Stormwater Pollution Prevention Plan
For:
Okanogan-Wenatchee
2016 Repairs, Phase II, A FS ERFO 2016(1)--23(1)
Wenatchee, Chelan, Kittitas, Okanogan, Snohomish, Wenatchee, and Yakima Counties, Washington
Federal Highway Administration, Western Federal Lands Highway Division
Project Engineer:-----------
General Contractor: ----------of
TAB 1: SWPPP/ESCP Narrative
TAB 2: NPDES Permit (Construction General Permit or Corresponding State Permit)
TAB 3: NOI, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence
TAB 4: Delegation of Authority
TABS: Maps
TAB 6: Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)
TAB 7: Permanent Stabilization and Revegetation Plan (plan sets and details)
TAB 8: SWPPP Amendment Log
TAB 9: Erosion/Sediment Control Inspection Reports and Requirements
TAB 10: Corrective Action Log
TAB 11: Water Quality Monitoring, Reporting Requirements, and Reports
TAB 12: Training Log
TAB 13: Waste and/or Borrow Site Information
TAB 14: Grading and Stabilization .Log
TAB 15: Hazardous Spill Plan
TAB 16: Other Applicable Permits(§ 404, § 401, Oregon Remove-Fill Permit)
TAB 17: NPDES Quality Assurance Checklist
TAB 18: NPDES Notice of Termination (NOT)
CONTRACTOR:
Complete SWPPP narrative in accordance with contract 107.0lA(b).
Revise SWPPP narrative as needed throughout construction in accordance with contract 107.0lA(f)
ALASKA, IDAHO AND WASHINGTON PROJECTS ONLY:
SWPPP narrative must be signed by General Contractor's responsible corporate officer as defined in CGP I.11.2.
File approved SWPPP narrative i~ Tab 1.
For Construction Activities at:
Project Name:
Project Site Location:
City; County, State, Zip Code:
SWPPP Prepared for:
Organization Name:
Address:
Telephone Number:
SWPPP Prepared by:
Name, Title:
Name, Title:
Company/Organization:
Address:
Telephone Number:
Okanogan-Wenatchee 2016 Repairs, Phase 2
WAFS ERFO 2016(1)-23(1)
Okanogan-Wenatchee National Forest
Wenatchee, Chelan, Kittitas, Okanogan, Snohomish, and Yakima Counties, Washington, 98801, 98807
FHWA, Western Federal Lands Highway Division
610 East Fifth Street
Vancouver, WA 98661-3801
360-619-7700
Christopher Kelly, Environmental Protection Specialist
FHWA, Western Federal Lands Highway Division
610 East Fifth Street
Vancouver, WA 98661-3801
360-619-7806
SWPPP Preparation Date: 02/12/2018
Estimated Construction Start Date: 07/21/2018 Estimated Construction Completion Date:
12/03/2018
Estimated Revegetation Start Date: 11/15/2018 Estimated Revegetation Completion Date:
10/15/2020
TAB 1:
TAB2:
TAB3:
TAB4:
TABS:
TAB6:
TAB7:
TAB8:
TAB9:
TAB 10:
TAB 11:
TAB 12:
TAB 13:
TAB 14:
TAB 15:
TAB 16:
TAB 17:
TAB 18:
SWPPP TABs (SWPPP Inclusions)
SWPPP/ESCP Narrative
NPDES Permit (Construction General Permit or Corresponding State Permit)
NOI, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence
Delegation of Authority
Maps
Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)
Revegetation Plan (if applicable)
SWPPP Amendment Log
Inspection Reports
Corrective Action Log
Water Quality Monitoring, Reporting Requirements, and Reports (if applicable)
Training/Certification Log
Government-Selected Waste, Borrow, Staging Sites
Grading and Stabilization Log
Hazardous Spill Plan or SPCC
Threatened and Endangered Species and Historic Preservation (Section 106) Documentation
NPDES Quality Assurance Checklist
NPDES Notice of Termination (NOT)
SWPPP/ESCP NARRATIVE
STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
SECTION 1: RESPONSIBLE PARTIES/CONTACT INFORMATION
1.1 Operator(s): .................................................................................................................................. _!!
1.2 Construction Site SWPPP Contact(s): ....................................................................................... _!!
1.3 SWPPP Prepared by: ................................................................................................................... 1-1-
1.4 NPDES Stormwater Perniit
1.5 SWPPP Administrator
1.6 Permitting Authority for FHWA/WFLHD Projects
SECTION 2: PROJECT INFORMATION
2.1 Project Name and Location ......................................................................................................... ::?_~
2.2 Project Site Characteristics ......................................................................................................... .§6
SECTION 3: NATURE OF CONSTRUCTION ACTIVITY
3.1 General Description of Project and Scope of Work: ................................................................. 2,-9
3.2 Sequence and Estimated Dates of Construction Activities .................................................. 12-H
3.3 Potential Sources of Pollutants ............................................................................................... 13~
SECTION 4: SITE MAPS
SECTION 5: DISCHARGES ...........................................•
5.1 Allowable Non-Stormwater Discharges ................................................................................. l5±€i
5.2 Receiving Waters: .................................................................................................................... 16+6
5.3 Water Quality Monitoring Requirements ............................................................................. 174-+
SECTION 6: COMPLIANCE WITH OTHER APPLICABLE REQUIREMENTS
6.1 Endangered Species Protection ............................................................................................... 18+8
6.2 Historic Preservation ............................................................................................................... 19-1-9
6.3 Safe Drinking Water Act Underground Injection Control Requirements .. ~ ...................... 20:2-0
SECTION 7: EROSION AND SEDIMENT CONTROLS ................................................ 21U
7.1 Natural Buffers or Equivalent Sediment Controls (Required for EPA CGP states only- ID, WA)21U
7.2 Perimeter Controls ................................................................................................................... 23;!.J
[i]
7.3 Sediment Track-Out ............................................................................................................... 24M
7.4 Stockpiled Soil or Other Erodible Materials ......................................................................... 24M
7 .5 Minimize Dust ........................................................................................................................... 25~
7 .6 Minimize Disturbance of Steep Slopes ................................................................................... 2~
7.7 Topsoil Conservation ............................................................................................................... 27:};7..
7.8 Minimize Soil Compaction ...................................................................................................... 27:};7..
7.9 Storm Drain Inlets and Culvert Inlets .................................................................................... 28i8
7.10 Constructed Stormwater Conveyance Channels and Culvert Outlets ................................ 28i8
7.11 Sediment Basins ........................................................................................................................ 29i9
7.12 Chemical Treatment ................................................................................................................ 29i9
7 .13 Dewatering Practices ................................................................................................................ 30JG
7.14 Erosion Control and Stabilization ......................................................................................... 31M
7.15 Removal of BMPs ..................................................................................................................... 32~
7.16 Post Construction Measures ......................................................................................... ; .......... 32J.;?.
SECTION 8: OPERATIONAL CONTROLS/GOOD HOUSEKEEPING MEASURES33JJ
8.1 Hazardous Spill Plan ................................................................................................................ 33M
8.2 Spills/Releases in Excess of Reportable Quantities ............................................................... 33M
8.3 EquipmentNehicle Fueling and Maintenance Practices ...................................................... 33M
8.4 EquipmentNehicle Washing ................................................................................................... 34J4
8.5 Material Handling and Waste Management. ......................................................................... 34J4
8.6 Designate Concrete Washout Areas ....................................................................................... 35~
SECTION 9: INSPECTIONS ............................................................................................... 36J.6
9.1 Inspection Frequency ............................................................................................................... 36J.6
9.2 Corrective Actions .................................................................................................................... 37J:/-
SECTION 10: DELEGATIONS OF AUTHORITY ........................................................... 38J&
SECTION 11: STAFF TRAINING ....................................................................................... 39J.9
SECTION 12: CERTIFICATION AND NOTIFICATION ............................................... 40.W
[ii]
1.1 Operator(s):
Organization Name:
Address:
Teleplt<me Number:
FHW A, Western Federal Lands Highway Division (WFLHD 610 East Fifth Street Vancouver, WA 98661-3801 360-619-7700 to sta1i
(AK, ID, WA projects only) TBD General Contractor
1.2 Construction Site SWPPP Contact(s):
General Contractor, TBD Company:
. (complete for all ~t(lt~~L
· Erosion Control Supervisor Name:
.. J<:<:>111Plete for all ~!~t~~) Address:
Telephone Number:
1.3 SWPPP Prepared by:
Organization/Company:
to start
Name, Position:
Role/Responsibility Telephone Number:
.. Christopher Kelly, Environmental Protection Specialist SWPPP preparer 360-619-7806
Email: christopher.kelly@dot.gov
[I]
1.4 NPDES Stormwater Permit
The Applicable EPA/State NPDES Stormwater Permit is located in TAB 2. The Project NOI and EPA/State Acknowledgement with NP DES Tracking Number is located in TAB 3.
1.5 SWPPP Administrator
The General Contractor (section 1.2) is responsible for maintaining the project SWPPP of Record. The General Contractor will provide a qualified Erosion Control Supervisor, who is responsible for managing the installation, maintenance, inspection, and reporting for erosion and sediment control measures, shall maintain and update the project SWPPP of Record and prepare all documentation required by the project NPDES stormwater permit and SWPPP.
The Erosion Control Supervisor (ECS) is identified in section 1.2 and his/her qualifications are documented in TAB 12.
The FHW A/WFLHD Project Engineer (PE) is the duly authorized representative of the FHWA for the purpose of overseeing compliance with the NPDES stormwater permit and SWPPP at the construction site. See Delegation of Authority TAB 4.
All SWPPP documentation, revisions/updates, and reports will be approved/signed by both the General Contractor's ECS and the FHW A PE.
1.6 Permitting Authority for FHW A/WFLHD Projects
Delivery Confirmation documentation of the NOI is located in TAB 3.
The applicable EPA/State NPDES permit is located in TAB 2
Idaho and Washington, Environmental Protection Agency EPA Region I 0
State Permittin2 Authority Washington • WDE is pemiitting authority for most discharges within the state EXCEPT for:
• EPA is pennitting authority for Federal Operators and Indian Country lands within the state
The NOI for projects in Idaho, Washington, Denali NP and Metlakatla Indian Reservation can be filed electronically at The EPA website.
[2]
2.1 Project Name and Location
This basic site info1mation is used to file for National Pollutant Discharge Elimination System (NPDES) pe1mit coverage. Pennit coverage is obtained by filing the Notice oflntent (NOI) after the SWPPP is complete.
Project Name:
Project Site Location:
City, County, State, Zip Code:
Okanogan-Wenatchee 2016 Repairs, Phase 2
WAFS ERFO 2016(1)-23(1)
Okanogan-Wenatchee National Forest
Wenatchee, Chelan, Kittitas, Okanogan, Snohomish, and Yakima Counties, Washington, 98801, 98807
All sites are in the Willamette Meridian:
Site # 1: Road 1000 MP 6.95
Latitude: 46.577456 ° N
Longitude: -121.24183 1 ° W
Township: 13N
Range: 13E
Section: 32
Site #2: Road 1000 MP 7.2
Latitude: 46.57483 ° N
Longitude: -121.24281 ° W
Township: 13N
Range: '13E
Section: 47
Site #3: Road 1000 MP 7.35
Latitude: 46.572964 ° N
Longitude: -121.243053 ° W
Township: 13N
Range: 13E
Section: 31
[3]
Site #4: Road 1000 MP 11. 7
Latitude: 46.518636 ° N
Longitude: -121.270281 ° W
Township: 12N
Range: 12E
Section: 23
Site #5: Road 1040 MP 0.1
Latitude: 46.57511 ° N
Longitude: -121.24311 ° W
Township: 13N
Range: 13E
Section: 47
Site #6: Road 1502 MP 1.5
Latitude: 46.80963 ° N
Longitude: -121.06705 ° W
Township: 15N
Range: 14E
Section: 10
Site #7: Road 3507 MP 8.0
Latitude: 4 7 .26828 ° N
Longitude: - 120.60506 ° W
Township: 21N
Range: 18E
Section: 32
Site #8: Road 4330 MP 5.0
Latitude: 48.13014 ° N
Longitude: -120.16631 ° W
Township: 30N
Range: 21E
Section: 2
Site #9: Road 5483 MP 2.1
Latitude: 47.30564 ° N
Longitude: - 121.38975 ° W
Township: 21N
Range: 1 lE
Section: 15 [4]
Site #10: Road 9737 MP 6.7
Latitude: 47.39931 ° N
Longitude: - 120.92397 ° W
Township: 22N
Range: 15E
Section: 14
Site #11: Road 9737 MP 9.2
Latitude: 47.43058 ° N
Longitude: -120.93653 ° W
Township: 22N
Range: 15E
Section: 3
Site #12: Road 9737 MP 9.6
Latitude: 47.43597 ° N
Longitude: -120.93703 ° W
Township: 23N
Range: 15E
Section: 35
Site #13: Road 4150-100 MP 2.2
Latitude: 48.23225 ° N
Longitude: -119.97864 ° W
Township: 32N
Range:23E
Section: 32
Site #14: Road 4150-200 MP 3.4
Latitude: 48.27850 ° N
Longitude: -119.99508 ° W
Township: 32N
Range: 23E
Section: 18
Site #15: Road 4330-400 MP 1.9
Latitude: 48.11931 ° N
Longitude: -120.09253 ° W
Township: 30N
Range: 22E
Section: 9
[5]
Site #16: Road 7322-200 MP 1.5
Latitude: 47.37817 ° N
Longitude: -120.67803 ° W
Township: 22N
Range: 17E
Section: 23
The method used for determining latitude/longitude was: USGS Topographic map
Is the project located in Indian country? No
If yes, the name of Reservation is:
Name of Reservation:
Are you applying for permit coverage as a "federal operator?" Yes
The project Does Not discharge stormwater into a Municipal Separate Storm Sewer System?
2.2 Project Site Characteristics
The undeveloped site and features of the land that are incorporated into the final soil Erosion and Sediment Control plan sheets (TAB 6), as well as natural resources that should be protected are described below:
Vegetation, trees, and sensitive areas, such as stream buffers, wetlands, highly erodible soils, and steep slopes at the site include:
The general setting is mountainous and forested, with numerous perennial and intermittent streams dissecting the hillslopes.
The primary waterbodies in the project area are Unnamed tributaries to the South Fork Tieton River, Rattlesnake Creek, Yockey Creek, Unnamed tributary to French Creek, Meadow Creek, Unnamed tributaries/drainages to the North Fork Teanaway River, and Middle Shaser Creek.
Two sites, Site 4150100-2.2 and Site 1040-0.1 have Category III Slope wetlands.
Construction limits will be marked to limit the impact to these wetlands.
Site 1502-1.5 will require access across a gravel bar (identified as a riverine wetland) of Rattlesnake Creek. Any equipment crossing of the gravel bar will avoid impacts to riparian vegetation during construction.
Also, see TAB 6
[6]
Stormwater currently drains from the site in the following manner, Site specific. Stormwater presently drains from the site by means of soil infiltration, sheet flow, and concentrated flows into adjacent gullies, ditches, and streams.
Also, see 6
The location of discharge points or areas
Site specific. Culvert outlets, roadside ditches that drain into surface waters, and adjacent vegetated buffers.
Also see 6
The location of all waters, including wetlands, are shown on the site map located in
TABs 5 and 6.
Critical slopes and slope lengths include:
Locations: WSDOT's Unstable Slopes database shows none within the vicinity.
Soil type(s) of highly erodible soils and the soils' infiltration capacity are identified as, 1
Summary by Map Unit - Kittitas County Area, Washington (WA637)
Map unit Map unit name symbol
3 Naxing ashy loam, 25 to 45 percent slopes
Naxing gravelly ashy loam, 45 to 65 percent slopes, stony
6 Ganis ashy silt loam, 7 to 25 percent slopes
14 Jumpe stony ashy loam, 25 to 45 percent north slopes
Loneridge ashy loam, 25 to 45 percent north slopes, stony
Rubble land-Rock outcrop complex, IO to 90 percent slopes
Loneridge ashy loam, 45 to 65 percent north slopes, stony
54 Loneridge ashy loam, 45 to 65 percent slopes, stony
129 Kafing ashy sandy loam, 30 to 60 percent south slopes
Scotties gravelly ashy sandy loam, sandy substratum, 45 to 75 percent north slopes
158 Kiper stony ashy sandy loam, 30 to 65 percent slopes
Totals for Area oflnterest
1 Access the Natural Resources Conservation Service Web Soil Survey.
[7]
Rating Acres in
AOI
5.9
47.0
.43 5.7
25.0
.28 148.3
40.3
.28 22.5
.28 17.0
0.2
13.9
12.3
338.l
Percent of
AOI
1.7%
13.9%
1.7%
7.4%
43.9%
11.9%
6.6%
5.0%
0.1%
4.1%
3.6%
100.0%
Any past soil contamination at the site is identified as, Unknown.
The following natural features, including trees, streams, wetlands, slopes and other features to be protected includes:
Also see TAB 6
Protected Natural Features:
Unnamed tributaries to the South Fork Tieton River, Rattlesnake Creek, Yockey Creek, Unnamed tributary to French Creek, Meadow Creek, Unnamed tributaries/drainages to the North Fork Teanaway River, and Middle Shaser Creek.
Measures to protect these features:
Project will utilize erosion and sediment control BMPs to avoid discharging sediment-laden, construction stormwater runoff into the streams and/or adjacent wetlands. In addition, in-water work will be done in the dry to maintain water quality standards.
Mean Annual Precipitation at the Project Site: Approx. 29.99 inches
The frequency, intensity, and duration of rainfall for the project site, which are the principal factors influencing erosion from a construction site, are described as, The 2-year, 24-hour storm event:2
Approx. 3.5 Inches per day
The 10-year, 24-hour storm event:
Approx. 5.0 Inches per day
The 25-year, 24-hour storm event:
Approx. 6.5 Inches per day
2 Precipitation frequency for Western States
[8]
3.1 General Description of Project and Scope of Work:
(i.e. highway construction, roadway realignment, highway and bridge reconstruction, etc.) is described below:
Site # 1: Road 1000 MP 6. 95
• Replace the existing culvert and clean the other two culverts; remove debris and reconstruct the ditch.
Site #2: Road 1000 MP 7.2
• Remove existing culvert, install new culvert with riprap apron. Project will resurface the gravel roadway.
Site #3: Road 1000 MP 7.35
• Clean existing culvert in place and remove debris/reconstruct the ditch.
Site #4: Road 1000 MP 11.7
• Reconstruct eroded roadway. Install a new pipe culvert with riprap apron, reuse down spout. Excavate excess material on inside lane and reconstruct catch basin. Re-surface the gravel roadway.
Site #5: Road 1040 MP 0.1
• Reconstruct the road with a reinforced soil slope; install a French drain with an outlet pipe to remove water from underground flow; replace the roadway surfacing; reconstruct the catch basin; replace the culvert; and reuse the existing downspout.
Site #6: Road 1502 MP 1.5
• Dewater east side of bridge and repair abutment. The existing bridge will remain in place.
The eroded area will be filled with select borrow after abutment repair to support new surface.
Site #7: Road 3507 MP 8.0
• Remove and replace existing culvert with a new pipe culvert. Replace slumped fill material.
Site #8: Road 4330 MP 5.0
• Repair will consist of reconstruction to fill in the large hole and replacement of the fill that eroded the length of the road. The project will include cleaning the inlets and catch basins of the three 18" culverts and re-compaction of the fill. Finally, replace the lost surfacing gravel.
Site #9: Road 5483 MP 2.1
• Reconstruct the roadway prism and fill slope. Remove the existing culvert and install structural plate arch according to specifications.
Site #10: Road 9737 MP 6.7
• Replace the double culverts with a new CMP that will pass the 100-year flood;
reconstruct the ditch and catch basin; clean out debris from the lower portion of the existing culvert; and replace eroded subgrade material and road surfacing material.
[9]
Site #11: Road 9737 MP 9.2
• Install new pipe culvert; clean 2 existing culverts; remove debris and reconstruct the ditch; fill the eroded roadway and ditch; remove large rock; and replace roadway surfacing.
Site #12: Road 9737 MP 9.6
• Install a new CMP culvert that will pass the 100-year flood at the drainage crossing; and replace eroded subgrade material and roadway surfacing.
Site #13: Road 4150-100 MP 2.2
• Replace the eroded fill material, remove the unsuitable material deposited on the road, construct a rock-lined ditch to allow the water to run down the ditch and off the road, reinstall the temporary CMP at the road junction and replace the eroded road surfacing.
Site #14: Road 4150-200 MP 3.4
• Reconstruct the eroded roadway, install a new pipe culvert that will pass the 100-year flood, and replace roadway surfacing.
Site #15: Road 4330-400 MP 1.9
• Replace fill material and surfacing in an eroded section and install a new CMP culvert where flow intercepted the road.
Site #16: Road 7322-200 MP 1.5
• Install a box culvert. Eroded fill material will be replaced and replace roadway surfacing.
The type or function of the project is: Road Construction
Contractor and PE
Note: Fill in all incomplete infonnation following contract award date and prior to start of construction
Construction Support Activities: If applicable, describe any construction support activities such as dedicated concrete or asphalt batch plants, dedicated aggregate sites, equipment staging yards, material storage areas, borrow, or disposal sites (government selected sites):
TBD by Contractor
NOTE: All Contractor-selected sources and support sites are the sole responsibility of the General Contractor. The SWPPP and NPDES permitting for Contractor-selected sites and sources are separate from this documentation (SCR 107.01A(h)).
Support activities are located on the general vicinity map and/or site map in
[IO]
Size of the Construction Project:
(Including all Government-selected support sites such as staging, bonow, waste, access roads, etc.)
Estimated Area
Total project area (within ROW or Construction limits):
Construction site area to be disturbed:
Percent Impervious Area BEFORE Construction: 41 %
Runoff Coefficient BEFORE Construction: 0.60
Percent Impervious Area AFTER Construction: 41 %
Runoff Coefficient AFTER Construction: 0.60
[11]
Units
4.5 Acres
4.5 Acres
3.
S eq ue nc e an d E st im at ed
D at es o f C on st ru ct io n A ct iv it ie s
C on tr ac to r
N ot e:
in co m pl et e fo ll ow in g co nt ra ct a w ar d da te a nd p ri or to s ta rt o f c on st ru ct io n
T he i nt en de d co ns tr uc ti on s eq ue nc in g an d ti m in g o f m aj or c on st ru ct io n ac ti vi ti es is d et ai le d he re in cl ud in g th e ph as ed g ra di ng a nd s ta bi li za ti on ac ti vi ti es u se d to m in im iz e ov er al l am ou nt o f d is tu rb ed s oi l.
P ha se
C on st ru ct io n se qu en ce d es cr ip ti on
D ur at io n o f s eq ue nc
B M
P s as so ci at ed w it h th is s eq ue nc e:
S ta bi li za ti on m ea su re s:
P ha se
C on st ru ct io n se qu en ce d es cr ip ti on
D ur at io n o f s eq ue nc
B M
P s as so ci at ed w it h th is s eq ue nc e:
I
S ta bi li za ti on m ea su re s:
[1 2] g 0 ·;:::
'.C
'O
D D D D J j
ID
D
3.3 Potential Sources of Pollutants
The follow table identifies all potential sources (checked activities in column 1) of sediment and other sources of pollution, which may reasonably be expected to affect the quality of storm water discharges from the construction site.
Potential Construction Site Pollutants
"' "' Construction Activity "' s "' ..... "' ., ., = .i!l ""
~ "' :"'2
"' ~ ·;: 0 'O
"' ·;:; s::· 2 b ~ ~ ~ ·;: '.C :a '-' "' ,::, "' "' ... i. "" = 0
<:/) CQ c. ,_.Q :::.. = Clearing, excavating, and grading x x Fill ofroadway embankment, backfill at structures x x Vehicle/equipment fueling and maintenance x x Vehicle/equipment use and storage x Sanitary/septic waste x x Dewatering operations x x Drilling and blasting operations x x x Concrete washout and waste x x Structure constrnction/painting/cleaning x x x Demolition and debris disposal x x x x Solid waste (trash and debris) x Hazardous waste or contaminated spills x x Paving operations x x Landscaping operations x x x Mining, rock extraction, crushing x x x contract to start
Construction and waste material expected to be stored on-site includes:
[13]
.i!l
.c =
- 0 0:::..
x x x x x x
Vicinity maps are located in TAB 5. Site maps and erosion and sediment control plan maps are located in TAB 6.
[14]
Industrial stormwater discharges associated with industrial activity other than construction at the site (including dedicated asphalt plants and dedicated concrete plants that are covered by this permit) include:
NOTE: An Industrial Activity Multi-Sector General Permit may be required for some activities.
Industrial Activity Stormwater Discharge Multi-Sector General Location Permit Number (if applicable)
I.NIA
5.1 Allowable Non-Stormwater Discharges
Non-stormwater discharges used at the construction sited are identified below, along with control measures used to eliminate or reduce the discharges and BMPs used to prevent stormwater contamination.
Applicable to this Project
(check all that apply)
D
• D
• D
• D
• D
• D
• D
• D
• D
Potential Non-Stormwater Discharges
Potable water including uncontaminated water line flushings
Construction dewatering (uncontaminated)
Ground water or spring water (uncontaminated)
Routine external building wash down that does not use detergents
Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed) and where detergents are not used
• Foundation or footing drains where flows are not contaminated with process materials such as solvents
• Landscape irrigation
• Discharges from emergency fire-fighting activities
• Fire hydrant flushings
• Uncontaminated air conditioning or compressor condensate
[15]
Control Measures
NOTE: The likely locations of these discharges are identified on the site map TAB 5 and/or
· TAB6
5.2 Receiving Waters:
Are there any surface waters located within 50 feet of the construction disturbance? Choose an item.
Name(s) of the first surface water that receives stormwater directly from your site and/or from the MS4
I. Unnamed tributaries to the South Fork Tieton River (Sites: 1000-7.2, 7.35, and 11.7: 1040- 0.1)
2.Unnamed tributary to French Creek (Site: 4150100-2.2) "-·-·-~-~-·••••"'---···--• ------ ~ .,,~· HW•••-•v-• - -••• •- ,_ ~""'""··-···
3. Rattlesnake Creek (Site: 1502-1.5)
4. Meadow Creek (Site: 5483-2.1)
5. Unnamed tributaries/drainages to the North Fork Teanaway River (Sites: 9737-9.2 and 9737- 9.6)
6. Yockey Creek (Site: 4150200-3.4)
7. Middle Shaser Creek (Site: 7322200-1.5)
Impaired Waters/TDMLs:
Answer the following for each surface water listed in Table 1:
Is this surface What pollutant(s) is Has a TMDL Pollutant(s) for which water listed as causing the been there is a TDML "impaired?" . . completed? 1111pa11
1. YesD No~ YesD No~
2. YesD No~ YesD No~
3. Yes~ No D Temperature YesD No~
4. YesD No~ YesD No~
5. YesD No~ YesD No~
6. YesD No~ YesD No~
7. :YesONo~ YesD No~ i 8. YesD No~ IYesONo~
Source used to determine whether your project discharges into an impaired water:
WA 303( d) list
Tier 2, 2.5 or 3 Waters Answer the following for each surface water listed in Table 1:
[16] i
Is this surface If yes, specify which Tier.
water designated as Tier 1,2 or 3?
1. Yes D No IZI Choose an
2. Yes D No IZI Choose an item.
3. Yes D No IZI Choose an
Yes D No IZI Choose an
5. Yes D No IZI Choose an item.
6. YesD No an item.
7. YesD No an item.
YesD No an item.
If applicable, documentation of consultation with State or Federal TMDL authorities on .
consistency of SWPPP conditions with the approved TMDL is found in TAB 11. The control measures required to ensure that discharge of pollutants from the site are consistent with the assumptions and requirements of the EPA-established or approved TMDL, including any specific waste-load allocations are included in that documentation.
5.3 Water Quality Monitoring Requirements
Provisions in Permit Conditions of the applicable NPDES stormwater permit, as well as the associated §401 certification or other special conditions, define additional monitoring and reporting requirements. Details about water quality monitoring and reporting requirements applicable to this project are included in TAB 11.
Samples and measurements taken for the purpose of monitoring will be representative of the monitored activity. Records of all monitoring information will be retained in TAB 11, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation.
Records of monitoring information will include:
1. The date, exact place, and time of sampling or measurements;
2. The individual(s) who performed the sampling or measurements;
3. The date(s) analyses were performed
4. The individual(s) who performed the analyses;
5. The analytical techniques or methods used; and
6. The results of such analyses.
[17]
6.1 Endangered Species Protection
Under which criterion is project eligible for Endangered Species coverage under the NPDES pem1it (EPA)?
DA DB De Dn ~E
Criterion A.
Criterion B.
Criterion C
Criterion D.
No federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site's "action area" as defined in Appendix A of EPA permit.
The construction site's discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility for your action area under eligibility Criterion A, C, D, E, or F and there is no reason to believe that federally-listed species or federally-designated critical habitat not considered in the prior certification may be present or located in the "action area". To certify your eligibility under this Criterion, there must be no lapse ofNPDES permit coverage in the other operator's certification.
By certifying eligibility under this Criterion, you agree to comply with any effluent limitations or conditions upon which the other operator's certification was based. You must include in your NOI the tracking number from the other operator's notification of authorization under this permit. If your certification is based on another operator's certification under Criterion C, you must provide EPA with the relevant supporting information required of existing dischargers in Criterion C in the EPA NOI form.
Federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in or near your site's "action area," and your site's discharges and discharge-related activities are not likely to adversely affect listed threatened or endangered species or critical habitat. This determination may include consideration of any stormwater controls and/or management practices you w:ill adopt to ensure that your discharges and discharge-related activities are not likely to adversely affect listed species and critical habitat. To make this certification, you must include the following in your NOI: 1) any federally listed species and/or designated habitat located in your "action area"; and 2) the distance between your site and the listed species or designated critical habitat (in miles). You must also include a copy of your site map with the
NOL
Coordination between you and the Services has been concluded. The coordination must have addressed the effects of your site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat, and must have resulted in a written concurrence from the relevant Service(s) that your site's discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat. You must include copies of the
[18]
Criterion E.
Criterion F.
correspondence between yourself and the Services in your SWPPP and
NOL
Consultation between a Federal Agency and the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service under section 7 of the ESA has been concluded. The consultation must have addressed the effects of the construction site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally designated critical habitat. The result of this consultation must be either:
L a biological opinion that concludes that the action in question (taking into account the effects of your site's discharges and discharge-related activities) is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat; or
1i. written concurrence from the applicable Service(s) with a finding that the site's discharges and discharge-related activities are not likely to adversely affect federally-listed species or federally-designated habitat.
You must include copies of the correspondence between yourself and the Services in your SWPPP and NOL
Your construction activities are authorized tbrougb tbe issuance of a permit under section 10 of the ESA, and this authorization addresses the effects of the site's discharges and discharge-related activities on federally listed species and federally-designated critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and NOL
Support Documentation for Endangered Species criterion eligibility is filed in TAB 16.
6.2 Historic Preservation
1. Will the project involve installation of any of the following storm water controls that entail subsurface earth disturbance? Yes
D Dike
D Berm
D Catch Basin
D Pond
[gJ Ditch, trench, swale, perimeter drain, etc.
[gJ Culvert
D Other ground-disturbing stormwater control Click here to enter text.
If the project involves no installation of earth-disturbing stonnwater controls, then no further historic preservation screening is necessary (for NPDES permitting purposes).
2. If answer to step 1 is Yes, have professional surveys or evaluations determined that historic properties do not exist (or have prior disturbances at the site precluded the existence of historic properties)? Yes
[19]
Provide documentation for the basis of this determination. FS completed Section 106 consultation and surveys where necessary, Forest Service is Section 106 lead.
3. If answer to step 2 is No, have professional surveys or evaluations determined that installation of stormwater controls will have no effect on historic properties? Choose an item.
Provide documentation for the basis of this determination. Click here to enter text.
4. Has the State Historic Preservation Officer (SHPO), Tribal Historic Preservation Office (THPO) or other tribal representative concurred with the determinations of effects on historic properties? Yes
Provide the nature of their response. SHPO concurrence letter for Site Road 1502 MP 1.5. Other sites are covered by a Programmatic Agreement. The FS is the Section 106 Federal Lead for the project sites.
6.3 Safe Drinking Water Act Underground Injection Control Requirements
Will the project plan install any of the following controls? No
Check all that apply:
D Infiltration trenches (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than is widest surface dimension, or has a subsurface fluid distribution system)
D Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults, chambers, or other devices designed to capture and infiltrate stormwater flow.
D Drywells, seepage pits, or improved sinkholes (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system)
If yes, provide documentation of communications with the EPA or applicable State agency.
Click here to enter text.
[20]
Control measures at the construction site are selected, installed, implemented, and maintained to minimize pollutants in the discharge as necessary to meet applicable water quality standards.
The objectives of this SWPPP include:
• Stabilize the site as soon as possible (targeting the preparation and implementation of erosion and sediment controls to get the site to final grade, and either permanently or temporarily stabilize all bare soil areas as soon as possible).
• Perimeter controls will be installed before ground disturbing activities are initiated.
• Perimeter protection will remain in place until final stabilization has been achieved.
• Slopes and channels will be protected by conveying concentrated stormwater runoff around the top of slopes and stabilize slopes as soon as possible. A void disturbing natural channels and the vegetation along natural channels as much as possible.
• Divert stormwater coming on to the site by conveying it safely around, through, or under the work area. (Divert the clean water, trap the dirty water.)
• Protect receiving waters and other environmentally sensitive waters or areas adjacent to the site.
• Follow pollution prevention measures by providing proper containers for waste and garbage at the site. Store hazardous materials and chemicals so that they are not exposed to stormwater.
• Minimize the area and duration of exposed soils. Clear only land that.will be under construction in the near future.
7.1 Natural Buffers or Equivalent Sediment Controls (Required for EPA CGP states only - ID, WA)
This section only applies if a surface water is located within 50 feet of the project's earth disturbing activities.
Are there any surface waters within 50 feet of the project's earth disturbances? Choose an item.
If No, then no further documentation is required for the SWPPP.
NOTE: Reference EPA CGP appendix G for buffer guidance.
If Yes, check which natural buffer compliance alternative is used at the project site:
D The project will provide and maintain a 50-foot wide undisturbed natural buffer.
The location and width of natural buffers are shown on the Erosion and Sediment Control Plan sheets in TAB 6.
[21]
D The project will provide and maintain an undisturbed natural buffer that is less than 50 feet in width and is supplemented by additional erosion and sediment controls, which in combination achieves the sediment load reduction equivalent to a 50-foot undisturbed natural buff er.
The location of natural buffers are shown on the Erosion and Sediment Control Plan sheets in TAB 6.
Insert the width of the natural buffer to be retained Click here to enter text.
Insert description of additional erosion and sediment controls to be used in combination with the natural buffer: Click here to enter text.
Document the method used to determine that the above combination of natural buffer and sediment and erosion controls equal the estimated sediment removal capacity of a 50-foot undisturbed natural buffer: Click here to enter text.
IZJ It is infeasible to provide and maintain an undisturbed natural buffer of any size, therefore, the project will implement erosion and sediment controls that achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer.
Insert rationale for concluding that providing and maintaining a natural buffer of any size is infeasible: Most of the ERFO repair sites include in-water work and therefore it is not feasible to maintain a natural buffer between the work activities and streams.
Insert description of erosion and sediment controls to be used to achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer: Fiber rolls and silt fence
D The project qualifies for one of the exceptions in EPA COP Part 2.1.2.1.e
D For a "linear project", site constraints (e.g. limited right of way) make it infeasible for the project to meet any of the COP part 2.1.2.1.a compliance alternatives.
D Other exception (state type): Click here to enter text.
Document why it is infeasible to meet one of the buffer compliance alternatives: Click here to enter text.
Insert description of erosion and sediment controls to be used to achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer: Click here to enter text.
[22]
7.2 Perimeter Controls
All Perimeter Sediment Controls will be installed prior to ground disturbing activities taking place. There will be no clearing or grubbing outside the physical clearance limits.
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in 6.
The following perimeter controls will be implemented:
Control measure: Fiber rolls
Implementation: All fiber rolls will be installed prior to any ground disturbing activities. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Sediment will be removed from fiber roll perimeter controls before deposits reach 50% of the above ground height. It is the Contractor's responsibility to upgrade erosion control measures as necessary if the sediment controls are ineffective and turbid water is observed discharging from the site. Fiber rolls will not be removed until vegetation is satisfactorily established.
Control measure: Silt Fence
Implementation: The silt fence shall be functional before other land disturbing activities take place. Silt fence should be functional throughout the duration of construction and for a long enough duration following construction to allow disturbed areas to stabilize following revegetation and seeding. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Silt fences should be inspected periodically for damage (such as tearing by wind, animals, or equipment) and for sediment that has accumulated. Remove the sediment when it reaches one-half the height of the silt fence. In situations where access is available, machinery can be used. Otherwise, silt should be removed manually. The following are key elements to remember:
• The sediment deposits should be removed when heavy rain or high water is anticipated.
• The sediment deposits should be placed in an area where there is little danger of erosion.
• The silt fence should not be removed until adequate vegetative growth ensures no further erosion of the slopes. Generally, the fabric is cut at ground level, the wire and posts are removed, then the sediment is spread, seeded, and protected (mulched) immediately.
Control measure: Temporary Diversion Berm
Implementation: In accordance with schedule and contract along the North Trail alignment.
Structure should be in working condition before usage is necessary and should remain in such condition until it is no longer needed. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Damaged sandbags should be replaced immediately.
[23]
Add other measures as needed.
7.3 Sediment Track-Out
The following methods will be implemented to minimize off-site vehicle tracking of sediment onto paved surfaces. If sediment escapes the construction site, off-site accumulations of sediment will be removed at a frequency sufficient to minimize off-site impacts.
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
~ Not applicable to this project. Reason: Click here to enter text.
If applicable:
. Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Add other measures as needed.
7.4 Stockpiled Soil or Other Erodible Materials
Stockpile management includes measures to minimize surface erosion and sediment transport from soil stockpiles or other erodible materials.
Locate erodible stockpiles away from drainages including storm sewer inlets and culvert inlets.
Locations of stockpiles are shown on the erosion and sediment control plan sheets in TAB 6.
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Fiber rolls
Implementation: All fiber rolls will be installed prior to any ground disturbing activities. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Sediment will be removed from fiber roll perimeter controls before deposits reach 50% of the above ground height. It is the Contractor's responsibility to upgrade erosion control measures as necessary if the sediment controls are ineffective and turbid water is observed discharging from the site. Fiber rolls will not be removed until vegetation is satisfactorily established.
Control measure: Silt Fence
Implementation: The silt fence shall be functional before other land disturbing activities take place. Silt fence should be functional throughout the duration of construction and for a long
[24] enough duration following construction to allow disturbed areas to stabilize following revegetation and seeding. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Silt fences should be inspected periodically for damage (such as tearing by wind, animals, or equipment) and for sediment that has accumulated. Remove the sediment when it reaches one-half the height of the silt fence. In situations where access is available, machinery can be used. Otherwise, silt should be removed manually. The following are key elements to remember:
61 The sediment deposits should be removed when heavy rain or high water is anticipated.
• The sediment deposits should be placed in an area where there is little danger of erosion.
61 The silt fence should not be removed until adequate vegetative growth ensures no further erosion of the slopes. Generally, the fabric is cut at ground level, the wire and posts are removed, then the sediment is spread, seeded, and protected (mulched) immediately.
Control measure: Plastic sheets
Implementation: Soil stockpiles and other erodible materials should be covered by plastic as soon as they are generated. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Contractor should frequently check plastic to ensure soil or other erodible material is covered.
Add other measures as needed.
7.5 Minimize Dust
Dust control includes practices used to reduce or prevent the surface and air transport of dust during construction
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Application of water for dust control
Implementation: During active construction as needed. Apply at a rate of 3 gallons per acre, using a diffused or sprinkled flow. Care should be taken not to saturate or muddy the dust and that dust generation does not increase. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Application of water for dust control requires constant attention.
Sprinkling will likely need to be done several times per day, especially during hot, dry weather.
[25]
7 .6 Minimize Disturbance of Steep Slopes
Describe how disturbance of steep slopes will be minimized. Describe controls (e.g. erosion control blankets, tackifiers) that will be implemented to minimize sediment discharges from slope disturbances.
If applicable, describe how storm water run-on and run-off will be managed. Flows may be diverted from exposed soils by retaining/detaining flows or otherwise minimizing runoff and the discharge of pollutants from exposed areas of the site. Placement of structural practices in floodplains will be avoided to the degree technologically and economically practicable and achievable.
IZI Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
[26]
7.7 Topsoil Conservation
Describe how topsoil will be preserved, if feasible. If conservation of topsoil is infeasible, explain why, and describe alternate methods to be used to insure optimum vegetation survival and growth.
Erosion and sediment control measures for topsoil stockpiles (and other erodible materials) are shown in section 4.4.
D Conservation of topsoil is Infeasible:
Reason: Click here to enter text.
Alternate method: Click here to enter text.
D Conservation of topsoil is Feasible:
Conservation measure: Click to enter text.
Implementation: Click to enter text.
Maintenance requirements: Click to enter text.
Conservation measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Add other measures as needed.
7.8 Minimize Soil Compaction
Minimize soil compaction in areas where final vegetative stabilization will occur and where infiltration practices will be installed.
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Distribute layer of soft vegetative top soil after compaction complete
Implementation: After soil compaction is complete and prior to revegetation efforts. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Maximize depth whenever possible and seed as soon as practicable.
If seeding cannot occur in a timely manner, other BMPs (nets, blankets, etc.) will be placed to mitigate erosion.
[27]
7.9…