This is a Construction Bid Addendum No. 02 issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division for the Houghton Lake Flats project. The addendum was issued on June 26, 2025, with a bid opening date of July 16, 2025. The professional firm Wade Trim, under Project Director David Lenz, is overseeing the project identified as file number 751/18123.DPL. This addendum incorporates clarifications and modifications to the original bidding documents and must be acknowledged by all bidders in the Bid Summary and Bid Form; failure to acknowledge the addendum may result in bid rejection.

The primary clarification provided in this addendum addresses insurance requirements. DTMB risk management has determined that Builders Risk Insurance will not be required for this project, representing a modification to the standard bidding conditions. Bidders should note that this addendum, along with all previous addenda, becomes part of the contract documents and must be formally acknowledged as a condition of bid acceptance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 6/25)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design & Construction Division

CONSTRUCTION BID ADDENDUM NO. 02

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

6/26/2025

PROJECT NAME

Houghton Lake Flats

FILE NUMBER

751/18123.DPL

PROFESSIONAL

Wade Trim

PROJECT DIRECTOR

David Lenz

BID OPENING DATE:

7/16/2025

The following are the answers and clarifications discussed during the pre-bid meeting.

DTMB risk management has determined that Builders Risk Insurance will NOT be required for this project.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: DATE: Click to enter date

APPROVED BY:

PROJECT DIRECTOR: David Lenz DATE: 6/26/2025 http://www.michigan.gov/SIGMAVSS