Text version
South Fork Tieton River ec ur pS ke er
C
1 MILE
Rimrock Lake htu oS kroF notei T dR Clear Lake
ROAD 1000, M.P.7.2
Silver Beach
1000 FT
South Fork Tieton River
N F
2000 FT
Nile
Rattlesnake Crk
NF 1502
NF 1500
Clover Springs Rd
N
VICINITY MAPS
SHEET 2 OF 3
Tieton Reservoir
Rd
NF 1502
A p p ro x . 3 m ile s to Y ak im a, W
A
Ri m R oc k
La ke , W
A
FN
12 12 12
Naches Riverel i N
1061 F N
NF 1070
NF 1070
Ap pr ox . 3 m ile s
Approx. 102 miles a n d S ta te H w y
T o R im ro c k
W A to Napavine, WA & I-5
Rim Rock Lake, WA
A p p ro x m il e s
ROAD 1000, M.P. 6.95
ROAD 1000, M.P. 7.35
ROAD 1040, M.P. 0.1
ROAD 1000 M.P. 7.2
ROAD 1000 M.P. 7.35
ROAD 1040 M.P. 0.1
ROAD 1000 M.P. 6.95
1421 FN
0021 FN
776 FN
N F
ROAD 1000, M.P. 11.7
ROAD 1000 M.P. 11.7
ROAD 1502, M.P. 1.5
ROAD 1502 M.P. 1.5
NF 1500
N F
NF
N F
F
N
F
N
F
N
A.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d w a e f1 a d .d g n
WA FS ERFO 2016(1)-23(1)
A
M
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y to Y a k im a , W
A
F ro m N ile s , W
Sheet and Description
D.1 D.2 D.3 D.4 D.5 D.6 D.7 D.8 D.9 D.10 D.11 D.12 D.13 D.14 D.15 D.16
Road
M.P. 6.95
Road
M.P. 7.2
Road
M.P. 7.35
Road M.P.
11.7
Road
M.P. 0.1
Road
M.P. 1.5
Road
M.P. 8.0
Road
M.P. 5.0
Road
M.P. 2.1
Road
M.P. 6.7
Road
M.P. 9.2
Road
M.P. 9.6
Road
M.P. 2.2
Road
M.P. 3.4
Road
M.P. 1.9
Road
M.P. 1.5
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL LPSM ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL
A0140 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 190 265 620 50 1,125
A0160 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 565 80 180 570 215 150 745 175 625 210 210 30 3,755
A0180 20120-1000 REMOVAL, INDIVIDUAL TREE EACH 10 10
A0200 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1 1 1 1 1 2 1 9
A0220 20302-1300 REMOVAL OF GUARDRAIL,
CONCRETE BARRIER LNFT 37.5 37.5 25.0 100.0
A0240 20401-0000 ROADWAY EXCAVATION CUYD 2,683 119 3,068 155 111 593 15 656 7,400
A0260 20420-0000 EMBANKMENT CONSTRUCTION CUYD 110 284 40 2,859 235 272 3,800
A0280 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 5 5 5 5 5 10 35
A0300 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 CUYD 19 37 10 15 19 100
A0320 25101-0400 PLACED RIPRAP, METHOD A,
CLASS 4 CUYD 50 50 10 110
A0340 25102-2400 PLACED RIPRAP, METHOD B,
CLASS 4 TON 57 22 30 11 120
A0360 25120-0000 RIPRAP DITCH, METHOD A LNFT 225 25 250
A0380 25205-0000 ROCK BUTTRESS CUYD 75 10 85
A0400 26101-0000 REINFORCED SOIL SLOPE SQFT 1,150 1,400 250 2,800
A0420 30201-1000 ROADWAY AGGREGATE, METHOD 1 CUYD 240 50 72 200 14 12 63 8 60 127 39 34 55 24 8 94 1,100
A0440 30302-1000 DITCH RECONDITIONING LNFT 600 80 180 150 100 600 200 55 135 2,100
A0460 30303-1000 ROADBED RECONDITIONING SQYD 1,333 400 1,200 288 374 105 3,700
A0480 57501-0000 MINOR BRIDGE WORK LPSM ALL ALL
A0500 60201-0800 24-INCH PIPE CULVERT LNFT 60 26 30 24 46 14 200
A0520 60201-1000 36-INCH PIPE CULVERT LNFT 80 44 16 140
A0540 60201-1200 48-INCH PIPE CULVERT LNFT 60 58 12 130
A0560 60201-1900 90-INCH PIPE CULVERT LNFT 44 6 50
A0580 60221-4450 14 FEET SPAN, 8 FEET RISE
REINFORCED CONCRETE BOX
CULVERT, SINGLE BARREL LNFT 26 26
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
-M ar -2
8:
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
O
K A-
W
EN
P ha se
E st im at e.
xl sx
]S he et
STATE PROJECT
B.1FS ERFO 2016(1)-23(1)WA
SHEET
NUMBER
Sheet and Description
D.1 D.2 D.3 D.4 D.5 D.6 D.7 D.8 D.9 D.10 D.11 D.12 D.13 D.14 D.15 D.16
Road
M.P. 6.95
Road
M.P. 7.2
Road
M.P. 7.35
Road M.P.
11.7
Road
M.P. 0.1
Road
M.P. 1.5
Road
M.P. 8.0
Road
M.P. 5.0
Road
M.P. 2.1
Road
M.P. 6.7
Road
M.P. 9.2
Road
M.P. 9.6
Road
M.P. 2.2
Road
M.P. 3.4
Road
M.P. 1.9
Road
M.P. 1.5
ALLOWANCE Bid Schedule
A0600 60304-0000 STRUCTURAL PLATE ARCH
(16'-3" SPAN, 10'-10" RISE) LNFT 72 3 75
A0620 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 150 10 160
A0640 60704-0000 CLEANING CULVERT IN PLACE EACH 2 3 2 2 9
A0660 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 80 80
A0680 62201-0700 BACKHOE LOADER, 1 CUBIC
YARD MINIMUM CAPACITY
FRONTEND BUCKET, 10 CUBIC
FOOT MINIMUM CAPACITY
BACKHOE BUCKET, 90 HP
MINIMUM FLYWHEEL HOUR 80 80
A0700 62201-3300 HYDRAULIC EXCAVATOR, 3/4
CUBIC YARD MINIMUM CAPACITY HOUR 30 30
A0720 62301-0000 GENERAL LABOR HOUR 80 80
A0740 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 334 208 100 2,056 243 261 1,917 249 1,674 133 122 358 7,655
A0760 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A0780 64703-3010 MITIGATION, ROCK WEIR EACH 13 6 3 3 25
A0800 64703-6000 MITIGATION, FISH PASSAGE
BOULDER EACH 24 12 6 3 45
A0820 64703-7000 MITIGATION, BAFFLE
(SEDIMENTATION RETENTION
SILL) EACH 12 6 2 20
A0840 64704-1000 MITIGATION, STREAMBED
MATERIAL CUYD 336 113 89 32 570
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
-M ar -2
8:
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
O
K A-
W
EN
P ha se
E st im at e.
xl sx
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2FS ERFO 2016(1)-23(1)WA
NUMBER
NO SCALE
N
MP 7.35
ROAD 1000
Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a representation.
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fc .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y g ni n oiti d n o c e R h cti
D
Existing Roadway pavement structure
See sheet C.1 for
Tie-in
CONNECTION DETAIL
NOTE:
LEGEND:
Roadbed Reconditioning
Install riprap apron
Install 24" pipe culvert
Remove existing culvert in place
MP 11.7
ROAD 1000
N
CUYD
EXC.
CUYD
EMB.
Road 1050.
Concrete Barriers located at junction of Road 1000 and
3. Notify the CO 7 days prior to removal of Concrete Barriers.
2. Place inlet invert of pipe to prevent ponding.
is a representation. Adjust to fit field conditions.
1. Site not surveyed. Horizontal and Vertical alignment
D.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fd .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
Existing Roadway pavement structure
See sheet C.1 for
Tie-in
CONNECTION DETAIL
Existing ground
Proposed grade I n s ta ll r ip r a p a p r o n
I n s ta ll p ip e c u lv e r t
ROAD 1000 MP 11.7
END ROAD 1000 MP 11.7
BEGIN
NOTE:
MP 9.2
ROAD 9737
NO SCALE
NOTE:
representation. Adjust to fit field conditions.
1. Site not surveyed. Horizontal alignment is a
Existing Roadway
(No Scale) pavement structure
See sheet C.3 for
Tie-in
CONNECTION DETAIL
LEGEND:
N
Clean culvert in place
Remove 4' X 4' boulder
Clean culvert in place g ni n oi ti d n o c e R h c ti
D
Roadbed Reconditioning
D.11
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fk .d g n
WA FS ERFO 2016(1)-23(1)
P
J a n u a r y
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
For information only. Do not measure for payment
16'
Install riprap apron Install 36" pipe culvert
[1]
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
1.
2 412932.580 1803305.480 2761.620 48°07'48.352137"N 120°09'58.690659"W 2702.6601 0.99981321 SPIKE
4 412697.450 1803352.610 2780.310 48°07'46.027729"N 120°09'58.025955"W 2721.3469 0.99981231 SPIKE
5 412670.640 1803377.680 2787.260 48°07'45.761010"N 120°09'57.659823"W 2728.2969 0.99981198 REBAR
GPS1 413142.760 1803283.170 2754.370 48°07'50.428202"N 120°09'58.992685"W 2695.4134 0.99981356 cp1 rbr/alcap
GPS3 413319.790 1803155.650 2731.410 48°07'52.186121"N 120°10'00.849914"W 2672.46 0.99981465 cp3 spike
CP1 467470.020 1844608.820 2818.430 48°16'42.553490"N 119°59'41.078721"W 2758.8337 0.99981442 aluminum cap
CP2 467466.430 1844700.130 2828.010 48°16'42.508243"N 119°59'39.729415"W 2768.4137 0.99981397 spike
CP3 467488.360 1844468.100 2805.560 48°16'42.749596"N 119°59'43.156108"W 2745.9669 0.99981504 spike
CP4 467687.450 1843932.590 2762.320 48°16'44.771681"N 119°59'51.040884"W 2702.7335 0.99981713 aluminum cap
CP1 453790.200 1453628.990 3671.930 46°34'31.182288"N 121°14'33.997415"W 3609.4203 0.99974223 ALUMINUM CAP
CP2 453732.210 1453554.060 3675.720 46°34'30.602880"N 121°14'35.062207"W 3613.2103 0.99974205 SPIKE
GPS3 453689.410 1453501.400 3682.220 46°34'30.175487"N 121°14'35.810251"W 3619.7103 0.99974174 SPIKE
GPS4 453692.340 1453502.680 3668.880 46°34'30.204529"N 121°14'35.792324"W 3606.3703 0.99974238 gps1 538817.560 1498148.270 2672.290 46°48'34.160768"N 121°04'05.465968"W 2608.6746 0.99979766 nail gps2 538770.770 1498414.010 2674.960 46°48'33.717779"N 121°04'01.640582"W 2611.3348 0.99979752 nail
CP1 720395.900 1419615.110 2862.020 47°18'19.212020"N 121°23'23.954916"W 2797.0595 0.99986012 ALUMINUM CAP
CP2 720586.350 1419804.940 2861.580 47°18'21.112728"N 121°23'21.231763"W 2796.6293 0.99986026 ALUMINUM CAP
CP3 720488.970 1419711.490 2859.930 47°18'20.141271"N 121°23'22.571737"W 2794.9728 0.99986028 SPIKE
CP4 720490.420 1419524.450 2866.780 47°18'20.134753"N 121°23'25.285813"W 2801.8162 0.99985995 SPIKE
CP3 753734.680 1535341.490 3561.140 47°23'57.757168"N 120°55'27.352176"W 3500.9498 0.99984858 aluminum cap
GPS1 753760.250 1535180.510 3567.450 47°23'58.000972"N 120°55'29.694107"W 3507.2598 0.9998483 aluminum cap
GPS2 753747.450 1535515.250 3562.270 47°23'57.892415"N 120°55'24.827480"W 3502.0864 0.99984853 spike
PROJECT : Okanogan-Wenatchee 2016 Repairs, Phase 2 COORDINATE SYSTEM : Washington North And Washington South SPCS NAD83 (2011) VERTICAL DATUM : Orthometric Elevations based on the NAVD88 GEOID12b
PROJECT UNITS : US SURVEY FOOT
EPOCH DATE :2010.000
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
4330 Road MP 5 (Washington North SPCS)
4150-200 Road (Washington North SPCS)
1040 Road MP 0 (Washington South SPCS)
1502 Road (Washington South SPCS)
5483 Road (Washington South SPCS)
9737 Road MP 6-7 (Washington South SPCS)
C
M yF ile s\
M
IS
C \c on tr ol _s he et s\ [O ka no ga n-
W en at ch ee
R ep ai rs
Ph as e
2_ co nt ro ls he et _v
2.
xl sx ]S he et
-N ov -2
2:
P M
U S
FS
U S
FS
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.17
SHEET
NUMBER
FS ERFO 2016(1)-23(1)WA
SURVEY CONTROL
MP 6.95
ROAD 1000
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e a .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
LEGEND:
Fiber Roll
Silt Fence
MP 7.2
NO SCALE
N
E.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e b .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
LEGEND:
MP 7.35
ROAD 1000
E.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e c .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
LEGEND:
MP 11.7
NO SCALE
E.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e d .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
ROAD 1000 MP 11.7
END
ROAD 1000 MP 11.7
BEGIN
LEGEND:
N
NO SCALE MP 0.1
ROAD 1040
E.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e e .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
400+80.00
402+20.00
ROAD 1040 MP 0.1
BEGIN
ROAD 1040 MP 0.1
END
LEGEND:
NO SCALE MP 1.5
ROAD 1502
E.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e f.
d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
N 79° 50' 20" W
Berm/Sandbags
ROAD 1502 MP 1.5
END
ROAD 1502 MP 1.5
BEGIN
0+85.75
1+63.41
Dewatering Area
LEGEND:
Berm
Fiber Roll
Silt Fence
Dewatering Area
R a tt le sn a k e C re e k
(10' Wide Path)
Access Area
Ordinary High Water Mark (OHWM)
(21' Width avg.)
Dewatering Area
Dewatering Area
Temporary Access Area
MP 8.0
ROAD 3507
NO SCALE
N
E.7
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e g .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
LEGEND:
MP 5.0
ROAD 4330
NO SCALE
E.8
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e h .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
101+70.00
108+00.00
ROAD 4330 MP 5.0
BEGIN
ROAD 4330 MP 5.0
END
LEGEND:
N
NO SCALE MP 2.1
ROAD 5483
E.9
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e i.
d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
5485+00.00
5485+80.00
ROAD 5483 MP 2.1
BEGIN
ROAD 5483 MP 2.1
END
LEGEND:
35553555
35703570
C M
P
C M
P
C M
P
C M
P
C M
P
N
NO SCALE MP 6.7
ROAD 9737
E.10
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e j.
d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
201+00.00
204+00.00
ROAD 9737 MP 6.7
BEGIN
ROAD 9737 MP 6.7
END
LEGEND:
MP 9.2
NO SCALE
N
E.11
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e k .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
LEGEND:
MP 9.6
NO SCALE
N
E.12
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e l.
d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
LEGEND:
Berm
MP 2.2
ROAD 4150 100
N
NO SCALE
E.13
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e m .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
LEGEND:
27502
2780 2780
0 2
N
MP 3.4
ROAD 4150 200
NO SCALE
E.14
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e n .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
303+00.00
308+50.00
ROAD 4150 200 MP 3.4
BEGIN
ROAD 4150 200 MP 3.4
END
LEGEND:
MP 1.9
ROAD 4330 400
E.15
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e o .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
LEGEND:
MP 1.5
ROAD 7322 200
N
NO SCALE
E.16
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e p .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
LEGEND:
157-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED: 6/2007
DIVERSION CHANNELS
TEMPORARY
STATE PROJECT
NUMBER
SHEET
E.17
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-23(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 e q .d g n a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
TEMPORARY CULVERT
DIVERSION CHANNEL
SECTION B-B
SECTION A-A
SECTION A-A SECTION B-B
SECTION B-B
PLAN
W
B
W
B
W
B B
W
T T
Ø when scheduled)
Silt fence (typ.
Roadway embankment
Roadway embankment
Temporary culvert backfill
Subgrade
Bedding
Sandbags
Riprap lining Riprap lining backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits when scheduled)
Silt fence (typ.
See Note 5
Permanent culvert
Roadway centerline temporary barrier
Use sandbags to construct
SandbagsPlastic liner
SSSS
SS SS
D
D D
D
SS
SS
SS SS
1.
2.
3.
4.
5.
FlowFlow
FlowFlow
Plastic liner when scheduled)
Silt fence (typ.
When specified replace the portion of the diversion channel through the roadway embankment with temporary culvert. Compact temporary culvert backfill using one of the methods listed in Subsection 204.11(a).
See Erosion Control Section for temporary culvert diameter, riprap class, channel dimensions and quantities.
Use plastic liner or riprap along the entire length and width of the temporary diversion channel.
Construct channel at a minimum grade of 0.5 percent.
Do not construct with longitudinal joints if using a plastic liner. Bury the upstream edge of the liner a minimum of
A
A
BB
GeotextileGeotextile
Flow
Natural ground and secure with sandbags (typ.)
6" deep and secure with riprap or sandbags.
2'2'
Bury plastic liner 6" deep
2'2'
NOTE:
with plastic liner or riprap
Temporary diversion channel
REVISED: 7/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
SILT FENCE
W157-1
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.18
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-23(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 e r .d g n a r c h
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
T o e o f s lo p e
PLAN
ELEVATION
4.
3.
2.
1.
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Varies
Geotextile
Steel or wood post
Backfilled and compacted soil fo r s p a c in g
S e e N o te
Limits of clearing
(undisturbed)
Existing ground
Silt fence reinforcement
NOTE:
Staple or tie
Section B
Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric See Note 3
End Posts Detail
End posts, see
End Posts Detail
End posts, see
See Note 3 fabric, Section A
Geotextile
Flow
Flow
Flow running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed m in m in m in
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
4" min.
6" min. trench
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.19
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-23(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 e s .d g n a r c h
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
Existing roadway pavement
Saw cut
1:2 pavement
Saw cut
Reinforced soil slope
(PAY LIMITS)
3'
Access ramp
Toe elevation
FOOTNOTE:
C o n s tr u c ti o n L im it s
C o n s tr u c ti o n L im it s
Existing ground white, plastic
Object marker post, LC
WITH RIPRAP ARMOR
REINFORCED SOIL SLOPE
pavement structure
See C Sheets for
Subgrade hinge
See Sheet G.2 for 6" perforated pipe underdrain system detail
Stabilization geogrid
Welded wire reinforcement
H
R e in fo r c e d S o il S lo p e P a y L im it s
Geotextile filter, class 1, non-woven, type A
Geotextile filter, class 1, non-woven, type A
Keyed riprap class 2
Keyed riprap, class 2
Reinforcement geogrid
SHEET 1 OF 2
Backfill material
6.
5.
4.
3.
2.
1.
[2][1]Geocomposite drain, type 1
2'
REINFORCED SOIL SLOPE PROFILE
Finished face
See Sheet G.2 for wrap detail pipe, 2% min. slope
6" Ø solid outlet drain
1:10
18" (typ.)
4' (min.)
13' (min.)
Toe elevation x x x x x x x x x x x xx x x x x x x x x x x x xx x x x x x x x x x x x xx x x x x x x x x x x x xx x x x x x x x x x x x xx
DETAILS
REINFORCED SOIL SLOPE
m a x
B e n c h h e ig h t class 2, 42" thickness (typ.)
Placed riprap, Reinforcement geogrid, type lll
(secondary) wrapped on face
Reinforcement geogrid, type lll (primary), wrapped at face
Reinforcement geogrid, type lll
[10]3'
Bench height is 3-feet (max.) at Road 3507 MP 8.0.
Cut bench steps in accordance with Section 204.09.
See welded wire reinforcement detail on Sheet G.2.
Allow 8-inch set back from finished face.
reinforcement geogrid. Embed 4-feet (min.) into reinforced zone.
Place welded wire reinforcement at same elevation as primary
Place stabilization geogrid within 1-foot of slope face.
Protect with granular backfill before placing riprap.
Place riprap concurrently with RSS construction.
Place post within 12-inches of the end of the pipes.
Mark the outlet with a 6-foot long post with 2-foot embedment.
Install the geocomposite drains to a height of 2/3H.
Place 24-inch wide geocomposite drains 10-feet on center.
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 h a .d g n
WA FS ERFO 2016(1)-23(1)
F e b r u a r y
C h e c k e d b y
D e s ig n e d b y over the pipe as a continuous reinforcement layer.
is less than half of the pipe cross-section, place the reinforcement trim the reinforcement along the length of the pipe. If the portion layer and more than half of the pipe cross-section is exposed, limits. If a portion of the culvert lies above the reinforcement
For culverts located within the reinforced soil slope construction
(max.)
Provide solid outlet drain pipe spaced 20-foot center-to-center on outlet.
slopes as directed by the CO. Install approved rodent guards
Bevel ends of outlet pipe to match the surrounding finish primary reinforcements.
Back of temporary excavation to extend 1-foot behind back of as reinforced soil slope construction proceeds.
Extend each course of reinforcements into access ramp areas
Slope or shore excavation according to Section 208.
14' (min.)
Foundation Width
[2]
[3]
[4]
[5]
[6]
[5]
[4]
[6]
[7]
[8]
[8][7]
[9]
[10]
FOOTNOTE:
2% min.
Granular backfill
UNDERDRAIN SYSTEM
6" PERFORATED PIPE
Perforated pipe 6" dia.
6"
3"
3"
6" dia. Solid outlet drain pipe
WRAP DETAIL
Primary reinforcement
Secondary reinforcement
2' embedment (min) all courses top and bottom, all courses
2.
1.
connect outlet and collector pipes
Provide applicable fittings to type A, non-woven
Geotextile filter, class 1, outlet and prevent soil from entering the connection joints.
the 6-inch collector pipe that allow unobstructed flow to the
Provide connections between the geocomposite drains and
Place 24-inch wide geocomposite drains X-feet on center.
type 1 both sides of drain
Geocomposite drain, max.
Provide solid outlet drain pipe spaced X-foot center-to-center on outlet.
slopes as directed by the CO. Install approved rodent guards
Bevel ends of outlet pipe to match the surrounding finish
DETAILS
REINFORCED SOIL SLOPE
SHEET 2 OF 2
type A, non-woven Geotextile filter, class 1, (typ.) all courses
4" to 6"
12"
4' top wrap (min.)
x x x x x x x x x x x x x x x x
Welded wire reinforcement
Welded wire reinforcementBackfill material x
WELDED WIRE REINFORCEMENT
PLAN VIEW
LC
F a c e o f
S lo p e
Longitudinal direction
W9.4 wires on 12" c-c
12"
W9.4 wires on 12" c-c
6"
15"
G.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 h b .d g n
WA FS ERFO 2016(1)-23(1)
O c to b e r
C h e c k e d b y
D e s ig n e d b y
[1]
[2]
[2]
10.4 x 16 20301 -1900
25101 -0200
25101 -0300
25101 -0400
25102 -2400
25120 -0000
30302 -1000
60201 -0800
60201 -1000
60201 -1200
60201 -1900
60221 -4450
60304 -0000
60501 -0000
60704 -0000
64703 -3010
64703 -6000
64703 -7000
64704 -1000
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D B
C
LA
S S
R
IP
R A P
D
IT
C H
M
ET
H
O D
A
D
IT
C H
R
EC
O N
D
IT
IO
N
IN
G
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
F
EE
T
S
PA
N
FE
ET
R
IS
E
R
EI
N
FO
R C
ED
C
O N
C R
ET
E B O
X
C U
LV
ER
T, S
IN
G
LE
B
A R R
EL
S
TR
U C
TU
R A L
PL
A
TE
A R
H
(1
6' -3
S
PA
N
R
IS
E)
S
TA
N D
A R D
U N
D
ER
D R
IN
S
YS
TE
M
C
LE
A N
IN
G
C U
LV
ER
T
IN
P
LA
C E
M
IT
IG
A
TI
O N
R O
C K W
EI
R
M
IT
IG
A
TI
O N
FI
S H
P A S S A G
E B O
U
LD
ER
M
IT
IG
A
TI
O N
B A
FF
LE
(S
ED
IM
EN
TA
TI
O N
R
ET
EN
TI
O
IL
L)
M
IT
IG
A
TI
O N
S
TR
EA
M
B
ED
TE
R
IA
L
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH CUYD CUYD CUYD TON LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT LNFT EACH EACH EACH EACH CUYD Lt Rt Road 1000 MP 6.95 1 19 600 80 2
Road 1000 MP 7.2 1 5 80 60
Road 1000 MP 7.35 1 5 180 26
Road 1000 MP 11.7 50 60
Road 1040 MP 0.1 1 5 150 30 150
Road 3507 MP 8.0 1 5 100 24
Road 4330 MP 5.0 10 3
Road 5483 MP 2.1 1 57 72 13 24 12 336 1.5 1.5 AOP
Road 9737 MP 6.7 2 22 44 6 12 6 113 1.5 1.5 AOP
Road 9737 MP 9.2 15 600 44 2
Road 4150 100 MP 2.2 225 2
Road 4150 200 MP 3.4 50 58
Road 4330 400 MP 1.9 5 200 46
Road 7322 200 MP 1.5 1 30 55 26 3 6 89 AOP
PROJECT TOTAL 0 9 25 44 100 109 225 1965 186 124 118 44 26 72 150 9 22 42 18 538
Allowable Pipe Material
NOTE: A Aluminum
1. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
2. See Std. 602-7 for acceptable concrete cell class. GS Galvanized steel
P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\m yf ile s\ pw _p ro du ct io n\ d0
Ph as e
D ra in ag e.
xl sx
]S he et
-M ar
-2
8:
W it uc ki 9/
D
C he ck er
/2
D es ig ne d by
C he ck ed b y:
STATE PROJECT
H.1
SHEET
NUMBER
FS ERFO 2016(1)-23(1)WA
Note: The quantities shown hereon are approximate and are subject to field adjustments.
50 40 30 0
PIPE INLET OUTLETHYDRAULIC INFORMATION
102060708090100110120130140 10 20 30 40 50 60 70 80 90 100 110 120 130 140
BANKFULL CHANNEL WIDTH: 12 ft
HW : 2853.58 ft
LENGTH: 72 ft
FLOWLINE SLOPE: 0.0961 ft/ft
WALL THICKNESS: NA
HEADWALL: Riprap
BURIAL DEPTH: 4.50 ft
INV N/E/EL: 720492.13/1419667.62/2848.08
BURIAL DEPTH: 4.50 ft
HEADWALL: Riprap
INV N/E/EL: 720452.52/1419727.34/2841.17
SCALE IN FEET
10 0 10 20 30 40
Q : 8 CFS
H.2
STATE PROJECT
NUMBER
WA FS ERFO 2016(1)-23(1)
J
N e ig h o r n
K
S te in h a u s
C h e c k e d b y
D e s ig n e d b y
PLAN AND PROFILE
CULVERT
ROAD 5483 MP 2.1
N o v e m b e r riprap end treatment method B, class 4 Placed raiprap, Proposed channel elev. 2845.67
Proposed Road Grade
Remove Existing 36" CMP
Proposed channel elev. 2852.58 riprap end treatment method B, class 4 Placed riprap, Proposed channel flowline
Existing ground
Slope 9.61%
Slope 9.61%
RISE: 10' - 10"SPAN: 16' - 3"
PIPE SLOPE: .0961 ft/ft
LOWER BEVEL HEIGHT: 2' - 8" LOWER BEVEL HEIGHT: 2' 8"
Q : 40.5 CFS
F lo w
Flow
TYPE: Struct. Plate Pipe Arch
Arch (16'-3" span x 10'10" rise) Proposed Structural Plate Pipe 5485+38.03
New culvert centerline
Remove existing 36" dia. culvert
5485+33.76, 32.86 LT
5485+43.07, 38.21 RT
N
LC
riprap end treatment method B, class 4 Placed riprap, riprap end treatment method B, class 4 Placed riprap, I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 h b .d g n boulder per detail sheet H.6 material and fish passage Backfill with streambed
Q : 33.5 CFS
:1
1:1
Proposed Road
8'-0" detail sheet H.8 Install rock weir per per detail sheet H.6, H.7 and H.8 rock weirs, and fish passage boulders Install sediment retention sills, BEVEL: 1 V : 1.5 H BEVEL: 1 V : 1.5 H plate assembly
Welded connection
PLAN
GENERAL NOTES:
Box invert
Bottom of Box
24"24"6'-0"6'-0"
Top headwall
Box crown
BOX CULVERT
12" depth
Bedding material, (per manufacturer)
Wire mesh along both sides (typ.)
" Bevel2 1" x 22
12 along both sides
" Bevel2 1" x 22 culvert concrete
Precast wingwall concrete
Precast and wingwall joint wrap along culvert
Grout and mastic
10" min.
10" min. base slab
Factored bearing resistance: 1 ton/sq. ft.
Unit weight: 125 lbs/cu. ft.
SOIL:
of any bar shall be 2-inches.
(ASTM, A615) grade 60. The minimum concrete cover to the face
All reinforcing steel shall conform to AASHTO M31, deformed
REINFORCING STEEL:
-inch.4 3Chamfer all exposed edges with minimum 28-day design compressive strength f'c=4,500 psi.
All concrete shall be structural concrete, class A(AE)
CONCRETE:
HL-93.
LIVE LOAD:
Concrete: 150 lb per cubic foot.
DEAD LOAD:
the CO. See section 104.
and grades shown in the plans and provide shop drawings for review by and cut-off walls conforming to ASTM-C1577 and to the dimensions, lines, Contractor shall provide precast concrete box culvert, headwalls, wingwalls, of Roads and Bridges on Federal Highway Projects, FP-14 (U.S. Customary).
Federal Highway Administration Standard Specifications for Construction
Detail is for general information only.
CONSTRUCTION:
CONNECTION PLATE DETAIL
Bottom of Cutt-off Wall sections (typ.)
manufacturer between precast
Install tie rods or connector plates per
SHEET 1 of 2
STRUCTURE DETAILS
BOX CULVERT
NO SCALE
SECTION A-A SECTION B-B
Install tie rods or connector plates per manufacturer between precast sections (typ.)
Weep holes per manufacturer
12" depth material, Bedding install connector plates per manufacturer along culvert and wingwall joint (typ.), and
Water tight grout and mastic wrap
A
A
B B plates (typ.)
connection
Embedded
Headed stud
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 h i.
d g n
N o v e m b e r
L e o n
J
N e ig h o r n
C h e c k e d b y
D e s ig n e d b y
STATE PROJECT
NUMBER
SHEET
WA ERFO 2016(1)-23(1) H.9
ty p
26"-0"
(4' min.)
spacing per manufacturer Watertight box joint
J.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 ja .d g n
WA FS ERFO 2016(1)-23(1)
M a r c h
C h e c k e d b y
D e s ig n e d b y
INFORMATIONAL QUANTITIES
TEMPORARY TRAFFIC CONTROL
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
Expressway / Freeway
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
W13-1P
(optional)
W13-1P
(optional) xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
J.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-23(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 jb .d g n
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
G20-2
G20-2
G20-2
G20-1
See Note 11
G20-1
See Note 11
M in o r R o a d
M a jo r R o a d
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-8P
See Note 9
W20-1
Ro ad N am e
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
W20-1
See Note 10
W20-1
See Note 10
G20-2
Erect all project advance warning signs before starting construction work.
Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of
NCHRP-350 or MASH for crashworthiness.
Maintain two-way traffic during all non-work hours except as approved by the CO.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
State standards may be used as an alternative if approved by the CO.
Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
B as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
LENGTH AND SPACING TABLE
APPROACH
SPEED*
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
* Approach speed based on the regulatory posted speed, not the advisory speed.
BUFFER SPACE
LENGTH
Expressway / Freeway
WORK
ROAD
AHEAD
BE
PREPARED
TO STOP
ROAD WORK
END
xxx
FEET
635-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
ROAD CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
J.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-23(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 jc .d g n
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel.
Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
For pilot car operation, mount the "PILOT CAR FOLLOW ME" (G20-4) sign at a conspicuous location on the rear of vehicle. Prominently display the name of the Contractor on the pilot car.
If closure is completely within the project limits, eliminate the "ROAD
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
For night time flagging operation, provide floodlighting at flagger stations.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
(See Length and
Spacing Table)
1.
2.
3.
4.
5.
6.
(See Length and
Spacing Table)
WORK SPACE
G20-2
See Note 4
W20-1
See Note 4
W3-4
W16-2P
(optional)
W20-7
BUFFER SPACE
NOTE:
ADVANCE WARNING AREA (See Sign Spacing Table)
TERMINATION AREAVARIABLEBUFFER SPACEABC
(optional)
A
Flagger location
Flagger location
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
NO SCALE
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 10/2017
REVISED:
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
1.5
1.5
1.5
1.5
STATE PROJECT
NUMBER
SHEET
J.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-23(1) WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 jd .d g n
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, 200' m in m in
6' - 12'
" dia. bolts 4 1Attach sign panels with a minimum of 2 - 1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post