DTMB-0414 (RFP Addendum).pdf
PDF 101 KB Posted
- Solicitation number
- RFP-171-250000001359-2
- Issued by
- Kalamazoo County, Huntington Woods City, Michigan
About this file
This is an Addendum No. 01 to a Request for Proposal issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration, Design and Construction Division for HVAC upgrades at selected buildings at Parnall Correctional Facility (SMT). The project number is 472/25081.GSA, with proposals due on March 6, 2025. The project scope includes ventilation improvements for shower areas in Housing Units A (Building 197) and B (Building 196), implementation of a new building control system compatible with current and future equipment, and establishment of campus-wide standards. The Gymnasium Building 219 has been removed from the scope. The work must comply with MDOC Physical Plant Standards.
The project will be split into two bid packages - one specifically for heating equipment for Housing Units A and B, and another for the remaining work. The heating work for the Housing Units must be expedited to be completed before the 2025 heating season. The Professional Service Contractor (PSC) is required to coordinate all available energy-savings rebates provided by Consumers Energy. The addendum is approved by Project Director George Ananich on February 20, 2025.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 01
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
2/21/2025
PROJECT NAME
Parnall CF (SMT) HVAC Upgrades at selected buildings
FILE NUMBER
472/25081.GSA
PROJECT DIRECTOR
George Ananich
PROPOSAL DUE DATE:
3/6/2025
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. Include study and corrective design/actions to improve ventilation at the shower areas for Housing Units A Bldg. 197 and B Bldg. 196.
2. Remove Gymnasium Bldg. 219 from scope of work. No work is to be provided for in this building in the RFP.
3. Study and design for implementation of new building control system compatible with current and future equipment and to establish a standard for future implementation across the campus.
4. All work to comply with MDOC Physical Plant Standards. See attached three (3) documents.
5. PSC to coordinate all available energy-savings rebates provided by Consumers Energy.
6. Provide two (2) bid packages. One for heating equipment for Housing Units A and B. the second for the remaining work. Heating work for the Housing Units is to be expedited to have project completed before the 2025 heating season.
7. See attached Pre-proposal sign-in sheet.
APPROVED BY:
George Ananich
PROJECT DIRECTOR DATE 2/20/2025