TMSEDS_Amendment_000002.pdf
PDF 1 MB Posted
- Attached to
- TMSEDS Synopsis Federal contract opportunity
- Solicitation number
- DTRT5716R20001
About this file
Amendment 000002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TMSEDS_Amendment_000005.pdf | ||
| TMSEDS_Amendment_A000004.pdf | ||
| TMSEDS_Amendment_000003.pdf | ||
| TMSEDS_Amendment_000001.pdf | ||
| Revised_J.8_TMSEDS_Proposal_Worksheet_Schedules.xlsx | XLSX spreadsheet | |
| DTRT5716R20001.pdf | ||
| J.4_DD_Form_254.pdf | ||
| J.8_Master_CBP_Schedules.xlsx | XLSX spreadsheet | |
| DTRT5716R20001_DRAFT_RFP_Questions_and_Answers.pdf | ||
| DTRT5716R20001_RFP_Draft.pdf | ||
| DTRT5716R20001_TMSEDS_Synopsis.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTRT5716R20001
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
V221
Cambridge MA 02142-1001 55 Broadway, V221 Off-Site Eng & R&D Contracts Branch USDOT/Volpe Center
V221
Cambridge MA 02142-1001 55 Broadway V221 Off-Site Eng & R&D Contracts Branch USDOT/Volpe Center
05/24/2016000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/06/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See attached continuation sheets.
RECOVERY: NON-RECOVERY
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Robert P. Robinson
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation No. DTRT5716R20001 Amendment No. 000002
The purpose of this amendment is to make the following changes to Solicitation
DTRT5716R20001:
1. The slides from the May 19, 2016 Pre-Proposal Webinar are attached to this amendment.
2. The list of attendees from the May 19, 2016 Pre-Proposal Webinar are attached to this amendment.
3. The Government received some questions prior to the pre-proposal webinar. The questions and Government responses are as follows:
A. Reference: L.5.D Section II, top of page 79. It is the responsibility of the Prime contractor to review and evaluate the subcontract proposals and document the reasonableness of the Subcontractors prices in accordance with FAR 15.404, as appropriate. accompanying cost or pricing data and furnish the results of such review to the Government as part of the cost submission, regardless of whether the details are provided to the Prime Offeror or separately to the Government. The Prime's review should be as detailed as the information provided by the subcontractor directly to the Prime permits.
Question: Due to the proprietary nature of much of the cost and pricing data that the Government requires our Subcontractors to submit as part of our Cost/Business proposal, and the fact that the prime contractor is not an auditing firm, we respectfully request that the Government delete the requirement for the prime to review our subcontractors’ proprietary cost information. We respectfully request the Government consider deleting the above-referenced highlighted language from the RFP and add suggested language in bold italicized text. As the prime contractor, we will not be privy to our Subcontractors’ proprietary information; however, we intend to document the reasonableness of the Subcontractors prices in accordance with FAR 15.404, as appropriate
Response: The highlight text will not be deleted. FAR 15.404-3 (Subcontractor Pricing Considerations) requires offerors to:
(1) Conduct appropriate cost or price analyses to establish the reasonableness of proposed subcontract prices;
(2) Include the results of these analyses in the price proposal; and
(3) When required, submit subcontractor certified cost or pricing data to the Government as part of its own certified cost or pricing data.
However if the offeror follows FAR 15.404 as proscribed in conducting cost or price analysis of its subcontractor’s as required, the Prime will have met its burden thereunder.
Solicitation No. DTRT5716R20001 Amendment No. 000002
B. Reference: L.5.E SECTION III – Business Proposal (Volume I), Subcontract Consent (Page 80), second paragraph: “Offerors are reminded that the successful Offeror, not the Government, will have a contract with any proposed subcontractor(s). The Offeror has the duty to document the reasonableness of the cost/price and to justify the placement of the subcontract even when information from a subcontractor is proprietary and must be submitted directly to the Government. It is the Prime’s duty to ensure that submissions to be made directly to the Government by any proposed subcontractor are, in fact, made. It is also primarily the Offeror’s duty and not the Government’s to ensure that the proposed fee under each subcontract is reasonable and does not exceed statutory limits. Other issues, such as unapproved accounting systems and indirect rates that are significantly lower or higher than rates approved for past years, must be resolved by the Offeror prior to the submission date for proposals. If ceilings on the indirect rates of a subcontractor are required, the Offeror must address this issue prior to the proposal submission date.”
Question: Due to the proprietary nature of much of the cost and pricing data that the Government requires our Subcontractors to submit as part of our Cost/Business proposal, and the fact that the prime contractor is not an auditing firm, we respectfully request that the Government delete the above-referenced highlighted language from the RFP. As the prime contractor, we will not be privy to our Subcontractors’ indirect rates but will document the reasonableness of the Subcontractors prices in accordance with FAR 15.404, as appropriate.
Response: The Government will not delete the highlighted text or relieve the Prime contractor of its burden to address the cost or price reasonableness of a subcontractor’s rates when using either cost or pricing data analysis in accordance with FAR 15.404 for determining placement of any subcontractor on the Prime contractor’s team. Offerors shall present cost or pricing analysis based on the information received and determine cost or price reasonableness as outlined under
FAR 15.404.
4. The due date and time for the submission of proposals remains unchanged.
5. Please acknowledge receipt of this amendment with the submission of your proposal.
6. All other terms and conditions of this solicitation remain unchanged.
Pre-Proposal Conference Traffic Management Systems Engineering and
Development Support (TMSEDS) Services Solicitation DTRT5716R20001
The National Transportation Systems Center
Advancing transportation innovation for the public good
U.S. Department of Transportation Office of Research and Technology John A. Volpe National Transportation Systems Center
May 19, 2016
Today’s Agenda
Introduction
Ground Rules and Logistics
Volpe Center Overview
TMSEDS SOW Overview & Procurement Objectives
RFP Highlights
Technical Proposal
Cost/Business Proposal
Proposal Submission Reminders
Ground Rules and Logistics
Any statements, remarks or explanations made during this pre-proposal conference shall not qualify the terms of the RFP, unless an amendment is issued.
A copy of today’s presentation and list of attendees will be provided as an amendment to the solicitation.
No questions will be entertained during this webinar.
Ground Rules and Logistics – cont’d
Any questions, clarification requests, or other inquires pertaining to the solicitation must be submitted, via e-mail, no later than 11:00 AM ET on Thursday, May 27, 2016
Written questions received after May 27, 2016 will be answered by amendment only if determined by the CO to be in the best interest of the Government.
An amendment will be issued answering written questions received by the CO
Today’s Presenters
Robert Robinson, Contracting Officer, Office of Acquisitions, V-
Jared J. Hegberg, Contract Specialist, Office of Acquisitions, V-221
Kevin Clark, Division Chief, Aviation Facilities and Business Services, V-344
Volpe Center Overview
Background Volpe established in 1970 Part of U.S. Department of
Transportation (DOT) Office of Research and Technology
Named after former DOT Secretary and MA Governor John A. Volpe
Volpe supports DOT goals Safety State of good repair Economic competitiveness Livable communities Environmental sustainability
About Volpe
Operations Offices
Volpe Center organization
Technical Centers
Safety Management and Human Factors Stephen Popkin
Policy, Planning, and Environment
Gregg Fleming
Air Traffic Systems and Operations
Anne Aylward, acting
Infrastructure Systems and Technology
Luisa Paiewonsky
Chief Financial Officer William Henrikson
Chief Counsel Monica Conyngham
EEO Officer Karen Kowalewski
Acting Director David Ishihara
Human Resources
Susan Connors
Acquisitions Mary Doherty
Information Technology
Eric Frykenberg
Facilities Management David Duncan
Communication and Knowledge Management
Cassandra Allwell
Director Emeritus Richard John
Strategic Management Rachel Winkeller
Deputy Director for Research and Technology
Anne Aylward
Deputy Director for Operations David Ishihara
Organizational Culture and Work Life Helen Blackman
Strategic Initiatives Ellen Bell
Multimodal Programs and Partnerships
Mike Dinning Research Infrastructure and Operations Bob Dorer
Technical organizations
Safety Management and Human
Factors
Policy, Planning, and Environment
Safety Information
Systems
Safety Measurement and Analysis
Aviation Safety
Management Systems
Surface Transportation Human Factors
Aviation Human Factors
Economic Analysis
Transportation Planning
Organizational Performance
Environmental Measurement and Modeling
Environmental Science and Engineering
Energy Analysis
CAFE
Program
Office
Infrastructure Systems and
Technology
Air Traffic Systems and Operations
Aviation Systems
Engineering
Situational Awareness and
Logistics
Systems Safety and
Engineering
Structures and Dynamics
Advanced Vehicle
Technology
Infrastructure Engineering and Deployment
Technology Innovation and Policy
Air Navigation and
Surveillance
Air Wakes and
Weather
Air Traffic Management
Systems
Aviation Facilities and Business Services
NextGen Program
Office
Air Traffic Systems and Operations Focus Development of aviation systems that alleviate air traffic congestion, improve safety, and mitigate environmental impacts
Planning, testing, research, and evaluation in support of the Next Generation Air Transportation System (NextGen)
Real-time operational communication, navigation, surveillance, and decision support systems
Example projects Aircraft wake turbulence and aircraft separation – FAA Remotely piloted aircraft technology assessments – FAA NextGen surveillance systems(ADS-B) – FAA NextGen modeling and simulation – FAA Air traffic facilities support – FAA
TMSEDS
Overview & Procurement
Objectives http://www.google.com/url?sa=i&rct=j&q=&source=imgres&cd=&cad=rja&uact=8&ved=0ahUKEwjQ2pHtz9LMAhXCGD4KHS-_ARsQjRwIBw&url=http://www.dcr.virginia.gov/natural-heritage/localitiesmap&psig=AFQjCNHmSF6pHxbBuDd6yBJ95wAaDfQ7xg&ust=1463076774820279 http://www.google.com/url?sa=i&rct=j&q=&source=imgres&cd=&cad=rja&uact=8&ved=0ahUKEwjQ2pHtz9LMAhXCGD4KHS-_ARsQjRwIBw&url=http://www.dcr.virginia.gov/natural-heritage/localitiesmap&psig=AFQjCNHmSF6pHxbBuDd6yBJ95wAaDfQ7xg&ust=1463076774820279 https://www.google.com/url?sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&uact=8&ved=0ahUKEwjLp_GS0NLMAhXBbT4KHSIWBTMQjRwIBw&url=https://en.wikipedia.org/wiki/United_States_Department_of_Homeland_Security&psig=AFQjCNH_OZ2htaENTxdvO8vfzhcIdbaMJA&ust=1463076851385393 https://www.google.com/url?sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&uact=8&ved=0ahUKEwjLp_GS0NLMAhXBbT4KHSIWBTMQjRwIBw&url=https://en.wikipedia.org/wiki/United_States_Department_of_Homeland_Security&psig=AFQjCNH_OZ2htaENTxdvO8vfzhcIdbaMJA&ust=1463076851385393
TMSEDS - Procurement Objective
By establishing a “pool” of professional technical/scientific resources, the Volpe Center can respond to uncertain, long-range requirements of its technical program in a timely and effective manner. The Contractor will constitute an important part of the Volpe Center’s resources and will provide high-technology capabilities and skills targeted to the Volpe Center’s programmatic requirements in the area of TMSEDS.
Recap - FBO Special Notice
TMIS Follow-On Acquisition Strategy Announced on 9/17/2015 https://www.fbo.gov/notices/9a2666bdd7d88cc9714e03c739aef75b
Work has “evolved” to require separate procurements Three Solicitations to be issued
Two for ATEPS (one Full & Open and one SBSA) One for TMSEDS (Full & Open) https://www.fbo.gov/notices/9a2666bdd7d88cc9714e03c739aef75b
TMSEDS – Background Current Contract
Traffic Management Infrastructure Systems (TMIS) multiple award ID/IQ contracts Six master contracts (Boeing Company, Computer Sciences Corporation, Engility
Corporation, Lockheed Martin IS&GS, Raytheon Company, and Science Application International Corporation) awarded December 8, 2011
Ordering Period Expires December 7, 2016. Performance period expires December 7, 2017
Maximum Value: $450 million over 5 Years
To date, 21 task orders have been issued under the TMIS multiple award contracts – 10 of the 21 Task Orders awarded were in support of various Air Traffic Management Systems.
TMSEDS – Acquisition Strategy
Full & Open – Multiple Award ID/IQ
Cost-Plus-Fixed-Fee(CPFF) and Firm-Fixed Price (FFP) Task Orders
TMSEDS - Procurement Overview
Statement of Work based on ongoing TMIS task orders and expected future work
Funded by Intra-Agency Agreements
Advisory and Assistance Services
Federal Acquisition Certification-certified personnel will ensure appropriate management controls and perform contracting functions under the contracts and all task orders
TMSEDS - SOW
Task Areas
The Contractor will support the following task areas:
Air Traffic Management (ATM) Systems Position, Navigation and Timing (PNT) Systems Communication Systems Autonomous Operations and Remote Sensing Systems
(AORSS)
System Engineering
TMSEDS SOW –Task Area 1
Air Traffic Management Systems
Activities related to traffic management systems and automation applications at various stages in their development, including initial research, conceptualization, design feasibility studies, proof-of-concept models, prototyping, design and development testing, verification, implementation, analysis, and continued operation and maintenance
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104 18
TMSEDS SOW –Task Area 2 Position, Navigation and
Timing Systems Activities related to the planning, development, and utilization of PNT systems for solutions to present and future transportation needs
Meter Point
Spot Release Planner
Runway Schedul er
TMSEDS SOW –Task Area 3 Communications Systems Activities related to the planning, development, and utilization of communications systems for solutions to present and future transportation needs and challenges
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104 20
TMSEDS SOW –Task Area 4 Autonomous Operations and Remote Sensing Systems
Activities related to the research, planning, development, and utilization of autonomous operations and remote sensing systems for solutions to present and future transportation needs and challenges
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104 21
TMSEDS SOW –Task Area 5
System Engineering Activities related to identification of the most beneficial operational capabilities for prioritization and implementation. This includes; functional architecture definition and system requirements allocation and control; and analyzing, and track technical performance measures and other system and service metrics
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104 22
RFP Highlights
Incremental Funding of Task Orders (G.12) – Apportionment and Allotment
Exclusions due to OCI (H.20)
Note the Cybersecurity Compliance Requirements (TAR 1252.239-70) in I.3
Note the Security and Position Sensitivity (DOT Order 1630.2B) Compliance Requirements in H.13
RFP – Section L
L.1 – Requirements for Certified Cost or Pricing Data
L.2.B – Award Without Discussions
RFP Questions – NLT 11:00 AM on May 27, 2016 (e-mail only)
Proposal Validity – Minimum of 180 Calendar Days
RFP – Section L – cont’d
L.3.B – Proposal Presentation Volume I – Cost/Business Proposal (three labeled sections) o CD/DVD must include the completed cost proposal schedules in Microsoft Excel 2013 or compatible format. Excel file will be used to verify calculations (no encrypted or protected cells) o Narrative (such as the subcontracting plan and other business proposal documents) must be provided in Adobe Acrobat or compatible format.
o CD/DVD Cover Label shall include: Title of Proposal, Volume #, RFP #, Name of Offeror o The number of CDs/DVDs submitted is not restricted (2 copies is preferred)
Volume II – Technical Proposal (three labeled sections) o The Technical Proposal must be in Adobe Acrobat format (Amendment will be issued to correct the RFP – currently requires Word).
RFP – Section L –Technical Proposal
Written Technical Proposal Submission Consisting of Two (2) Sections Staffing Contract Past Performance
Oral Presentations Consisting of Two (2) Sections:
Technical Understanding Management Approach
L.3.D – Proposal Format
NO COST INFORMATION SHALL BE INCLUDED IN THE
TECHNICAL PROPOSAL
RFP – Section L –Technical Proposal – Oral Presentations
ORAL PRESENTATION SCHEDULE
Evaluation Factor Topic Time Limit* Presenters N/A Introduction 5 minutes Program Manager and/or any of the Task Area Managers Only
Technical Understanding Presentation of Technical Understanding
40 minutes Program Manager and/or any of the Task Area Managers only
Technical Understanding Structured Questions and Answers on Technical Understanding
30 minutes Program Manager and/or any of the Task Area Managers Only
Break 15 minutes Management Approach Presentation of Management
Approach 30 minutes Program Manager and/or any of the Task Area Managers Only
Management Approach Structured Questions and Answers on Management Approach
30 minutes Program Manager and/or any of the Task Area Managers Only
N/A Conclusion 5 minutes Program Manager and/or any of the Task Area Managers Only
* These are Time Limits. Offerors are encouraged to be concise and are not required to present for the maximum time
Oral Presentations The order of oral presentations will be determined by the drawing of lots by CO after the receipt of proposals Offerors will be notified in writing via e-mail of the date and time of the scheduled presentation Offerors must confirm their schedule presentation via e-mail to the CO Request to reschedule presentations will not be honored Oral Presentations are tentatively scheduled to commence on
August 8th
TMSEDS – Section L Cost/Business Proposal
Follow the guidance as provided in Section L.4 Identification of uncompensated overtime (FAR Provision 52.237-10) Include information required under FAR Provision 52.222-46
(Evaluation of Compensation of Professional Employees) Proposals must contain sufficient information for the Government to complete its evaluation (completely filled out Cost Proposal Schedules )
Supporting documentation must be clear, complete, and convincing Proposals need to be stand-alone proposals and not reference previously submitted proposals or other provided documentation
Cost/Business Proposal cont’d
Prime Offerors must complete all ten (10) Attachment J.8 Cost Proposal Schedules
Cost Type Subcontractors must Complete Attachment J.8 Schedules 1 through 5, Schedule 9, and other items as identified on the Attachment J.7 Checklist NOTE: Cost type subcontractors must provide evidence (such as an approval letter) that their accounting system has been approved by a Federal Government Audit Agency or describe how their accounting system could be reviewed and approved.
Cost Type Subcontractors – when completing Schedules 2 and 3, enter $0 for subcontracts and $0 for RFP-stipulated ODC.
Those are reserved for the prime offeror.
Note that second-tier subcontracting is not permissible unless the Offeror can provide a strong technical rationale for inclusion of a second-tier subcontract and demonstrate what steps have been taken to prevent layering of costs and profit.
Cost Type Subcontractors shall also enter 90% of their direct labor to Schedule 2 and the remaining 10% to Schedule 3.
Time and Material (T&M) Subcontractors must provide items as identified on the Attachment J.7 Checklist Consent for T&M type subcontractors will be based on cost build up or commerciality of billing rates (fully loaded).
If consent is based on commerciality, the offeror must provide information and statistical information demonstrating the use of billing rates in substantial quantities to the non-Government public
Burden of proof rests with the offeror and subcontractor If based on commerciality, include a signed statement that the offered rate is
“most favored customer rate” or provide an explanation why the most favored customer rate was not provided
Schedule 1 CPFF Columns: Enter Estimated Cost and Fixed Fee for Contract Period 1 (from the totals in Schedule 2) o Note to include the RFP stipulated ODC as shown on Schedule 2 o Offeror estimated ODC may be proposed provided that a detailed breakdown is provided. The Master Contract will include a list of offeror proposed ODCs
FFP Columns: Enter Estimated Cost and Profit for Contract Period 1 (from the totals in Schedule 3) o Note that there is no RFP stipulated ODCs for FFP.
o Offeror estimated ODC may be proposed provided that a detailed breakdown is provided. The Master Contract will include a list of offeror proposed ODCs
Schedule 2 Complete the elements of cost for each cost element for Contract Period 1.
Totals will be entered in the CPFF Table on Schedule 1 Direct Labor comes from the CPFF labor calculations of Schedule 4 (90% of
Direct Labor Costs) Fixed fee comes the calculations provided in Schedule 6
Schedule 3 Complete the elements of cost for each cost element for Contract Period 1.
Totals will be entered in the FFP Table on Schedule 1 Direct Labor comes from the Schedule 4 Profit comes the calculations provided in Schedule 6
Schedule 4 Prime Offeror Labor is entered on this schedule o Prime labor hours (excluding subcontractor assigned LOE) is provided in Section A of this schedule o For Administrative Labor, the offeror shall specify the labor category, the number of hours proposed (Section A) and the unburdened hourly rate in Section B o Unburdened labor rates for each category must be entered in Section B (Labor Rate Calculations - see page 94 – Direct Labor) o Extended Labor costs (hours time hourly rates) must be shown in Section C o 90% of the annual direct labor total costs is entered in Schedule 2 (by contract period) o 10% of the annual direct labor total costs is entered in Schedule 3 (by contract period)
Schedule 5 Prime Offerors shall indicate their indirect rates by their Fiscal Year and calculate a weighted average based on the anticipated performance period (beginning January 1st in each year of contract performance)
Indicate and provide evidence whether the offeror has an approved Forward Price Rate Agreement with the Government. Include a copy of the FPRA.
Offerors shall provide a copy from their cognizant audit agency, such as DCAA, that their Accounting System has received Government approval.
Offerors shall provide the allocation base for each indirect rate
Schedule 6 Prime Offerors shall complete the schedule for the purpose of indicating the maximum factors for fixed fee and profit The fixed fee amounts shall come from Schedule 2 and the profit estimate costs shall come from Schedule 3 The total fixed fee and profit percentages shall be entered in Clause H.9 of the contract Note that the Government reserves the right to negotiate lower percentages (if the Government decides to negotiate instead of awarding without discussions).
The Government shall analyze proposed fixed fee and profit based on DOT
Weighted Guidelines. NOTE: A proposal that proposes fixed fee in excess of statutory limitations shall be eliminated from consideration.
Schedule 7 Complete the amount proposed for each subcontract (for Contract Period 1). In addition to the amount indicate the type of subcontract and the total number of technical hours proposed.
90% of the total for subcontractors is entered in Schedule 2 while the remaining 10% is entered in Schedule 3.
Schedule 8 Offerors shall provide the allocation of direct labor hours for the prime and each proposed subcontractor.
Additionally, provide the value and type of subcontract.
Schedule 9 Offerors shall provide an estimate for each of its Offeror-estimated ODCs that it anticipates invoicing directly during performance of the initial Task Orders.
The Offeror must clearly identify the different types of costs that may be direct costs in accordance with its established accounting practice, the amount for each cost, and the basis of the cost estimate.
Schedule 10 Complete the Labor Cost Realism Schedule by providing the Labor Category for the Resumed Person, the Resumed Person’s Name, their Company Affiliation, their current unburdened labor rate and the Contract Period 1 unburdened labor rate for that labor category (from Schedule 4). If the resume person rate is greater or lower than 5% of the Schedule 4 rate, the offeror must provide an explanation on why the rate is higher or lower.
Business Proposal
Cost Control Plan Subcontract Consent
Offeror compliance with FAR Part 44
Subcontracting Plan Conflict of Interest Disclosure
Required for offeror and each proposed subcontractor
Limitations on Pass-Through Charges Compliance with FAR 52.215-22 Provide the required information Description of value added is required
TMSEDS – Section M Evaluation Factors for Award
Basis for Award Award to be made to responsive and responsible offerors whose proposal provides the best value to the Government Award may be made based on initial offers However, the Government may determine during proposal evaluation that discussions may be necessary
Evaluation Factors for Award – cont’d
Order of Importance Technical Proposal significantly more important than the Cost Business Proposal Offerors are cautioned not to minimize the importance of the Cost Business proposal.
Technical Proposal Factors for Evaluation Technical Understanding Staffing Management Approach Past Performance
Evaluation Factors for Award – cont’d
Cost Proposal Evaluation Criteria Cost Proposal for Master Contract to be evaluated for Realism, Reasonableness and Completeness Analysis will include a probable cost determination Best Value Determination will be based on Cost Realism
Cost/Business Proposal Evaluation by the Government will also include:
Evaluation for Consistency Evaluation of Proposed Fee Assignment of Risk Evaluation of Uncompensated Overtime, Compensation for Professional
Employees Evaluate the Acceptability of the Cost Control Plan
Amendment 000001
Issued via FBO on May 13th
Made Corrections to:
Minimum Guarantee amount for FAR Clause 52.216-19 (Order Limitations);
Evaluated Labor Level for the Cost Proposal;
LOE Table in L.4;
RFP-Stipulated ODCs;
Labor Category Qualifications (Attachment J.3); and Proposal Worksheets Schedules 1 -10 (Attachment J.8)
Proposals can be submitted in Adobe Acrobat format. Cost Proposals must still be provided in Microsoft Excel 2013.
Amendment 000002
To be issued next week Provide Webinar PowerPoint Slides
Response to Offeror submitted questions o Subcontract Cost or Pricing Data o Past Performance o Oral Presentations
Questions received after today’s webinar will be responded to in a future Amendment
Important Dates and Reminders
Offerors are encouraged to ask questions.
RFP Questions due NLT 11:00 AM, May 27, 2016 via e-mail to:
Jared.Hegberg@dot.gov
Terms and Conditions of the Solicitation remain unchanged unless the CO issues an Amendment
Proposals must remain valid for a minimum of 180 calendar days effective from the proposal due date (June 30, 2016)
Proposals Due at 3:00 PM ET, on June 30, 2016.
THANK YOU FOR YOUR ATTENDANCE
mailto:Camille.hogan@dot.gov
FirstName LastName Email Company Janet Gustin janet.gustin@engilitycorp.com Engility Corporation parick godfrey pgodfrey@mathtechinc.com Mathtech, inc Corinne Militz corinne.militz@noblis.org Noblis Therese El-Masry el-masry_therese@bah.com Booz Allen Hamilton Inc.
Carol Shiflett carol.shiflett@lstechllc.com LS Technologies, LLC Scott Seifert scott.seifert@saic.com SAIC Daniel Finkelsztein dfinkelsztein@sgt-inc.com SGT Inc Bernadette Morrow bernadette.v.morrow@lmco.com LMCO Don Hogan donal.hogan@engilitycorp.com Engility Corporation Kerin Eaton eaton_kerin@bah.com Booz Allen Jim Blaylock jim.blaylock@humansolutionsinc.com Human Solutions, Inc.
Dolly Kaur dolly@icatalystinc.com iCatalyst Inc.
Bill Yeagley william.a.yeagley@saic.com SAIC David Barr dbarr@sgt-inc.com SGT, Inc.
Ron Marinzel rmarinzel@sgt-inc.com SGT William Sellers sellers_william@bah.com Booz Allen Hamilton Mark Contarino mark.contarino@ees-net.com EES Kristi Lovelace kristi.lovelace@noblis.org Noblis, Inc.
Graham Hankey graham.w.hankey@saic.com SAIC Aditi Vardhan aditi.vardhan@icatalystinc.com iCatalyst, Inc.
BRUNO SALAMON bruno.salamon@metronaviation.com Metron Aviation, Inc.
Jerry Strong gerald.r.strong@saic.com SAIC Tracey Yanity tracey.yanity@engilitycorp.com Engility Corporation Alicia Manfra amanfra@atcorp.com Architecture Technology Corp Kerri Steadman kerri.a.steadman@saic.com SAIC Norman Couture norman.couture@engilitycorp.com Engility Robert Joynson robert.joynson@csra.com CSRA Douglas Taggart dtaggart@overlooksys.com Overlook Systems Technologies, Inc.
Lauren McClurg lauren.e.mcclurg@raytheon.com Raytheon Company LaShanda Jordan lashanda.jordan@engilitycorp.com Engility Corporation Ela Kubiak ekubiak@flightview.com FlightView Inc.
Linda Zhou linda.zhou@gdit.com GDIT Mark Prickett mark.m.prickett@saic.com SAIC Rick Zurawski richard.d.zurawski@saic.com SAIC Curt Anderson canderson@cssiinc.com CSSI David Sharp sharpdv@saic.com SAIC Jason Child jason.c.child@saic.com SAIC Lawrence Cogut larry.cogut@gdit.com General Dynamics Bridget Chatman bridget.l.chatman@saic.com SAIC Norman Galer galer_norman@bah.com Booz Allen Hamilton Catherine Fontaine catherine.fontaine@noblis.org Noblis, Inc.
Steven Goldstein steve@indigoarc.com Indigo Arc, LLC John Fries john.fries@noblis.org Noblis, Inc.
Paul Abramson pda-associates@comcast.net PDA Associates Ross Burton rburton@cssiinc.com CSSI, Inc.
Jim Ries jim.ries@csra.com CSRA, LLC.
| TMSEDS Amendment 000002 |
| TMSEDS Amendment 000002 |
| TMSEDS Pre-Proposal Slides |
| Slide Number 1 |
| Today’s Agenda |
| Ground Rules and Logistics |
| Ground Rules and Logistics – cont’d |
| Today’s Presenters |
| Slide Number 6 |
| Slide Number 7 |
| Volpe Center organization |
| Technical organizations |
| Air Traffic Systems and Operations |
| TMSEDS�Overview & Procurement Objectives� |
| TMSEDS - Procurement Objective |
| Recap - FBO Special Notice |
| TMSEDS – Background �Current Contract |
| TMSEDS – Acquisition Strategy |
| TMSEDS - Procurement Overview |
| TMSEDS - SOW �Task Areas |
| TMSEDS SOW – Task Area 1 |
| TMSEDS SOW – Task Area 2 |
| TMSEDS SOW – Task Area 3 |
| TMSEDS SOW – Task Area 4 |
| TMSEDS SOW – Task Area 5 |
| RFP Highlights |
| RFP – Section L |
| RFP – Section L – cont’d |
| RFP – Section L – Technical Proposal |
| RFP – Section L – Technical Proposal – Oral Presentations |
| Oral Presentations |
| TMSEDS – Section L �Cost/Business Proposal |
| TMSEDS – Section L�Cost/Business Proposal cont’d |
| TMSEDS – Section L �Cost/Business Proposal cont’d |
| TMSEDS – Section L�Cost/Business Proposal cont’d |
| TMSEDS – Section L �Cost/Business Proposal cont’d |
| TMSEDS – Section L�Cost/Business Proposal cont’d |
| TMSEDS – Section L�Cost/Business Proposal cont’d |
| TMSEDS – Section L �Cost/Business Proposal cont’d |
| TMSEDS – Section L�Cost/Business Proposal cont’d |
| TMSEDS – Section L�Cost/Business Proposal cont’d |
| TMSEDS – Section L �Cost/Business Proposal cont’d |
| TMSEDS – Section L�Business Proposal |
| TMSEDS – Section M�Evaluation Factors for Award |
| TMSEDS – Section M�Evaluation Factors for Award – cont’d |
| TMSEDS – Section M �Evaluation Factors for Award – cont’d |
| Amendment 000001 |
| Amendment 000002 |
| Important Dates and Reminders |
| TMSEDS Webinar Attendees |
| Sheet1 |
File details come from the government source that posted it. Updated .