MT PRA GLAC 10(30), West Entrance to Avalanche Creek Bridge, Phase X, Glacier National Park, Flathead County, Montana.
This project consists of reconstruction, subexcavation, overlay, pullout rehabilitation, culvert replacement
PROJECT LENGTH: 15.5 miles.
TENTATIVE COMPLETION DATE: Spring, 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
ESTIMATED PRICE RANGE: Between $7,000,000 and $10,000,000
LOCATION: .32 miles Northwest of West Glacier, Montana
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
Sc h
Na m e
A_
DIVISION 150 – Project Requirements 151 MOBILIZATION (yes/no) Yes
152 CONSTRUCTION SURVEY AND
STAKING (yes/no) Yes 154 CONTRACTOR TESTING (yes/no) Yes 155 CONSTRUCTION SCHEDULE (yes/no) Yes 157 SOIL EROSION CONTROL Yes 158 WATERING FOR DUST CONTROL Yes
DIVISION 200 –
Earthwork
201 CLEARING AND GRUBBING 0.8 ACRE
203 REMOVAL OF WHEELSTOP 17 EACH
REMOVAL OF CURB 1,739 LNFT
REMOVAL OF FENCE(LOG RAIL) 1,314 LNFT
REMOVAL OF PAVEMENT, ASPHALT 5,125 SQYD
REMOVAL OF SIDEWALK, ASPHALT 1,583 SQYD
204 ROADWAY EXCAVATION 21,816 CUYD
UNCLASSIFIED BORROW 183 CUYD
SELECT BORROW 7,111 CUYD
207 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C 700 SQYD
SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 2, TYPE B 28,117 SQYD
GEOGRID, STABILIZATION 13,085 SQYD
ch ed ul e
Sc h
Na m e
A_
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 PLACED RIPRAP, METHOD A,
CLASS 1 8,724 CUYD
PLACED RIPRAP, METHOD A,
CLASS 4 506 CUYD
BOULDER 186 EACH
REMOVE AND RESET BOULDER 7 EACH
252 ROCKERY 1,450 SQFT
DIVISION 300 – Aggregate and Base Courses
301 AGGREGATE SURFACE COURSE,
6-INCH DEPTH(GOVERNMENT
FURNISHED)
323 SQYD
302 ROADWAY AGGREGATE, METHOD 2 9,327 TON
303 DITCH RECONDITIONING(REMOVE
AGGREGATE TURNOUT) 250 LNFT
313 AGGREGATE-TOPSOIL COURSE 806 TON
DIVISION 400 – Asphalt Pavements & Surface Treatments
401 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL 9,888 TON
ANTISTRIP ADDITIVE, TYPE 3 79 TON
412 TACK COAT 24 TON
414 CRACKS, CLEANING AND SEALING 10,797 LNFT
DIVISION 500 – Rigid Pavement
502 SEALING JOINTS AND CRACKS 620 LNFT
DIVISION 600 – Incidental Construction
602 4 FEET SPAN, 4 FEET RISE
REINFORCED CONCRETE BOX
CULVERT, SINGLE BARREL) 136 LNFT
605 STANDARD UNDERDRAIN SYSTEM 500 LNFT
607 REPAIRING DRAINAGE
STRUCTURE(SPRAGUE CREEK) 1 LPSM
REPAIRING DRAINAGE
STRUCTURE(JACKSON CREEK) 1 LPSM
609 CURB, CONCRETE(LOG PATTERN) 1,818 LNFT
ch ed ul e
Sc h
Na m e
A_
WHEELSTOP, CONCRETE(LOG
PATTERN) 17 EACH
RESET WHEELSTOP 5 EACH
615 SIDEWALK, ASPHALT(2"
COMPACTED DEPTH) 1,583 SQYD
619 FENCE(LOG RAIL) 1,689 LNFT
BOLLARD POST 5 EACH
BOLLARD POST(REMOVE) 5 EACH
620 STONE MASONRY(STEPS 4'L x 1.5'W x 6"H) 20 CUYD
STONE MASONRY(VENEER) 1 LPSM
STONE MASONRY WALL(HEADWALL) 60 SQYD
REMOVE AND RESET STONE
MASONRY(HEADWALL REPAIR) 55 SQYD
REPOINT STONE
MASONRY(HEADWALL) 2,476 SQFT
622 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY 250 HOUR
WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY 100 HOUR
COMPACTOR 50 HOUR
HYDRAULIC EXCAVATOR, CRAWLER
MOUNTED, 1.0 CUBIC YARD
MINIMUM CAPACITY WITH THUMB
ATTACHMENT 250 HOUR
CHAIN SAW 75 HOUR
623 GENERAL LABOR 500 HOUR
625 TURF ESTABLISHMENT
.8 ACRE
633 REMOVE AND RESET SIGN 3 EACH
SNOW POLE HOLDER(REMOVE AND
RESET) 44 EACH
634 PAVEMENT MARKINGS, TYPE B,
SOLID(WHITE) 5,611 LNFT
PAVEMENT MARKINGS, TYPE B,
ACCESSIBILITY SYMBOL 6 EACH
635 TEMPORARY TRAFFIC CONTROL 1 LPSM
636 UTILITY BOX, CONCRETE 2 EACH
UTILITY TRENCH 39,919 LNFT
UTILITY TRENCH(MP 5.5) 660 LNFT
646 FIXTURE, WAYSIDE EXHIBIT(PAD
TYPE 1) 3 EACH
FIXTURE, WAYSIDE EXHIBIT(PAD
TYPE 2) 3 EACH
FIXTURE, WAYSIDE
EXHIBIT(REMOVE PAD) 3 EACH
| MT PRA GLAC 10(30), West Entrance to Avalanche Creek Bridge, Phase X, Glacier National Park, Flathead County, Montana. |
| This project consists of reconstruction, subexcavation, overlay, pullout rehabilitation, culvert replacement |
| PROJECT LENGTH: 15.5 miles. |
| TENTATIVE COMPLETION DATE: Spring, 2018 |
| (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.) |
| LOCATION: .32 miles Northwest of West Glacier, Montana |
| 201 CLEARING AND GRUBBING |
| 313 AGGREGATE-TOPSOIL COURSE |
| 619 FENCE(LOG RAIL) |
| BOLLARD POST |
| BOLLARD POST(REMOVE) |