Addendum 1 23074 - MDOT Garage Structural Repairs BP2.pdf
PDF 2 MB Posted
- Solicitation number
- RFQ - 171 - 230000000777
- Issued by
- Lenawee County, Livingston County, Michigan
About this file
This document is an Addendum to the Construction Documents for the MDOT Garage Structural Repairs - Bid Package #2 project, involving the Michigan Department of Technology, Management and Budget (DTMB) and the Michigan Department of Transportation (MDOT) for facilities located in Lenawee and Livingston Counties.
The Addendum includes revisions to the Bid Schedule, replacing drawings R1.2, R5.1, R5.2, and R5.3, and providing clarifications on the scope of work. Key changes include separating Alternate A1 into Alternates A1 and A2 for the Adrian and Brighton locations respectively, increasing the quantity for Alternate A2 at Brighton, and adding Alternate A3 to remove and reinstall the power washer at the Brighton Storage Building. The bid opening date remains September 27, 2023.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 10/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
9/22/2023
PROJECT NAME
MDOT Garage Structural Repairs - Bid Package #2, Brighton & Adrian
FILE NUMBER
472.23074.CTS
PROFESSIONAL
Restore Consulting, LLC - Dan Elliot
PROJECT DIRECTOR
Chris Schanbeck
BID OPENING DATE:
9/27/2023
ADDENDUM ITEMS:
1. Attached are the pre-bid meeting minutes and sign-in sheet.
2. Attached is the Restore Consulting Addendum 1.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Dan Elliot DATE: 9/22/2023
APPROVED BY:
PROJECT DIRECTOR: Chris Schanbeck DATE: 9/22/2023
Restore Consulting, LLC | 313.RESTORE (313.737.8673) | info@restoreces.com
ADDENDUM
ADDENDUM #1
to the Construction Documents for
MDOT Garage Structural Repairs – Bid Package #2 DTMB File No. 591/23074.CTS
MDOT Program No. F000833CON & F000834CON Unit No. 3080
Restore Project # 2023-1001
September 22, 2023
This Addendum shall be considered part of the construction documents for the above mentioned project as though it had been issued at the same time and shall be incorporated integrally therewith. Where provisions of this Addendum differ from those of the original construction documents, this Addendum shall govern and take precedence.
Bidders are hereby notified that they shall make any necessary adjustments in their estimates as a result of this
Addendum. It will be construed that each bidder's proposal is submitted with full knowledge of all modifications and supplemental data specified herein.
1. Bid Schedule
A. Replace the Bid Schedule with the revised Bid Schedule attached to this Addendum. The following is a summary of the changes:
1. Separated Alternate A1 into Alternates A1 and A2. Alternate A1 is for Adrian and Alternate A2 is for Brighton.
2. Increased quantity for Alternate A2 at Brighton from 3 EA to 4 EA.
3. Added Alternate A3 to remove and reinstall power washer at Brighton Storage Building.
2. Drawing R1.2 – MDOT Brighton Storage Building Floor Plan:
A. Replace Drawing R1.2 – MDOT Brighton Storage Building Floor Plan with the revised drawing attached to this Addendum. The following is a summary of the changes:
1. Added note to paint new concrete pier safety yellow at grid line B-5.
2. Changed keynote for Alternate A1 to Alternate A2.
3. Added keynote for Alternate A2 to column at grid line A-5
4. Added keynote for Alternate A3 to remove and reinstall power washer near grid line C-5.
5. Added Detail A3 for removing and reinstalling power washer.
3. Drawing R5.1 – Repair Details:
A. Replace Drawing R5.1 – Repair Details with the revised drawing attached to this Addendum. The following is a summary of the changes:
Addendum #1
State of Michigan MDOT Garage Structural Repairs – Bid Package #2
September 22, 2023
Restore Consulting, LLC | Page 2 of 2
1. Detail 1A: Added note to clean and paint corroded metal panel prior to installing new concrete.
2. Details 1E, 1F & 1G: Added note to remove metal panel rib as needed to install new plate assembly. Only the minimum amount of metal panel shall be removed as needed to complete the work. Removal of metal panel rib shall follow profile of plate assembly. Joints sealant shall be installed between the metal panel and new plate assembly.
3. Detail 1H:
a. Modified notes regarding joint sealant installation.
b. Added note to paint column up to 3’-0” above new concrete pier.
4. Drawing R5.2 – Repair Details:
A. Replace Drawing R5.2 – Repair Details with the revised drawing attached to this Addendum. The following is a summary of the changes:
1. Detail 2A: Added note to clean and paint corroded metal panel prior to installing new concrete.
2. Details 2E & 2G: Added note to remove metal panel rib as needed to install new plate assembly.
Only the minimum amount of metal panel shall be removed as needed to complete the work.
Removal of metal panel rib shall follow profile of plate assembly. Joints sealant shall be installed between the metal panel and new plate assembly.
3. Detail 2H:
a. Modified notes regarding joint sealant installation.
b. Added note to paint column up to 3’-0” above new concrete pier.
5. Drawing R5.3 – Repair Details:
A. Replace Drawing R5.3 – Repair Details with the revised drawing attached to this Addendum. The following is a summary of the changes:
1. Added Detail A2: Detail shows scope of work for cleaning and painting columns at Brighton with metal panels at exterior wall.
END OF ADDENDUM #1
Bidding and Contract Document (R 03/22) Project Name: MDOT Garage Structural Repairs – BP #2 File No. 591/23074.CTS
Addendum #1
BID SCHEDULE – ADRIAN (MDOT Program # F000833CON)
Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:
Base Bid Item No.
Bid Quantity
Description
Unit Price
Item Bid Price
3 1 EA Column Repair – Type 3
5 2 EA Surface Prepare & Paint Column and Install Nuts
6 1 LS Mobilization (Not to Exceed 4% of Base Bid) NA
7 NA Contingency Allowance NA $2,500
SUBTOTAL $
BID SCHEDULE – BRIGHTON (MDOT Program # F000834CON)
Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:
Base Bid Item No.
Bid
Item Bid Price
1 7 EA Column Repair – Type 1
2 2 EA Column Repair – Type 2
4 1 EA Column Repair – Type 4
6 1 LS Mobilization (Not to Exceed 4% of Base Bid) NA
7 NA Contingency Allowance NA $2,500
SUBTOTAL $
Base Bid (Sum of Item Bid Prices for all Base Bid Items, includes both Adrian and Brighton):
______________________________________________________________________ Dollars $__________________________ (use words) (in figures)
Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:
Alternate Item No.
Bid
Item Bid Price
A1 3 EA Surface Prepare & Paint Column at Adrian
A2 4 EA Surface Prepare & Paint Column at Brighton
A3 1 EA Remove & Reinstall Power Washer at Brighton
The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.
20'-0"
N
BRIGHTON STORAGE BUILDING FLOOR PLAN
Scale: 1/8" = 1'-0"
A
2 3 4 5
20'-0" 20'-0" 20'-0"
80'-0"
D
B
C
'-3
'-0
'-3
1'
-9
1' -9
'-0
R1.2
MDOT Brighton Storage Building Floor Plan
SHEET NOTES:
1. REFER TO DRAWING G1.2 FOR GENERAL NOTES.
LEGEND
XX
WORK ITEM #
ESTIMATED QUANTITY
= COLUMN REPAIR - TYPE 1,
REFER TO DRAWING R5.1
COLUMN REPAIR - TYPE 2,
REFER TO DRAWING R5.2
# = COLUMN REPAIR - TYPE 4,
REFER TO DETAILS 4A-4D/R5.3
A1
# = ALTERNATE #A1 - CLEAN & PAINT COLUMN,
REFER TO DETAIL A1/R5.3
# = COLUMN REPAIR - TYPE 3,
REFER TO DETAILS 3A-3D/R5.3
# = CLEAN & PAINT COLUMN AND INSTALL NUTS,
REFER TO DETAILS 5A-5B/R5.3
A2
# = ALTERNATE #A2 - CLEAN & PAINT COLUMN,
REFER TO DETAIL A2/R5.3
A3
# = ALTERNATE #A3 - REMOVE & REINSTALL POWER WASHER,
REFER TO DETAIL A3/R1.2
1 EA
1 EA
1 EA
1 EA
1 EA
A2
1 EA
1 EA
1 EA
1 EA
A2
1 EA
A2
1 EA
1 EA
1 EA
PAINT NEW CONC.
PIER SAFETY YELLOW
SHEET NO.
Restore Consulting, LLC 313.737.8673 www.restoreces.com
M D
O T
G ar ag e
St ru ct ur al R ep ai rs Bi d Pa ck ag e #2
Ad ria n
Br ig ht on
G ar ag es
SHEET NAME
DRAWINGS SHALL NOT BE REPRODUCED WITHOUT WRITTEN
CONSENT FROM RESTORE CONSULTING, LLC.
Project # 2023-1001
MDOT Program No.: F000833CON, F000834CON
Date: 9/11/23
Designed by: D.S.E.
Drawn by: G.L.A.
No. Revision DescriptionDate
DTMB File No.: 591/23074.CTS
Issued For: Bidding & Construction
1 Addendum #19/22/23
A2
1 EA
REMOVE & REINSTALL POWERWASHER
NTSA3
MOVE POWER WASHER AS NEEDED
TO COMPLETE THE WORK AND
REINSTALL IN ORIGINAL LOCATION
AFTER WORK IS COMPLETE.
DISCONNECT DUCT WORK
(TEMPORARILY SUPPORT AS NEEDED)
AND RECONNECT WHEN POWER
WASHER IS REINSTALLED.
SHUT OF GAS & DISCONNECT GAS
LINE FROM POWER WASHER AS
NEEDED TO MOVE POWER WASHER.
RECONNECT WHEN WORK IS
COMPLETED. WORK SHALL BE
PERFORMED BY A LICENSED
PLUMBER IN ACCORDANCE WILL ALL
APPLICABLE CODES AND STANDARDS.
NOTES:
1. ANY DAMAGE CAUSED BY CONTRACTOR SHALL BE REPAIRED AT NO ADDITIONAL COST.
A3
1 EA
R5.1
Repair Details
COLUMN REPAIR TYPE 1 - SECTION (STEP 2)
1 1/2" = 1'-0"1D D103
8" 1'-6"
EXIST. CONCRETE
PIER
9"
1'-4"
6" 21 2"
4" 21 2"
(2) #4 BARS E.C. W/ 90°
HOOK AT EACH END
(8) #4 BARS E.C. EMBED 6"
INTO EXIST. CONC PIER &
ANCHOR W/ ADHESIVE
2" 91
2" 4"
NEW CONC. PIER
EXIST. CONC. SLAB
CONTRACTOR'S OPTION TO
INSTALL 1"Ø S.S. THREADED
RODS NOW OR IN STEP 3,
REFER TO DET. 1E.
NOTES:
1. NEW CONCRETE SHALL BE FLAT AT TOP OF PIER TO PROVIDE EVEN BEARING SURFACE FOR NEW
BASE PLATE.
METAL PANEL
INSULATION
GIRT FRAMING
METAL PANEL
COLUMN REPAIR TYPE 1 - PLAN (STEP 1)
1 1/2" = 1'-0"1A D100
1'-0" 1'-0"
1' -6
2' -2
NOTES:
1. VERIFY ALL EXISTING DIMENSIONS IN THE FIELD.
2. PRIOR TO INSTALLING NEW STEEL PLATES, PAINT ALL SURFACES THAT WILL NOT BE EXPOSED
ONCE INSTALLED. REFER TO SPEC 099100 FOR SURFACE PREPARATION.
1B
R5.1 EXIST. CONC. PIER
EXIST. STEEL RIGID FRAME
COLUMN W/ TAPERED WEB
CLEAN ALL EXPOSED
STEEL AND INSTALL
PRIMER AND TWO (2)
COATS OF EPOXY PAINT
PRIOR TO INSTALLING NEW
CONCRETE, SEE NOTE 2.
8" THICK CONCRETE
FOUNDATION WALL
WITH METAL PANEL
ABOVE FLOOR LINE.
NEW 12" THICK STEEL
PLATE WELDED TO
COLUMN FLANGES,
WEB & BASE PLATE CLEAN & PAINT
CORRODED METAL
PANEL PRIOR TO
INSTALLING NEW
CONCRETE
COLUMN REPAIR TYPE 1 - SECTION (STEP 1)
1 1/2" = 1'-0"1B D101
8" 1'-6"
EXIST. ANCHOR
EXIST. CONCRETE
PIER
4"
6 3 4"± (V.I.F.)
6 18"± (V.I.F.)
8"
NEW 12" THICK STEEL PLATE
WELDED TO COLUMN FLANGES &
WEB. NOTCH PLATE AS NEEDED
TO ACCOMMODATE VERTICAL
BRACING WHERE APPLICABLE
8"
EXIST. SLAB
STEEL RIGID FRAME COLUMN
WITH TAPERED WEB
1 2"
METAL PANEL
7"
INSULATION
GIRT FRAMING
COLUMN REPAIR TYPE 1 - PLAN (STEP 2)
1 1/2" = 1'-0"1C D102
1' -6
1D R5.1
EXIST. CONC. PIER
NEW CONC. PIER
1' -4
EXIST. STEEL RIGID FRAME
4" 91 2"
21 2"
3" M
IN
C
LE
AR
, T
YP
4" 8"4"
(8) #4 BARS E.C. EMBED 6"
INTO EXIST. CONC PIER &
ANCHOR W/ ADHESIVE
(2) #4 BARS E.C. W/ 90°
HOOK AT EACH END
3"5"
2'-0"
2' -2
COLUMN REPAIR TYPE 1 - PLAN (STEP 3)
1 1/2" = 1'-0"1E D104
1F
R5.1 EXIST. CONC. PIER
NEW CONC. PIER
EXIST. STEEL RIGID FRAME
2'-0"
NEW 8"x6 3 4"±x3 4"
STEEL BASE PLATE,
TYP. (2 TOTAL)
NEW 12" STEEL SIDE
PLATE, TYP. (4 TOTAL)
8" 4 12"
4"
8"
4"
±1 4"
SIDE ⅊ TO BASE ⅊,
SIDE ⅊ TO FLANGE
SIDE ⅊ TO WEB &
BASE ⅊ TO WEB,TYP.
2"
EQ
EQ
NEW 1"Ø S.S. THREADED
ROD, EMBED 8" INTO EXIST.
CONC. PIER & ANCHOR W/
ADHESIVE, TYP.
1G R5.1
NOTES:
1. PRIOR TO INSTALLING NEW STEEL PLATES, PAINT ALL SURFACES THAT WILL NOT BE EXPOSED
OR DIFFICULT TO PAINT ONCE INSTALLED (IE BOTTOM SIDE OF BASEPLATE, PLATES THAT ABUT
EXIST. STEEL FLANGE, ETC.)
PAINT STEEL PLATE
PRIOR TO INSTALLING,
TYP. SEE NOTE 1.
REMOVE METAL PANEL RIB
AS REQ'D TO INSTALL NEW
PLATE ASSEMBLY
COLUMN REPAIR TYPE 1 - SECTION (STEP 3)
1 1/2" = 1'-0"1F D105
8" 1'-6"
EXIST. CONCRETE PIER
9"
1'-4"
8"
21 2" 4"
21 2"
NEW CONC. PIER
EXIST. CONC. SLAB
NEW 1"Ø S.S. THREADED ROD,
EMBED 8" INTO EXIST. CONC. PIER
& ANCHOR W/ ADHESIVE, TYP
4"
SIDE ⅊ TO BASE ⅊,
SIDE ⅊ TO FLANGE
SIDE ⅊ TO WEB &
BASE ⅊ TO WEB,TYP.
NEW 12" STEEL SIDE
PLATE, TYP (4 TOTAL)
NEW 8"x6 3 4"±x3
4" STEEL
BASE PLATE, TYP. (2 TOTAL)
8" 4 12"
4"
2" 91
2" 4"
.METAL PANEL RIB
TO BE REMOVED
AS REQ'D TO
INSTALL NEW
PLATE ASSEMBLY
METAL PANEL
RIB TO REMAIN
EXIST. METAL PANEL
COLUMN REPAIR TYPE 1 - SECTION (STEP 3)
1 1/2" = 1'-0"1G D106
EXIST.
CONC.
PIER
NEW CONC.
PIER, REINF.
NOT SHOWN
FOR CLARITY
EXIST.
CONC. SLAB
NEW 12" STEEL SIDE
PLATE, TYP (4 TOTAL)
NEW STEEL BASE
PLATE, TYP. (2 TOTAL)
NEW 1"Ø S.S. THREADED
ROD, EMBED 8" INTO EXIST.
CONC. PIER & ANCHOR W/
ADHESIVE, TYP.
4"
SIDE ⅊ TO BASE ⅊,
SIDE ⅊ TO FLANGE
SIDE ⅊ TO WEB &
BASE ⅊ TO WEB,TYP.
EXIST. STEEL COLUMN
EXIST. METAL
PANEL RIB, TYP.
REMOVE METAL PANEL RIB
AS REQ'D TO INSTALL NEW
PLATE ASSEMBLY, REMOVAL
OF RIB SHALL FOLLOW
PROFILE OF SIDE PLATE
COLUMN REPAIR TYPE 1 - SECTION (STEP 4)
1 1/2" = 1'-0"1H D107
EXIST. CONCRETE PIER
NEW CONC. PIER
EXIST. CONC. SLAB
INSTALL SEALANT AT JOINT BETWEEN
NEW/EXIST. STEEL AND NEW CONC. PIER.
SEALANT TO BE INSTALLED ON ALL SIDES.
INSTALL SEALANT BETWEEN
NEW CONC. PIER & EXIST.
CONC. SEALANT TO BE
INSTALLED ON 3 SIDES
PAINT NEW STEEL PLATE
ASSEMBLY TO MATCH EXIST.
PAINT EXIST. STEEL COLUMN UP
TO 3'-0" ABOVE NEW CONC. PIER
INSTALL VERTICAL & HORIZONTAL COVE JOINT
SEALANT BETWEEN EXIST. METAL PANEL & NEW CONC.
PIER AND BETWEEN NEW PLATE ASSEMBLY & EXIST.
METAL PANEL. EXTEND SEALANT VERTICALLY 1'-0"
ABOVE TOP OF CONC. PIER AT EXIST. COLUMN.
SEALANT TO BE INSTALL ON BOTH SIDES OF COLUMN.
1' -0
TY
P.
3' -0
N
.T .S
PA
IN
T
EX
IS
T.
C
O
LU
M N
SHEET NO.
Restore Consulting, LLC 313.737.8673 www.restoreces.com
M D
O T
G ar ag e
St ru ct ur al R ep ai rs Bi d Pa ck ag e #2
Ad ria n
Br ig ht on
G ar ag es
SHEET NAME
DRAWINGS SHALL NOT BE REPRODUCED WITHOUT WRITTEN
CONSENT FROM RESTORE CONSULTING, LLC.
Project # 2023-1001
MDOT Program No.: F000833CON, F000834CON
Date: 9/11/23
Designed by: D.S.E.
Drawn by: G.L.A.
No. Revision DescriptionDate
DTMB File No.: 591/23074.CTS
Issued For: Bidding & Construction
1 Addendum #19/22/23
R5.2
COLUMN REPAIR TYPE 2 - SECTION (STEP 4)
1 1/2" = 1'-0"2H D143
EXIST. CONCRETE PIER
NEW CONC. PIER
EXIST. CONC. SLAB
INSTALL SEALANT AT JOINT BETWEEN
NEW/EXIST. STEEL AND NEW CONC. PIER.
SEALANT TO BE INSTALLED ON ALL SIDES.
INSTALL SEALANT BETWEEN
NEW CONC. PIER & EXIST.
CONC. SEALANT TO BE
INSTALLED ON 3 SIDES
PAINT NEW STEEL PLATE
ASSEMBLY TO MATCH EXIST.
INSTALL VERTICAL & HORIZONTAL COVE JOINT
SEALANT BETWEEN EXIST. METAL PANEL & NEW CONC.
PIER AND BETWEEN NEW PLATE ASSEMBLY & EXIST.
METAL PANEL. EXTEND SEALANT VERTICALLY 1'-0"
ABOVE TOP OF CONC. PIER AT EXIST. COLUMN.
SEALANT TO BE INSTALL ON BOTH SIDES OF COLUMN.
1' -0
TY
P.
PAINT EXIST. STEEL COLUMN UP
TO 3'-0" ABOVE NEW CONC. PIER
3' -0
N
.T .S
PA
IN
T
EX
IS
T.
C
O
LU
M N
COLUMN REPAIR TYPE 2 - PLAN (STEP 1)
1 1/2" = 1'-0"2A D136
8" 8"
1' -0
1' -8
NOTES:
1. VERIFY ALL EXISTING DIMENSIONS IN THE FIELD.
2. PRIOR TO INSTALLING NEW STEEL PLATES, PAINT ALL SURFACES THAT WILL NOT BE EXPOSED
ONCE INSTALLED. REFER TO SPEC 099100 FOR SURFACE PREPARATION.
2B R5.2
EXIST. CONC. PIER
EXIST. STEEL COLUMN
CLEAN ALL EXPOSED
STEEL AND INSTALL
PRIMER AND TWO (2)
COATS OF EPOXY PAINT
PRIOR TO INSTALLING NEW
CONCRETE, SEE NOTE 2.
8" THICK CONCRETE
FOUNDATION WALL
WITH METAL PANEL
ABOVE FLOOR LINE.
NEW 12" THICK STEEL
PLATE WELDED TO
COLUMN FLANGES,
WEB & BASE PLATE
4"
NEW ⅊ TO FLANGE,
NEW ⅊ TO NEW ⅊
NEW ⅊ TO BASE ⅊
4"
NEW ⅊ TO FLANGE,
NEW ⅊ TO WEB
NEW ⅊ TO BASE ⅊
4"
4"
4"
NEW 9"x8"x1
2" STEEL PLATE
NEW 3 12"x8"X1
2" STEEL PLATE
NEW 3"x8"x1
2" STEEL PLATE
CLEAN & PAINT CORRODED
METAL PANEL PRIOR TO
INSTALLING NEW CONCRETE
COLUMN REPAIR TYPE 2 - SECTION (STEP 1)
1 1/2" = 1'-0"2B D137
8" 1'-0"
EXIST. ANCHOR
EXIST. CONCRETE
PIER
4"
7"± (V.I.F.)
8"
NEW 12" THICK STEEL PLATE WELDED
TO COLUMN FLANGES & WEB.
8"
EXIST. SLAB
STEEL COLUMN
1 2"
METAL PANEL
4"±
INSULATION
GIRT FRAMING
NEW 12" THICK STEEL PLATE REFER
TO DET. 2A FOR SIZE & WELDS
NEW 12" THICK
STEEL PLATE
REFER TO DET. 2A
FOR SIZE & WELDS
COLUMN REPAIR TYPE 2 - PLAN (STEP 2)
1 1/2" = 1'-0"2C D138
1' -0
2D R5.2
NEW CONC. PIER SAME DIMENSIONS
AS EXIST. CONC. PIER
EXIST. STEEL COLUMN
3" 61 2"
21 2"
3" 10"
(4) #4 BARS E.C. EMBED 6"
INTO EXIST. CONC PIER &
ANCHOR W/ ADHESIVE
(2) #4 BARS E.C.
3"
1'-4"
1' -8
1 2"
M
IN
C
LE
AR
, T
YP
7 12"
11"
4" 4"
7 12"
COLUMN REPAIR TYPE 2 - SECTION (STEP 2)
1 1/2" = 1'-0"2D D139
8"
EXIST. CONCRETE PIER
9"
1'-0"
6" 21 2"
4" 21 2"
(2) #4 BARS E.C.
(4) #4 BARS E.C. EMBED 6"
INTO EXIST. CONC PIER &
ANCHOR W/ ADHESIVE
2" 61
2" 3"
NEW CONC. PIER
EXIST. CONC. SLAB
CONTRACTOR'S OPTION TO
INSTALL 12" Ø S.S. THREADED
RODS NOW OR IN STEP 3,
REFER TO DET. 2E.
NOTES:
1. NEW CONCRETE SHALL BE FLAT AT TOP OF PIER TO PROVIDE EVEN BEARING SURFACE FOR NEW
BASE PLATE.
METAL PANEL
INSULATION
GIRT FRAMING
COLUMN REPAIR TYPE 2 - PLAN (STEP 3)
1 1/2" = 1'-0"2E D140
2F R5.2
NEW CONC. PIER
EXIST. STEEL COLUMN
1'-4"
NEW 7"x 7"± x 3 4"
STEEL BASE PLATE,
TYP. (2 TOTAL)
NEW 12" STEEL SIDE
PLATE, TYP. (4 TOTAL)
7" 4 12"
4"
7"
7" ±1
4"
SIDE ⅊ TO BASE ⅊,
SIDE ⅊ TO FLANGE
SIDE ⅊ TO WEB &
BASE ⅊ TO WEB,TYP.
8"
EQ
EQ
NEW 12" Ø S.S. THREADED
ROD, EMBED 8" INTO EXIST.
CONC. PIER & ANCHOR W/
ADHESIVE, TYP.
2G R5.2
NOTES:
1. PRIOR TO INSTALLING NEW STEEL PLATES, PAINT ALL SURFACES THAT WILL NOT BE EXPOSED
OR DIFFICULT TO PAINT ONCE INSTALLED (IE BOTTOM SIDE OF BASEPLATE, PLATES THAT ABUT
EXIST. STEEL FLANGE, ETC.)
PAINT STEEL PLATE
PRIOR TO INSTALLING,
TYP. SEE NOTE 1.
REMOVE METAL
PANEL RIB AS REQ'D
TO INSTALL NEW
PLATE ASSEMBLY
COLUMN REPAIR TYPE 2 - SECTION (STEP 3)
1 1/2" = 1'-0"2F D141
8"
EXIST. CONCRETE PIER
9"
1'-0"
8"
21 2" 4"
21 2"
NEW CONC. PIER
EXIST. CONC. SLAB
NEW 12" Ø S.S. THREADED ROD,
EMBED 8" INTO EXIST. CONC. PIER
& ANCHOR W/ ADHESIVE, TYP
4"
SIDE ⅊ TO BASE ⅊,
SIDE ⅊ TO FLANGE
SIDE ⅊ TO WEB &
BASE ⅊ TO WEB,TYP.
NEW 12" STEEL SIDE
PLATE, TYP (4 TOTAL)
NEW 7" x 7"± x 3 4" STEEL
BASE PLATE, TYP. (2 TOTAL)
7" 4 12"
4"
2" 61
2" 3"
COLUMN REPAIR TYPE 2 - SECTION (STEP 3)
1 1/2" = 1'-0"2G D142
EXIST. CONC. PIER
NEW CONC. PIER,
REINF. NOT SHOWN
FOR CLARITY
EXIST. CONC. SLAB
NEW 12" STEEL SIDE
PLATE, TYP (4 TOTAL)
7" 4 12"
4"
NEW STEEL BASE
PLATE, TYP. (2 TOTAL)
NEW 12" Ø S.S. THREADED
ROD, EMBED 8" INTO EXIST.
CONC. PIER & ANCHOR W/
ADHESIVE, TYP.
4"
SIDE ⅊ TO BASE ⅊,
SIDE ⅊ TO FLANGE
SIDE ⅊ TO WEB &
BASE ⅊ TO WEB,TYP.
EXIST. STEEL COLUMN
EXIST. METAL
PANEL RIB, TYP.
REMOVE METAL PANEL
RIB AS REQ'D TO INSTALL
NEW PLATE ASSEMBLY,
REMOVAL OF RIB SHALL
FOLLOW PROFILE OF
SIDE PLATE
SHEET NO.
Restore Consulting, LLC 313.737.8673 www.restoreces.com
M D
O T
G ar ag e
St ru ct ur al R ep ai rs Bi d Pa ck ag e #2
Ad ria n
Br ig ht on
G ar ag es
SHEET NAME
DRAWINGS SHALL NOT BE REPRODUCED WITHOUT WRITTEN
CONSENT FROM RESTORE CONSULTING, LLC.
Project # 2023-1001
MDOT Program No.: F000833CON, F000834CON
Date: 9/11/23
Designed by: D.S.E.
Drawn by: G.L.A.
No. Revision DescriptionDate
DTMB File No.: 591/23074.CTS
Issued For: Bidding & Construction
1 Addendum #19/22/23
R5.3
CLEAN & PAINT COLUMN AT ADRIAN
1 1/2" = 1'-0"A1 D121
EXIST. CONCRETE
PIER
1' -0
CLEAN & PAINT ALL EXPOSED SURFACES
INCLUDING BOTTOM 1 FT OF COLUMN,
BASE PLATE, & NUTS/BOLTS
EXIST. CONC.
SLAB OR CURB
NOTES:
1. REFER TO SPECIFICATIONS FOR SURFACE PREPARATION AND PAINT SYSTEMS.
ALTERNATE #A1
COLUMN REPAIR TYPE 4 (STEP 2)
1 1/2" = 1'-0"4D D134
6" 7"
NEW 12" x 7" REPAIR PLATE
4"
COLUMN REPAIR TYPE 4 - EXISTING CONDITIONS
1 1/2" = 1'-0"4A D131
STEEL RIGID FRAME COLUMN
WITH TAPERED WEB
1' -0
8"±
FINISHED FLOOR
CONCRETE PIER
7"± 8"
IMPACT DAMAGED (BENT)
COLUMN FLANGE
COLUMN REPAIR TYPE 4 (STEP 1)
1 1/2" = 1'-0"4B D132
FINISHED FLOOR
CONCRETE PIER
STRAIGHTEN COLUMN
FLANGE
DAMAGE LENGTH, MEASURE
IN THE FIELD.
COLUMN REPAIR TYPE 4 (STEP 2)
1 1/2" = 1'-0"4C D133
FINISHED FLOOR
CONCRETE PIER
8" 8"
D
AM
AG
ED
L
EN
G
TH
4D R5.3
PAINT NEW STEEL PLATE
TO MATCH EXIST.
COLUMN REPAIR TYPE 3 - EXIST. CONDITIONS
NTS3B
CONTRACTOR SHALL MOVE EXIST.
CABINET & REINSTALL AFTER
REPAIRS HAVE BEEN COMPLETED.
COORDINATE W/ OWNER
EXIST. SINK TO REMAIN
CLEAN & PAINT COLUMN AND INSTALL NUTS
1 1/2" = 1'-0"5A D122
CLEAN & PAINT ALL EXPOSED
SURFACES INCLUDING
BOTTOM 4'-0" OF COLUMN,
BASE PLATE & BOLTS
CLEAN & PAINT
STEEL COLUMN
EXIST. PAINTED STEEL TO REMAIN
NOTES:
1. WELD EXISTING ANCHOR BOLT TO BASE PLATE ONLY IF A NEW NUT CANNOT BE INSTALLED
AFTER TRYING TO RE-THREAD BOLTS.
2"
NOTE 1
4' -0
INSTALL NEW NUTS ON EXIST. BOLTS
(4 TOTAL). RE-THREAD BOLTS USING
DIE PROCESS AS NEEDED TO INSTALL
NEW NUTS.
CLEAN & PAINT COLUMN AND INSTALL NUTS
NTS5B
INSTALL NEW NUTS ON EXIST. BOLTS.
RE-THREAD BOLTS AS NEEDED TO
INSTALL NEW NUTS. WELD BOLT TO
BASE PLATE ONLY IF NUTS CANNOT
BE INSTALLED, REFER TO DET. 5A/R5.3
CLEAN & PAINT STEEL COLUMN,
REFER TO DET. 5A/R5.3
COLUMN REPAIR TYPE 3 (STEP 2)
1 1/2" = 1'-0"3D D145
NOTE:
1. ALL SURFACES THAT WILL BE HIDDEN OR NOT EASILY ACCESSIBLE AFTER INSTALLATION SHALL
BE PAINTED PRIOR TO INSTALLATION.
EXISTING CMU WALL
EXISTING CONCRETE PIER
NEW 11 12"± x12"x1
2" STEEL PLATE,
WELDED TO EXISTING COLUMN
FLANGES, WEB & BASE PLATE. PAINT
TO MATCH EXISTING, SEE NOTE 1.
NEW 10 x 12" x 12" STEEL PLATE, WELDED TO EXISTING COLUMN
FLANGE. PAINT TO MATCH
EXISTING, SEE NOTE 1.
4"
TYP. @ FLANGES,
WEB & BASE PLATE
4"
COLUMN REPAIR TYPE 3 (EXISTING CONDITION)
1 1/2" = 1'-0"3A D144
1' -3
11 2" 7 16
1' -0
7 16
7 16
2" 41
2"
1'-7"
4"
NOTES:
1. VERIFY ALL EXISTING DIMENSIONS IN THE FIELD.
CMU WALL
(2) CORRODED
FASTENING NUTS
CONCRETE PIER
COLUMN REPAIR TYPE 3 (STEP 1)
1 1/2" = 1'-0"3C D145
℄ EXISTING CMU WALL
REPLACE (2) CORRODED
FASTENING NUTS
EXISTING CONCRETE PIER
REMOVE CORRODED STEEL
AREAS (EXISTING FLANGES,
WEB & BASE PLATE), CLEAN
TO NEAR WHITE METAL &
PAINT PRIOR TO INSTALLING
NEW STEEL PLATE.
SHEET NO.
Restore Consulting, LLC 313.737.8673 www.restoreces.com
M D
O T
G ar ag e
St ru ct ur al R ep ai rs Bi d Pa ck ag e #2
Ad ria n
Br ig ht on
G ar ag es
SHEET NAME
DRAWINGS SHALL NOT BE REPRODUCED WITHOUT WRITTEN
CONSENT FROM RESTORE CONSULTING, LLC.
Project # 2023-1001
MDOT Program No.: F000833CON, F000834CON
Date: 9/11/23
Designed by: D.S.E.
Drawn by: G.L.A.
No. Revision DescriptionDate
DTMB File No.: 591/23074.CTS
Issued For: Bidding & Construction
1 Addendum #19/22/23
CLEAN & PAINT COLUMN AT BRIGHTON
1 1/2" = 1'-0"A2 D124
NOTES:
1. REFER TO SPECIFICATIONS FOR SURFACE PREPARATION AND PAINT SYSTEMS.
ALTERNATE #A2
EXIST. CONCRETE
PIER
EXIST. SLAB
3' -9
N
.T .S
CLEAN & PAINT ALL EXPOSED SURFACES
INCLUDING BOTTOM 3'-9" OF COLUMN,
BASE PLATE, & NUTS/BOLTS
CLEAN & PAINT METAL PANEL
WHERE THERE IS CORROSION
Restore Consulting, LLC | 313.RESTORE (313.737.8673) | info@restoreces.com
PREBID MEETING MINUTES
Project: MDOT Garage Structural Repairs – Bid Package #1 Date: September 19, 2023 DTMB File No.: 591/23074.CTS Time: 9:00 am MDOT Program No.: F000833CON, F000834CON Location: Brighton Garage, then Adrian Garage Restore Project Number: 2023-1001 Attendees: Dan Elliott (Restore Consulting), Jake Grimaldi (Pullman), Zach Carroll (Pullman), Alan Albright (Foundation Steel), Val Woodruf (MDOT), Chris Schanbeck (DTMB) cc: Mark Postma (Restore Consulting)
I. General / Schedule
A. Bid documents are available on SIGMA.
B. Bids are due on September 27, 2023 at 2:00 pm
C. Bids shall be submitted electronically to SIGMA VSS.
1. Don’t wait until last minute to submit your bid due to potential issues with SIGMA.
D. Deadline for questions is September 21, 2023 at 2:00 pm. Submit questions in writing to Dan Elliott at delliott@restoreces.com.
E. Construction time is 60 calendar days from preconstruction meeting to substantial completion.
F. Liquidated damages are included in the contract at $500 per day.
II. Scope of Work:
A. Requirements for various column repairs were discussed.
B. Alternate #1 for painting select columns was discussed.
C. A brief walkthrough was completed to review the repair locations and scope of work at the Brighton
Heated Storage Building and at the Adrian Garage.
III. Construction Phasing / Staging
A. Brighton: Prior to November, one side (East or West Side) may be closed for construction to complete the work. Limited work area will be available after October.
B. Adrian: Contractor may close off as many spaces as needed (within reason) to complete the work in a timely manner. The wash bay may be closed as needed to complete column repair work in a timely manner.
C. Work hours were discussed. Refer to spec section 01010 – Summary of Work for a description of work hours.
IV. Permits
A. Contractor is responsible for obtaining and paying for permits required by LARA.
mailto:delliott@restoreces.com
吉事音 ●憲 /茎 �〔 (⊃ ¥」 も ヤ ー告 埜 ミ手 ′0 ヽノ 、、、_一 一へ. 一号 「¥ �ミ 0 ∪ ヽ む き ¥ 瑳 l さ も さ も 、○○、 .、、 さ も ∪ N �くせ ・、。二 鳥 七 ㌣ ほ d 雪 子書 ゝ _Q ぢ 〔 さ -〇〇〇〇〇〇 �ウ ● ‾2 こす J き ㊤ ∪ ヾ J ¥り くさ鼻 ユ こじ J �○ ) そ ぐ 〇 、 モ ¥) 、、、 し っ と 〇 〇 三 �き 〇 、} ヽ′ヽ ヤ ⊆ ミ ミ ○ ¥、」 > トラ ‾“-○7 ㊦ ._ノ ′-二l ヽ一) き し h � � � � �
、窒 e 毒 �蚤 か」¥ ノ ミ≡ �薄 1 鞍 下 l 二ゝ 箪 �〇二ミ ′葦↓ 雪、 点 叩 く ミ ニ「 �く⊃ 丁 レ¥ つで I 蒋 勺「 �合 わ 「ヽ! , こト ⊂) ぺ l ら �士 Nヽ [√¥ ( 〇 品 l ヽこン⊃ 二「 で-も � � � � �
き しヽ ヾ 売 電 (豊 �よ V) マ 寸 ミ J J 注 �ヽ) 諸 で モ ーで つ く王 �言 上 �Q ㌻ ¥、 �ゝ 」 ∈> � � � � �
、調 香 �専 一、●- 工 、三 二 �寄 § 登 竜 読 �幸 .′千〇- ヽ一 ∠ _l �せ J しリ e 缶 J ∨¥ ち 二三 �し⊥ l つ ノ .六 〇 〇 ゝ �`〇一′ /“ヽ ヽ〇〇〇〇‾ 、さ き ’こ く」,, 9) ゝ 市 � � � � �
一l〇一①∞きd∈○霧①∪竺○〕S①」二m卜の∞.卜m卜.雷さ一蓋○トS山∝・曾小一∪士、∞u三つ竺OU①」○〕S①∝
①∞2」e○○…e∪①号の至り〇三∞雲]…○雷撃○○
∈e○○‥①‥e∈羊 m乙eN、蜜」のq∈①〕d①S[a〕e合
さ〇十…gZ誉Uq重さともe百〇d
乙韓①∞eぢedP琶-S」一巳d①竺巳…書写」〕SS幾響e〇十〇〇∑竜也o」d
∞u竜①∑p享①」d三〇竜王」USOきざ革霊室
築館㊧輸出館山弱毒重里謡重臣高言寮董蒲田璽
| DTMB-0414 (Construction Addendum).pdf |
| MDOT Garage Structural Repairs BP2 - Addendum #1.pdf |
| MDOT Garage Structural Repairs BP2 - Prebid Mtg Minutes.pdf |
| BP2 - Prebid Sign In Sheet.pdf |
File details come from the government source that posted it. Updated .