DWG - 2272 Carpet PDPG252858---.pdf
PDF 232 KB Posted
- Attached to
- CARPET BUILDING 2272
- Solicitation number
- W50S74-25-R-A019
- Issued by
-
Department of the Army National Guard
About this file
This document is a carpet replacement project specification for Building 2272 at the 163rd Civil Engineering Squadron, California Air National Guard. The project involves removing existing carpet tiles, vapor barrier, and rubber base, and installing new carpet tiles and rubber base in office areas, vestibules, breakroom, and lactation rooms. Specific requirements include using Interface Cubic 6393 carpet tiles for office areas, Interface SR799 Onyx for vestibules, and Johnsonite Tightlock resilient and carpet base in various colors. The project scope includes protecting existing materials, moving furniture, climatizing materials for one week prior to installation, and providing manufactured outside corners and transitions. The total area covers 3,930 square feet of office carpet, 210 square feet of vestibule carpet, and 920 linear feet of base. The project is scheduled for completion by 28 February 2025, with detailed inspection requirements for each phase of the work.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CACTUS
VISITOR
GRAEBER
MEYER
INSPECTION
GATE
PROJECT
EL
LS
W O
R
TH
163 CIVIL ENGINEERING SQUADRON
CALIFORNIA AIR NATIONAL GUARD
ANTHONY.ALVES.1@US.AF.MIL 714 609 1076
1CARPET
BUILDING 2272
PDPG252425
GENERAL
28 FEB 2025
CONSTRUCTION
1. PROTECT EXISTING
2. MOVE FURNITURE AS REQUIRED
3. DEMO CARPET TILE W/ TACTILES & ROLLED VAPOR BARRIER. PROTECT IN PLACE 3.25"
JOHNSONITE TIGHTLOCK CARPET BASE & RUBBER CORRIDOR TRANSITIONS
4. DEMO 4" COVED RUBBER BASE AT CORRIDORS & VESTIBULES
5. CLIMATIZE ALL MATERIAL IN BUILDING FOR 1 WEEK MINIMUM PRIOR TO INSTALL
6. PROVIDE ROLLED VAPOR BARRIER W/ TAPE: VERSA SHIELD MBX OR EQ
7. PROVIDE CARPET TILE USING TACTILES ONLY
OFFICE AREA: INTERFACE CUBIC 6393 HEIGHT - NO EQ
VESTIBULES: INTERFACE SR799 ONYX - NO EQ
8. PROVIDE RUBBER BASE AT RUBBER TILE CORRIDORS & BREAKROOM. FILL WALL GAPS
THAT WOULD BE EXPOSED W/ NEW BASE W/ RUBBER TILE (GFCI)
JOHNSONITE TIGHTLOCK RESILIENT 4.375" - 82 BLACK PEARL - OR EQ.
6. PROVIDE RUBBER BASE AT CARPET TILE VESTIBULES
JOHNSONITE TIGHTLOCK CARPET 4.25" - 82 BLACK PEARL - OR EQ
7. BREAKROOM & LACTATION RMS: TIGHTLOCK RESILIENT THRUOUT
8. PROVIDE MANUFACTURED OUTSIDE CORNERS
9. PROVIDE TRANSITION AT VESTIBULES & BREAKROOM - TARKETT SLT-XX-A BLACK OR EQ
INSPECTION
NOTIFY GOV FOR PRIOR & POST INSPECTION
1. CARPET & VAPOR BARRIER DEMO
2. RUBBER BASE DEMO
3. MATERIAL STAGING
4. CARPET INSTALL
5. BASE INSTALL
LOADING
BREAKRM
LAC
LEGEND
OFFICE CARPET 3,930 SF
VESTIBULE CARPET 210 SF
BASE 920 LF
16'8'163 CIVIL ENGINEERING SQUADRON
CALIFORNIA AIR NATIONAL GUARD
ANTHONY.ALVES.1@US.AF.MIL 714 609 1076
2CARPET
BUILDING 2272
PDPG252425
PLAN
28 FEB 2025
| Sheets and Views |
| 2272 Carpet & Paint-1 CPT GEN |
| 2272 Carpet & Paint-2 CPT PLAN |
File details come from the government source that posted it. Updated .