PROJECT_DESCRIPTION.pdf

PDF 32 KB Posted

Attached to
WA FS ERFO 2016(1)-23(1), Okanogan-Wenatchee 2016 Repairs, Phase 2
Solicitation number
DTFH7017B00027
Issued by

About this file

Project Description

View the file

Other files

File Type Posted
Bid_Summary_Oka_Wen.pdf PDF
Q&A_5-15-18.pdf PDF
OKA-WEN_Phase_2_XS_Final.pdf PDF
Plan_Request_Form.pdf PDF
SWPPP_WA_FS_ERFO_2016(1)_-_23(1).pdf PDF
IFB_Okanogan.pdf PDF
OKA-WEN_Phase_2_Earthwork.pdf PDF
GM_27-17_PH-2_Geotechnical_Recommendations.pdf PDF
OKA-WEN_Phase_2_Plans_Final.pdf PDF
Site_Locations_OKA-WEN_Phase_2_Pre-Ad.pdf PDF
OKA-WEN_Phase2_Vicinity.pdf PDF
OKA-WEN_(2)_Preliminary-Letter.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA FS ERFO 2016(1)-23(1), Okanogan-Wenatchee 2016 Repairs, Phase 2

The work consists of embankment repair, bridge approach repair, drainage, base, paving and other small items of work.

Project length: 0.92 Miles

Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $1 million to $2 million

Location: Various Miles North of Wenatchee, Oregon. See attached site locations for the coordinates of each site.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

On e S ch ed ul e

Sc h

Na m e

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices)

DIVISION 200 – Earthwork 201 Clearing & Grubbing 203 Removal of Structures & Obstructions (structures, demolition) 204 Excavation & Embankment 207 Earthwork Geosynthetics

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 253 Gabions & Revet Mattresses 255 Mechanically Stabilized Earth Walls (retaining walls)

On e S ch ed ul e

Sc h

Na m e

257 Contactor-Designed Retaining Walls (contractor completed designs) 261 Reinforced Soil Slopes

DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 303 Road Reconditioning

DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete

DIVISION 550 – Bridge Construction 552 Structural Concrete (concrete – major structures) 554 Reinforcing Steel 562 Temporary Works 575 Minor Bridge Work DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 603 Structural Plate Structures (culverts & drains) 607 Cleaning, Relaying, & Repairing Existing Drainage Structures 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 625 Turf Establishment (indicate seeding or mulching separately) 635 Temporary Traffic Control – LPSM 650 Temporary Diversions

DIVISION 200 – Earthwork
DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate and Base Courses
DIVISION 400 – Asphalt Pavements & Surface Treatments
DIVISION 550 – Bridge Construction