RFQ - Fort Meade Rockenbach ACP.pdf
PDF 103 KB Posted
- Attached to
- Fort Meade Design-Build Federal contract opportunity
- Solicitation number
- DTFH71-12-R-00002
About this file
RFQ - All Phase One SOQs must be received no later than 2 00 p.m. local time on Friday December 16 2011 in order to be considered for further evaluation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Shortlist - Fort Meade Rockenbach ACP DB.pdf | ||
| Amendment 001.pdf | ||
| Appendix C.pdf | ||
| Draft RFP - Fort Meade Rockenbach ACP.pdf | ||
| Appendix F.pdf | ||
| Appendix A.pdf | ||
| Appendix H.pdf | ||
| Appendix E.pdf | ||
| Appendix B.pdf | ||
| Appendix G.pdf | ||
| Synopsis - Fort Meade Design-Build.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FORT GEORGE G. MEADE
ROCKENBACH ACCESS CONTROL POINT
PROJECT FORT MEADE ROCKENBACH ACP
DESIGN-BUILD (D-B) SOLICITATION
REQUEST FOR QUALIFICATIONS (RFQ)
DTFH71-12-R-00002
Project Description: This project consists of the design and construction of a new access control point at the intersection of Rockenbach and Clark Roads, and other road and security improvements for Fort George G. Meade in Anne Arundel County, Maryland. Fort George G.
Meade (FGGM) has completed the NEPA compliance. All work will occur on FGGM property.
The design and construction cost for this project is estimated to be between $5,000,000 and $10,000,000. At the time of this RFQ solicitation, award of this project is "Subject to the Availability of Funding".
Design-Build Scope of Work (SOW): The detailed scope of work to be undertaken by the successful Offeror under the design-build contract for this project will be identified in the Request for Proposal (RFP). However, the work is anticipated to include, among other things:
(a) design (b) utility relocations, adjustments and coordination; (c) water quality permit acquisition; (d) roadway construction; (e) demolition of existing structures; (f) installation of new structures; (g) quality assurance and quality control for design and construction; (h) temporary roadway pavements; (i) installation of permanent security fence; and (j) overall project management. The following is a listing of some of the major work elements expected for this project:
Design Work:
• Field survey and mapping, deed research, and property boundary location
• Utility as-built investigation and verification, including utility mapping and location for design
• Utility relocation coordination with all utility companies
• Utility relocation plans
• Utility test pits for horizontal and vertical location
• A geotechnical investigation and evaluation for design of roadway embankments, cut and fill slopes, and pavements
• Pavement design
• Geometric roadway design
• Maintenance of traffic design
• Pavement marking and signing design
• Landscaping design
• Prepare a reforestation plan in accordance with the current Fort Meade Forest
Conservation Act and Tree Management Policy
• Hydraulic and hydrologic analysis and design of culverts, inlets, ditches, etc.
• Prepare design of stormwater management practices and construction erosion and sediment control measures using Maryland Stormwater Management Guidelines for State and Federal Projects, April 15, 2010 and Maryland Stormwater Design Manual, Volumes 1 and 2, May 2009. Design must be approved by Maryland Department of the Environment’s Water Administration
• Prepare design of erosion and sediment control measures using Maryland Standards and Specifications for Soil Erosion and Sediment Control, August 2010 and Maryland Stormwater Design Manual, Volumes 1 and 2, May 2009. Erosion and sediment control design to be approved by Maryland Department of the Environment
• Design for canopies, ID checkpoint, and search shelter
• Electrical, structural, mechanical, plumbing, and architectural design of gatehouse and guard booths
• Security system design for the Intrusion Detection System, Duress Alarm System, and
Closed Circuit Television
• Infrastructure design for Automated Installation Entry System
• Exterior security lighting
• Active vehicle barrier controls
• Prepare and submit a Joint Permit Application to the USACE Baltimore District and
Maryland Department of the Environment (MDE) and obtain authorization for any unavoidable impacts to wetlands and other Waters of the US, MDE wetland buffers, and 100 year floodplains
• Feasibility study and design for providing new gravity sewer outfall connected to local FGGM sanitary sewer mains. If the feasibility study reveals the use of gravity sewer is not possible, then provide sanitary pump station design.
• Generator design
• Provide specification and operation manuals for associated alarm systems and AST fuel tanks
• Information and communication systems design
• Security fence and passive barrier design
• Traffic Management Plan preparation
• Sidewalk design
• Development of Permanent and Temporary Easement Plans and Plats
• Applicable design manuals include: Unified Facilities Criteria (UFC), American
Association of State Highway and Transportation Officials (AASHTO) Greenbook, AASHTO Roadside Design Guide, Manual on Uniform Traffic Control Devices (MUTCD), Surface Deployment and Distribution Command Transportation Engineering Agency (SDDCTEA) Traffic and Safety for Better Entry Control Facilities, and Army Access Control Points Standard Design/Criteria (2009), Fort Meade Installation Design Guide (2011)
• Coordination with FGGM DPW-Environmental Division to ensure all project design elements are compatible with applicable Fort Meade Environmental Special Conditions
• Obtain compensatory mitigation, and implementing permit requirements including erosion and sediment control measures.
Construction Work:
• Milling and resurfacing of existing roadways
• Installation and maintenance of temporary traffic control devices
• Construction of new roadways with pavement markings, signing, and sidewalk
• Construction of curbs and protective crash barriers, slab on grade for gatehouse and guard booths, and pedestrian access crossing in accordance with ADA requirements
• Construction of canopies, ID checkpoint, gatehouse and guard booths, active vehicle barrier controls, traffic signals and controls, passive vehicle barriers, private-owned vehicle and truck search area with canopies, search shelter
• Construction of drainage appurtenances and storm water management facilities
• Turf establishment and landscaping
• Reforestation planting and establishment
• Installation of temporary and permanent erosion and sediment control measures
• Removal of existing pavements for roadways, and obliteration and turf re-establishment of extraneous pavement areas after roadway construction
• Construction of temporary pavements for maintaining traffic
• Removal of existing security fencing, and placement of temporary and permanent security fencing
• Obtain all permits for construction
• Obtain dig permit-excavation and road cut permit from FGGM.
• Obtain hot work permit from fire department (for welding, etc.)
• Utility relocation coordination with utility companies and installation of all in-plan utilities
• Coordination with other projects within FGGM
• Development of as-built plans, including survey, following construction
• Acquisition of MDSHA permits necessary for project construction
• Coordination with FGGM’s DPW-Environmental Division to ensure all project designs is compatible with applicable Fort Meade Environmental Special Conditions.
• Notification and coordination with FGGM’s DPW and Environmental Division on UXO recognition and procedures to follow if UXO’s are found.
• Notification and coordination with FGGM’s DPW-Environmental Management Office for handling and mitigation of hazardous spills.
• Prepare and certify all as-built plans and tables according to Maryland Stormwater
Management Guidelines for State and Federal Projects, April 15, 2010
• Provide person with State of Maryland Erosion and Sediment Control Certification to conduct Weekly Inspections and maintain Log Book
• Coordination with FGGM’s Archeological and Historic Preservation Office(s) to ensure all project designs are acceptable to any applicable historical themes and proper care is taken when artifacts are encountered
• Prepare and certify all as-built plans and tables according to Maryland Stormwater Management Guidelines for State and Federal Projects, April 15, 2010
• Provide person with State of Maryland Erosion and Sediment Control Certification to conduct Weekly Inspections and maintain Log Book
Supplemental Work: Design-Build (D-B) firms/teams are expected to provide qualified and experienced staff to:
• develop appropriate pre-construction or construction protocols as designated by state, federal, and local regulations/guidelines, including but not limited to: a Work Plan, Accident Prevention Plan, and Health and Safety Plan; Environmental Management Plan, Waste Management Plan, Recycling Plan.
Procurement Overview of the Project: In accordance with Public Law 104-106 (41 U.S.C.
253m, the Eastern Federal Lands Highway Division (EFLHD) is conducting a "two phased" D-B selection process for the FGGM. Under this Notice, the EFLHD is soliciting D-B firms/teams to participate in Phase One – Qualifications Based Selection – of this "two phased" D-B selection process.
A selection evaluation board will review and evaluate the Statement of Qualifications (SOQ) submitted by all responsive D-B firms/teams (Offerors). The selection committee will select a maximum of three (3) of the most highly qualified Offerors to participate in Phase Two of this D-B selection process based on the established RFQ evaluation criteria. During Phase Two, those Offerors short-listed will be sent a RFP, which will outline the remainder of the selection process requirements. The RFP will contain the requirements necessary for the short-listed Offerors to submit both a Technical Proposal and a Cost Proposal during Phase Two. Those Offerors will be required to provide the necessary information to the EFLHD within approximately 50 calendar days after receiving the RFP. A site visit/pre-proposal meeting will be held within approximately the first 21 calendar days of this Phase Two period to provide additional information. A copy of the draft RFP will be available to interested Offerors during Phase One.
After receipt of the Phase Two Technical and Price Proposals, an Evaluation Board will conduct a "best value" analysis, and submit their recommendations to the Selection Official for approval.
Award of one Firm Fixed Price contract is anticipated by approximately May 22, 2012, with Notice to Proceed issued by approximately July 2, 2012. Construction is to be completed by August 31, 2013.
It is not the intent of EFLHD to receive project specific design or engineering recommendations as part of this Phase One selection process. Offerors should limit their SOQs to the information required by this Notice, and other information that may be relevant to the qualifications and experience of the Offeror. No reimbursement will be made for any expenses associated with the preparation of Phase One SOQs.
Evaluation and Weighting Criteria: All Offerors responding during Phase One will be evaluated using the following criteria and weightings as outlined in the SF330:
Part I. Contract-Specific Qualifications
A. Contract Information
B. Point of Contact - Identify the official representative and point of contact for the Offeror relative to this RFQ and the SOQ. Identify such representative’s title, address, phone and fax numbers, and e-mail addresses, and be signed by an authorized representative of Offeror’s organization. If the Offeror is not yet a legal entity or is a joint venture, all major participants or joint venture members shall sign the letter.
C. Proposed Team (Maximum Score = 35) - The Government (EFLHD, and Center of Standardization (COS)) will review and evaluate the information about each Offerors' past performance in the design and construction of roadway and access control point projects based on the Offeror's record and reputation for satisfactorily completing projects similar in size and scope, with emphasis on those projects done for the US Army.
As a minimum, include the following:
• If the Offeror is a limited liability company, joint venture or any form of partnership, provide complete copies of the organizational documents that allow, or would allow by the time of contract award, the Offeror to do business.
• Include evidence that the lead engineer and the lead architect are licensed professionals. If they are not already licensed in Maryland, provide a statement that each will obtain professional engineering or architecture licenses with the State of Maryland if awarded the contract and before they begin the design work.
• A letter from a surety or insurance company (with a Best’s Financial Strength Rating of A minus and Financial Size Category VIII or better by A.M. Best Co.)
stating that the Offeror is capable of obtaining a performance and payment bond based on the current estimated contract value referenced in Section 2.1, which bonds will cover the Project and any warranty periods. The letter of surety shall clearly state the rating categorization noted above and reference the estimated contract value as identified in Section 2.1, in a manner similar to the notation provided below:
“As surety for [the above named Contractor], [XYZ Company] with A.M.
Best Financial Strength Rating [rating] and Financial Size Category [Size Category] is capable of obtaining 100% Performance Bond and 100% Labor and Materials Payment Bond in the amount of the anticipated cost of construction, and said bonds will cover the Project and any warranty periods on behalf of the Contractor, in the event that such firm be the successful bidder and enter into a contract for this project.”
D. Organization Chart of Proposed Team (This section will be used to further evaluate Part I.C.) Provide an organizational chart showing the flow of “chain of command” with lines identifying the participants who are responsible for major functions to be performed and their reporting relationships in submitting the SOQ, managing, designing and constructing the Project. If the Offeror intends to use a specific subconsultant or major subcontractor, then it shall identify such entity by name in the organizational chart provided, however, that the obligation to keep Team intact, shall apply for such identified parties. This chart should provide the following:
The functional structure of Offeror’s project team down to the design discipline leader and construction superintendent level identified by name. Ensure positions/personnel are color coded in accordance with the organization with which they are associated. Key Personnel as identified in RFQ shall be identified through the use of symbol identified in a legend within the organizational chart.
If a corporate officer is listed among the Key Personnel, provide a brief description of how and where he/she plans to perform project duties, including number of hours per week dedicated to this project in their role as Key Personnel, while also fulfilling corporate obligations.
Identification of design subconsultants, specialty subconsultants and major subcontractors.
E. Resumes of Key Personnel Proposed for this Contract (Maximum Score = 35) – The Government will review and evaluate each Offeror's personnel and engineering, architectural, and highway and access control point design experience, including technical similarities between the Offeror's design experience and the work described in this solicitation.
Submit one Section E for each of the key design personnel to be involved in the design and construction of the project, indicating their specific experience within the past five
(5) years performing technically the same or similar highway, architectural, geotechnical work, hydrology/hydraulics and erosion control, permitting, utility coordination, project management, construction and QA/QC work for MD SHA, EFLHD, the US Army, or similar state or federal government agencies. As a minimum, include documentation for the following key personnel:
• Design-Build Project Manager - The Contractor’s principal point of contact for all activities throughout the entire design-build process. This individual shall have a minimum of two (2) years experience within the past five (5) years performing technically the same or similar work.
• Engineering Designer of Record - The Contractor’s single point of responsibility for all engineering design procedures and decisions. This individual shall be a registered, licensed, Professional Engineer in the state of Maryland and have a
• Architectural Designer of Record- The Contractor’s single point of responsibility for all architectural design procedures and decisions. This individual shall be a registered, licensed, Professional Architect in the state of Maryland and have a
• Quality Assurance Manager (QAM)- The Contractor’s designee responsible for providing Quality Assurance and Quality Control of the work, and ensuring conformance with the Contract documents. The QAM is responsible for 100% review and oversight of all QC activities. This individual shall be a registered, licensed, Professional Engineer in the state of Maryland having a minimum of ten
(10) years supervisory experience in roadway and building design or ten (10) years supervisory experience in inspection or materials testing on civil and/or building construction projects or a combination thereof. This person shall work for an independent firm not owned by the contractor.
• Permitting and Utility Coordinator – The Contractor’s single point of contact for coordinating with permitting agencies and utilities. The Contractor may separate the permitting and utility coordinator responsibilities by assigning a permit coordinator separate from the utilities coordinator. This individual shall have a minimum of two (2) years experience within the past five (5) years performing technically the same or similar work in the state of Maryland, and shall be familiar with coordination with Maryland Department of Environment.
• Superintendent – The Contractor’s authorized representative in charge of the construction work. This individual shall have a minimum of two (2) years experience within the past five (5) years performing technically the same or similar work.
Obligation to keep team intact:
In connection with the services covered by this procurement process, any in-house personnel, subcontractors, and outside associates or consultants will be limited to the individuals or firms that are specifically identified during the RFQ submittal process. The contractor shall obtain the Contracting Officer’s written consent before making any substitution for these designated in-house personnel, subcontractors, associates, or consultants.
F. Example Projects (This section will be used to further evaluate Part I.C.) - Submit documentation that shows direct experience of the Offeror, joint venture partners, Offerors related by an ownership agreement, and/or experience of subcontractors that the Offeror proposes to utilize in the execution of this D-B project. Identify any projects where the lead contractor and the lead designer have worked together, on the same project, in a Design-Build relationship. The lead design firm and lead construction contractor shall each list at least three (3), but no more than five (5), relevant access control point projects, including any D-B projects, performed in the past five (5) years.
The lead construction contractor's projects shall be those with a contract value of greater than $3,000,000. If any D-B project is provided as a reference that was not performed together by the lead design firm and lead construction contractor, then the Offeror shall identify the design professional or construction entity with whom it contracted for each such project.
Example projects should include experience in some or all of the following:
• Roadway and intersection design and construction.
• Roadway/intersection signalization.
• Entry control facilities/access control points.
• Vehicle inspection stations.
• Phased roadway construction while maintaining traffic flow.
• Active vehicle barriers (K-12 rated type) and associated control systems.
• Obtaining roadway/intersection design approval through local governments.
• Obtaining permits from Maryland Department of the Environment.
• Design/construction adjacent to historic/archeological sites, including coordination with State Historic Preservation Offices (SHPOs).
• Design/construction conforming with UFC 4-022-01 Security Engineering: Entry
Control Facilities/Access Control Points;
• Design/construction conforming with UFC 4-022-02 Selection and Application of
Vehicle Barriers;
• Leading or supporting community involvement activities and hearings for construction projects.
The offeror may submit other types of projects, but must specifically explain the relevance of those projects to the project that is being solicited. At least two (2) of the submitted projects under this factor must be Design/Build projects. Acceptable D-B projects are those where both the design and construction portions of the project are acquired under a single award.
Submit documentation that shows evidence of performance with past and present customers; past and present subcontractors; and Federal, State, and local government agencies. In addition, submit documentation of any long-term, multiple project relationships with owners. Include names, titles, email addresses, and phone numbers for all references submitted.
G. Key Personnel Participating in Example Projects (This section will be used to further evaluate Part I.E.)
H. Additional Information i.Quality Control Plan (Maximum Score =15) - The Government will review and evaluate each Offerors' quality control plan to assess the soundness and reasonableness of the Offeror’s planned QA/QC for Design and Construction including materials Sampling and Testing. The plan should be specific to this project.
Submit a description of the system to be used to manage the design and construction schedule, and the management system to control cost and quality of materials. Describe how the systems will be updated and monitored. Explain how the Offeror will provide quality assurance (“QA”) and quality control (“QC”) for both the design and construction elements of the project, including the names of QC managers, the names of independent testing laboratories, and the number of personnel at various certification levels planned for the Project. Describe how the QA/QC organization will operate, including how it will interface with the
Offeror's organization and EFLHD. The Offeror should demonstrate how QA and QC functions will be performed independently to maintain the integrity of the QA/QC process.
Submit evidence of relevant construction performance within the past five (5) years, indicating that quality work was completed on-schedule and within budget.
Include any statements as to the Offeror's integrity, reasonable and cooperative conduct, and commitment to QA/QC and customer satisfaction. Submit a minimum of two (2) references. Include agency or firm’s name, point of contact name, email addresses and phone number, date work was performed and nature of work.
ii.Legal and Financial Condition (Total Maximum Score = 5). The Government will review and evaluate each Offerors' financial condition to perform the design and construction of the project.
Submit the most recent audit report performed by the Defense Contract Audit Agency, or similar audit, reflecting the Offeror's rates and detailing the makeup of cost pools from which the rates are derived. Include audits for all joint venture partners and architect-engineering firm subcontractors. Include a Dun and Bradstreet Comprehensive Report, or a similar report, prepared by an independent business reporting agency that provides a company profile to include the number of employees; a debt to asset ratio; payment history; a credit evaluation/rating and a comparison of this rating to other firms in the same industry; and a history of the Offeror's ownership.
Describe any project that the lead contractor or lead designer were involved in within the past five (5) years that resulted in: (a) the assessment of liquidated damages against one of such parties; (b) claims being submitted by or against one of such parties that involve the project owner; (c) one such parties having received a notice to cure a default due to the party’s non-performance or poor performance of the underlying contract; or (d) one of such parties being terminated for cause. For any such situation, explain the circumstances and identify the project owner’s representative and his/her current telephone number.
Disclose any outstanding litigation that could materially and adversely affect the financial condition of the lead contractor and/or the lead designer.
iii.Project Understanding and Approach (Maximum Score = 10). The Government will review and evaluate each Offerors' understanding of tasks involved and approach to managing, designing, and constructing the project.
Submit a general description of the tasks involved in the project and the approach the Offeror will take for design and construction administration, including the involvement of the design members of the Offeror's team during construction.
Identify potential risk factors, special issues or problems that are likely to be encountered and explain the approach to mitigate those risks, issues or problems.
Include discussion on how the Offeror intends to maximize the benefits of the D- B process.
Describe the means and methods by which Offeror will plan and control the scheduling of work to meet the contractual completion date(s), including any plans which address the possibility of early completion.
Part II. General Qualifications (This section will be used to further evaluate Part I.C.)
Phase One Submittals: Interested Offerors may use the Standard Form (SF) 330 U.S.
Government Architect-Engineer Qualifications, as the basis for their SOQ. SF 330’s are available on the U.S. General Services Administration website at: http://www.gsa.gov/forms/.
Although SF 330s are formatted for Architect-Engineer and Related Services, the construction elements of the Offeror's SOQ may also be included on the SF 330. Alternate forms and formats may be submitted, provided that the applicable information from the SF 330 is included.
Each Offeror must provide 1 original clearly marked and eight (8) duplicate original hard copies of the completed SOQ. In addition, provide one (1) CD-ROM containing the completed SOQ in PDF format. The SOQ should contain no more than forty (40) pages typed on one side only.
The Phase One SOQ shall be bound and tabbed with the major headings. If tabs contain project-specific information they will be counted as pages. Provide one audit report which should be packaged separately and will not count against the forty (40) page total. The SOQ shall be written on 8.5" x 11" paper. All SOQs shall be written using Times New Roman with a font of 12-point. The SOQ should address each of the rating categories in the same order as listed above.
Submit one (1) copy of the documents supporting the Contractor’s Legal and Financial Condition (Evaluation Criteria H (ii)) including one audit report with the Prime Construction Contractor and Prime Architecture and Engineering Firm’s Data Universal Numbering System (DUNS) number in the cover letter to the address below no later than December 9, 2011. The Financial Condition documents will not be included in the forty (40) page count.
Send all information to the following address:
Federal Highway Administration Eastern Federal Lands Highway Division 21400 Ridgetop Circle Sterling, VA 20166 Attn: Jason Albright (Fax and email submissions will not be accepted.)
Other Information: Copies of the Draft RFP will be available on or about November 18, 2011.
All interested Offerors are strongly encouraged to review the Draft RFP. Questions concerning this solicitation may be directed to Jason Albright at 703-404-6212, e-mail to:
EFLHD.contracts@dot.gov, or in his absence, to Ms. Selam Hailegiorgis at 703-948-1412. All http://www.gsa.gov/forms/ mailto:EFLHD.contracts@dot.gov
Phase One SOQs must be received no later than 2:00 p.m. local time on Friday, December 16, 2011 in order to be considered for further evaluation.
In accordance with FAR 36.303-1, the following factors will be considered when evaluating proposals submitted during Phase Two, and should NOT be addressed in the Phase One submittals/SOQs. These evaluation factors are subject to change prior to issuance of the final RFP in Phase Two.
A. Technical Approach to Design and Construction. Total Maximum Score = 500.
1. Approach to design and construction of access control points and entry control facilities, including but not limited to vehicle inspection stations, active vehicle barriers (K-12 rated) and associated control system, security system, roadway and intersection design and construction, roadway intersection signaling, roadway vertical and horizontal alignments, utilities, drainage and stormwater management, landscaping, temporary and permanent erosion control, and temporary and permanent traffic control. Maximum score = 300.
On a plan view, identify the significant design features of the access control point including security fences and passive barrier systems, gatehouses, guard booths, search shelter, truck inspection area, truck queuing area, private-owned vehicle inspection area, curbs and gutter, striping, slopes, bike lanes, and pedestrian facilities. Signing, and striping details may be provided on plan sheets or separately. Identify the appropriate design criteria for each feature. Identify any deviations, other than approved design exceptions, from established design criteria that will be utilized. Explain why the deviation is necessary.
• Proposed building layout including architectural features, structural, mechanical, electrical, information and communication systems.
• Proposed preliminary site layout, roadway alignments, and profiles, stating any deviations from the EFLHD conceptual design plans and why the deviations provide a better engineering solution while meeting all the required design criteria. The proposed design shall not infringe any further on the wetlands shown on the concept design plans.
• Proposed site utilities including sanitary sewer, water line, storm water system, electrical, information and communication systems.
• Proposed design for security system design for the Intrusion Detection System, Duress Alarm System, Closed Circuit Television, Automated Installation Entry System, and Exterior security lighting
• Proposed hydrological design methodologies for temporary and permanent erosion control to conform to Maryland Standards and Specifications for Soil Erosion and Sediment Control, August 2010 and Maryland Stormwater Design Manual, Volumes
1 and 2, May 2009.
• Proposed design methodologies for Stormwater Management to conform to Maryland
Stormwater Management Guidelines for State and Federal Projects, April 15, 2010 and Maryland Stormwater Design Manual, Volumes 1 and 2, May 2009.
• Proposed temporary traffic control and stages of construction to maintain traffic flow, minimize traffic disruptions, and ensure proper access through Rockenbach Road to
FGGM.
• Proposed approach to installing the new access control point, while maintaining the existing gate before it is replaced with the new access control point.
• Proposed approach to protection of existing natural resources and mitigation of wetlands within the project limit.
• Proposed plan for landscaping and reforestation.
• Proposed haul routes to minimize disruptions to local roads and streets.
2. Approach to coordinating with utility owners for relocation of utilities in conflict with the project work. Maximum score = 150
B. Project and Management Plan of how the contractor plans to accomplish the work.
Total Maximum Score = 350.
1. Proposed Quality Assurance and Quality Control plans for design and construction in order to deliver a quality design and construction project on-time and within budget (see Sections 153 and 155). Maximum score = 100.
• Description of management system to be used to control costs. Include procedures to ensure project is designed and constructed within approved budget. Also include documentation procedures, and procedures for keeping the Contracting Officer’s Technical Representative (COTR) informed and up-to-date.
• Preliminary Schedule of Values showing approximate quantities and contribution factors for each Pricing Item activity. Do not include pricing information with the preliminary Schedule of Values submitted with the Technical Proposal.
• Description of QA/QC procedures for design and construction, including but not limited to independent reviews, and Contractor’s inspection of the construction operations (Section 153).
• Organizational structure. Include a summary of the Design-Build team, identifying major participants and describing their roles in the project. Include a summary of key personnel to be assigned to the project. At a minimum, include the Design-Build
Project Manager, the Engineer of Record, the Construction Superintendent, and the QA/QC Manager for design, the QA Manager for construction, the geotechnical engineer, traffic engineer, and the utilities relocation coordinator. Verify that major participants and key personnel have not changed from that submitted with the Phase One Request for Qualifications (RFQ). Also include how the design personnel will interface with the construction efforts, and how the construction personnel will interfere with the design efforts.
• Procedures for coordinating with the COTR during design to ensure all comments and concerns are incorporated (see Section 121).
• Procedures for coordinating with the CO during construction to ensure all comments and concerns are incorporated.
• Procedures for the detection, monitoring, removal and disposal of any hazardous waste encountered on the project.
• Procedure for coordinating with FGGM’s Department of Public Works and
Environmental Division should an UXO be encountered; and information dissemination to employees and workmen on identification of UXOs, avoidance and reporting procedures.
• Procedures for complying with FGGM’s Environmental Special Conditions.
• Procedures for coordinating with FGGM’s Archeological and Historic Preservation
Offices, and a contingency plan for continuance of work in order to meet project schedule milestones should unknown artifacts be discovered.
2. Procedures and coordination for obtaining permits (see Subsection 107.01) and for utility relocations and adjustments (see Subsection 107.02), to ensure that the permitting and utility agency’s requirements get incorporated during design and construction, and that the project remains on schedule. Maximum score = 100.
• Procedures for coordinating with each of the permitting agencies listed in Subsection
107.01, and for ensuring that all of the permitting agency’s requirements are incorporated into the design and construction of the project. Include any other agencies not specifically listed that may potentially require a permit. Include procedures for ensuring that permit submittals, agency reviews, and other requirements do not delay the overall project schedule.
• Procedures for coordinating with utility companies and ensuring that all of the utility requirements are incorporated into the design and construction of the project. List all utility companies that may potentially be affected by the project. Include procedures for ensuring that submittals, utility company reviews, and other requirements do not delay the overall project schedule.
• Procedures for protecting threatened and endangered species.
• Procedures for meeting U.S. Army security and anti-terrorism / force-protection requirements.
3. Approach to coordinating with the Government and local jurisdictions on the preparation of the Traffic Management Plan. Approach to public safety and public awareness.
Maximum score = 100.
• Description of overall approach to coordinating with the FGGM and MD SHA to ensure that all traffic and access needs are understood and met.
• Proposed public safety plan (including accident management and reporting) and public awareness efforts during construction.
• Proposed public involvement during the design and construction.
4. Subcontracting plan; and procedures for housekeeping, clean up, and personnel control.
Maximum score = 50.
• Description of overall subcontracting plan (see Subsection 108.02).
• Procedures for housekeeping, clean-up, personnel control, and other management or project control procedures.
C. Project Controls. Maximum Score = 150.
1. Procedure and coordination for monitoring the commencement, prosecution and completion of work and reporting to CO and COTR.
• Description of system to be used to manage the design and construction schedule.
Include procedures to ensure a timely completion of the project. Include procedures for rescheduling activities and schedule recovery. Also include documentation procedures, and procedures for keeping the CO and COTR informed and up-to-date.
• Proposed project schedule. Include major and critical activities for design and construction (including permitting and Government reviews), durations, logical relationships, and design and construction milestones. Include milestones for Intermediate Design Submittals, Final Design Submittals, Beginning of Construction, and End of Construction.
• Project Completion Time. The completion of contract with respect to established contract time.
• Procedures to ensure timely review and approval of submittals, both internal between the Contractor and the Design firm, and external between the Contractor/Designer and Government, local jurisdictions, permitting agencies, and utility companies.
File details come from the government source that posted it. Updated .