This document is Construction Addendum 4 to the Department of Technology, Management and Budget (DTMB) contract for sanitary sewer upgrades at the Chippewa Community Foundation in Michigan. The addendum modifies the original construction contract terms and conditions. The project involves sanitary sewer system upgrades, though specific quantities and detailed project scope modifications are contained within the addendum document itself. The addendum establishes revised contractual requirements and obligations for the contractor performing the work on this municipal infrastructure improvement project in Michigan.
The addendum addresses modifications to pricing terms, contractual obligations, and project conditions as they relate to the original contract award. Specific pricing adjustments, funding sources, and financial requirements are detailed within the addendum provisions. As a formal contract modification document, this addendum supersedes or supplements provisions in the original contract documents and establishes binding requirements for contract performance, payment terms, and project completion standards between the State of Michigan and the selected contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/25)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design & Construction Division
CONSTRUCTION BID ADDENDUM NO. 4
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
11/4/2026
PROJECT NAME
Chippewa Correctional Facility – Sanitary Sewer Upgrade
FILE NUMBER
472/26156.MDL
PROFESSIONAL
Matrix Consulting Engineers
PROJECT DIRECTOR
Mike Lusk
BID OPENING DATE:
11/11/2026
ADDENDUM ITEMS:
1. Reissued sheets E-201, E-500, E-900
2. Clarification: The existing feeder extends from a 60A breaker in the 1100 Warehouse building. Both must remain operational until the new system is fully commissioned. Refer to MDOC shutdown requirements for any additional items.
3. Clarification: Installation of all site conduits will be directionally bored. Field verify the optimal locations of handholes based on the exact location of the existing feeder. One shall be marked as Electrical and one as communications.
4. Clarification: Underground raceways to be Schedule 40 RNC/HDPE.
5. Clarification: Panelboard enclosures to be Nema 1. Surge protection is not required.
6. Clarification: LP-A should be 3 wire. Refer to revised Sheets E-201 and E-900.
7. Clarification: Everything installed within the indicated boundary to be C1D1 compliant.
8. Clarification: No disconnect/starter is required for D-1 and D-2. EF-2 to run continuously, no thermostat required for EF-2. Refer to sequence of operation for EF-1 and EF-2 operation.
9. Clarification: Gas Monitoring Oxygen Setpoints, Range 0-25%/VOL-Low Limit Alarm at 19.5%. High
Limit Alarm at 17%-Shut down source of O2 depleting gas, remote audio visual activated and evacuated the space in question.
10. Clarification: Lift station will be monitored by the Starnet panel with a single point connection that annunciates in the control center.
11. Fiber and network: Section 27 0500 describes 24-strand fiber, while Section 27 1323 describes 12-strand fiber. Which is required? 12 strand fiber to be installed. To be extended from existing rack in the 1100 Warehouse building.
12. Clarification: Lighting circuit to be on RPA-4. Refer to revised sheet E-500.
13. Clarification: Modified and new equipment will need to be included in the updated arc flash study. An existing arc flash study will be provided by the owner.
14. Clarification: Ultra Link System to be supplied and installed by the contractor.
15. Clarification: Starnet system to be supplied and installed by the contractor.
16. Clarification: Cat 6 cabinet to be provided for lift station alarm panel.
17. Clarification: Fiber panel does not need to be installed in an explosion proof enclosure.
http://www.michigan.gov/SIGMAVSS
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Troy Thelen, Matrix DATE: 11/4/2026
APPROVED BY:
PROJECT DIRECTOR: Mike Lusk
DATE: 11/4/2026
M-80
J J
EXISTING
GRINDER
EXISTING
ELECTRICAL
SERVICE
EX CONDUIT
AND WIRE
J
EXISTING
ELECTRICAL
MANHOLE
EX GRINDER
CONTROL PANEL
EX
GRINDER/BUILDING
DISCONNECT
EX CONDUIT
AND WIRE
BAR SCREEN
BUILDING
ELECTRICAL KEY NOTES
CONTRACTOR SHALL PROVIDE AN INSTALL NEW 2" CONDUIT AND FIBER
FROM EXISTING BUILDING 1100 NETWORK SWITCH. CONNECT TO NEW
SWITCH IN BAR SCREEN BUILDING. REFER TO SHEET E-800 FOR MORE
INFORMATION.
CONTRACTOR SHALL INSTALL NEW PULL BOX FOR BAR SCREEN BUILDING
POWER. INTERCEPT AND SPLICE EXISTING GRINDER FEEDER, AND EXTEND
TO NEW BUILDING AS INDICATED.
CONTRACTOR SHALL INSTALL NEW PULL BOX FOR BAR SCREEN BUILDING
FIBER.
CONTRACTOR SHALL REMOVE ALL EXISTING GRINDER SYSTEMS UPON
COMPLETION AND TESTING OF NEW BUILDING BAR SCREEN EQUIPMENT.
REMOVE ALL ASSOCIATED CONDUIT AND WIRE TO SOURCE.
60A/3P 3Ø, 4W
NEMA 3R
FUSED
EXISTING 60A BREAKER
FROM BUILDING 1100
EMDP
GRINDER
CONTROL
PANEL
GRINDER
1 NEW PARTIAL RISER DIAGRAM
SCALE: NTS
J
KVA
T
EX
PANEL
EXISTING
GRIND BLDG
120/208V 3Ø, 4W
100A, MLO
PANEL
NEW
LP-A
480V
3Ø, 3W
60A, MCB
KVA
T #8
A
PANEL
NEW
RP-A
208/120V 3Ø, 4W
60A, MCB
(3) #4
(1) #8 GND
1-1/4" CND
(3) #10
(1) #10 GND
3/4" CND
(4) #6
(1) #8 GND
1" CND
NEW PULL
BOX
N PARTIAL ELECTRICAL SITE PLAN - NEW
file no.
checked by drawn by consultant issue date index no.
contract order no.
consultant job no.
260678.00
472/26156.MDL
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
100% CD's 10/05/2026 sheet description
M a t r ix
ADDENDUM 4 11/03/2026
E-201
DDA
JFS
PARTIAL ELECTRICAL SITE
PLAN - NEW
SCALE: 1" = 30'-0"
01 5 20 40 75
PANEL RP-A
208/120V-3Ø, 60A
PANEL LP-A
480/277V-3Ø, 60A
LC
LCEM
RP-A-4
XA
LAEM
LA
LA
LAEM
LA
RP-A-4
LBEM
LB
LB
PC
RP-A-4
C1D1
BOUNDARY
ELECTRICAL LIGHTING KEY NOTES
ALL WORK IN HAZARDOUS LOCATIONS SHALL BE IN ACCORDANCE WITH
ARTICLE 500 OF THE NAITONAL ELECTRICAL CODE. LIGHTS, DEVICES, AND
EQUIPMENT INSTALLED IN THESE LCOATIONS SHALL BE EXPLOSION-PROOF
OR UTILIZE INTRINSICALLY SAFE CIRCUITRY. PROVIDE SEALL-OFF FITTINGS
FOR ALL WIRING THAT ENTERS/LEAVES HAZARDOUS LOCATIONS.
EQUIPMENT INSTALLED IN CORROSIVE AREAS SHALL BE PVC COATED OR
CONSTRUCTED OF CORROSION RESISTANT MATERIALS. THE LOCATION AND
TYPE OF GAS-TIGHT SEALS FOR CABLES, CONDUIT, AND WIRES MUST MEET
THE NEC, AND ALLOW FOR EASY DISCONNECTION AND REMOVAL OF PUMPS
AND INSTRUMENTS FOR MAINTENANCE.
WP
GFI
TA
15KVA TRANSFORMER4
RP-A-1
LIFT STATION
CONTROL PANEL
L-1
D-1
FIBER PANEL
NEW FIBER
GROUND BAR
J J J
WP GFI
48" AFF
RP-A-2
OXYGEN SENSOR
HYDROGEN SULPHIDE SENSOR
CATALYTIC COMBUSTIBLE SENSOR
RP-A-3
EUH-1
480V-3Ø, 12.7A
LP-A-1,3,5
D-2
7 WP GFI
48" AFFRP-A-2
L-2
LP-A-7,9,11
LP-A-8,10,12
8LP-A-2,4,6
RP-A-5,7
RP-A-2
C1D1
BOUNDARY
GARAGE DOOR
208V-1Ø, 5A
EUH-2
480V-3Ø, 12.7A
SANITARY SCREEN
480V-3Ø, 2.1A
WASHER
480V-3Ø, 1.6A
EF-2
EF-1
120V-1Ø, 4.4A
PANEL RP-A
PANEL LP-A
480/277V-3Ø, 60A
AMC-1400 FOUR
CHANNEL GAS MONITOR
EUH-3
480V-3Ø, 4.3A
LP-A-14,16,18
AUDIO/VISUAL
ALARM
AUDIO/
VISUAL
ALARM
120V-1Ø, 5.8A
208/120V-3Ø, 60A
ELECTRICAL POWER KEY NOTES
CONTRACTOR SHALL TIE NEW LIFT STATION PUMP(S) ALARM CONTROLS
INTO EXISTING STARNET SYSTEM.
DISCONNECT BY MANUFACTURER.
CONTRACTOR SHALL PROVIDE AND INSTALL WEATHER PROOF AMC-1400
FOUR CHANNEL GAS MONITOR CONTROL PANEL. CONTRACTOR SHALL TIE
THE NEW GAS MONITORING SYSTEM INTO THE EXISTING STARNET SYSTEM.
INSTALL 4" CONCRETE HOUSEKEEPING PAD FOR TRANSFORMER.
TRANSFORMER TO BE SECURELY MOUNTED PER MANUFACTURERS
RECOMMENDATION.
CONTRACTOR SHALL PROVIDE CONDUIT AND WIRE FROM NEW CONTROL
PANEL TO NEW PUMPS.
CLASS 1, DIVISION 1, EXPLOSION PROOF EQUIPMENT. INTERLOCK D-1 WITH
EF-1. D-1 SHALL OPEN WHEN EF-1 OPERATES.
CLASS 1, DIVISION 1, EXPLOSION PROOF EQUIPMENT. INTERLOCK D-2 WITH
EF-2. D-2 SHALL OPEN WHEN EF-2 OPERATES.
CONTRACTOR SHALL PROVIDE AND INSTALL CLASS 1, DIVISION 1,
EXPLOSION PROOF EQUIPMENT.
NEW SECOR FIBER PANEL. CONTRACTOR SHALL PROVIDE ALL
COMPONENTS AND ACCESSORIES TO TIE SYSTEM INTO STARNET 2 SYSTEM.
REFER TO E800 FOR MORE INFORMATION.
CONTRACTOR SHALL PROVIDE AND INSTALL NEW TELECOMMUNICATIONS
GROUND BAR. REFER TO SHEET E800 DETAIL 3 FOR MORE INFORMATION.
CONTRACTOR SHALL CONNECT GAS DETECTION SYSTEMS SENSORS AND
DEVICES INTO THE MONITORING CONTROL PANEL. PROVIDE ASSOCIATED
CONDUIT AND WIRE. CONFIRM WIRING REQUIREMENTS WITH SYSTEM
PROVIDER.
ALL WORK IN HAZARDOUS LOCATIONS SHALL BE IN ACCORDANCE WITH
ARTICLE 500 OF THE NAITONAL ELECTRICAL CODE. LIGHTS, DEVICES, AND
EQUIPMENT INSTALLED IN THESE LCOATIONS SHALL BE EXPLOSION-PROOF
OR UTILIZE INTRINSICALLY SAFE CIRCUITRY. PROVIDE SEALL-OFF FITTINGS
FOR ALL WIRING THAT ENTERS/LEAVES HAZARDOUS LOCATIONS.
EQUIPMENT INSTALLED IN CORROSIVE AREAS SHALL BE PVC COATED OR
CONSTRUCTED OF CORROSION RESISTANT MATERIALS. THE LOCATION AND
TYPE OF GAS-TIGHT SEALS FOR CABLES, CONDUIT, AND WIRES MUST MEET
THE NEC, AND ALLOW FOR EASY DISCONNECTION AND REMOVAL OF PUMPS
AND INSTRUMENTS FOR MAINTENANCE.
N FLOOR PLAN - LIGHTING
SCALE: 1/4" = 1'-0"
0 1 5 10
N FLOOR PLAN - POWER
SCALE: 1/4" = 1'-0"
0 1 5 10 file no.
checked by drawn by consultant issue date index no.
contract order no.
consultant job no.
260678.00
472/26156.MDL
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
100% CD's 10/05/2026 sheet description
M a t r ix
ADDENDUM 4 11/03/2026
E-500
DDA
JFS
ELECTRICAL
FLOOR PLAN
NEW
file no.
checked by drawn by consultant issue date index no.
contract order no.
consultant job no.
260678.00
472/26156.MDL
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
100% CD's 10/05/2026 sheet description
M a t r ix
ADDENDUM 4 11/03/2026
E-900
DDA
JFS
ELECTRICAL
PANEL SCHEDULE(S)