Attachement J-6 Contract Pricing Summary.xls

XLS spreadsheet 119 KB Posted

Attached to
Project Management Oversight Support Services
Solicitation number
DTFT60-08-R-00010
Issued by

About this file

Section J Attachment J-6 Revisions

View the file

Other files

File Type Posted
DTFT60-08-R-00010 AMENDMENT 006.pdf PDF
AMENDMENT 0005.DTFT60-08-R-00010.pdf PDF
AMENDMENT 0004 DTFT60-08-R-00010.pdf PDF
Amendment 0003 - DTFT60-08-R-00010 - PMO.pdf PDF
Amendment 2 Summary - PMO.doc DOC document
Section J Attachment J-1 PMO.doc DOC document
OP01 Administrative Conditions and Requirements D3.doc DOC document
Section C 7-28-08.doc DOC document
Section M 7-28-08.doc DOC document
Amendment 1 Summary of Changes.doc DOC document
SECTION L 7-28-08.doc DOC document
Section A SF 33 Amendment 1.doc DOC document
Section B 7-28-08.doc DOC document
Section J Attachment J-1.docm DOCM document
Attachment J-5 Conflict of Interest Matrix.xls XLS spreadsheet
RFP DTFT60-08-R-00010 Sections A - J.pdf PDF
RFP DTFT60-08-R-00010 Sections K-L-M.pdf PDF
Section J Attachment J-3 Oversight Procedures.pdf PDF
RFP DTFT60-08-R-00010 Section J Attachments .pdf PDF
Section C 4-18-08.doc DOC document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J PricingSum

Attachment J-6PAGE 1 OF 4 PAGES
CONTRACT PRICING SUMMARY
(For New Contracts Including Letter Contracts)OMB Contract No.
(See Instructions on Reverse)Expiration Date: [.]
This form is for use in support of Standard Form 1411 prescribed by GSA, FAR (48 CFR) 53.215-2(c), Format 7(a)
Public reporting burden for this collection of information is estimated to average 5 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data
needed, and completeing and reviewing the collection of information. Send comments regarding this burden estimate or any aspect of this collection of information, including suggestions for reducing this burden, to the
FAR Secretarial (VRS), Office of Federal Acquisition and Regulatory Policy, GSA, Washington, D.C. 20405; and to the Office of Management and Budget, Paperwork Redcutrion Project (2105-0517), Washington, D.C. 20503.
NAME OF OFFERORPrime ContractorSUPPLIES AND/OR SERVICES TO BE FURNISHED
HOME OFFICE ADDRESSProject Management Oversight Services DC-
DIVISION(S) AND LOCATION(S) WHERE WORK IS TO BE PERFORMEDGOV'T SOLICITATION NO.
DETAILED DESCRIPTION OF COST ELEMENTS
1. DIRECT MATERIALEST. COST ($)TOTAL EST. COSTREFERENCE
A. PURCHASED PARTS$0
B. SUBCONTRACTED ITEMS$0
C. OTHER - (1) RAW MATERIAL$0
(2) STANDARD COMMERCIAL ITEMS$0
TOTAL DIRECT MATERIAL$0
2. MATERIAL OVERHEAD (Ratebase = )$0
3. DIRECT LABOR5 yr hrs (pg 2 col K)Calculated Rate / HourFive Yrr Direct Cost (pg 2 col R)
Officer-in-Charge (No Subs)600$ 26.81$16,087
Program Manager (No Subs)3,000$ 22.52$67,567
Task Order Manager (No Subs)9,600$ 21.45$205,919
Government and Regulatory Manager1,200$ 25.74$30,888
Real Estate Manager1,200$ 16.99$20,387
Document Control Manager1,200$ 13.80$16,565
Add Additional rows for each Skillset
TOTAL DIRECT LABOR16,200$357,413
4. LABOR OVERHEADOH RATEX BASE =EST COST ($)
10.00%$357,413$35,741
TOTAL LABOR OVERHEAD$35,741
5. OTHER DIRECT COSTSEST COST ($)
A. SPECIAL TOOLING/EQUIPMENT$0
TOTAL SPECIAL TOOLING/EQUIPMENT$0
B. TRAVELEST COST ($)
(1) TRANSPORTATION$850,000
(2) PER DIEM OR SUBSISTENCE$0
TOTAL TRAVEL$850,000
C. SUBCONTRACTED CONSULTANT SERVICESSubcontracted Direct LaborEST COST ($)
See Attached Subconsultant ONE Cost Summary5,400$99,233
See Attached Subconsultant TWO Cost Summary4,200$129,063
Add Additional rows for each Subconsultant Cost Summary$0
TOTAL SUBCONTRACTED CONSULTANT SERVICES$228,296
D. OTHEREST COST ($)
TOTAL OTHER$0
SUBTOTAL DIRECT COST$1,078,296
6. GENERAL & ADMINISTRATIVE (G&A) EXPENSE20.00%of BASE LABOR (I.E., COST ELEMENT NOS. )=$71,483
7. ROYALTIES
8.SUBTOTAL ESTIMATED COST$1,542,933
9. CONTRACT FACILITIES CAPITAL AND COST OF MONEY$0
10.SUBTOTAL ESTIMATED COST$1,542,933
11. FEE OR PROFIT2.00%$9,293
12.TOTAL ESTIMATED COST AND FEE OR PROFIT$1,552,225

&LAmendment 1 hours & rates

Attachment J-2; sheet 2 of 4(escalation factor, maximum 4% ), Maximum Labor Rate RatePAGE 2 OF 4 PAGES
Labor Classification - SkillsetConsultants Name/TitlePrime or Sub-Contractor [insert name of firm]Year 1 (2009) DYear 2 (2010) EYear 3 (2011) FYear 4 (2012) GYear 5 (2013) HCost Proposal Baseline Manhours for 5 years (To J-6)Cost Proposal Baseline Manhours each year KDirect Labor Cost Year 1 D x KDirect Labor Cost Year 2 E x KDirect Labor Cost Year 3 F x KDirect Labor Cost Year 4 G x KDirect Labor Cost Year 5 H x KFive Year Direct Labor Cost to Export to the firm's J-6
Program Manager (No Subs)John Jones, ManagerPrime21.0021.7422.5023.2824.103000600$12,600$13,041$13,497$13,970$14,459$67,567
Task Order Manager (No Subs)James Wang, ManagerPrime20.0020.7021.4222.1722.9596001920$38,400$39,744$41,135$42,575$44,065$205,919
Systems Integration ManagerChris Poe, EngineerTWO13.0013.3913.7914.2114.633000600$7,800$8,034$8,275$8,523$8,779$41,411
Civil Engineer (PE)Art Hunkle, EngineerTWO12.0012.3612.7313.1113.514200840$10,080$10,382$10,694$11,015$11,345$53,516
Risk Assessment ManagerSreve Right, PlannerONE11.0011.3311.6712.0212.383600720$7,920$8,158$8,402$8,654$8,914$42,048
Officer-in-Charge (No Subs)Susan Brown, VPPrime25.0025.8826.7827.7228.69600120$3,000$3,105$3,214$3,326$3,443$16,087
QA/QC Manager (CMQ/OE)1200240
Business Economics Manager1200240
Professional Planner (PP)1200240
Government and Regulatory ManagerBonnie Gee, AttorneyPrime24.0024.8425.7126.6127.541200240$5,760$5,962$6,170$6,386$6,610$30,888
Contracts and Terms Manager1200240
Procurement / Supply Manager1200240
Real Estate ManagerRon IsretiredPrime16.0016.4816.9717.4818.011200240$3,840$3,955$4,074$4,196$4,322$20,387
Architect/Architectural Engineer (RA)1200240
Rail Vehicle/Bus/Motor Vehicle EngineerGordon Shane, EngineerONE/subct25.0025.0025.0025.0025.001200240$6,000$6,000$6,000$6,000$6,000$30,000
System Safety Expert1200240
Construction Management Manager1200240
Transit Operations Planning Manager1200240
Mobility Expert1200240
Project Scheduling Manger1200240
Document Control ManagerEdward North, AdministratorPrime13.0013.3913.7914.2114.631200240$3,120$3,214$3,310$3,409$3,512$16,565
Cost Estimation ManagerJoe Smith, engineerONE15.0015.4515.9116.3916.88600120$1,800$1,854$1,910$1,967$2,026$9,556
Industrial Engineer600120
Rail Signal Engineer600120
CBTC / Automatic Train Control Engineer600120
Communications Engineer600120
Rail / Bus Vehicle Maintenance Manager600120
Rail Right of Way Maintenance Manager600120
Rail Track Design Engineer (PE)600120
Roadway Design Engineer, BRT (PE)600120
Structural Engineer (PE)600120
Bridge Engineer (PE)600120
Environmental Engineer (PE)600120
Geotechnical Engineer (PE)600120
Tunnel Engineering/ Construction Manager600120
Value Engineer600120
Mechanical Engineer (PE)600120
Electrical / Traction Power Engineer(PE)600120
Fare Collection Manger600120
Data Acquisition Manager (DAS)600120
System Security Expert600120
Construction Safety Manager600120
Buy America Expert600120
Clerical Support Staff4800960

&LAmendment 1 sub ONE

Attachment J-6PAGE 3 OF 4 PAGES
CONTRACT PRICING SUMMARY
(For New Contracts Including Letter Contracts)OMB Contract No.
(See Instructions on Reverse)Expiration Date: [.]
This form is for use in support of Standard Form 1411 prescribed by GSA, FAR (48 CFR) 53.215-2(c), Format 7(a)
Public reporting burden for this collection of information is estimated to average 5 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data
needed, and completeing and reviewing the collection of information. Send comments regarding this burden estimate or any aspect of this collection of information, including suggestions for reducing this burden, to the
FAR Secretarial (VRS), Office of Federal Acquisition and Regulatory Policy, GSA, Washington, D.C. 20405; and to the Office of Management and Budget, Paperwork Redcutrion Project (2105-0517), Washington, D.C. 20503.
NAME OF OFFERORSub -Contractor ONESUPPLIES AND/OR SERVICES TO BE FURNISHED
HOME OFFICE ADDRESSProject Management Oversight Services DC-
DIVISION(S) AND LOCATION(S) WHERE WORK IS TO BE PERFORMEDGOV'T SOLICITATION NO.
DETAILED DESCRIPTION OF COST ELEMENTS
1. DIRECT MATERIAL(included with Prime)EST. COST ($)TOTAL EST. COSTREFERENCE
A. PURCHASED PARTS$0
B. SUBCONTRACTED ITEMS$0
C. OTHER - (1) RAW MATERIAL$0
(2) STANDARD COMMERCIAL ITEMS$0
TOTAL DIRECT MATERIAL$0
2. MATERIAL OVERHEAD (Ratebase = )$0
3. DIRECT LABOR5 yr hrs (pg 2 col K)Calculated Rate / HourFive Yrr Direct Cost (pg 2 col R)
Cost Estimation Manager600$ 15.939,556
Risk Assessment Manager3,600$ 11.6842,048
Add Additional rows for each Skillset$ -$0
Add Additional rows for each Skillset$ -$0
Add Additional rows for each Skillset$ -$0
Add Additional rows for each Skillset$ -$0
TOTAL DIRECT LABOR4,200$51,605
4. LABOR OVERHEADOH RATEX BASE =EST COST ($)
19.00%$51,605$9,805
TOTAL LABOR OVERHEAD$9,805
5. OTHER DIRECT COSTSEST COST ($)
A. SPECIAL TOOLING/EQUIPMENT (included with Prime)$0
TOTAL SPECIAL TOOLING/EQUIPMENT$0
B. TRAVELEST COST ($)
(1) TRANSPORTATION (included with Prime)$0
(2) PER DIEM OR SUBSISTENCE (included with Prime)$0
TOTAL TRAVEL$0
C. INDIVIDUAL CONSULTANT SERVICES; fully burdened rates rates cannot escalateEST COST ($)
Rail Vehicle/Bus/Motor Vehicle Engineer; hrs x burdened rate12002530000
; hrs x burdened rate0
TOTAL INDIVIDUAL CONSULTANT SERVICES$30,000
D. OTHEREST COST ($)
TOTAL OTHER$0
SUBTOTAL DIRECT COST$30,000
6. GENERAL & ADMINISTRATIVE (G&A) EXPENSE10.00%of BASE LABOR (I.E., COST ELEMENT NOS. )=$5,160
7. ROYALTIES
8.SUBTOTAL ESTIMATED COST$96,570
9. CONTRACT FACILITIES CAPITAL AND COST OF MONEY$0
10.SUBTOTAL ESTIMATED COST$96,570
11. FEE OR PROFIT4.00%$2,663
12.TOTAL ESTIMATED COST AND FEE OR PROFIT$99,233

&LAmendment 1 sub TWO

Attachment J-6PAGE 4 OF 4 PAGES
CONTRACT PRICING SUMMARY
(For New Contracts Including Letter Contracts)OMB Contract No.
(See Instructions on Reverse)Expiration Date: [.]
This form is for use in support of Standard Form 1411 prescribed by GSA, FAR (48 CFR) 53.215-2(c), Format 7(a)
Public reporting burden for this collection of information is estimated to average 5 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data
needed, and completeing and reviewing the collection of information. Send comments regarding this burden estimate or any aspect of this collection of information, including suggestions for reducing this burden, to the
FAR Secretarial (VRS), Office of Federal Acquisition and Regulatory Policy, GSA, Washington, D.C. 20405; and to the Office of Management and Budget, Paperwork Redcutrion Project (2105-0517), Washington, D.C. 20503.
NAME OF OFFERORSub -Contractor TWOSUPPLIES AND/OR SERVICES TO BE FURNISHED
HOME OFFICE ADDRESSProject Management Oversight Services DC-
DIVISION(S) AND LOCATION(S) WHERE WORK IS TO BE PERFORMEDGOV'T SOLICITATION NO.
DETAILED DESCRIPTION OF COST ELEMENTS
1. DIRECT MATERIAL(included with Prime)EST. COST ($)TOTAL EST. COSTREFERENCE
A. PURCHASED PARTS$0
B. SUBCONTRACTED ITEMS$0
C. OTHER - (1) RAW MATERIAL$0
(2) STANDARD COMMERCIAL ITEMS$0
TOTAL DIRECT MATERIAL$0
2. MATERIAL OVERHEAD (Ratebase = )$0
3. DIRECT LABOR5 yr hrs (pg 2 col K)Calculated Rate / HourFive Yrr Direct Cost (pg 2 col R)
Systems Integration Manager3,00014$41,411.26
Civil Engineer (PE)4,20013$53,516.09
Add Additional rows for each Skillset$ -$0
Add Additional rows for each Skillset$ -$0
Add Additional rows for each Skillset$ -$0
Add Additional rows for each Skillset$ -$0
TOTAL DIRECT LABOR4,200$94,927
4. LABOR OVERHEADOH RATEX BASE =EST COST ($)
15.00%$94,927$14,239
TOTAL LABOR OVERHEAD$14,239
5. OTHER DIRECT COSTSEST COST ($)
A. SPECIAL TOOLING/EQUIPMENT (included with Prime)$0
TOTAL SPECIAL TOOLING/EQUIPMENT$0
B. TRAVELEST COST ($)
(1) TRANSPORTATION (included with Prime)$0
(2) PER DIEM OR SUBSISTENCE (included with Prime)$0
TOTAL TRAVEL$0
C. INDIVIDUAL CONSULTANT SERVICES; fully burdened rates rates cannot escalateEST COST ($)
; hrs x burdened rate0
; hrs x burdened rate0
TOTAL INDIVIDUAL CONSULTANT SERVICES$0
D. OTHER(included with Prime)EST COST ($)
TOTAL OTHER$0
SUBTOTAL DIRECT COST$0
6. GENERAL & ADMINISTRATIVE (G&A) EXPENSE17.00%of BASE LABOR (I.E., COST ELEMENT NOS. )=$16,138
7. ROYALTIES
8.SUBTOTAL ESTIMATED COST$125,304
9. CONTRACT FACILITIES CAPITAL AND COST OF MONEY$0
10.SUBTOTAL ESTIMATED COST$125,304
11. FEE OR PROFIT3.00%$3,759
12.TOTAL ESTIMATED COST AND FEE OR PROFIT$129,063