Bid_Opening_Results_-_FW-OHRI_10(1) _100(1).ppt
PPT presentation 167 KB Posted
- Solicitation number
- DTFH71-15-B-00035
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0001_-FW-OHRI_10(1) _100(1).pdf | ||
| IFB_Solicitation_FW-OHRI_10(1) _100(1).pdf | ||
| Report_2_NOI_Instructions.pdf | ||
| VETS-100A-Form.pdf | ||
| Synopsis_-_FWS-OHRI_10(1) _100(1).pdf | ||
| Report_3_GPP.pdf | ||
| FP14_Eng.pdf | ||
| Plans_FW-OHRI_10(1) _100(1).pdf | ||
| Report_1_NEPA.pdf | ||
| Report_4_SWPPP.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
| Bid Opening |
| for |
FW-OHRI 10(1), 100 (1)
Ohio River National Wildlife Refuge
SOLICITATION NO. DTFH71-15-B-00035
August 11, 2015 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. DTFH71-15-B-00035, PROJECT NUMBER: FW-OHRI 10(1), 100(1)
August 11, 2015, 2:00 p.m. local time The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 50 and less than or equal to ( < ) 100.
| BIDDER | BID TOTAL | DAYS | TOTAL PRICE |
| Atlantic Icon Corp. | Schedule A |
$ 842,820.00 Schedule B
| $ 93,380.00 | Calendar Days |
| 100 | Schedules A and B |
$1,036,200.00 Kovilic Construction Co., Inc. Schedule A $ 694,100.00 Schedule B
| $ 81,800.00 | Calendar Days |
| 90 | Schedules A and B |
$865,900.00 Riley Bridge Co., Inc. Schedule A $ 786,693.00 Schedule B
| $ 94,000.00 | Calendar Days |
| 90 | Schedules A and B |
$ 970,693.00 Engineer’s Estimate Schedule A $ 620,000.00 Schedule B
| $ 75,000.00 | Calendar Days |
| 100 | Schedules A and B |
$ 795,000.00
File details come from the government source that posted it. Updated .