Plans_-_NY_ERFO_FIIS_2013-1(6).pdf
PDF 4 MB Posted
- Attached to
- Fire Island National Seashore Federal contract opportunity
- Solicitation number
- DTFH71-14-B-00037
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0001_-_NY_ERFO_FIIS_2013-1(6).pdf | ||
| Synopsis_-_NY_ERFO_FIIS_2013-1(6).doc | DOC document | |
| Categorical_Exclusion_Form_(NEPA).pdf | ||
| Proprietary_Item_Memo.pdf | ||
| FP03_Errata.pdf | ||
| Subcontracting_plan.doc | DOC document | |
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Geotech_Report.pdf | ||
| VETS-100A-Form.pdf | ||
| Pier_Inspection_Report.pdf | ||
| FP03_Eng_.pdf | ||
| IFB_Solicitation_-_NY_ERFO_FIIS_2013-1(6).pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
KEY MAP
DESCRIPTION OF PROJECT
IMPROVEMENT:
PLANS PREPARED FOR
PLANS PREPARED BY
Project Manager
John Wilson
U.S. Department of Transportation
Federal Highway Administration
SHEET
NO
Know what's
R
SPECIFICATION:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 US Customary Units
PROJECT NY ERFO FIIS 2013-1(6)
SUFFOLK COUNTY
NEW YORK
Timothy Bryant
RECONSTRUCT LIGHTHOUSE DOCK
AND ELECTRICAL SYSTEMS
Construct new dock and electrical system.
TITLE SHEET
GENERAL NOTES
QUANTITIES
GENERAL LOCATION PLAN
LOCATION PLAN
SUBSTRUCTURE PLAN & ELEVATION
PARTIAL SUBSTRUCTURE LAYOUT PLAN
SUPERSTRUCTURE LAYOUT PLAN
FRAMING PLAN AND PARTIAL ELEVATION
TYPICAL DETAILS 1 of 3 TYPICAL DETAILS 2 of 3 TYPICAL DETAILS 3 of 3
ELECTRICAL SYMBOL LIST, ABBREVIATIONS AND NOTES
ELECTRICAL SITE POWER PLAN 1 OF 2
ELECTRICAL SITE POWER PLAN 2 OF 2
ELECTRICAL DETAILS 1 OF 3
ELECTRICAL DETAILS 2 OF 3
ELECTRICAL DETAILS 3 OF 3
ELECTRICAL PANEL SCHEDULES
PMIS # 201450 - LIGHTHOUSE DOCK
REG STATE PROJECT SHEET
NO.
NE NY 1615
123117201450
TOTAL
SHEETS
NPS DISASTER # NY-2013-1-NPS
SHEETS 1-12
GENERAL NOTES:
SPECIFICATIONS:
MATERIALS:
SCOPE OF WORK:
GENERAL NOTES
SCALE:
1. C
GENERAL CONSTRUCTION NOTES:
ITEM DESCRIPTION UNIT ESTIMATED QUANTITIES
QUANTITIES
PAY ITEM
QUANTITIES
NOTE:
See Sheets 4 and 5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINA
GENERAL LOCATION PLAN
FIRE ISLAND NATIONAL SEASHORE
NY ERFO FIIS2013-1(6)NYNE
123117201446
PROJECT SHEET NO.STATEREGNPS
NO.
PMIS
NO.
3/
/2
:0
PM
\v hb
\p ro j\ W at -T
S \3
.0
N
PS
_N
ER
_T ra ns Te ch S up p\ te ch \F
II
S \G
IS
\O ve ra llL oc at io nm ap
_R ev is ed
.m xd
0 2 41 Miles
0 100 200 Feet
NE NY 5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
FIRE ISLAND NATIONAL SEASHORE
123117
LOCATION PLAN
FRAMING PLAN
1 27261918171615141312111098765432
EAST ELEVATION
0.0
-10.0
-20.0
10.0
39 38 36
252423222120
(Railings and pile bracing not shown for clarity)
(Railings and pile bracing not shown for clarity)
Scale:1"= 20'-0"
Scale:1"= 20'-0"
SUBSTRUCTURE PLAN &
ELEVATION
PARTIAL FRAMING PLAN
(Decking structure, railings and pile bracing not shown for clarity)
Scale: 1"= 10'-0"
23 29
38 3740 3639
24 25 26 27 28
7NE NY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
FIRE ISLAND NATIONAL SEASHORE
123117201450
PARTIAL SUBSTRUCTURE
LAYOUT PLAN
SUPERSTRUCTURE LAYOUT PLAN
Scale:1"= 20'-0"
F F
F
F
LADDER DETAIL
NOT TO SCALE SUPERSTRUCTURE
LAYOUT PLAN
FRAMING PLAN AND
PARTIAL ELEVATION
L
L
4x6 Post (Typ.)
5'-0" Max.
(Typ.)
4" (Typ.)
2x2 Composite baluster (Typ.)
Composite decking
2x6 Composite rail cap
2x6 Composite top rail
2x6 Composite bottom rail
C 4x6 Lighting post (Typ.)
C Rail post
PARTIAL ELEVATION - TYPICAL
PARTIAL FRAMING PLAN
4x6 Post (Typ.)
L
L
L
5' -0
M ax
(T yp
LC Rail post
LC Rail post
5/4x6 Composite decking
1" Gap (Typ.)
9 - 2x10 Stringer
2x10 Blocking (Typ. at all rail posts)
C Support
C Support
C Support
12"Ø Timber pile placed at midspan of existing span (Typ.)
(Railings and pile bracing not shown for clarity)
0" M ax
(T yp
(T yp
6"
6"
10'-0" Max.
2x10 Stringer
3x12 Cross tie
12" Ø Timber pile (Typ.)
6" Nom.
(Typ.)
(Typ.)
spaced @ 1113 16" on center
Existing 12"Ø timber pile to be cut off at ground line (Typ.)
1/
L of
S pa n (T yp
8'-0"
0" (T yp
PARTIAL ELEVATION WITH ATTENUATOR
2X10 Attenuator board (Typ.)
2X10 Attenuator board (Typ.)
6' -6
4"± Gap (Typ.)
Notes:
1. Not all fasteners are shown. See applicable details for locations and types of fasteners.
2. Orient balusters so that wide dimension is parallel to face of rail.
3. Construct railing so that the top rail, bottom rail, and rail cap are continuous over a minimum of two post spans.
7/8"Ø bolt (Typ.)3x8 Longitudinal bracing (Typ.
each row of piles. Omit exterior diagonal at attenuator.)
(Longitudinal bracing omitted on attenuator face)
1' -6
5/8" Ø bolt (Typ.)
6x8 Attenuator blocking (Typ.)
1' -6
6x8 Attenuator blocking (Typ.)
(T yp
LC Dock (match C of existing dock) L
4x4 Solid blocking w/ 5/8" Ø bolt (Typ.)
2' -6
2-1" Ø bolts through pile (Typ.)
3x12 Cross tie (Typ.)
4"± Gap
3x8 Cross bracing (Typ.)
Deck elevation to match existing dock deck elevation (level)
Deck elevation to match existing dock deck elevation (level)
Alternate rail cap, top & bottom rail butt splice locations (Typ.)
(see note 3)
1'-6" (Max.)
SCALE 1/4" = 1'-0"
SCALE 1/4" = 1'-0"
SCALE 1/4" = 1'-0"
3x6 Blocking (Typ.)
Blocking for ladder connection
LC Ladder
Longitudinal bracing (Typ.)
Additional stringer at ladder locations (set flush with attenuator
3' -0
NE NY
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
FIRE ISLAND NATIONAL SEASHORE
123117
201450 11
SCALE 3
8" = 1'-0"
TYPICAL DETAILS 2 of 3
TYPICAL DOCK SUPPORT @ ATTENUATOR
DETAIL A
SCALE 3
4" = 1'-0"
SCALE 3
8" = 1'-0"
TYPICAL DOCK SUPPORT
SECTION A-A
SCALE 3
4" = 1'-0"
NE NY
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
FIRE ISLAND NATIONAL SEASHORE
123117
201450
SCALE 1/4" = 1'-0"
VIEW A-A
NOT TO SCALE
SECTION B-B
NOT TO SCALE
TYPICAL DETAILS 3 of 3
PARTIAL FRAMING PLAN
(Railings and pile bracing not shown for clarity)
(Corner shows 90° bend @ 8'-0" and 10'-0" dock, other bend similar)
SCALE 1/4" = 1'-0"
DOCK GATE
ELEVATION
PLAN
SCALE 1/4" = 1'-0"
DOCK END PLAN
NOT TO SCALE
DETAIL A
(Rail cap not shown for clarity)