Preliminary Alignment.pdf
PDF 4 MB Posted
- Attached to
- Fort Lee Design Build - VA-AD-AD JPR(1)
- Solicitation number
- DTFH71-11-R-00002
About this file
Project VA-AD-AD-JPR(1) Preliminary Alignment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Short list for Ft Lee VA-A-AD JPR(1).doc | DOC document | |
| Draft RFP VA-AD-AD-JPR(1).pdf | ||
| SHPO Clearance.pdf | ||
| Draft Cemetery Survey.pdf | ||
| Location Map.pdf | ||
| RFQ.pdf | ||
| Fort Lee Synopsis.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Minimum Radius = 465’ Radius center circle 32‘ Design Speed = 40 mph 2-20’ Lane Round - about 2 - 12’ / 150’ turn lanes 5’ sidewalk on north east side tshiff Callout Cemetery Property
File details come from the government source that posted it. Updated .