Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7700

Fax 360-619-7846

NOTICE TO PROSPECTIVE BIDDERS

RE: MT PRA GLAC 10(30)

West Entrance to Avalanche Creek Bridge, Phase X Solicitation No. DTFH7017R00001

MT PRA GLAC 10(30), West Entrance to Avalanche Creek Bridge, Phase X will be solicited to the Glacier SATOC Contractor. Information on the IDIQ contractor may be found on our web site at: https://flh.fhwa.dot.gov/business/construction/idiq/gtsr.htm

The attached preliminary plans are being furnished to aid prospective Subcontractors in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Subcontractors are encouraged to view the project during fall as conditions permit. After December 1, 2016 access will be weather dependent; contact the Glacier National Park for current road conditions at 406-888-7973. No Federal Highway Administration personnel will be available for show-me tours.

Multiple Bid Schedules – There are no option or schedules for this task order.

Project Location and Type of Work - All project work is located in Flathead County, Montana on NPS, approximately .32 miles west of West Glacier, Montana.

• GTSR- West Entrance to Avalanche Creek Bridge o Work on this this segment consists of grading, major and minor drainages, base, paving, masonry, pathways, and pullouts.

• Utility Corridor – Work consists of reconstructing existing Utilities on GTSR along

Lake McDonald from Apgar T to Lake McDonald Lodge. The Utilities consist of Sewer (gravity and forces), Power (Flathead Electric), Phone (Century Link), and future Fiber (Park).

Technical Questions – All technical questions must be submitted by email plans_spec@dot.gov (plans_spec@dot.gov) or FAX 360-619-7932

General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.

Solicitation documents - Documents will be available during the winter of 2016/2017. Please monitor the FedBizOpps (FBO) site for actual date of solicitation release (www.fbo.gov). To receive automatic notification through FBO, select the “Watch this opportunity” feature and follow the steps as indicated.

Thank you for your interest in this project.

October 13, 2016 https://flh.fhwa.dot.gov/business/construction/idiq/gtsr.htm mailto:plans_spec@dot.gov mailto:wfl.contracts@dot.gov http://www.fbo.gov/

RE: MT PRA GLAC 10(30)

File details come from the government source that posted it. Updated .