Q&A_april_14.pdf

PDF 75 KB Posted

Attached to
ID CANYON 2013(1), Riverside Road and Lake Shore Drive Rehabilitation
Solicitation number
DTFH7017B00012
Issued by

View the file

Other files

File Type Posted
BidSum.LakeShore.pdf PDF
SF30_A003.pdf PDF
A002_Lake_Shore_Drive.pdf PDF
Q&A_April_18.pdf PDF
Q&A.pdf PDF
Q&A.pdf PDF
EW_id-a2013004xs03a.pdf PDF
Plan_Request_for_Riverside_Road.pdf PDF
SWPPP_ID_CANYON_2,_Riverside_Road_and_Lakeshore_Drive_Rehabilitation.pdf PDF
EW_id-a2013004xs05.pdf PDF
id-a2013004_100__xs_layout_walker.pdf PDF
EW_id-a2013004xs04.pdf PDF
id-a2013004_xs_layout_river0.pdf PDF
A0001_ID_CANYON_2013(1).pdf PDF
GM24-15_Geotech_Recommendations_Riverside_Road_&_Lakeshore_Drive_Rehabilitation_14July2015.pdf PDF
100__Plan_Set_Riverside_Rd.pdf PDF
id-a2013004_xs_layout_river.pdf PDF
EW_id-a2013004xs01.pdf PDF
EW_id-a2013004xs03c.pdf PDF
id-a2013004_100__xs_layout_lake1.pdf PDF
id-a2013004_100__xs_layout_lake0.pdf PDF
id-a2013004_xs_layout_lowell.pdf PDF
EW_id-a2013004xs02.pdf PDF
IFB_Lake_Shore_Dr..pdf PDF
id-a2013004_100__xs_layout_lake0.pdf PDF
id-a2013004_xs_layout_river0.pdf PDF
EW_id-a2013004xs04.pdf PDF
Plan_Request_form_Fall_Creek.pdf PDF
EW_id-a2013004xs02.pdf PDF
EW_id-a2013004xs01.pdf PDF
EW_id-a2013004xs05.pdf PDF
id-a2013004_100__xs_layout_walker.pdf PDF
GR18-15_Fall_Creek_Bridge,_Final_Foundation_and_Geotech_Rpt.pdf PDF
id-a2013004_xs_layout_lowell.pdf PDF
SWPPP_ID_CANYON_2,_Riverside_Road_and_Lakeshore_Drive_Rehabilitation.pdf PDF
id-a2013004_100__xs_layout_lake1.pdf PDF
IFB2_Fall_Creek.pdf PDF
EW_id-a2013004xs03c.pdf PDF
id-a2013004_xs_layout_river.pdf PDF
EW_id-a2013004xs03a.pdf PDF
Plan-Set_2.pdf PDF
PROJECT_DESCRIPTION_ID_CANYON_2013(1).pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No.: ID CANYON 2013(1) Project Name: Riverside Road and Lake Shore Drive Rehabilitation

# General Technical Question Answer Date

1 X THE ROAD MUST BE OPEN TO TRAFFIC FROM

6;00 AM TO 8;00 AM AGAIN FROM 4;00 PM TO

6;00 PM WE CAN HAVE ONE LANE CLOSED WITH

30 MIN. DELAYS FROM 8;00 AM TO 4;00 PM

THAN AGAIN FROM 6;00 PM TO 6;00 AM. I WAS

WONDERING IF THAT WOULD BE ONE DAY OR

TWO DAYS FOR A TRAFFIC CONTROL

SUPERVISOR.IF THE PRIME WAS TO WORK

DURING BOTH INTERVALS.

One TCS will be paid for each day that TCS work is measured according to Subsection 635.24

4/4/2017

2 X We are working diligently on the above‐ referenced proposal. We are accustomed to include Past Performance and Technical with our Proposals. Your Invitation for Bid does not ask for these documents. Am I understanding this correctly?

DTFH7017B00012 is being offered under FAR Part 14 Sealed Bidding procedures. We do not ask for Past Performance or Technical responses. Invitation for Bids are request for lowest priced responsive (compliance with bidding requirements) bids, from responsible contractors. We verify responsiveness and responsibility of the lowest bidder after receipt of bids. For further detail see FAR Part 14 Sealed Bidding.

4/13/17

Check General or Technical

File details come from the government source that posted it. Updated .