DWG - 2272 Carpet PDPG252858---.pdf

PDF 232 KB Posted

Attached to
CARPET BUILDING 2272
Solicitation number
W50S74-25-R-A019
Issued by

About this file

This document is a carpet replacement project specification for Building 2272 at the 163rd Civil Engineering Squadron, California Air National Guard. The project involves removing existing carpet tiles, vapor barrier, and rubber base, and installing new carpet tiles and rubber base in office areas, vestibules, breakroom, and lactation rooms. Specific requirements include using Interface Cubic 6393 carpet tiles for office areas, Interface SR799 Onyx for vestibules, and Johnsonite Tightlock resilient and carpet base in various colors. The project scope includes protecting existing materials, moving furniture, climatizing materials for one week prior to installation, and providing manufactured outside corners and transitions. The total area covers 3,930 square feet of office carpet, 210 square feet of vestibule carpet, and 920 linear feet of base. The project is scheduled for completion by 28 February 2025, with detailed inspection requirements for each phase of the work.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CACTUS

VISITOR

GRAEBER

MEYER

INSPECTION

GATE

PROJECT

EL

LS

W O

R

TH

163 CIVIL ENGINEERING SQUADRON

CALIFORNIA AIR NATIONAL GUARD

ANTHONY.ALVES.1@US.AF.MIL 714 609 1076

1CARPET

BUILDING 2272

PDPG252425

GENERAL

28 FEB 2025

CONSTRUCTION

1. PROTECT EXISTING

2. MOVE FURNITURE AS REQUIRED

3. DEMO CARPET TILE W/ TACTILES & ROLLED VAPOR BARRIER. PROTECT IN PLACE 3.25"

JOHNSONITE TIGHTLOCK CARPET BASE & RUBBER CORRIDOR TRANSITIONS

4. DEMO 4" COVED RUBBER BASE AT CORRIDORS & VESTIBULES

5. CLIMATIZE ALL MATERIAL IN BUILDING FOR 1 WEEK MINIMUM PRIOR TO INSTALL

6. PROVIDE ROLLED VAPOR BARRIER W/ TAPE: VERSA SHIELD MBX OR EQ

7. PROVIDE CARPET TILE USING TACTILES ONLY

OFFICE AREA: INTERFACE CUBIC 6393 HEIGHT - NO EQ

VESTIBULES: INTERFACE SR799 ONYX - NO EQ

8. PROVIDE RUBBER BASE AT RUBBER TILE CORRIDORS & BREAKROOM. FILL WALL GAPS

THAT WOULD BE EXPOSED W/ NEW BASE W/ RUBBER TILE (GFCI)

JOHNSONITE TIGHTLOCK RESILIENT 4.375" - 82 BLACK PEARL - OR EQ.

6. PROVIDE RUBBER BASE AT CARPET TILE VESTIBULES

JOHNSONITE TIGHTLOCK CARPET 4.25" - 82 BLACK PEARL - OR EQ

7. BREAKROOM & LACTATION RMS: TIGHTLOCK RESILIENT THRUOUT

8. PROVIDE MANUFACTURED OUTSIDE CORNERS

9. PROVIDE TRANSITION AT VESTIBULES & BREAKROOM - TARKETT SLT-XX-A BLACK OR EQ

INSPECTION

NOTIFY GOV FOR PRIOR & POST INSPECTION

1. CARPET & VAPOR BARRIER DEMO

2. RUBBER BASE DEMO

3. MATERIAL STAGING

4. CARPET INSTALL

5. BASE INSTALL

LOADING

BREAKRM

LAC

LEGEND

OFFICE CARPET 3,930 SF

VESTIBULE CARPET 210 SF

BASE 920 LF

16'8'163 CIVIL ENGINEERING SQUADRON

CALIFORNIA AIR NATIONAL GUARD

ANTHONY.ALVES.1@US.AF.MIL 714 609 1076

2CARPET

BUILDING 2272

PDPG252425

PLAN

28 FEB 2025

Sheets and Views
2272 Carpet & Paint-1 CPT GEN
2272 Carpet & Paint-2 CPT PLAN

File details come from the government source that posted it. Updated .