Geotechnical_Report.pdf

PDF 23 MB Posted

Attached to
Tennessee National Wildlife Refuge
Solicitation number
DTFH71-15-B-00022
Issued by

View the file

Other files

File Type Posted
Amendment_0002-_FW-TNS_113(1).pdf PDF
Amendment_0001-_FW-TNS_113(1).pdf PDF
FP03_Errata.pdf PDF
Synopsis_-_FW-TNS_113(1).doc DOC document
Categorical_Exclusion_Form_(NEPA).pdf PDF
Plans_-_FW-TNS_113(1).pdf PDF
IFB_Solicitation_-_FW-TNS_113(1).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
VETS-100A-Form.pdf PDF
FP03_Eng_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GEOTECHNICAL

REPORT NO. 02-03

PROJECT RRP-TNS 10(1)

TENNESSEE NATIONAL WILDLIFE REFUGE

(DUCK RIVER UNIT)

HUMPHREYS COUNTY, TENNESSEE

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

STERLING, VIRGINIA

November 2003

TABLE OF CONTENTS

REPORT PAGE

INTRODUCTION

Project Description Regional Geology

PROCEDURES AND RESULTS

Soil Borings Sampling Field Tests and Measurements Data Summary Laboratory Investigation Findings

ANALYSIS

Pavement Design Embankment Settlement Slope Stability Analysis

CONCLUSIONS AND RECOMMENDATIONS

Earthwork Pavement Section Construction Considerations

DISCLAIMER/LIMITATIONS CLAUSE

APPENDICES

Appendix A - Figures Appendix B - Boring Location Plans Appendix C - Boring Logs Appendix D - Laboratory Test Results Appendix E - Pavement Design Analysis Appendix F - Slope Stability Analysis Result Appendix G – Embankment Settlement Estimation Appendix H - Miscellaneous Details Appendix I - Photos

Note: Design changes made subsequent to distribution of this report and prior to project advertisement will be documented by a memo inserted after the title page. If no changes have been made, a memo stating this fact will be inserted.

GEOTECHNICAL

REPORT NO. 02-03

PROJECT RRP-TNS 10(1)

TENNESSEE NATIONAL WILDLIFE REFUGE

(DUCK RIVER UNIT)

HUMPHREYS COUNTY, TENNESSEE

INTRODUCTION

Project Description

This report presents the findings of the subsurface investigation and makes geotechnical recommendations for Project RRP-TNS 10(1) at Tennessee National Wildlife Refuge (Duck River Unit) located in Humphreys County, Tennessee. This project will consists of improving and raising of Refuge Lane (3 ½ miles) and Haul Road (1 ½ miles). Refuge Lane and Haul Road will remain two-lane roads with two-way traffic. Other interior refuge roads that are included in this project will be upgraded from refuge service roads only to one-lane, one-way public access roads. These roads will provide a one-way loop access from the west end of Haul Road back to Refuge Lane. Road improvements will include pull-offs and bus accessibility. Haul Road, as well as several parking areas, will be paved. Also, five parking areas will be reconstructed and two will be resurfaced. The above information was obtained from Project Development. Refer to Figure 1 in Appendix A for Project Location Map.

Regional Geology

The project site is located within the Highland Rim and Cumberland Plateau. More specifically, the Duck River Unit site is underlain by alluvial deposits that accumulated during the Quaternary Period. These alluvial deposits consist of sand, clay and gravel. Below the alluvial deposits and surrounding areas are underlain by the Chattanooga Shale and/or the Fort Payne Formation that formed during the Mississippian Period. The Chattanooga Shale consists of black carbonaceous shale, and the Fort Payne Formation consists of bedded chert, calcareous and dolomitic silicastone, minor limestone and shale, and scattered lenses of crinoidal limestone. Refer to Figure 2 in Appendix A for a Geologic Map of the project area.

PROCEDURES AND RESULTS

Soil Borings

The Eastern Federal Lands Highway Division (EFLHD) geotechnical field crew conducted a field investigation from January 23, 2003 through January 24, 2003 consisting of drilling 28 borings.

The location of each boring is presented on the Boring Location Plans in Appendix B. All borings were advanced using hollow-stem augers and a CME 45C rotary drill rig to a depth of 5 feet.

Boring Logs are presented in Appendix C.

Sampling

Sampling of materials beneath the tip of hollow stem augers was performed in Borings B-1 through B-15 and Borings B-17 through B-29 as borings were advanced. Sampling was typically conducted continuously on 2-foot intervals. Soil samples were recovered with a 2 ¼-inch outside diameter split-barrel sampler in accordance with AASHTO T200-87. Representative portions of recovered samples were preserved in glass jars for laboratory testing. Bag samples were obtained at depths of 1 to 5-ft for Borings B-3, B-10, B-15 and B-29 for California Bearing Ratio (CBR) test and organic content. The sampling sequence for the borings is summarized on the Boring Logs in APPENDIX C.

Field Tests and Measurements

The geotechnical field crew performed the following field tests and measurements during the course of the subsurface exploration. Boring locations were determined from features present on-site and by referencing the existing roadway. Boring elevations were estimated from topography maps developed by Project Development. Standard penetration tests (SPT) were performed and resistance was recorded during the recovery of each split barrel sample, in accordance with AASHTO T206-87. The sampler was driven into the soil using an automatic hammer. Sample recovery measurements were made and recorded for each sampling attempt. A field description by color and texture was made for each recovered sample.

Data Summary

The results of field tests and measurements were recorded on the driller’s logs and appropriate data sheets in the field. These data sheets and logs contain information concerning the boring methods; samples attempted and recovered; indications of the presence of various materials such as gravel, pebbles, organic matter, etc.; and observations of groundwater. They also contain interpretations by the geotechnical field crew team leader of the conditions based on the performance of the equipment and visual examination of the cuttings brought to the surface by the drilling tools. Therefore, the field data represents both factual and interpretative information.

The Boring Logs in Appendix C of this report represent a compilation of field and laboratory data and descriptions of the soil samples by a geotechnical engineer. These records occasionally do not include all data recorded on driller’s logs and field data sheets, but do include all information considered relevant to the design and construction of this report.

Water was not encountered during or after drilling in any of the borings, however, fluctuations in the ground water level due to seasonal and climatic effects should be expected.

Laboratory Testing

At the conclusion of the fieldwork by the EFLHD geotechnical field crew, laboratory testing was conducted on select representative soil samples. Laboratory testing included gradation (AASHTO T27), Atterberg limits (AASHTO T89 & T90), moisture content (AASHTO T265), classification (AASHTO M317), Standard Proctor (AASHTO T99), CBR (AASHTO T193) and organic content (AASHTO M145). The results of the laboratory tests are presented in Appendix

D and summarized in Table 1 below.

Table 1. Results of Laboratory Testing

Boring Sample Sample Depth

(ft)

%-200 LL(1) PI(2) %-

MC

Organic Content(1)

CBR(1) Classification

B-1 J-1 1 – 3 94.4 39 24 19.7 N.D. N.D. A-6 (23) B-3 Bag 1 0 - 5 77.9 42 22 N.D. N.D. 5.4 A-7-6 (17) B-6 J-1 1 – 3 92.0 51 29 26.0 N.D. N.D. A-7-6 (29) B-8 J-1 1 – 3 91.8 43 26 19.8 N.D. N.D. A-7-6 (25) B-13 J-1 1 – 3 46.2 N.D. N.D. 18.0 N.D. N.D. N.D.

B-15 Bag 1 0 - 5 73.2 30 13 N.D. 3.03 5.0 A-6 (7) B-19 J-1 1 – 3 86.1 41 24 23.2 N.D. N.D. A-7-6 (20) B-22 J-1 1 – 3 81.1 N.D. N.D. 19.1 N.D. N.D. N.D.

B-26 J-1 1 – 3 81.3 N.D. N.D. 21.6 N.D. N.D. N.D.

B-28 J-1 1 – 3 89.8 50 30 24.3 N.D. N.D. A-7-6 (29)

(1) N.D. = Not Determined (2) N.P. = Non-Plastic

Findings

Refuge Lane (Borings B-1 through B-14)

Borings B-1 through B-6 were drilled on the existing grade of Refuge Lane, and Borings B-7 through B-13 were drilled on the raised grade embankment. Boring B-11 was drilled on a stone weir located in the area of raised grade embankment.

Approximately 3 inches of gravel-surfaced pavement was encountered at the ground surface in Borings B-1 through B-6. Dark brown clay with a minor quantity of silt, sand and gravel (A-6 & A-7-6) was encountered in Borings B-1 through B-6 below the gravel surface extending to a depth of 5 feet below the ground surface. Standard Penetration Test (SPT) N-values ranged from 6 to 16 with an average value of 10; and laboratory tests yielded average values of 44% liquid limit (LL), 25% plasticity index (PI), and 23% moisture content (MC). A California Bearing Ratio (CBR) determined for the material in Boring B-3 was on the order of 5.4.

Approximately 4 ½ inches of crushed aggregate surfaced pavement was encountered at the ground surface in Borings B-7 through B-13. A geotextile fabric was encountered below the aggregate surface in Borings B-9 through B-13. Brown gravelly clay with a minor quantity of silt and sand (A-7-6) was encountered in Borings B-7 through B-13 below the gravel surface extending to a depth of 1 to 5 feet below the ground surface. Standard Penetration Test (SPT) N-values ranged from 9 to 27 with an average value of 16; and laboratory tests yielded average values of 43% LL, 26% PI, and 19% MC. Brown clay with a minor quantity of sand was encountered in Borings B-12 and B-13 below the gravelly clay extending to a depth of 3.8 to 5 feet below the ground surface. Standard Penetration Test (SPT) N-values ranged from 8 to 14 with an average value of 11. Stones for a weir was encountered 1 foot below the ground surface in Boring B-11 resulting an auger refusal.

Haul Road (Borings B-14, B-15, and B-17 through B-19)

Approximately 2 inches of gravel-surfaced pavement was encountered at the ground surface in Borings B-14, B-15 and B-17 through B-19. Brown and gray clay with a minor quantity of sand and gravel (A-6 & A-7-6) was encountered in all 5 borings below the gravel surface extending to a depth of 5 feet below the ground surface. A trace of organic content was discovered in Boring B-15 at depth 0.2 to 3 feet below the ground surface. Standard Penetration Test (SPT) N-values ranged from 4 to 14 with an average value of 10; and laboratory tests yielded average values of 36% LL, 19% PI, and 23% MC. A California Bearing Ratio (CBR) and an organic content determined for the material in Boring B-15 was on the order of 5.0 and 3%, respectively.

Interior Roads (Borings B-20 through B-29)

Approximately 2 inches of gravel-surfaced pavement was encountered at the ground surface in Borings B-23 and B-24. Brown and gray clay with a minor quantity of sand and gravel (A-7-6) was encountered in all 10 borings below the gravel surface or at the ground surface extending to a depth of 5 feet below the ground surface. Standard Penetration Test (SPT) N-values ranged from 3 to 18 with an average value of 6; and laboratory tests yielded average values of 50% LL, 30% PI, and 22% MC.

ANALYSIS

Pavement Design

Flexible pavement design analysis was performed in accordance with 1993 AASHTO Pavement Design procedure using the DARWin (Version 3.01) Pavement Design System to determine the future structural number (SN) necessary for the proposed Haul Road. The flexible pavement design analysis was for a 20-year performance period. The design analysis to determine the 18-kip ESAL’s for the roadway was performed using the Rigorous ESAL Calculation in DARWin and based upon average daily traffic of 300 on Haul Road with 5% bus volume, 2% light-truck volume and 2% maintenance truck volume. The traffic growth rate of 2% was assumed. The vehicle classification data were obtained from Project Development. The effective roadbed soil resilient modulus (MR) was determined for the roadway from empirical correlations to CBR values and soil classifications. The average value of MR for the project was assumed to be 7,500 psi. Other parameters specified in the analysis included a reliability of 80 percent, an overall standard deviation of 0.45, and initial serviceability index of 4.2, and a terminal serviceability index of 2.0. The required SN for future traffic was calculated to be 2.09 for Haul Road. The results of the analysis are presented in Appendix E.

Embankment Settlement

Embankment settlement analyses were performed as per stress increase in subsoil layers due to embankment (Osterburg) and as per Elastic Settlement Theory. According to laboratory results, the on-site soils at Refuge Lane and Haul Road have liquidity index range from 0.14 to 0.26.

Thus, the on-site soils appear to be pre-consolidated and elastic analyses were performed. Based on the slope stability analysis results, an assumed maximum height of embankment was 10 feet (+/-) from the toe of slope. The results of the analysis are presented in Appendix G.

Slope Stability Analysis

Slope stability analyses were performed as per Bishop with Ordinary and Janbu Method, SLOPE/W (Version 4) Slope Stability Analysis Program to determine maximum embankment height with satisfactory safety factor (SF) of 1.3. The analyses assumed: 3(H):1(V) proposed embankment side slope; no tension crack; no seismic coefficient; and live load surcharge of 2 feet on top of embankment. Based on these assumptions, the embankment was found to have satisfactory factor of safety of 1.32. The result of the analysis is presented in Appendix F.

RECOMMENDATIONS

Earthwork

Roadway Embankments: Proposed roadway embankments should be constructed per Section 204 of the FP-96 Specifications. All imported fill material for embankments should be Unclassified Borrow per Subsection 704.06 and should be compacted per Subsection 204.11(b) of the FP-96 Specifications. Prior to constructing embankments, the existing adjacent slopes should be benched per Standard Detail E204-2, a geotextile fabric (Type IV-B per Subsection 704.01 of the FP-96 Specifications) should be placed in between the on-site soil and the imported borrow.

Based on settlement estimation, settlement of 1 ¾ inch is expected for maximum fill height of 10 feet from the toe of slope. Due to presence of pre-consolidated soils at the site, the settlement will be take place during and soon after constructing embankments.

Subgrade Preparation: Proposed cut road and shoulder areas should be scarified to a minimum depth of 6 inches below the subgrade and should be recompacted to at least 95% of maximum density in accordance with the AASHTO T 180 Method D. If unsuitable subgrade materials are encountered in isolated areas, sub-excavation of unsuitable materials is recommended. Geotextile Type IV-B per Subsection 704.01 of the FP-96 Specifications should be placed on sub-excavated areas, and then should be backfilled with aggregate base material specified below. Based on the field investigation, a minimum of 50 cubic yards of sub-excavation and backfill and 200 square yards of geotextile should be included in the project quantity.

Aggregate Base Course: The proposed aggregate base course should be placed and compacted to at least 95% of maximum density in accordance with the AASHTO T 180 Method D. The gradation and material should be Base Aggregate, Grading C or D as per Section 703.05(b) of the FP-96 Specifications.

Pavement Section

A minimum pavement section for Haul Road is provided in Tables 2 below. The design SNs for the proposed pavement section is 2.47.

Table 2 – Minimum Pavement Section for Haul Road

Layer Thickness (in) Comments

AC Surface Course 1 ½ Superpave Asphalt Concrete Pavement (SACP), < 0.3 X 106 ESAL’s, 3/8” nominal maximum size aggregate, Type II smoothness

AC Base Course 2 ½ SACP, < 0.3 X 106 ESAL’s, 3/4” nominal maximum size aggregate.

Base Aggregate 6 Base Aggregate, Grading C or D as per Subsection 703.05(b) of the FP-96 Specifications

The pavement section for all other roads and parking areas should consist of Type IV-B Geotextile on scarified subgrade or on filled subgrade, and a minimum 8-inch thick aggregate surface course (Grading C or D). The proposed aggregate surfaced roadway will provide a significantly shorter performance period and will require routine maintenance work.

Construction Considerations

Stone Weir: Appropriate riprap size, as determined by Hydraulics, should be used for the proposed stone weirs on Refuge Lane. Prior to placing riprap, Type IV-B Geotextile Fabric should be placed on the soil. To prevent washout due to water overtopping and losing the road subgrade into riprap voids, use reinforced earth slope for the top 18 inches of subgrade. A schematic cross-section of stone weir is presented in Appendix H.

Roadway Embankments: Prior to constructing embankments, the existing adjacent slopes should be benched per Standard Detail E204-2.

Soil Cover for Buried Structures: Based on Standard Details, pipes and other buried structure should have a minimum soil cover of 12 inches.

APPENDIX A – Figures

APPENDIX B – Boring Location Plan

APPENDIX C – Boring Logs

3" GRAVEL

Stiff to medium, Dark brown CLAY, trace Silt, trace Sand, trace Tree root [A-6(23)]

- moist

End of Borehole @ Depth 5'

362.3

357.5

J-1

J-2

0.3

5.0

1.8

4-6-5-6

3-3-3-5

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Refuge Lane Sta. 106+50

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

362.5 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-01

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

/0

4" GRAVEL

Stiff, Dark brown CLAY, trace Silt, trace Sand

- moist

Stiff, Gray CLAY, some Sand, trace Gravel

- moist

End of Borehole @ Depth 5'

360.7

357.4

356.0

J-1

J-2

0.3

3.6

5.0

1.8

1.8

4-6-7-8

8-8-6-5

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Refuge Lane Sta. 119+70

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

361.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-02

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Stiff, Dark brown CLAY, some Sand, trace Gravel [A-7-6(17)]

- moist

- CBR = 5.4 @ Depth 0 to 5'

End of Borehole @ Depth 5'

359.8

355.0

J-1

J-2

0.3

5.0

1.6

1.6

5-9-7-18

5-5-6-7

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Refuge Lane Sta. 132+90

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

- Bulk sample taken from depth 0 to 5 ft.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

360.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-03

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

4" GRAVEL

Stiff, Dark brown CLAY, some Sand, some Gravel

- moist

Medium, Brown CLAY, trace Sand, trace Gravel

- moist

End of Borehole @ Depth 5'

360.7

358.0

356.0

J-1

J-2

0.3

3.0

5.0

1.4

1.7

3-5-5-4

3-4-4-4

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Refuge Lane Sta. 146+10

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

361.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-04

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Stiff, Dark brown CLAY, some Sand, some Gravel

- moist

Stiff, Light brown CLAY, trace Sand

- moist

End of Borehole @ Depth 5'

360.4

357.0

J-1

J-2

1.6

5.0

1.6

1.6

4-5-4-4

3-4-6-8

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Refuge Lane Sta. 158+30

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

362.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-05

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Stiff, Dark brown CLAY, trace Sand, trace Gravel [A-7-6(29)]

- moist

End of Borehole @ Depth 5'

361.3

356.5

J-1

J-2

0.3

5.0

1.4

1.2

4-4-5-7

3-3-3-4

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Refuge Lane Sta. 172+50

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

361.5 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-06

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

5" AGGREGATE BASE

Stiff, Brown CLAY, some Gravel, some Sand (Fill)

- moist

End of Borehole @ Depth 5'

363.6

359.0

J-1

J-2

0.4

5.0

1.2

1.7

4-4-5-11

3-8-15-15

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Refuge Lane Sta. 191+00

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

364.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-07

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

4" AGGREGATE BASE

Stiff, Brown CLAY, trace Sand, trace Gravel (Fill) [A-7-6(25)]

- moist

End of Borehole @ Depth 5'

363.7

359.0

J-1

J-2

0.3

5.0

1.5

1.1

4-6-7-6

5-8-7-5

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Refuge Lane Sta. 202+10

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

364.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-08

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

4" AGGREGATE BASE

GEOTEXTILE FABRIC

Stiff, Brown CLAY, some Sand, trace Gravel (Fill)

- moist

End of Borehole @ Depth 5'

363.7

359.0

J-1

J-2

0.3

5.0

1.2

3-6-9-8

2-3-10-8

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Refuge Lane Sta. 213+30

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

364.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-09

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Very stiff, Brown CLAY, some Sand, trace Gravel (Fill)

- moist

End of Borehole @ Depth 5'

363.6

359.0

J-1

J-2

0.4

5.0

1.4

1.6

4-8-9-5

4-9-18-9

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Refuge Lane Sta. 224+40

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

- Bulk sample taken from depth 0 to 3 ft.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

364.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-10

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Brown CLAY, some Sand, some Gravel (Fill)

- moist

Auger Refusal @ Depth 1'

363.6

363.0

0.4

1.0

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Refuge Lane Sta. 235+50 (On Top of a Stone Weir)

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

364.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-11

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Stiff, Brown GRAVELLY CLAY, some Sand (Fill)

- moist

Stiff, Brown CLAY, some Sand

- moist

End of Borehole @ Depth 5'

364.6

361.2

360.0

J-1

J-2

0.4

3.8

5.0

1.2

1.8

3-5-10-15

10-6-8-9

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Refuge Lane Sta. 246+70

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

365.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-12

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Stiff, Brown GRAVELLY CLAY, some Sand (Fill)

- moist

Medium, Dark brown CLAY, some Sand

- moist

End of Borehole @ Depth 5'

364.6

361.1

360.0

J-1

J-2

0.4

3.9

5.0

1.5

2-7-12-9

4-3-5-6

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Refuge Lane

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

365.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-13

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

2" GRAVEL

Stiff to soft, Greenish brown CLAY, trace Sand, trace Gravel

- moist to wet

End of Borehole @ Depth 5'

364.8

360.0

J-1

J-2

0.2

5.0

1.6

1.3

3-6-6-6

1-2-2-2

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Haul Road Sta. 258+20

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

365.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-14

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Stiff, Gray CLAY, some Gravel, some sand, trace Organics [A-6(7)]

- moist

- Organic Content = 3.03% @ Depth 0.2 to 3'

- CBR = 5.0 @ Depth 0 to 5'

Soft, Gray CLAY, trace Sand, trace Gravel

- moist

End of Borehole @ Depth 5'

362.8

360.0

358.0

J-1

J-2

0.2

3.0

5.0

1.8

0.7

4-6-5-3

1-2-1-3

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Haul Road Sta. 245+00

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

- Bulk sample taken from depth 0 to 5 ft.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

363.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-15

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Medium, Brown CLAY, trace Sand, trace Gravel

- moist

End of Borehole @ Depth 5'

359.8

355.0

J-1

J-2

0.3

5.0

1.7

3-3-4-4

2-3-3-4

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Haul Road Sta. 231+80

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

360.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-17

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

359.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

3" GRAVEL

Stiff, Gray CLAY, trace Organics

- moist

Stiff, Brown CLAY, trace Sand, trace Gravel

- moist

End of Borehole @ Depth 5'

358.8

357.8

354.0

J-1

J-2

0.3

1.2

5.0

1.7

1.8

4-6-6-8

2-5-9-7

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Haul Road Sta. 218+60

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-18

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Stiff to soft, Brown CLAY, some Sand, trace Gravel [A-7-6(20)]

- moist

End of Borehole @ Depth 5'

359.8

355.0

J-1

J-2

0.2

5.0

1.5

0.5

4-5-6-6

4-2-2-3

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Haul Road Sta. 205+40

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

360.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-19

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Stiff, Brown CLAY, some Gravel, trace Sand (Fill)

End of Borehole @ Depth 5' 356.0

J-1

J-2

5.0

0.5

1.5

4-9-9-9

4-5-6-9

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Interior Road Sta. 400+00

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

361.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-20

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Medium, Brown CLAY, trace Sand, trace Gravel (Fill)

Medium, Gray CLAY, trace Sand

- moist

End of Borehole @ Depth 5'

357.0

355.0

J-1

J-2

3.0

5.0

3-3-3-3

1-3-3-2

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Interior Road Sta. 413+20

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

360.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-21

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Stiff, Brown CLAY, some Sand, trace Gravel (Fill)

Medium, Gray CLAY, trace Sand

- moist

End of Borehole @ Depth 5'

360.2

356.0

J-1

J-2

0.8

5.0

1.4

2-4-5-4

2-3-3-2

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Interior Road Sta. 426+40

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

361.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-22

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Medium, Dark brown CLAY, trace Sand, trace Gravel (Fill)

- moist

End of Borehole @ Depth 5'

360.8

356.0

J-1

J-2

0.2

5.0

1.4

0.7

3-3-4-5

1-2-2-2

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Interior Road Sta. 439+60

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

361.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-23

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

6" GRAVEL

Medium to soft, Greenish gray CLAY, trace Sand

- moist

End of Borehole @ Depth 5'

358.5

354.0

J-1

J-2

0.5

5.0

1.3

1.1

1-3-3-4

1-1-2-3

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Interior Road Sta. 610+90

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

359.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-24

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Medium, Brown CLAY, some Gravel, some Sand (Fill)

- moist

Medium to soft, Greenish brown CLAY, some Sand

- moist

End of Borehole @ Depth 5'

359.6

356.0

J-1

J-2

1.4

5.0

1.6

0.9

3-3-3-3

2-2-3-3

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Interior Road Sta. 624+10

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

361.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-25

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Medium, Dark brown CLAY, some Sand, trace Gravel (Fill)

- moist

Stiff, Brown CLAY, trace Sand

- moist

End of Borehole @ Depth 5'

360.6

359.0

J-1

J-2

3.4

5.0

1.5

1.6

3-3-4-6

3-4-7-6

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/23/03

Plastic Limit

Interior Road Sta. 637+30

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

364.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/23/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-26

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Stiff, Brown CLAY, some Gravel, trace Sand (Fill)

Soft, Greenish gray CLAY, trace Sand

- moist

End of Borehole @ Depth 5'

358.7

355.0

J-1

J-2

1.3

5.0

1.5

1.1

5-5-4-3

1-1-2-2

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/24/03

Plastic Limit

Interior Road Sta. 513+20

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

360.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/24/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-27

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Medium, Brown CLAY, trace Sand, trace Gravel (Fill) [A-7-6(29)]

- moist

Soft, Brown CLAY, trace Sand

- moist

Soft, Greenish gray CLAY, trace Sand

- moist

End of Borehole @ Depth 5'

358.7

357.8

355.0

J-1

J-2

1.3

2.2

5.0

1.2

0.8

2-2-4-4

1-1-2-3

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/24/03

Plastic Limit

Interior Road Sta. 526+40

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

360.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/24/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-28

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

Medium, Brown CLAY, some Gravel, trace Sand (Fill)

Soft, Greenish gray CLAY, some Sand

- moist

End of Borehole @ Depth 5'

358.7

355.0

J-1

J-2

1.3

5.0

1.5

0.4

5-4-4-4

1-1-2-2

(Blows / ft) hrs

Bl ow s pe r in

La ye r D ep th

(f t)

R ec

SAMPLE

1/24/03

Plastic Limit

Interior Road Sta. 539+60

Sheet: 1 of 1

U. S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BORING LOG

- No water was encountered during or after drilling.

- Bulk sample taken from depth 1 to 5 ft.

HSABoring Method:

Vane Shear

Density, Color, Plasticity, Size, Proportions, Moisture Ty pe

Boring Location:

Boring No.:

Groundwater Depth:

At Completion:

30 in.

140 lbs/Auto 8.0 in.

360.0 ft Caved at:

Hammer Drop:

Hammer Wt. & Type:

Surface Elevation: Boring Began: Completed:

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Auger Cuttings UD

10 80N o.

Sample Types:

Encountered at:

1/24/03

Thornton/Hughes Kingsley/Richardson

Cold

Project Name:

El ev at io n (fe et

Water Content %

Remarks:

G ra ph ic

Lo g

Rock Core Diam:

Hole Diameter:

D ep th Sc al e

(ft

SPT

Penetrometer

MATERIAL DESCRIPTION

Liquid Limit

Standard Penetration Test Data

B-29

Weather:

Operator:

Inspector:

After

Project Location:

Pavement Core

BO

R

IN

G

L O

G T

N S

(1

).G

PJ

F H

W A_

VA

.G

D T

0/

APPENDIX D – Laboratory Test Results

APPENDIX E – Pavement Design Analysis

1993 AASHTO Pavement Design

DARWin Pavement Design and Analysis System

A Proprietary AASHTOWare Computer Software Product

Flexible Structural Design Module

RRP-TNS 10(1)

Tennessee National Wildlife Refuge (Duck River Unit)

Haul Road

Flexible Structural Design

18-kip ESALs Over Initial Performance Period 80,356 Initial Serviceability 4.2 Terminal Serviceability 2 Reliability Level 80 % Overall Standard Deviation 0.45 Roadbed Soil Resilient Modulus 7,500 psi Stage Construction 1

Calculated Design Structural Number 2.09 in

Rigorous ESAL Calculation

Performance Period (years) 20 Two-Way Traffic (ADT) 300 Number of Lanes in Design Direction 1 Percent of All Trucks in Design Lane 100 % Percent…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .