Amendment 0002 The new Bid Opening date is August 17, 2017, at 2:00 p.m.

View the file

Other files

File Type Posted
ROBO_-_SER_PMS_FY17(1).pdf PDF
DTFH71-17-B-00027_-_Amendment_0001.pdf PDF
FP14_Eng.pdf PDF
Plans_-_SER_PMS_FY17(1).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
VETS-4212.pdf PDF
IFB_Solicitation_-_SER_PMS_FY17(1).pdf PDF
Report_NEPA.pdf PDF
Synopsis_SER_PMS_FY17(1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7117B00027

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

SER PMS FY17(1)08/11/20170002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/13/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project: SER PMS FY17(1)

See attached.

The new Bid Opening date is August 17, 2017, at 2:00 p.m. EST.

15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0002

Info Page 1 of 1

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0002

SER PMS FY17(1)

Southeast Region Pavement Preservation

ANDE, CHAT, CHCH, HOBE, JICA, KEMO,

MALU, RUCA, SEMO, TUAI, and TUIN Solicitation: DTFH71-17-B-00027

The purpose of this Amendment is to:

1) Revise the Solicitation B Pages to replace the Schedules A and B Bid Schedules to add shoulder reconditioning and turf establishment pay items.

2) Revise the Special Contract Requirements (J Pages) as follows:

a) Section 303 to add requirements for shoulder work.

b) Section 420 to add requirements for shoulder work.

c) Section 624 to add requirements for shoulder work.

3) Revise the Plans to add shoulder reconditioning and turf establishment pay items for Schedules A and B.

4) Reschedule the Bid Opening date to August 17, 2017, at 2:00 p.m. EST.

Bidders are reminded to submit any questions to eflhd.contracts@dot.gov. All questions should be submitted as early as possible so the bid opening will not be delayed. Questions submitted within 7 days of the bid opening have the potential of not being answered with enough time for bidders to finalize their bids.

mailto:eflhd.contracts@dot.gov

Solicitation B Pages changes 1 of 1

Solicitation B Pages Changes

Delete the Solicitation Bid Schedule pages B-1 thru B-4, and substitute the amended Bid Schedule pages B-1 thru B-4.

a) For Schedules A and B, added pay item 30302-2000 Shoulder Reconditioning.

b) For Schedules A and B, added pay item 62502-0000 Turf Establishment.

Plan Sheet Changes

Delete Plan Sheets C01 and C19, and substitute the amended Plan Sheets C01 and C19.

a) Sheet C01 (Tabulation of Quantities) updated to add pay items for shoulder reconditioning and turf establishment for Schedules A and B.

b) Sheet C19 (Summaries and Schedules) updated to add quantities for shoulder reconditioning and turf establishment for Schedules A and B.

B I D S C H E D U L E Schedule A (Base Contract)

AMENDMENT 2

Project No: SER PMS FY17(1)

Name: Pavement Preservation

Item No. Quantity Unit Unit Price Amount

15101-0000

Line A0020 ALL LPSM $

15401-0000

Line A0040 ALL LPSM $

15706-1000

Line A0060 27 EACH $ $

30302-2000

Line A0080 500 LNFT $ $

41402-2000

Line A0100 18.4 MILE $ $

41801-2000

Line A0120 2,050 SQYD $ $

42001-0000

Line A0140 210,000 SQYD $ $

60405-0000

Line A0160 10 EACH $ $

60406-0000

Line A0180 13 EACH $ $

60915-1000

Line A0200 95 EACH $ $

60920-0000

Line A0220 210 EACH $ $

62502-0000

Line A0240 110 SQYD $ $

63401-1500

Line A0260 110,000 LNFT $ $

63405-2890

Line A0280 17 EACH $ $

63405-2900

Line A0300 6 EACH $ $

63405-2950

Line A0320 28 EACH $ $

MOBILIZATION

CONTRACTOR TESTING

SOIL EROSION CONTROL, INLET PROTECTION

SHOULDER RECONDITIONING

CRACKS, CLEANING AND SEALING

ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

PAVEMENT MARKINGS, TYPE H, SOLID

PAVEMENT MARKINGS, TYPE H, "BUS PARKING", "NO PARKING", AND "RV/BUS ONLY" WORD

MESSAGE

PAVEMENT MARKINGS, TYPE H, TURN ARROW

PAVEMENT PRESERVATION TREATMENT

MANHOLE ADJUSTMENT

INLET ADJUSTMENT

WHEELSTOP, CONCRETE

RESET WHEELSTOP

TURF ESTABLISHMENT

PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW

Schedule A (Base Contract)

AMENDMENT 2

Project No: SER PMS FY17(1)

Name: Pavement Preservation

Item No. Quantity Unit Unit Price Amount

63405-3000

Line A0340 2 EACH $ $

63405-3250

Line A0360 55 EACH $ $

63501-0000

Line A0380 ALL LPSM $

63602-6020

Line A0400 8 EACH $ $

63701-0000

Line A0420 1 EACH $ $

TEMPORARY TRAFFIC CONTROL

SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP

FIELD OFFICE (CELLULAR PHONE & PRINTER/COPIER)

PAVEMENT MARKINGS, TYPE H, STRAIGHT/TURN ARROW COMBINATION

PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL

Schedule A Total:

Submitted by:

Schedule B (Government Option 1)

AMENDMENT 2

Project No: SER PMS FY17(1)

Name: Pavement Preservation

Item No. Quantity Unit Unit Price Amount

15101-0000

Line B0020 ALL LPSM $

15401-0000

Line B0040 ALL LPSM $

15706-1000

Line B0060 5 EACH $ $

30302-2000

Line B0080 500 LNFT $ $

41402-2000

Line B0100 1.0 MILE $ $

41801-2000

Line B0120 6 SQYD $ $

42001-0000

Line B0140 27,000 SQYD $ $

60405-0000

Line B0160 7 EACH $ $

60920-0000

Line B0180 45 EACH $ $

62502-0000

Line B0200 110 SQYD $ $

63401-1500

Line B0220 9,400 LNFT $ $

63405-2900

Line B0240 2 EACH $ $

63405-2950

Line B0260 45 EACH $ $

63405-3050

Line B0280 5 EACH $ $

MOBILIZATION

CONTRACTOR TESTING

SOIL EROSION CONTROL, INLET PROTECTION

SHOULDER RECONDITIONING

CRACKS, CLEANING AND SEALING

ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW

PAVEMENT MARKINGS, TYPE H, "ONLY" WORD MESSAGE

PAVEMENT PRESERVATION TREATMENT

MANHOLE ADJUSTMENT

RESET WHEELSTOP

TURF ESTABLISHMENT

PAVEMENT MARKINGS, TYPE H, SOLID

PAVEMENT MARKINGS, TYPE H, TURN ARROW

Schedule B (Government Option 1)

AMENDMENT 2

Project No: SER PMS FY17(1)

Name: Pavement Preservation

Item No. Quantity Unit Unit Price Amount

63405-3250

Line B0300 20 EACH $ $

63501-0000

Line B0320 ALL LPSM $

PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL

TEMPORARY TRAFFIC CONTROL

Schedule B Total:

Submitted by:

SCR_Changes

Special Contract Requirement (J Pages) Changes

1. Add Section 303 to the Special Contract Requirements, page J-11:

Section 303. — ROAD RECONDITIONING

303.02. Add the following:

Topsoil 713.01

303.04. Add the following:

At locations where the shoulder drop-off exceeds 1½ inches, furnish and place topsoil for reconditioned shoulders as directed by the CO and according to Section 624.

303.08. Add the following:

Topsoil for shoulder reconditioning will be evaluated under Subsections 106.02 and 106.04.

2. Add the following to Subsection 420.05 of the Special Contract Requirements, page J-30:

If the shoulder drop-off exceeds 1½ inches after the placement of the pavement preservation treatment, recondition the shoulder as directed by the CO according to Section 303.

3. Add Section 624 to the Special Contract Requirements, page J-31:

Section 624. — TOPSOIL

624.04. Add the following:

Furnish and place topsoil on shoulder reconditioning areas as directed by the CO.

Apply turf establishment to all topsoil areas according to Section 625 and as directed by the CO.

624.06. Add the following:

Measure furnishing and placing topsoil under Section 303.