCIATED ACCESSORIES TO REMAIN UNLESS
OTHERWISE NOTED.
2. DEMOLITION OF EXISTING DOMESTIC HOT WATER SYSTEM MUST BE COORDINATED/APPROVED BY THE
FACILITY BEFORE ANY DEMOLITION WORK CAN BEGIN.
3. EXISTING HOT WATER SYSTEM IS LOCATED NEAR EXTERIOR WALL. EXISTING DOMESTIC HOT WATER
SYSTEM SHOWN AWAY FROM WALL FOR CLARITY.
X-P-4
X-MV
M
X-WATER METER
X-3/4''
X-
TW
R
X-
TW
X-
CW
X-
CW
X-2''
X-2''
X-3/4''
X-
TW
X-2''
X-2''
X-
TW
R
XT-500
HW
2"
2"
2" 2"
3/4"
TW
R
1DWH-500-1
CW
3 3/4"
2"
HW
CW
2"
X-MV
X-CW
X-TWR
X-TW
X-2"
X-3/4"
X-P
X-2"
X-FLOOR
X-2"
X-CW
X-2"
X-CONCRETE PAD
DWH-500-1
XT-500
1P
HW
PRESSURE GAUGE
AUTOMATIC AIR VENT
3/4"
2"
CW
2" CW
1-1/2" DRAIN VALVE PIPE
TO FLOOR DRAIN (TYP.)
UNION (TYP.)
SHUTOFF
VALVE (TYP.)CW
2"
P
P
P/T
PIPE TO
FLOOR
DRAIN
THERMOMETER (TYP.)
PRESSURE
GAUGE (TYP.)
2"
BAS
SENSOR
3/4"
HWR HWR
X-MV
X-DWH-1 X-DWH-2
X-CW
X-TWR
X-TW
X-
CW
X-2"
X-3/4"
X-P
X-2"
X-FLOOR
X-2"
X-CW
X-2"
X-CONCRETE PAD 1
X-
HW
X-
CW
X-CW
X-1-1/2"
X-2"
P-402
BUILDING 500 -
UPPER LEVEL FLOOR PLAN -
PLUMBING DEMOLITION/NEW
DBP
CAT
24314.00
472/24257.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
7/28/2025 CD SET
KEY PLAN
SCALE: NTS
N
N BUILDING 500 UPPER LEVEL FLOOR PLAN1 BUILDING 500 MECHANICAL ROOM ENLARGED - PLUMBING DEMOLITION
SCALE: 1/2" = 1' - 0"
3 BUILDING 500 DOMESTIC WATER HEATER - PLUMBING DEMOLITION
SCALE: NTS
2 BUILDING 500 MECHANICAL ROOM ENLARGED - PLUMBING NEW
SCALE: 1/2" = 1' - 0"
4 BUILDING 500 DOMESTIC WATER HEATER - PLUMBING NEW
SCALE: NTS
N
SCALE: 1/16" = 1'-0"
10510 4020
X-DWH-2
X-DWH-1
X-MV
X-P-9
X-HWR
X-
TW
R
X-CW
X-TW
X-
CW
X-3'' X-4''
X-3/4''
X-3''
X-4''
X-3''
X-3''
X-4''
X-CW
X-
CW
X-3''
X-
TW
X-3''
X-4''
X-3/4''
X-3/4''
M
X-WATER METER
DWH-600-2
DWH-600-1
XT-600
CW
CW
HW
HW
HW
2" CW
DN
2" CW DN
2" HW DN
2" HW DN
3/4"
2-1/2"
2-1/2"
2 1/2"
UP
UP UP
P-403
DEMO NEW
P-403
GENERAL DEMOLITION NOTES
DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC HOT WATER
HEATER, EXPANSION TANK, PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE AND DEMO EXISTING DOMESTIC HOT WATER PIPING,
DOMESTIC HOT WATER RETURN PIPING, DOMESTIC COLD WATER PIPING,
VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES TO THE EXTENT
SHOWN.
EXISTING MIXING VALVE, PIPING, AND ALL ASSOCIATED ACCESSORIES TO
REMAIN.
EXISTING PUMPS, PIPING, CONTROLS, CONTROL WIRING, AND ALL
ASSOCIATED ACCESSORIES TO REMAIN.
DEMOLITION NOTES
1. EXISTING MECHANICAL/PLUMBING EQUIPMENT AND ALL ASSOCIATED ACCESSORIES TO REMAIN UNLESS
OTHERWISE NOTED.
2. DEMOLITION OF EXISTING DOMESTIC HOT WATER SYSTEM MUST BE COORDINATED/APPROVED BY THE
FACILITY BEFORE ANY DEMOLITION WORK CAN BEGIN.
3. EXISTING HOT WATER SYSTEM IS LOCATED NEAR EXTERIOR WALL. EXISTING DOMESTIC HOT WATER
SYSTEM SHOWN AWAY FROM WALL FOR CLARITY.
X-DWH-2
X-DWH-1
X-MV
X-P-9
X-HWR
X-
TW
R
X-CW
X-TW
X-
CW
X-3'' X-4''
X-3/4''
X-3''
X-4''
X-3''
X-2-1/2''
X-3''
X-4''
X-CW
X-
CW
X-
HW
X-
CW
X-
CW
X-2-1/2''
X-2-1/2''
X-3''
X-
TW
X-3''
X-4''
X-3/4''
X-3/4''
M
X-WATER METER
X-2-1/2''
X-2-1/2'' HW DN
(TYP. 2)
X-2-1/2'' CW DN
(TYP. 2)
X-XT
X-DWH-2X-DWH-1
X-MV
X-TWR
X-CW
X-TW
X-HW
X-3"
X-4"
X-3/4"
X-3"
X-3"
X-3"
X-
CW
X-FLOOR
X-P
X-4"
X-CONCRETE PAD 1
3" X-TW TO
BUILDING
X-CW
X-XT
PLUMBING KEY NOTES
INSTALL NEW INDIRECT DOMESTIC WATER HEATER, PIPING, VALVES,
FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION
SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW EXPANSION TANK, PIPING, AND ALL ASSOCIATED
ACCESSORIES IN LOCATION SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. INSTALL NEW EXPANSION TANK ON
EXISTING CONCRETE PAD.
INSTALL NEW DOMESTIC HOT WATER PIPING, DOMESTIC HOT WATER
RETURN PIPING, DOMESTIC COLD WATER PIPING, VALVES, FITTINGS,
AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN. MODIFY
EXISTING PIPING AS REQUIRED TO MAKE NEW CONNECTION.
GENERAL PLUMBING NOTES
1. CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS REQUIRED TO
CONNECT NEW EQUIPMENT TO THE EXISTING DDC CONTROL PANEL AND
JCI METASYS BAS. CONTRACTOR TO PROVIDE ALL CONTROL
COMPONENTS REQUIRED TO INTEGRATE ALL NEW EQUIPMENT INTO THE
EXISTING FRONT-END GRAPHICS.
2. NEW DOMESTIC HOT WATER SYSTEM TO BE INSTALLED NEAR WALL ON
EXISTING CONCRETE PAD. NEW DOMESTIC WATER HEATER SYSTEM
SHOWN OFF WALL FOR CLARITY. CONTRACTOR TO INSTALL ALL NEW
EQUIPMENT PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS
AND MAINTAIN ALL REQUIRED SERVICE CLEARANCES.
X-TWR
X-CW
X-TW
X-4"
X-3/4"
X-3"
X-3"
X-FLOOR
X-4"
X-CONCRETE PAD
3" X-TW TO
BUILDING
X-CW
DWH-600-1
DWH-600-2
CW
CW
XT-6002
P
PRESSURE GAUGE
(TYP.)
AUTOMATIC AIR VENT
1-1/2" DRAIN VALVE PIPE
TO FLOOR DRAIN (TYP.)
HW
CW
P/T (TYP.) P
P
P
P
SHUTOFF VALVE (TYP.)
UNION (TYP.)
PIPE TO
FLOOR
DRAIN
(TYP.)
3/4"
BAS
SENSOR
2-1/2"
THERMOMETER (TYP.)
2"
2-1/2" 2" 2-1/2"
2" 2"
P-403
BUILDING 600 -
UPPER LEVEL FLOOR PLAN -
PLUMBING DEMOLITON/NEW
DBP
CAT
24314.00
472/24257.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
7/28/2025 CD SET
KEY PLAN
SCALE: NTS
N
N BUILDING 600 UPPER LEVEL FLOOR PLAN
SCALE: 1/16" = 1'-0"
10510 4020
2 BUILDING 600 MECHANICAL ROOM ENLARGED - PLUMBING NEW
SCALE: 1/2" = 1' - 0"
4 BUILDING 600 DOMESTIC WATER HEATER - PLUMBING NEW
SCALE: NTS
1 BUILDING 600 MECHANICAL ROOM ENLARGED - PLUMBING DEMOLITION
SCALE: 1/2" = 1' - 0"
3 BUILDING 600 DOMESTIC WATER HEATER - PLUMBING DEMOLITION
UP
UP
UP
P-404
DEMONEW
P-404
PLUMBING KEY NOTES
INSTALL NEW INDIRECT DOMESTIC WATER HEATER, PIPING, VALVES, FITTINGS,
AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW EXPANSION TANK, PIPING, AND ALL ASSOCIATED ACCESSORIES IN
LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW EXPANSION TANK ON EXISTING CONCRETE PAD.
INSTALL NEW DOMESTIC HOT WATER PIPING, DOMESTIC HOT WATER RETURN
PIPING, DOMESTIC COLD WATER PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN. MODIFY EXISTING PIPING
AS REQUIRED TO MAKE NEW CONNECTION.
GENERAL PLUMBING NOTES
1. CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS REQUIRED TO
CONNECT NEW EQUIPMENT TO THE EXISTING DDC CONTROL PANEL AND JCI
METASYS BAS. CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS
REQUIRED TO INTEGRATE ALL NEW EQUIPMENT INTO THE EXISTING
FRONT-END GRAPHICS.
2. NEW DOMESTIC HOT WATER SYSTEM TO BE INSTALLED NEAR WALL ON
EXISTING CONCRETE PAD. NEW DOMESTIC WATER HEATER SYSTEM SHOWN
OFF WALL FOR CLARITY. CONTRACTOR TO INSTALL ALL NEW EQUIPMENT PER
THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND MAINTAIN ALL
REQUIRED SERVICE CLEARANCES.
DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC HOT WATER
HEATER, EXPANSION TANK, PIPING, VALVES, FITTINGS, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE AND DEMO EXISTING DOMESTIC HOT WATER PIPING,
DOMESTIC HOT WATER RETURN PIPING, DOMESTIC COLD WATER PIPING,
VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES TO THE EXTENTS
SHOWN.
EXISTING MIXING VALVE, PIPING, AND ALL ASSOCIATED ACCESSORIES TO
REMAIN.
EXISTING PUMPS, PIPING, CONTROLS, CONTROL WIRING, AND ALL
ASSOCIATED ACCESSORIES TO REMAIN.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. EXISTING MECHANICAL/PLUMBING EQUIPMENT AND ALL ASSOCIATED ACCESSORIES TO REMAIN UNLESS
OTHERWISE NOTED.
2. DEMOLITION OF EXISTING DOMESTIC HOT WATER SYSTEM MUST BE COORDINATED/APPROVED BY THE
FACILITY BEFORE ANY DEMOLITION WORK CAN BEGIN.
3. EXISTING HOT WATER SYSTEM IS LOCATED NEAR EXTERIOR WALL. EXISTING DOMESTIC HOT WATER
SYSTEM SHOWN AWAY FROM WALL FOR CLARITY.
X-MV
X-DWH-1
X-P
X-CW
X-TWR
X-HW
X-TW
X-2" X-2"
X-3"X-3/4"
X-2"
X-2"
X-3/4"
X-FLOOR
X-CW
X-2"
X-
CW
X-DWH-2
X-2"
X-CW
X-2"
2 2
X-
HW
X-CONCRETE PAD1
X-DWH-3
X-2"
X-
HW
X-CW
X-2"
X-XT
X-3/4"3
X-MV X-P
X-CW
X-TWR
X-TW X-3"X-3/4"
X-2"
X-3/4" X-CW
X-2"
X-CONCRETE PAD
X-3/4"
DWH-700-1
P
2 XT-700
CW
CW
HW
1-1/2" DRAIN VALVE PIPE
TO FLOOR DRAIN (TYP.)
3/4"
2"
PRESSURE GAUGE
(TYP.)
AUTOMATIC AIR VENT
P
CW
UNION (TYP.)
SHUTOFF
VALVE (TYP.)
P
PIPE TO
FLOOR
DRAIN
P/T
2"
2"
BAS
SENSOR
3/4"
THERMOMETER
(TYP.)
M
X-WATER METER
X-3''
X-P-4
X-MV
X-2''
X-2''
X-3''
X-CW
X-CW
X-CW
X-TWR
X-2''
X-TW
X-3/4''
X-3''
HW
CW
XT-700
DWH-700-1
2"
2"
3/4"
3/4"
HWR
M
X-WATER METER
X-3''
X-P-4
X-MV
X-2''
X-2''
X-3''
X-CW
X-CW
X-CW
X-TWR
X-
CWX-
HW
X-2''
X-TW
X-DWH-1
X-DWH-2
X-3/4''
X-HW DN
(TYP. 3)
X-CW DN (TYP. 3)
X-DWH-3
X-2''
X-XT1
X-3''
P-404
BUILDING 700 -
UPPER LEVEL FLOOR PLAN -
PLUMBING
DEMOLITION/NEW
DBP
CAT
24314.00
472/24257.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
7/28/2025 CD SET
KEY PLAN
SCALE: NTS
N
N
BUILDING 700 UPPER LEVEL FLOOR PLAN
1 BUILDING 700 MECHANICAL ROOM ENLARGED - PLUMBING DEMOLITION
SCALE: 1/2" = 1' - 0"
3 BUILDING 700 DOMESTIC WATER HEATER - PLUMBING DEMOLITION
SCALE: NTS
2 BUILDING 700 MECHANICAL ROOM ENLARGED - PLUMBING NEW
SCALE: 1/2" = 1' - 0"
4 BUILDING 700 DOMESTIC WATER HEATER - PLUMBING NEW
SCALE: NTS
SCALE: 1/16" = 1'-0"
UP
UP
UP
P-405
DEMONEW
P-405
PLUMBING KEY NOTES
INSTALL NEW INDIRECT DOMESTIC WATER HEATER, PIPING, VALVES, FITTINGS,
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW EXPANSION TANK, PIPING AND ALL ASSOCIATED ACCESSORIES IN
LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW EXPANSION TANK ON EXISTING CONCRETE PAD.
INSTALL NEW DOMESTIC HOT WATER PIPING, DOMESTIC HOT WATER RETURN
PIPING, DOMESTIC COLD WATER PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN. MODIFY EXISTING PIPING
AS REQUIRED TO MAKE NEW CONNECTION.
GENERAL PLUMBING NOTES
1. CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS REQUIRED TO
CONNECT NEW EQUIPMENT TO THE EXISTING DDC CONTROL PANEL AND JCI
METASYS BAS. CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS
REQUIRED TO INTEGRATE ALL NEW EQUIPMENT INTO THE EXISTING
FRONT-END GRAPHICS.
2. NEW DOMESTIC HOT WATER SYSTEM TO BE INSTALLED NEAR WALL ON
EXISTING CONCRETE PAD. NEW DOMESTIC WATER HEATER SYSTEM SHOWN
OFF WALL FOR CLARITY. CONTRACTOR TO INSTALL ALL NEW EQUIPMENT PER
THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND MAINTAIN ALL
REQUIRED SERVICE CLEARANCES.
M
X-WATER METER
X-3''
X-P-4
X-MV
X-2''
X-2''
X-3''
X-CW
X-CW
X-CW
X-TWR
X-
CWX-
HW
X-2''
X-TW
X-DWH-1
X-DWH-2
X-3/4''
X-HW DN
(TYP. 3)
X-CW DN (TYP. 3)
X-DWH-3
X-2''
X-XT1
X-3''
DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC HOT WATER
HEATER, EXPANSION TANK, PIPING, VALVES, FITTINGS, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE AND DEMO EXISTING DOMESTIC HOT WATER PIPING,
DOMESTIC HOT WATER RETURN PIPING, DOMESTIC COLD WATER PIPING,
VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES TO THE EXTENTS
SHOWN.
EXISTING MIXING VALVE, PIPING, AND ALL ASSOCIATED ACCESSORIES TO
REMAIN.
EXISTING PUMPS, PIPING, CONTROLS, CONTROL WIRING, AND ALL
ASSOCIATED ACCESSORIES TO REMAIN.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. EXISTING MECHANICAL/PLUMBING EQUIPMENT AND ALL ASSOCIATED ACCESSORIES TO REMAIN UNLESS
OTHERWISE NOTED.
2. DEMOLITION OF EXISTING DOMESTIC HOT WATER SYSTEM MUST BE COORDINATED/APPROVED BY THE
FACILITY BEFORE ANY DEMOLITION WORK CAN BEGIN.
3. EXISTING HOT WATER SYSTEM IS LOCATED NEAR EXTERIOR WALL. EXISTING DOMESTIC HOT WATER
SYSTEM SHOWN AWAY FROM WALL FOR CLARITY.
M
X-WATER METER
X-3''
X-P-4
X-MV
X-2''
X-2''
X-3''
X-CW
X-CW
X-CW
X-TWR
X-2''
X-TW
X-3/4''
X-3''
HW
CW
XT-800
DWH-800-1
2"
3/4"2" 2"
3/4"
X-MV
X-DWH-1
X-P
X-CW
X-TWR
X-HW
X-TW
X-2" X-2"
X-3"X-3/4"
X-2"
X-2"
X-3/4"
X-FLOOR
X-CW
X-2"
X-
CW
X-DWH-2
X-2"
X-CW
X-2"
2 2
X-
HW
X-CONCRETE PAD1
X-DWH-3
X-2"
X-
HW
X-CW
X-2"
X-XT
X-3/4"
X-MV X-P
X-CW
X-TWR
X-TW X-3"X-3/4"
X-2"
X-3/4" X-CW
X-2"
X-CONCRETE PAD
X-3/4"
DWH-800-1
P
2 XT-800
CW
CW
HW
1-1/2" DRAIN VALVE PIPE
TO FLOOR DRAIN (TYP.)
3/4"
2"
PRESSURE GAUGE
(TYP.)
AUTOMATIC AIR VENT
P
CW
UNION (TYP.)
SHUTOFF
VALVE (TYP.)
P
PIPE TO
FLOOR
DRAIN
P/T
BAS
SENSOR
2" 3/4"
THERMOMETER
(TYP.)
2"
P-405
BUILDING 800 -
UPPER LEVEL FLOOR PLAN -
PLUMBING DEMOLITION/NEW
DBP
CAT
24314.00
472/24257.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
7/28/2025 CD SET
KEY PLAN
SCALE: NTS
N
N BUILDING 800 UPPER LEVEL FLOOR PLAN1 BUILDING 800 MECHANICAL ROOM ENLARGED - PLUMBING DEMOLITION
SCALE: 1/2" = 1' - 0"
3 BUILDING 800 DOMESTIC WATER HEATER - PLUMBING DEMOLITION
SCALE: NTS
2 BUILDING 800 MECHANICAL ROOM ENLARGED - PLUMBING NEW
SCALE: 1/2" = 1' - 0"
4 BUILDING 800 DOMESTIC WATER HEATER - PLUMBING NEW
SCALE: NTS
SCALE: 1/16" = 1'-0"
UP
UP
UP
P-406
DEMONEW
P-406
PLUMBING KEY NOTES
INSTALL NEW INDIRECT DOMESTIC WATER HEATER, PIPING, VALVES, FITTINGS,
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW EXPANSION TANK, PIPING, AND ALL ASSOCIATED ACCESSORIES IN
LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW EXPANSION TANK ON EXISTING CONCRETE PAD.
INSTALL NEW DOMESTIC HOT WATER PIPING, DOMESTIC HOT WATER RETURN
PIPING, DOMESTIC COLD WATER PIPING, VALVES, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN. MODIFY EXISTING PIPING
AS REQUIRED TO MAKE NEW CONNECTION.
GENERAL PLUMBING NOTES
1. CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS REQUIRED TO
CONNECT NEW EQUIPMENT TO THE EXISTING DDC CONTROL PANEL AND JCI
METASYS BAS. CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS
REQUIRED TO INTEGRATE ALL NEW EQUIPMENT INTO THE EXISTING
FRONT-END GRAPHICS.
2. NEW DOMESTIC HOT WATER SYSTEM TO BE INSTALLED NEAR WALL ON
EXISTING CONCRETE PAD. NEW DOMESTIC WATER HEATER SYSTEM SHOWN
OFF EXTERIOR WALL FOR CLARITY. CONTRACTOR TO INSTALL ALL NEW
EQUIPMENT PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND
MAINTAIN ALL REQUIRED SERVICE CLEARANCES.
DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC HOT WATER
HEATER, EXPANSION TANK, PIPING, VALVES, FITTINGS, CONTROLS,
CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE AND DEMO EXISTING DOMESTIC HOT WATER PIPING,
DOMESTIC HOT WATER RETURN PIPING, DOMESTIC COLD WATER PIPING,
VALVES, FITTINGS, AND ALL ASSOCIATED ACCESSORIES TO THE EXTENTS
SHOWN.
EXISTING MIXING VALVE, PIPING, AND ALL ASSOCIATED ACCESSORIES TO
REMAIN.
EXISTING PUMPS, PIPING, CONTROLS, CONTROL WIRING, AND ALL
ASSOCIATED ACCESSORIES TO REMAIN.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. EXISTING MECHANICAL/PLUMBING EQUIPMENT AND ALL ASSOCIATED ACCESSORIES TO REMAIN UNLESS
OTHERWISE NOTED.
2. DEMOLITION OF EXISTING DOMESTIC HOT WATER SYSTEM MUST BE COORDINATED/APPROVED BY THE
FACILITY BEFORE ANY DEMOLITION WORK CAN BEGIN.
3. EXISTING HOT WATER SYSTEM IS LOCATED NEAR EXTERIOR WALL. EXISTING DOMESTIC HOT WATER
SYSTEM SHOWN AWAY FROM WALL FOR CLARITY.
X-MV
X-DWH-1
X-P
X-CW
X-TWR
X-HW
X-TW
X-2" X-2"
X-3"X-3/4"
X-2"
X-2"
X-3/4"
X-FLOOR
X-CW
X-2"
X-
CW
X-DWH-2
X-2"
X-CW
X-2"
2 2
X-
HW
X-CONCRETE PAD1
X-DWH-3
X-2"
X-
HW
X-CW
X-2"
X-XT
X-3/4"
X-MV X-P
X-CW
X-TWR
X-TW X-3"X-3/4"
X-2"
X-3/4" X-CW
X-2"
X-CONCRETE PAD
X-3/4"
DWH-900-1
P
2 XT-900
CW
CW
HW
1 1/2" DRAIN VALVE PIPE
TO FLOOR DRAIN (TYP.)
3/4"
2"
PRESSURE GAUGE
(TYP.)
AUTOMATIC AIR VENT
P
CW
UNION (TYP.)
SHUTOFF
VALVE (TYP.)
P
PIPE TO
FLOOR
DRAIN
P/T
THERMOMETER
(TYP.)
3/4"
2"
2"
BAS
SENSOR
M
X-WATER METER
X-3''
X-P-4
X-MV
X-2''
X-2''
X-3''
X-CW
X-CW
X-CW
X-TWR
X-
CWX-
HW
X-2''
X-TW
X-DWH-1
X-DWH-2
X-3/4''
X-HW DN
(TYP. 3)
X-CW DN (TYP. 3)
X-DWH-3
X-2''
X-XT1
X-3''
M
X-WATER METER
X-3''
X-P-4
X-MV
X-2''
X-2''
X-3"
X-3''
X-CW
X-CW
X-CW
X-TWR
X-2''
X-TW
X-3/4''
X-3''
HW
CW
XT-900
DWH-900-1
2"
3/4"2" 2"
3/4"
P-406
BUILDING 900 -
UPPER LEVEL FLOOR PLAN -
PLUMBING DEMOLITION/NEW
DBP
CAT
24314.00
472/24257.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
7/28/2025 CD SET
KEY PLAN
SCALE: NTS
N
N
BUILDING 900 UPPER LEVEL FLOOR PLAN
1 BUILDING 900 MECHANICAL ROOM ENLARGED - PLUMBING DEMOLITION
SCALE: 1/2" = 1' - 0"
3 BUILDING 900 DOMESTIC WATER HEATER - PLUMBING DEMOLITION
SCALE: NTS
2 BUILDING 900 MECHANICAL ROOM ENLARGED - PLUMBING NEW
SCALE: 1/2" = 1' - 0"
4 BUILDING 900 DOMESTIC WATER HEATER - PLUMBING NEW
SCALE: NTS
SCALE: 1/16" = 1'-0"
UP
UPUP
UP
P-407
DEMO NEW
P-407
DISCONNECT, REMOVE, AND DEMO EXISTING DOMESTIC HOT WATER HEATER, PIPING,
VALVES, FITTINGS, CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE AND DEMO EXISTING DOMESTIC HOT WATER PIPING,
DOMESTIC HOT WATER RETURN PIPING, DOMESTIC COLD WATER PIPING, VALVES,
FITTINGS, AND ALL ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN.
EXISTING MIXING VALVE, PIPING, AND ALL ASSOCIATED ACCESSORIES TO REMAIN.
EXISTING PUMPS, PIPING, CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES TO REMAIN.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. EXISTING MECHANICAL/PLUMBING EQUIPMENT AND ALL ASSOCIATED ACCESSORIES TO REMAIN UNLESS
OTHERWISE NOTED.
2. DEMOLITION OF EXISTING DOMESTIC HOT WATER SYSTEM MUST BE COORDINATED/APPROVED BY THE
FACILITY BEFORE ANY DEMOLITION WORK CAN BEGIN.
3. EXISTING HOT WATER SYSTEM IS LOCATED NEAR EXTERIOR WALL. EXISTING DOMESTIC HOT WATER
SYSTEM SHOWN AWAY FROM WALL FOR CLARITY.
X-DWH-1
X-DWH-2
X-P-4
X-MV
M
X-WATER METER
X-3/4''
X-
TW
R
X-
TW
X-
CW
X-
CW
X-2''
X-2''
X-3/4''
X-
TW
X-2''
X-2''
X-
TW
R
X-HW DN
(TYP. 2)
X-CW DN
(TYP. 2)
X-2"
X-2''2
PLUMBING KEY NOTES
INSTALL NEW INDIRECT DOMESTIC WATER HEATER, PIPING, VALVES, FITTINGS,
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN THE
LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW EXPANSION TANK, PIPING, AND ALL ASSOCIATED ACCESSORIES IN
THE LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INSTALL NEW EXPANSION TANK ON EXISTING CONCRETE PAD.
INSTALL NEW DOMESTIC HOT WATER PIPING, DOMESTIC HOT WATER RETURN
PIPING, DOMESTIC COLD WATER PIPING, VALVES, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN. MODIFY EXISTING PIPING AS REQUIRED
TO MAKE NEW CONNECTION.
GENERAL PLUMBING NOTES
1. CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS REQUIRED TO CONNECT
NEW EQUIPMENT TO THE EXISTING DDC CONTROL PANEL AND JCI METASYS BAS.
CONTRACTOR TO PROVIDE ALL CONTROL COMPONENTS REQUIRED TO INTEGRATE
ALL NEW EQUIPMENT INTO THE EXISTING FRONT-END GRAPHICS.
2. NEW DOMESTIC HOT WATER SYSTEM TO BE INSTALLED NEAR WALL ON EXISTING
CONCRETE PAD. NEW DOMESTIC WATER HEATER SYSTEM SHOWN OFF EXTERIOR
WALL FOR CLARITY. CONTRACTOR TO INSTALL ALL NEW EQUIPMENT PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS AND MAINTAIN ALL REQUIRED
SERVICE CLEARANCES.
X-P-4
X-MV
M
X-WATER METER
X-3/4''
X-
TW
R
X-
TW
X-
CW
X-
CW
X-2''
X-2''
X-3/4''
X-
TW
X-2''
X-2''
X-
TW
R
XT-1200
HW
2"
2"
2" 2"
3/4"
TW
R
1DWH-1200-1
CW
3 3/4"
2"
HW
CW
2"
X-MV
X-CW
X-TWR
X-TW
X-2"
X-3/4"
X-P
X-2"
X-FLOOR
X-2"
X-CW
X-2"
X-CONCRETE PAD
DWH-1200-1
XT-1200
1P
HW
PRESSURE GAUGE
AUTOMATIC AIR VENT
3/4"
2"
CW
2" CW
1-1/2" DRAIN VALVE PIPE
TO FLOOR DRAIN (TYP.)
UNION (TYP.)
SHUTOFF
VALVE (TYP.)CW
2"
P
P
P/T
PIPE TO
FLOOR
DRAIN
THERMOMETER (TYP.)
PRESSURE
GAUGE (TYP.)
2"
BAS
SENSOR
3/4"
HWR HWR
X-MV
X-DWH-1 X-DWH-2
X-CW
X-TWR
X-TW
X-
CW
X-2"
X-3/4"
X-P
X-2"
X-FLOOR
X-2"
X-CW
X-2"
X-CONCRETE PAD 1
X-
HW
X-
CW
X-CW
X-1-1/2"
X-2"
P-407
DBP
CAT
24314.00
472/24257.CTS
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
7/28/2025 CD SET
KEY PLAN
SCALE: NTS
N
BUILDING 1200 -
UPPER LEVEL FLOOR PLAN -
PLUMBING DEMOLITION/NEW
N
BUILDING 1200 UPPER LEVEL FLOOR PLAN
1 BUILDING 1200 MECHANICAL ROOM ENLARGED - PLUMBING DEMOLITION
SCALE: 1/2" = 1' - 0"
3 BUILDING 1200 DOMESTIC WATER HEATER - PLUMBING DEMOLITION
SCALE: NTS
2 BUILDING 1200 MECHANICAL ROOM ENLARGED - PLUMBING NEW
SCALE: 1/2" = 1' - 0"
4 BUILDING 1200 DOMESTIC WATER HEATER - PLUMBING NEW
SCALE: NTS
N
SCALE: 1/16" = 1'-0"
NN
GENERAL HVAC NOTES
1. LOCATE EXHAUST OUTLETS OF VENTILATION SYSTEMS,
COMBUSTION EQUIPMENT STACKS, PLUMBING VENTS AT
LEAST 10 FEET FROM OUTDOOR AIR INTAKES.
2. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES PER
MANUFACTURERS WRITTEN INSTRUCTIONS.
3. LOCATE OUTDOOR INTAKES AT LEAST 6 FEET ABOVE GROUND
LEVEL OR 3 FEET ABOVE ROOF LEVEL. UNLESS OTHERWISE
INDICATED.
4. ALL EXISTING SYSTEMS (INCLUDING PUMPS) THAT SERVES
AREAS BEING RENOVATED SHALL BE REBALANCED AS
REQUIRED.
5. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION
THAT MAY AFFECT NORMAL OPERATION OF OTHER AREAS.
6. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY
CONFLICT WITH NEW CONSTRUCTION AND RELOCATE AS
NEEDED.
7. LOCATIONS OF THE THERMOSTATS TO BE VERIFIED IN FIELD.
8. FIRE DAMPERS & COMBINATION FIRE/SMOKE DAMPERS SHALL
MATCH RATING OF WALL. UNLESS NOTED OTHERWISE.
9. INTERLOCK FIRE/SMOKE DAMPERS BY ELECTRICAL TRADES.
PROVE OPEN BEFORE AIR HANDLING UNITS FAN(S) START.
10. FIELD VERIFY EXISTING LOUVER SIZES PRIOR TO
CONSTRUCTION AND ORDERING NEW DAMPERS.
11. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER
DISCIPLINES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.
12. PROVIDE MANUAL AIR VENTS WITH 3/4" HOSE CONNECTION AT
ALL HIGH POINTS.
13. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.
14. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,
ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS
THAT MAY AFFECT THE WORK.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
THE INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW"
CONDITION DURING CONSTRUCTION.
16. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED BY
LAW.
17. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE,
LATEST APPLICABLE EDITION.
18. CONTRACTOR SHALL USE LOW PRESSURE LOSS DUCT
FITTINGS IN ACCORDANCE WITH SMACNA. (WYES, RADIUSED
OR VANED TEES, ETC.) DUCTWORK SHALL BE GALVANIZED
SHEET METAL, MIN. 26 GA.
19. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS,
REVISIONS, AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE
STATUTES, ORDINANCES, CODES OR REGULATIONS OF
FEDERAL, STATE, AND LOCAL AUTHORITIES HAVING
JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
20. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY
OSHA, UNDERWRITERS, LABORATORIES, AMERICAN CODES,
ASA, ASHRAE, ARI, NEC, STATE FIRE INSURANCE REGULATION
BODY, NFPA OR OTHERS, THESE STANDARDS SHALL BE
FOLLOWED WHETHER OR NOT INDICATED ON THE DRAWING
AND SPECIFICATIONS.
21. DRAWING LAYOUT IS SCHEMATIC. EXACT LOCATION OF
EQUIPMENT SHALL BE COORDINATED WITH BUILDING
STRUCTURE, EQUIPMENT FURNISHED, AND ALL OTHER
TRADES PRIOR TO INSTALLATION. ANY CONTRACTOR
INSTALLING WORK WITHOUT PRIOR COORDINATION SHALL
RELOCATE HIS WORK AT HIS EXPENSE TO ALLOW PROPER
INSTALLATION OF ANY AND ALL TRADES WORK.
22. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR
SPECIFICATIONS THE MORE STRINGENT AND GREATER COST
ITEM SHALL BE USED.
23. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND DUCTS AND SUGGESTED ROUTES.
IT IS NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE
HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.
DO NOT SCALE FROM DRAWINGS.
24. ANY ADDITIONAL LOW VOLTAGE CONTROL WIRING THAT IS
REQUIRED SHALL BE PROVIDED BY THE HVAC CONTRACTOR.
CONTROL WIRING SHALL BE RUN IN CONDUIT IF REQUIRED BY
LOCAL CODES. POWER SHALL BE PROVIDED BY THE
ELECTRICAL CONTRACTOR.
25. 4.CONTRACTOR TO REPAIR CEILING/WALL/ROOF TO MATCH
EXISTING AS REQUIRED WHERE NEW/DEMOLITION WORK
OCCURRED.
26. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH POST
CONSTRUCTION MEETING WITH THE ENGINEER AND OWNER
TO REVIEW AND FIX ISSUES DURING THE WARRANTY PERIOD.
27. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO
OWNER OF THE AMOUNT OF MATERIAL BEING RECYCLED
THROUGHOUT THE PROJECT.
28. CONTRACTOR WILL HAVE 1 ESCORT TO WORK WITH THROUGH
AT THE PROJECT.
29. CONTRACTOR TO PATCH AND PAINT EXISTING WALLS AS
NEEDED TO MATCH EXISTING WHERE DEMOLITION AND/OR
NEW WORK IS COMPLETED.
30. FIELD VERIFY EXISTING SIZE OF ALL EQUIPMENT PRIOR TO
ORDERING NEW EQUIPMENT.
31. CONTRACTOR TO NOTIFY THE FACILITY AT LEAST 1 DAY IN
ADVANCE FOR ANY HOT WORK TO ALLOW THE OWNER TO
DISABLE THE FIRE ALARM.
32. ALL FASTENERS USED IN AREAS EXPOSED TO INMATES SHALL
USE TAMPERPROOF SCREWS.
33. ALL ROOF PENETRATIONS SHALL BE SEALED WATER TIGHT
AND SHALL MAINTAIN ALL EXISTING WARRANTIES.
34. CONTRACTOR TO PROVIDE ALL REQUIRED CONTROLS
EQUIPMENT AND ASSOCIATED ACCESSORIES TO CONNECT
NEW EQUIPMENT TO EXISTING JCI BAS AND INTEGRATE NEW
EQUIPMENT ON TO THE EXISTING FRONT END GRAPHICS.
35. CONNECT ALL BOILER ALARM CONTACTS TO STARNET 2
SYSTEM THRU ETHERNET CONTACT CLOSURE. CONNECT TO
SECURITY IT RACK WITH PURPLE CAT-6 CABLES(S) AS
REQUIRED TO CONNECT TO STARNET 2 SYSTEM.
CONTRACTOR TO HIRE AND COORDINATE CONNECTION TO
SECURITY IT RACK WITH BRETT EMERSON FROM COMMTECH
DESIGN (PHONE 616-433-7210).
36. COMBUSTION AIR AND VENT PIPE ARE TO BE ROUTED
THROUGH NEW ROOF PENETRATIONS AND ROUTED UP
THROUGH A NEW ROOF CURB AND ROOF BOOT. PATCH ROOF
PENETRATIONS AS REQUIRED TO MATCH EXISTING, SEAL
WATERTIGHT, AND MAINTAIN ANY EXISTING ROOF
WARRANTIES. ALL COMBUSTION AIR AND VENT PIPE EXTERIOR
OPENINGS ARE TO BE EQUIPPED WITH BUG SCREEN.
37. ALL COORDINATION ITEMS AND/OR REQUIRED SYSTEM
SHUTDOWNS MUST BE COORDINATED AND APPROVED BY
MDOC 10 DAYS IN ADVANCE. CONTRACTOR TO PROVIDE
DETAILED SCHEDULE OF WHAT IS GOING TO OCCUR AND
WHAT WILL BE AFFECTED. CONTRACTOR TO ALSO PROVIDE
MDOC WITH SAFETY AND BACKUP PLANS IF AN UNEXPECTED
EVENT WERE TO OCCUR DURING THE COORDINATION ITEMS
AND/OR REQUIRED SYSTEM SHUTDOWNS.
38. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR
INSTALLATION OF ALL 24 VOLT CONTROL WIRING AS REQUIRED
TO CONTROL ALL HVAC EQUIPMENT PER THE SEQUENCE OF
OPERATIONS. REFER TO MECHANICAL SPECIFICATIONS AND
COORDINATE WITH MECHANICAL CONTRACTOR. ELECTRICAL
CONTRACTOR IS RESPONSIBLE FOR INSTALLING WIRING AND
RACEWAY PER ELECTRICAL SPECIFICATIONS.
39. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING
AND INSTALLING ALL MECHANICAL EQUIPMENT.
40. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL OTHER
HARDWARE REQUIRED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .