Amendment 0001 The Bid Opening date of August 15, 2017, at 2:00 p.m. will remain the same.

View the file

Other files

File Type Posted
ROBO_-_SER_PMS_FY17(1).pdf PDF
DTFH71-17-B-00027_-_Amendment_0002.pdf PDF
FP14_Eng.pdf PDF
Plans_-_SER_PMS_FY17(1).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
VETS-4212.pdf PDF
IFB_Solicitation_-_SER_PMS_FY17(1).pdf PDF
Report_NEPA.pdf PDF
Synopsis_SER_PMS_FY17(1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7117B00027

x x

0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

SER PMS FY17(1)08/07/20170001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/13/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project: SER PMS FY17(1)

See attached.

15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0001

Info Page 1 of 2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

SER PMS FY17(1)

Southeast Region Pavement Preservation

ANDE, CHAT, CHCH, HOBE, JICA, KEMO,

MALU, RUCA, SEMO, TUAI, and TUIN Solicitation: DTFH71-17-B-00027

The purpose of this Amendment is to provide a summary of responses to questions/clarifications asked by potential bidders.

The Bid Opening date of August 15, 2017, at 2:00 p.m. will remain the same.

Questions / Clarifications

Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.

Questions can be submitted at any time, but questions submitted within 7 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.

The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.

The Government’s direct response to the sender may also have been updated below for better clarity.

1. Per Subsection 404.02 of the Special Contract Requirements (SCRs), each proposed JMF is to include copies of laboratory test reports to demonstrate they meet Federal, state, or local government agency specs. Can the testing methods used by the approved state or local agency also be approved with the JMF? For example: If the approved state agency uses Gse method, can the Gse testing method also be approved?

Response: A specific State Department of Transportation approved asphalt mix design is appropriate as long as it meets the requirements specified in Section 404 of the SCRs;

however, the Contractor will need to submit their proposed asphalt mix design for approval during construction. It will be acceptable to use the Effective Specific Gravity (Gse) of an asphalt mix design in the Voids in Mineral Aggregate (VMA) calculation provided that the VMA design and test results are 0.5 percent greater than those specified in Section 404. The Government will not evaluate mix designs during the advertisement of the project.

Info Page 2 of 2

2. This project includes 11 different sites and therefore, 11 different asphalt plants. Will 600 pound. samples be required from each plant to be sent to the Sevierville laboratory for testing?

Response: The contract permits multiple pavement preservation techniques and therefore the verification requirements are different for each. Some of site’s closeness in proximity to each other will allow a single producer to supply the pavement preservation option.

Material verification requirements will be based on amount of material being placed from a single producer and will be determined by the CO.

3. There will be 11 different asphalt plants for this project. Some may not have the current JMF for thin lift asphalt. If it is not available, can an approved standard mix be used and applied as thin lift?

Response: The contract permits multiple pavement preservation techniques as outlined in Section 420 of the SCRs. In order to place asphalt at the Type II treatment depth of 3/4 inches Nominal Maximum Size Aggregate (NMSA) of the asphalt mix must be 4.75 mm (No. 4).

4. Due to the traffic around Metro Atlanta area, as well as the asphalt requirements, can the work at Martin Luther King Jr. National Historic Site be performed at night?

Response: No. Nighttime operations are not allowed on the project.