This document contains the bid plans for the MDOT Garage Structural Repairs Bid Package #2 for the Adrian and Brighton garages, with DTMB File Number 591/23074.CTS. The project involves structural repairs to the MDOT maintenance garage in Adrian and the storage building in Brighton, including column repairs, cleaning and painting, and related concrete work. The bid package provides detailed repair plans, specifications, and a schedule of special inspections. The bid submittal deadline is 2:00 PM on the due date. Approved emailed submissions will be accepted on a case-by-case basis prior to the deadline. The contract is for the MDOT Garage Structural Repairs project, which will be awarded to a qualified contractor.
The bid package outlines the required concrete, steel, and waterproofing materials and installation standards. Pricing is not provided, as this is a bid solicitation. The project is funded through the MDOT program, with the work to be performed at the Adrian and Brighton locations in Lenawee and Livingston counties, Michigan. No other salient information is provided regarding pricing terms, set asides, incumbents, or funding details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Michigan MDOT Garage Structural Repairs
Bid Package #2 Adrian & Brighton Garages
DTMB File Number: 591/23074.CTS MDOT Program Number: F000833CON (Adrian); F000834CON (Brighton)
Unit Number: 3080
T1.1 TITLE PAGE
G1.1 GENERAL NOTES
R1.1 MDOT ADRIAN MAINTENANCE GARAGE FLOOR PLAN
R1.2 MDOT BRIGHTON STORAGE BUILDING FLOOR PLAN
R5.1 REPAIR DETAILS
R5.2 REPAIR DETAILS
R5.3 REPAIR DETAILS
T1.1
Title Page
N
PROJECT LOCATION - ADRIAN
N.T.S.1
Site Address: 2451 North Adrian Highway, Adrian, MI 49221
SHEET INDEX
PROJECT LOCATION -
MDOT ADRIAN GARAGE
SHEET NO.
Restore Consulting, LLC 313.737.8673 www.restoreces.com
M D
O T
G ar ag e
St ru ct ur al R ep ai rs Bi d Pa ck ag e #2
Ad ria n
Br ig ht on
G ar ag es
SHEET NAME
DRAWINGS SHALL NOT BE REPRODUCED WITHOUT WRITTEN
CONSENT FROM RESTORE CONSULTING, LLC.
Project # 2023-1001
MDOT Program No.: F000833CON, F000834CON
Date: 9/11/23
Designed by: D.S.E.
Drawn by: G.L.A.
No. Revision DescriptionDate
DTMB File No.: 591/23074.CTS
Issued For: Bidding & Construction
N
PROJECT LOCATION - BRIGHTON
N.T.S.2
Site Address: 10102 East Grand River Avenue, Brighton, MI 48116
PROJECT LOCATION -
MDOT BRIGHTON GARAGE
G1.1
General Notes
GENERAL
1. DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE FOLLOWING (LATEST
EDITION):
A. MICHIGAN BUILDING CODE
B. MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS
C. STEEL CONSTRUCTION MANUAL
D. STRUCTURAL WELDING CODE ANSI/AWS D1.1/D1.1M:2020
2. CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL NECESSARY PERMITS.
3. CONTRACTOR SHALL ABIDE BY LOCAL NOISE ORDINANCES AS NEEDED.
4. CONTRACTOR SHALL COORDINATE ALL WORK ACTIVITIES WITH GARAGE SUPERVISOR THAT
MAY CAUSE INTERFERENCE OR DISRUPTION TO MDOT OPERATIONS.
5. PROVIDE ACCESS FOR THE ENGINEER AND/OR OWNER TO REVIEW WORK AS REQUIRED.
6. REPORT ANY DISCREPANCIES OR CONFLICTS BETWEEN CONSTRUCTION DOCUMENTS AND
ACTUAL ON-SITE CONDITIONS IMMEDIATELY TO ENGINEER PRIOR TO PROCEEDING WITH
WORK.
7. DIMENSIONS INDICATED ON THE DRAWINGS FOR EXISTING STRUCTURES ARE APPROXIMATE
AND THE ENGINEER/OWNER TAKE NO RESPONSIBILITY FOR THE ACCURACY OF THE
DIMENSIONS SHOWN ON THE DRAWINGS. CONTRACTOR SHALL FIELD VERIFY ALL CRITICAL
DIMENSIONS NEEDED FOR LAYOUT OR TO PROPERLY PERFORM THE WORK PRIOR TO
BEGINNING WORK.
8. PROVIDE SUBMITTALS FOR ALL MATERIALS, COLOR SAMPLES (WHEN REQUESTED) AND TRIAL
AREAS, AS INDICATED, FOR ALL WORK ITEMS. THESE ARE TO BE SUBMITTED OR COMPLETED
FOR APPROVAL BY ENGINEER. APPROVAL OF ENGINEER MUST BE RECEIVED PRIOR TO
DEVIATING FROM ANY OF THE DETAILING, MATERIALS, SCOPE, ETC AS SHOWN ON THESE
DOCUMENTS.
9. CONTRACTOR IS SOLELY RESPONSIBLE FOR MEANS AND METHODS AND JOB-SITE SAFETY.
ENGINEER'S SITE VISIT DO NOT INVOLVE REVIEWING JOB-SITE SAFETY AND ENGINEER WILL
NOT DIRECT CONTRACTOR'S PERSONNEL. CONTRACTOR SHALL PERFORM WORK IN
ACCORDANCE WITH ALL APPLICABLE MIOSHA HEALTH & SAFETY STANDARDS, RULES AND
REGULATIONS.
10. CONTRACTOR IS RESPONSIBLE FOR TEMPORARY SHORING AND BRACING AS SHOWN ON THE
DRAWINGS OR AS NEEDED TO SAFELY PERFORM THE WORK. SHORING SHALL BE PROVIDED
AT NO ADDITIONAL COST.
11. FIRE SUPPRESSION SYSTEM SHALL BE MAINTAINED AT ALL TIMES. MAINTAIN ACCESS TO AND
CLEARANCE OF EXISTING FIRE DEPARTMENT CONNECTIONS.
12. CARE SHALL BE TAKEN TO NOT DAMAGE THE EXISTING ELECTRICAL SERVICE OR OTHER
UTILITIES. LOCATE ALL CONDUITS AND OTHER UTILITIES PRIOR TO DEMOLITION OR CUTTING.
13. STRUCTURAL MEMBERS SHALL NOT BE CUT UNLESS SPECIFICALLY DETAILED OR APPROVED IN
WRITING BY THE ENGINEER.
14. CONTRACTOR SHALL COORDINATE DELIVERIES AND STORAGE OF MATERIALS WITH OWNER.
15. ALL MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS WRITTEN
INSTALLATION INSTRUCTIONS.
CONSTRUCTION PHASING
1. REPAIRS AT THE BRIGHTON GARAGE SHALL BE TOP PRIORITY.
2. ADRIAN:
A. CONTRACTOR MAY CLOSE OFF AS MANY SPACES AS NEEDED TO COMPLETE COLUMN
REPAIR WORK IN A TIMELY MANNER.
B. WASH BAY MAY CLOSED AS NEEDED TO COMPLETE COLUMN REPAIR WORK IN A TIMELY
MANNER.
3. BRIGHTON:
A. PRIOR TO NOVEMBER CONTRACTOR CAN HAVE ONE SIDE (EAST SIDE OR WEST SIDE) OF
BUILDING TO COMPLETE THE WORK.
B. LIMITED WORK AREA WILL BE AVAILABLE DURING THE WINTER MONTHS (NOV.-MARCH) AS
ALL MAINTENANCE TRUCKS MUST BE KEPT INSIDE THE BUILDING.
4. COORDINATE ALL SPACE CLOSURES WITH BUILDING MANAGER.
CONCRETE
1. DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH ACI 318 AND ACI 562. REFER TO
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. PROVIDE 3 4" CHAMFER AT ALL EXPOSED CORNERS, UNLESS NOTED OTHERWISE.
3. REINFORCEMENT SHALL BE ASTM A615, GRADE 60. REINFORCEMENT SHALL BE EPOXY
COATED UNLESS NOTED OTHERWISE.
4. LAP SPLICES SHALL BE IN ACCORDANCE WITH ACI 318.
5. CONCRETE MIX REQUIREMENTS:
A. MINIMUM 28-DAY COMPRESSIVE STRENGTH = 5,000 PSI
B. AIR CONTENT = 6.5%, ±1.5%
C. MAXIMUM WATER/CEMENT RATIO = 0.40
D. CALCIUM NITRITE BASED CORROSION INHIBITOR DOSED AT 2 GAL/CY OF CONCRETE
E. CEMENT: ASTM C150, TYPE I
F. AGGREGATES: ASTM C33
6. PREPACKAGED CONCRETE REPAIR MATERIALS MAY BE USED AT CONTRACTORS OPTION,
REFER TO SPECIFICATION SECTION 030130, CONCRETE REPAIR.
7. GROUT (TO BE USED UNDER BASE PLATES): ASTM C1107, NON-SHRINK, NON-METALLIC,
NON-STAINING CEMENTITIOUS GROUT THAT CONTAINS NO CHLORIDE. 6,000 PSI MINIMUM
COMPRESSIVE STRENGTH.
METALS
1. STEEL PLATES SHALL BE ASTM A36.
2. WELDED CONNECTIONS SHALL CONFORM TO AWS D1.1, "STRUCTURAL WELDING CODE" USING
E70XX LOW HYDROGEN ELECTRODES.
3. ALL WELDERS SHALL BE QUALIFIED IN THE PROCESS USED AND AWS CERTIFIED. WELDS
SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE AMERICAN WELDING SOCIETY
SPECIFICATIONS.
4. WELDS SHALL BE CONTINUOUS BETWEEN ABRUPT CHANGES IN DIRECTION WHERE NO WELD
LENGTH IS SHOWN ON THE WELD SYMBOLS.
WATERPROOFING
1. INSTALL NEW JOINT SEALANT AS INDICATED ON DRAWINGS.
PAINTING
1. CLEAN & PAINT STEEL MEMBERS AS INDICATED ON THE DRAWINGS.
A. ALL EXPOSED STEEL SURFACES SHALL BE CLEANED AND PREPPED IN ACCORDANCE WITH
SPECIFICATION SECTION 099100 PRIOR TO PAINTING.
B. COLOR OF FINISH COAT TO MATCH EXISTING, UNLESS NOTED OTHERWISE.
C. APPLY PRIMER WITHIN 8 HOURS OF ABRASIVE BLASTING.
SCHEDULE OF SPECIAL INSPECTIONS
TYPE FREQUENCY1 REFERENCED STANDARD
MATERIAL VERIFICATION OF WELD FILLER MATERIALS S AISC 360 A3.5, AWS D1.1
VERIFY WELDER CERTIFICATION FOR ALL FIELD WELDERS
WHO WILL PERFORM FIELD WELDING S AWS D1.1
INSPECTION OF WELDING P AWS D1.1, MBC 1705.2.1
1 S = SUBMITTAL, C = CONTINUOUS, P = PERIODIC
SPECIAL INSPECTION NOTES:
1. GUIDELINES AND REQUIREMENTS FOR SPECIAL INSPECTIONS ARE INDICATED IN CHAPTER 17 OF THE MICHIGAN BUILDING CODE.
2. SPECIAL INSPECTORS SHALL BE GIVEN ACCESS TO THE SITE TO PERFORM TESTING AND INSPECTION AS NECESSARY.
SHEET NO.
Restore Consulting, LLC 313.737.8673 www.restoreces.com
M D
O T
G ar ag e
St ru ct ur al R ep ai rs Bi d Pa ck ag e #2
Ad ria n
Br ig ht on
G ar ag es
SHEET NAME
DRAWINGS SHALL NOT BE REPRODUCED WITHOUT WRITTEN
CONSENT FROM RESTORE CONSULTING, LLC.
Project # 2023-1001
MDOT Program No.: F000833CON, F000834CON
Date: 9/11/23
Designed by: D.S.E.
Drawn by: G.L.A.
No. Revision DescriptionDate
DTMB File No.: 591/23074.CTS
Issued For: Bidding & Construction
20'-0"
A
2 3 4 5 6 7 8 9
20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0"
D
10 11 12 13
B
C
E
25'-4" 20'-0" 25'-2"2'-2"
'-8
'-0
'-0
'-6
R1.1
MDOT Adrian Maintenance Garage Floor Plan
N
ADRIAN MDOT MAINTENANCE GARAGE FLOOR PLAN
Scale: 3/32" = 1'-0"
SHEET NO.
Restore Consulting, LLC 313.737.8673 www.restoreces.com
M D
O T
G ar ag e
St ru ct ur al R ep ai rs Bi d Pa ck ag e #2
Ad ria n
Br ig ht on
G ar ag es
SHEET NAME
DRAWINGS SHALL NOT BE REPRODUCED WITHOUT WRITTEN
CONSENT FROM RESTORE CONSULTING, LLC.
Project # 2023-1001
MDOT Program No.: F000833CON, F000834CON
Date: 9/11/23
Designed by: D.S.E.
Drawn by: G.L.A.
No. Revision DescriptionDate
DTMB File No.: 591/23074.CTS
Issued For: Bidding & ConstructionSHEET NOTES:
1. REFER TO DRAWING G1.2 FOR GENERAL NOTES.
LEGEND
XX
WORK ITEM #
ESTIMATED QUANTITY
= COLUMN REPAIR - TYPE 1,
REFER TO DRAWING R5.1
COLUMN REPAIR - TYPE 2,
REFER TO DRAWING R5.2
# = COLUMN REPAIR - TYPE 4,
REFER TO DETAILS 4A-4D/R5.3
A1
# = ALTERNATE #A1 - CLEAN & PAINT COLUMN,
REFER TO DETAIL A1/R5.3
# = COLUMN REPAIR - TYPE 3,
REFER TO DETAILS 3A-3D/R5.3
# = CLEAN & PAINT COLUMN AND INSTALL NUTS,
REFER TO DETAILS 5A-5B/R5.3
1 EA
1 EA
1 EA
A1
1 EA
A1
1 EA
A1
1 EA
20'-0"
N
BRIGHTON STORAGE BUILDING FLOOR PLAN
Scale: 1/8" = 1'-0"
A
2 3 4 5
20'-0" 20'-0" 20'-0"
80'-0"
D
B
C
'-3
'-0
'-3
1'
-9
1' -9
'-0
R1.2
MDOT Brighton Storage Building Floor Plan
SHEET NO.
Restore Consulting, LLC 313.737.8673 www.restoreces.com
M D
O T
G ar ag e
St ru ct ur al R ep ai rs Bi d Pa ck ag e #2
Ad ria n
Br ig ht on
G ar ag es
SHEET NAME
DRAWINGS SHALL NOT BE REPRODUCED WITHOUT WRITTEN
CONSENT FROM RESTORE CONSULTING, LLC.
Project # 2023-1001
MDOT Program No.: F000833CON, F000834CON
Date: 9/11/23
Designed by: D.S.E.
Drawn by: G.L.A.
No. Revision DescriptionDate
DTMB File No.: 591/23074.CTS
Issued For: Bidding & ConstructionSHEET NOTES:
1. REFER TO DRAWING G1.2 FOR GENERAL NOTES.
LEGEND
XX
WORK ITEM #
ESTIMATED QUANTITY
= COLUMN REPAIR - TYPE 1,
REFER TO DRAWING R5.1
COLUMN REPAIR - TYPE 2,
REFER TO DRAWING R5.2
# = COLUMN REPAIR - TYPE 4,
REFER TO DETAILS 4A-4D/R5.3
A1
# = ALTERNATE #A1 - CLEAN & PAINT COLUMN,
REFER TO DETAIL A1/R5.3
# = COLUMN REPAIR - TYPE 3,
REFER TO DETAILS 3A-3D/R5.3
# = CLEAN & PAINT COLUMN AND INSTALL NUTS,
REFER TO DETAILS 5A-5B/R5.3
1 EA
1 EA
1 EA
1 EA
1 EA
A1
1 EA
1 EA
1 EA
1 EA
A1
1 EA
A1
1 EA
1 EA
1 EA
R5.1
Repair Details
COLUMN REPAIR TYPE 1 - SECTION (STEP 2)
1 1/2" = 1'-0"1D D103
8" 1'-6"
EXIST. CONCRETE
PIER
9"
1'-4"
6" 21 2"
4" 21 2"
(2) #4 BARS E.C. W/ 90°
HOOK AT EACH END
(8) #4 BARS E.C. EMBED 6"
INTO EXIST. CONC PIER &
ANCHOR W/ ADHESIVE
2" 91
2" 4"
NEW CONC. PIER
EXIST. CONC. SLAB
CONTRACTOR'S OPTION TO
INSTALL 1"Ø S.S. THREADED
RODS NOW OR IN STEP 3,
REFER TO DET. 1E.
NOTES:
1. NEW CONCRETE SHALL BE FLAT AT TOP OF PIER TO PROVIDE EVEN BEARING SURFACE FOR NEW
BASE PLATE.
METAL PANEL
INSULATION
GIRT FRAMING
COLUMN REPAIR TYPE 1 - PLAN (STEP 1)
1 1/2" = 1'-0"1A D100
1'-0" 1'-0"
1' -6
2' -2
NOTES:
1. VERIFY ALL EXISTING DIMENSIONS IN THE FIELD.
2. PRIOR TO INSTALLING NEW STEEL PLATES, PAINT ALL SURFACES THAT WILL NOT BE EXPOSED
ONCE INSTALLED. REFER TO SPEC 099100 FOR SURFACE PREPARATION.
1B
R5.1 EXIST. CONC. PIER
EXIST. STEEL RIGID FRAME
COLUMN W/ TAPERED WEB
CLEAN ALL EXPOSED
STEEL AND INSTALL
PRIMER AND TWO (2)
COATS OF EPOXY PAINT
PRIOR TO INSTALLING NEW
CONCRETE, SEE NOTE 2.
8" THICK CONCRETE
FOUNDATION WALL
WITH METAL PANEL
ABOVE FLOOR LINE.
NEW 12" THICK STEEL
PLATE WELDED TO
COLUMN FLANGES,
WEB & BASE PLATE
COLUMN REPAIR TYPE 1 - SECTION (STEP 1)
1 1/2" = 1'-0"1B D101
8" 1'-6"
EXIST. ANCHOR
EXIST. CONCRETE
PIER
4"
6 3 4"± (V.I.F.)
6 18"± (V.I.F.)
8"
NEW 12" THICK STEEL PLATE
WELDED TO COLUMN FLANGES &
WEB. NOTCH PLATE AS NEEDED
TO ACCOMMODATE VERTICAL
BRACING WHERE APPLICABLE
8"
EXIST. SLAB
STEEL RIGID FRAME COLUMN
WITH TAPERED WEB
1 2"
METAL PANEL
7"
INSULATION
GIRT FRAMING
COLUMN REPAIR TYPE 1 - PLAN (STEP 2)
1 1/2" = 1'-0"1C D102
1' -6
1D R5.1
EXIST. CONC. PIER
NEW CONC. PIER
1' -4
EXIST. STEEL RIGID FRAME
4" 91 2"
21 2"
3" M
IN
C
LE
AR
, T
YP
4" 8"4"
(8) #4 BARS E.C. EMBED 6"
INTO EXIST. CONC PIER &
ANCHOR W/ ADHESIVE
(2) #4 BARS E.C. W/ 90°
HOOK AT EACH END
3"5"
2'-0"
2' -2
COLUMN REPAIR TYPE 1 - PLAN (STEP 3)
1 1/2" = 1'-0"1E D104
1F
R5.1 EXIST. CONC. PIER
NEW CONC. PIER
EXIST. STEEL RIGID FRAME
2'-0"
NEW 8"x6 3 4"±x3 4"
STEEL BASE PLATE,
TYP. (2 TOTAL)
NEW 12" STEEL SIDE
PLATE, TYP. (4 TOTAL)
8" 4 12"
4"
8"
4"
±1 4"
SIDE ⅊ TO BASE ⅊,
SIDE ⅊ TO FLANGE
SIDE ⅊ TO WEB &
BASE ⅊ TO WEB,TYP.
2"
EQ
EQ
NEW 1"Ø S.S. THREADED
ROD, EMBED 8" INTO EXIST.
CONC. PIER & ANCHOR W/
ADHESIVE, TYP.
1G R5.1
NOTES:
1. PRIOR TO INSTALLING NEW STEEL PLATES, PAINT ALL SURFACES THAT WILL NOT BE EXPOSED
OR DIFFICULT TO PAINT ONCE INSTALLED (IE BOTTOM SIDE OF BASEPLATE, PLATES THAT ABUT
EXIST. STEEL FLANGE, ETC.)
PAINT STEEL PLATE
PRIOR TO INSTALLING,
TYP. SEE NOTE 1.
COLUMN REPAIR TYPE 1 - SECTION (STEP 3)
1 1/2" = 1'-0"1F D105
8" 1'-6"
EXIST. CONCRETE PIER
9"
1'-4"
8"
21 2" 4"
21 2"
NEW CONC. PIER
EXIST. CONC. SLAB
NEW 1"Ø S.S. THREADED ROD,
EMBED 8" INTO EXIST. CONC. PIER
& ANCHOR W/ ADHESIVE, TYP
4"
SIDE ⅊ TO BASE ⅊,
SIDE ⅊ TO FLANGE
SIDE ⅊ TO WEB &
BASE ⅊ TO WEB,TYP.
NEW 12" STEEL SIDE
PLATE, TYP (4 TOTAL)
NEW 8"x6 3 4"±x3
4" STEEL
BASE PLATE, TYP. (2 TOTAL)
8" 4 12"
4"
2" 91
2" 4"
COLUMN REPAIR TYPE 1 - SECTION (STEP 3)
1 1/2" = 1'-0"1G D106
EXIST.
CONC.
PIER
NEW CONC.
PIER, REINF.
NOT SHOWN
FOR CLARITY
EXIST.
CONC. SLAB
NEW 12" STEEL SIDE
PLATE, TYP (4 TOTAL)
8" 4 12"
4"
NEW STEEL BASE
PLATE, TYP. (2 TOTAL)
NEW 1"Ø S.S. THREADED
ROD, EMBED 8" INTO EXIST.
CONC. PIER & ANCHOR W/
ADHESIVE, TYP.
4"
SIDE ⅊ TO BASE ⅊,
SIDE ⅊ TO FLANGE
SIDE ⅊ TO WEB &
BASE ⅊ TO WEB,TYP.
EXIST. STEEL COLUMN
COLUMN REPAIR TYPE 1 - SECTION (STEP 4)
1 1/2" = 1'-0"1H D107
EXIST. CONCRETE PIER
NEW CONC. PIER
EXIST. CONC. SLAB
INSTALL SEALANT AT JOINT BETWEEN
NEW/EXIST. STEEL AND NEW CONC. PIER.
SEALANT TO BE INSTALLED ON ALL SIDES.
INSTALL SEALANT BETWEEN
NEW CONC. PIER & EXIST.
CONC. SEALANT TO BE
INSTALLED ON 3 SIDES
PAINT NEW STEEL PLATE
ASSEMBLY TO MATCH EXIST.
EXIST. STEEL COLUMN
INSTALL VERTICAL COVE JOINT SEALANT BETWEEN
EXIST. METAL PANEL & NEW CONC. PIER AND BETWEEN
EXIST. STEEL COLUMN & EXIST. METAL PANEL. EXTEND
SEALANT 1'-0" ABOVE TOP OF CONC. PIER
1' -0
TY
P.
INSTALL HORIZONTAL COVE JOINT
SEALANT BETWEEN EXIST. METAL
PANEL AND NEW CONC. PIER.
SHEET NO.
Restore Consulting, LLC 313.737.8673 www.restoreces.com
M D
O T
G ar ag e
St ru ct ur al R ep ai rs Bi d Pa ck ag e #2
Ad ria n
Br ig ht on
G ar ag es
SHEET NAME
DRAWINGS SHALL NOT BE REPRODUCED WITHOUT WRITTEN
CONSENT FROM RESTORE CONSULTING, LLC.
Project # 2023-1001
MDOT Program No.: F000833CON, F000834CON
Date: 9/11/23
Designed by: D.S.E.
Drawn by: G.L.A.
No. Revision DescriptionDate
DTMB File No.: 591/23074.CTS
Issued For: Bidding & Construction
R5.2
SHEET NO.
Restore Consulting, LLC 313.737.8673 www.restoreces.com
M D
O T
G ar ag e
St ru ct ur al R ep ai rs Bi d Pa ck ag e #2
Ad ria n
Br ig ht on
G ar ag es
SHEET NAME
DRAWINGS SHALL NOT BE REPRODUCED WITHOUT WRITTEN
CONSENT FROM RESTORE CONSULTING, LLC.
Project # 2023-1001
MDOT Program No.: F000833CON, F000834CON
Date: 9/11/23
Designed by: D.S.E.
Drawn by: G.L.A.
No. Revision DescriptionDate
DTMB File No.: 591/23074.CTS
Issued For: Bidding & Construction
COLUMN REPAIR TYPE 2 - SECTION (STEP 4)
1 1/2" = 1'-0"2H D143
EXIST. CONCRETE PIER
NEW CONC. PIER
EXIST. CONC. SLAB
INSTALL SEALANT AT JOINT BETWEEN
NEW/EXIST. STEEL AND NEW CONC. PIER.
SEALANT TO BE INSTALLED ON ALL SIDES.
INSTALL SEALANT BETWEEN
NEW CONC. PIER & EXIST.
CONC. SEALANT TO BE
INSTALLED ON 3 SIDES
PAINT NEW STEEL PLATE
ASSEMBLY TO MATCH EXIST.
EXIST. STEEL COLUMN
INSTALL VERTICAL COVE JOINT SEALANT BETWEEN
EXIST. METAL PANEL & NEW CONC. PIER AND BETWEEN
EXIST. STEEL COLUMN & EXIST. METAL PANEL. EXTEND
SEALANT 1'-0" ABOVE TOP OF CONC. PIER
1' -0
TY
P.
INSTALL HORIZONTAL COVE JOINT
SEALANT BETWEEN EXIST. METAL
PANEL AND NEW CONC. PIER.
COLUMN REPAIR TYPE 2 - PLAN (STEP 1)
1 1/2" = 1'-0"2A D136
8" 8"
1' -0
1' -8
NOTES:
1. VERIFY ALL EXISTING DIMENSIONS IN THE FIELD.
2. PRIOR TO INSTALLING NEW STEEL PLATES, PAINT ALL SURFACES THAT WILL NOT BE EXPOSED
ONCE INSTALLED. REFER TO SPEC 099100 FOR SURFACE PREPARATION.
2B R5.2
EXIST. CONC. PIER
EXIST. STEEL COLUMN
CLEAN ALL EXPOSED
STEEL AND INSTALL
PRIMER AND TWO (2)
COATS OF EPOXY PAINT
PRIOR TO INSTALLING NEW
CONCRETE, SEE NOTE 2.
8" THICK CONCRETE
FOUNDATION WALL
WITH METAL PANEL
ABOVE FLOOR LINE.
NEW 12" THICK STEEL
PLATE WELDED TO
COLUMN FLANGES,
WEB & BASE PLATE
4"
NEW ⅊ TO FLANGE,
NEW ⅊ TO NEW ⅊
NEW ⅊ TO BASE ⅊
4"
NEW ⅊ TO FLANGE,
NEW ⅊ TO WEB
NEW ⅊ TO BASE ⅊
4"
4"
4"
NEW 9"x8"x1
2" STEEL PLATE
NEW 3 12"x8"X1 2" STEEL PLATENEW 3"x8"x1
2" STEEL PLATE
COLUMN REPAIR TYPE 2 - SECTION (STEP 1)
1 1/2" = 1'-0"2B D137
8" 1'-0"
EXIST. ANCHOR
EXIST. CONCRETE
PIER
4"
7"± (V.I.F.)
8"
NEW 12" THICK STEEL PLATE WELDED
TO COLUMN FLANGES & WEB.
8"
EXIST. SLAB
STEEL COLUMN
1 2"
METAL PANEL
4"±
INSULATION
GIRT FRAMING
NEW 12" THICK STEEL PLATE REFER
TO DET. 2A FOR SIZE & WELDS
NEW 12" THICK
STEEL PLATE
REFER TO DET. 2A
FOR SIZE & WELDS
COLUMN REPAIR TYPE 2 - PLAN (STEP 2)
1 1/2" = 1'-0"2C D138
1' -0
2D R5.2
NEW CONC. PIER SAME DIMENSIONS
AS EXIST. CONC. PIER
EXIST. STEEL COLUMN
3" 61 2"
21 2"
3" 10"
(4) #4 BARS E.C. EMBED 6"
INTO EXIST. CONC PIER &
ANCHOR W/ ADHESIVE
(2) #4 BARS E.C.
3"
1'-4"
1' -8
1 2"
M
IN
C
LE
AR
, T
YP
7 12"
11"
4" 4"
7 12"
COLUMN REPAIR TYPE 2 - SECTION (STEP 2)
1 1/2" = 1'-0"2D D139
8"
EXIST. CONCRETE PIER
9"
1'-0"
6" 21 2"
4" 21 2"
(2) #4 BARS E.C.
(4) #4 BARS E.C. EMBED 6"
INTO EXIST. CONC PIER &
ANCHOR W/ ADHESIVE
2" 61
2" 3"
NEW CONC. PIER
EXIST. CONC. SLAB
CONTRACTOR'S OPTION TO
INSTALL 12" Ø S.S. THREADED
RODS NOW OR IN STEP 3,
REFER TO DET. 2E.
NOTES:
1. NEW CONCRETE SHALL BE FLAT AT TOP OF PIER TO PROVIDE EVEN BEARING SURFACE FOR NEW
BASE PLATE.
METAL PANEL
INSULATION
GIRT FRAMING
COLUMN REPAIR TYPE 2 - PLAN (STEP 3)
1 1/2" = 1'-0"2E D140
2F R5.2
NEW CONC. PIER
EXIST. STEEL COLUMN
1'-4"
NEW 7"x 7"± x 3 4"
STEEL BASE PLATE,
TYP. (2 TOTAL)
NEW 12" STEEL SIDE
PLATE, TYP. (4 TOTAL)
7" 4 12"
4"
7"
7" ±1
4"
SIDE ⅊ TO BASE ⅊,
SIDE ⅊ TO FLANGE
SIDE ⅊ TO WEB &
BASE ⅊ TO WEB,TYP.
8"
EQ
EQ
NEW 12" Ø S.S. THREADED
ROD, EMBED 8" INTO EXIST.
CONC. PIER & ANCHOR W/
ADHESIVE, TYP.
2G R5.2
NOTES:
1. PRIOR TO INSTALLING NEW STEEL PLATES, PAINT ALL SURFACES THAT WILL NOT BE EXPOSED
OR DIFFICULT TO PAINT ONCE INSTALLED (IE BOTTOM SIDE OF BASEPLATE, PLATES THAT ABUT
EXIST. STEEL FLANGE, ETC.)
PAINT STEEL PLATE
PRIOR TO INSTALLING,
TYP. SEE NOTE 1.
COLUMN REPAIR TYPE 2 - SECTION (STEP 3)
1 1/2" = 1'-0"2F D141
8"
EXIST. CONCRETE PIER
9"
1'-0"
8"
21 2" 4"
21 2"
NEW CONC. PIER
EXIST. CONC. SLAB
NEW 12" Ø S.S. THREADED ROD,
EMBED 8" INTO EXIST. CONC. PIER
& ANCHOR W/ ADHESIVE, TYP
4"
SIDE ⅊ TO BASE ⅊,
SIDE ⅊ TO FLANGE
SIDE ⅊ TO WEB &
BASE ⅊ TO WEB,TYP.
NEW 12" STEEL SIDE
PLATE, TYP (4 TOTAL)
NEW 7" x 7"± x 3 4" STEEL
BASE PLATE, TYP. (2 TOTAL)
7" 4 12"
4"
2" 61
2" 3"
COLUMN REPAIR TYPE 2 - SECTION (STEP 3)
1 1/2" = 1'-0"2G D142
EXIST. CONC. PIER
NEW CONC. PIER,
REINF. NOT SHOWN
FOR CLARITY
EXIST. CONC. SLAB
NEW 12" STEEL SIDE
PLATE, TYP (4 TOTAL)
7" 4 12"
4"
NEW STEEL BASE
PLATE, TYP. (2 TOTAL)
NEW 12" Ø S.S. THREADED
ROD, EMBED 8" INTO EXIST.
CONC. PIER & ANCHOR W/
ADHESIVE, TYP.
4"
SIDE ⅊ TO BASE ⅊,
SIDE ⅊ TO FLANGE
SIDE ⅊ TO WEB &
BASE ⅊ TO WEB,TYP.
EXIST. STEEL COLUMN
R5.3
CLEAN & PAINT COLUMN
1 1/2" = 1'-0"A1 D121
EXIST. CONCRETE
PIER
1' -0
CLEAN & PAINT ALL EXPOSED SURFACES
INCLUDING BOTTOM 1 FT OF COLUMN,
BASE PLATE, & NUTS/BOLTS
EXIST. CONC.
SLAB OR CURB
NOTES:
1. REFER TO SPECIFICATIONS FOR SURFACE PREPARATION AND PAINT SYSTEMS.
ALTERNATE #A1
SHEET NO.
Restore Consulting, LLC 313.737.8673 www.restoreces.com
M D
O T
G ar ag e
St ru ct ur al R ep ai rs Bi d Pa ck ag e #2
Ad ria n
Br ig ht on
G ar ag es
SHEET NAME
DRAWINGS SHALL NOT BE REPRODUCED WITHOUT WRITTEN
CONSENT FROM RESTORE CONSULTING, LLC.
Project # 2023-1001
MDOT Program No.: F000833CON, F000834CON
Date: 9/11/23
Designed by: D.S.E.
Drawn by: G.L.A.
No. Revision DescriptionDate
DTMB File No.: 591/23074.CTS
Issued For: Bidding & Construction
COLUMN REPAIR TYPE 4 (STEP 2)
1 1/2" = 1'-0"4D D134
6" 7"
NEW 12" x 7" REPAIR PLATE
4"
COLUMN REPAIR TYPE 4 - EXISTING CONDITIONS
1 1/2" = 1'-0"4A D131
STEEL RIGID FRAME COLUMN
WITH TAPERED WEB
1' -0
8"±
FINISHED FLOOR
CONCRETE PIER
7"±
8"
IMPACT DAMAGED (BENT)
COLUMN FLANGE
COLUMN REPAIR TYPE 4 (STEP 1)
1 1/2" = 1'-0"4B D132
FINISHED FLOOR
CONCRETE PIER
STRAIGHTEN COLUMN
FLANGE
DAMAGE LENGTH, MEASURE
IN THE FIELD.
COLUMN REPAIR TYPE 4 (STEP 2)
1 1/2" = 1'-0"4C D133
FINISHED FLOOR
CONCRETE PIER
8" 8"
D
AM
AG
ED
L
EN
G
TH
4D R5.3
PAINT NEW STEEL PLATE
TO MATCH EXIST.
COLUMN REPAIR TYPE 3 - EXIST. CONDITIONS
NTS3B
CONTRACTOR SHALL MOVE EXIST.
CABINET & REINSTALL AFTER
REPAIRS HAVE BEEN COMPLETED.
COORDINATE W/ OWNER
EXIST. SINK TO REMAIN
CLEAN & PAINT COLUMN AND INSTALL NUTS
1 1/2" = 1'-0"5A D122
CLEAN & PAINT ALL EXPOSED
SURFACES INCLUDING
BOTTOM 4'-0" OF COLUMN,
BASE PLATE & BOLTS
CLEAN & PAINT
STEEL COLUMN
EXIST. PAINTED STEEL TO REMAIN
NOTES:
1. WELD EXISTING ANCHOR BOLT TO BASE PLATE ONLY IF A NEW NUT CANNOT BE INSTALLED
AFTER TRYING TO RE-THREAD BOLTS.
2"
NOTE 1
4' -0
INSTALL NEW NUTS ON EXIST. BOLTS
(4 TOTAL). RE-THREAD BOLTS USING
DIE PROCESS AS NEEDED TO INSTALL
NEW NUTS.
CLEAN & PAINT COLUMN AND INSTALL NUTS
NTS5B
INSTALL NEW NUTS ON EXIST. BOLTS.
RE-THREAD BOLTS AS NEEDED TO
INSTALL NEW NUTS. WELD BOLT TO
BASE PLATE ONLY IF NUTS CANNOT
BE INSTALLED, REFER TO DET. 5A/R5.3
CLEAN & PAINT STEEL COLUMN,
REFER TO DET. 5A/R5.3
COLUMN REPAIR TYPE 3 (STEP 2)
1 1/2" = 1'-0"3D D145
NOTE:
1. ALL SURFACES THAT WILL BE HIDDEN OR NOT EASILY ACCESSIBLE AFTER INSTALLATION SHALL
BE PAINTED PRIOR TO INSTALLATION.
EXISTING CMU WALL
EXISTING CONCRETE PIER
NEW 11 12"± x12"x1
2" STEEL PLATE,
WELDED TO EXISTING COLUMN
FLANGES, WEB & BASE PLATE. PAINT
TO MATCH EXISTING, SEE NOTE 1.
NEW 10 x 12" x 12" STEEL PLATE, WELDED TO EXISTING COLUMN
FLANGE. PAINT TO MATCH
EXISTING, SEE NOTE 1.
4"
TYP. @ FLANGES,
WEB & BASE PLATE
4"
COLUMN REPAIR TYPE 3 (EXISTING CONDITION)
1 1/2" = 1'-0"3A D144
1' -3
11 2" 7 16
1' -0
7 16
7 16
2" 41
2"
1'-7"
4"
NOTES:
1. VERIFY ALL EXISTING DIMENSIONS IN THE FIELD.
CMU WALL
(2) CORRODED
FASTENING NUTS
CONCRETE PIER
COLUMN REPAIR TYPE 3 (STEP 1)
1 1/2" = 1'-0"3C D145
℄ EXISTING CMU WALL
REPLACE (2) CORRODED
FASTENING NUTS
EXISTING CONCRETE PIER
REMOVE CORRODED STEEL
AREAS (EXISTING FLANGES,
WEB & BASE PLATE), CLEAN
TO NEAR WHITE METAL &
PAINT PRIOR TO INSTALLING
NEW STEEL PLATE.
| Sheets and Views |
| 2023-1001 BP2 0-T1.1-T1.1 |
| 2023-1001 BP2 1-G1.1-G1.1 |
| 2023-1001 BP2 2-R1.1 to R1.2-R1.1 |
| 2023-1001 BP2 2-R1.1 to R1.2-R1.2 |
| 2023-1001 BP2 3-R5.1 to R5.3-R5.1 |
| 2023-1001 BP2 3-R5.1 to R5.3-R5.2 |
| 2023-1001 BP2 3-R5.1 to R5.3-R5.3 |
File details come from the government source that posted it. Updated .