100__Plan_Set_Riverside_Rd.pdf
PDF 26 MB Posted
- Solicitation number
- DTFH7017B00012
About this file
Plans ID CANYON 2013(1)
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX TO SHEETS
INDEX TO SHEETS INDEX TO SHEETS
F. EROSION CONTROL
E. APPROACH ROADS
D. PLAN-PROFILE
C. TYPICAL SECTIONS
B. SUMMARIES
A. GENERAL INFORMATION
J. PERMANENT TRAFFIC CONTROL PLAN
I. TEMPORARY TRAFFIC CONTROL PLAN
H. SAFETY FEATURES
G. DRAINAGE
F.9
F.2-8
F.1
E.8
E.7
E.6
E.5
E.3-4
E.2
E.1
D.23
D.22
D.20-21
D.14-19
D.12-13
D.2-11
D.1
C.2-5
C.1
B.1-2
A.4
A.3
A.2
A.1
STD DRWG. W157-21, FIBER ROLL
EROSION CONTROL PLANS
TABULATION OF EROSION CONTROL QUANTITIES
RAISED ISLAND DETAILS
LOWELL ROAD APPROACH LAYOUT
WALKER LAKE ROAD APPROACH LAYOUT
MINOR APPROACH DETAILS
APPROACH ROAD PLAN AND PROFILE
APPROACH ROAD TYPICAL SECTIONS
TABULATION OF APPROACH ROAD QUANTITIES
SURVEY CONTROL
DAM MONITORING POINT CASE AND COVER DETAIL
PLAN - 1275+50 TO 1310+97.97
PLAN AND PROFILE - 1201+48.00 TO 1275.50.00
PLAN AND PROFILE - 151+00 TO 176+30.85
PLAN AND PROFILE - 16+52.56 TO 151+00.00
TABULATION OF PLAN QUANTITIES
TYPICAL SECTIONS
TABULATION OF TYPICAL SECTION QUANTITIES
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
INDEX TO SHEETS
TITLE SHEET
J.20
J.19
J.18
J.17
J.7-16
J.1-6
I.9
I.6-8
I.4-5
I.2-3
I.1
H.2
H.1
G.9
G.8
G.7
G.2-6
G.1
A.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d id a a b .d g n
ID CANYON 2013(1)
A
M
J a n u a r y
B
V in c e n t
K .P a r k e r
C h e c k e d b y
D e s ig n e d b y
LOWELL ROAD INTERSECTION STRIPING DETAIL
CENTER TURN LANE DETAIL
LINEAR PAVEMENT MARKINGS DETAIL
STEEL SIGN POST
PERMANENT SIGN INSTALLATION DETAILS -
PERMANENT TRAFFIC CONTROL PLANS
QUANTITIES
TABULATION OF PERMANENT TRAFFIC CONTROL
SIGN PANEL DETAILS
STANDARD DRAWINGS AND DETAILS
DETOUR PLAN
ADVANCE SIGNING PLAN
QUANTITIES
TABULATION OF TEMPORARY TRAFFIC CONTROL
GUARDRAIL TERMINAL STANDARD DRAWING
G4 W-BEAM GUARDRAIL STEEL POSTS DETAIL
RIPRAP DOWNDRAIN DETAILS
STORM DRAIN PROFILE
INLET TYPE 6B DETAILS
STANDARD DRAWINGS
TABULATION OF DRAINAGE QUANTITIES
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material P
J u n e
U
S C m y fi le s p w p r o d u c ti o n d id a a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.3 CANYON 2013(1) ID
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
VICINITY MAP
Marsing Rd.
Lowell Rd.
Houlk Rd.
Pear Ln.
W. Orchard Ave.
C h ic k e n D in n e r R d
C h ic k e n D in n e r R d
M a lt R d
F a r m w a y R d
S th A v e
S
M o n ta n a A v e
R iv e r s id e R d
R iv e rs id e R d
Lake Shore Drive
Lake Shore Drive
L a k e S h o r e D r iv e P e r c h R d
P e c a n L n
9 miles
To Nampa
2 m ile s
To M ar sin g
SCALE IN MILES
0 11 2
END PROJECT
BEGIN PROJECT
R iv e r s id e R d
LAKE LOWELL
LAKE LOWELL
W a lk e r L a k e R d
Hoadley Rd.
Lake Shore Drive
NATIONAL WILDLIFE REFUGE
DEER FLAT
NWR
NWR
R W
N
R W
N
RWNR
WN
R W
N
RWN
R W
N
RWN
R
W N
R W
N
RWN
RWN
RWN
R W
N
R W
N
R W
N
R W
N
RWN
R W
N
R W
N
R4W R3W
T3N
T2N
RESUME WORK
1201+48.00
SUSPEND WORK
176+30.85
1310+97.97
16+52.56
A.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a a d .d g n
ID CANYON 2013(1)
D e c e m b e r
C h e c k e d b y
D e s ig n e d b y
Sheet and Description
Section C Section D Section E Section F Section G Section I Section J
Typical Section
Plan & Profile
Approach Roads
Erosion Control Drainage
Temporary Traffic Control
Permanent Traffic Control
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15703-1500 SOIL EROSION CONTROL, TEMPORARY SOIL TACKIFIER ACRE 4.0 0.2 4.2
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,540 80 1,620
A0160 15801-0000 WATERING FOR DUST CONTROL MGAL 700 700
A0180 20101-0000 CLEARING AND GRUBBING ACRE 8.4 0.1 0.5 9.0
A0200 20302-1200 REMOVAL OF GUARDRAIL LNFT 6,870.25 112.50 17.25 7,000.00
A0220 20401-0000 ROADWAY EXCAVATION CUYD 4,498 78 224 4,800
A0240 20411-0000 SELECT BORROW TON 6,163 22 315 6,500
A0260 20425-1000 DITCH, EXCAVATION LNFT 8 2 10
A0280 20701-0200 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE B, WOVEN SQYD 10,410 1,040 11,450
A0300 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1, DOWNDRAIN CUYD 4 1 5
A0320 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 31,916 218 1,606 33,740
A0340 30502-0600 FULL DEPTH RECLAMATION WITH CEMENT, 6-INCH DEPTH SQYD 71,816 863 3,641 76,320
A0360 30510-0000 CEMENTITIOUS MATERIAL TON 1,155 15 120 1,290
A0380 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 18,589 241 940 19,770
A0400 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 185.9 2.4 9.7 198.0
A0420 41201-0000 TACK COAT TON 46.2 0.5 2.3 49.0
A0440 60103-0060 CONCRETE, HEADWALL FOR 12-INCH PIPE CULVERT EACH 10 10
A0460 60201-0400 12-INCH PIPE CULVERT LNFT 473 27 500
A0480 60403-1900 INLET, FLH TYPE 6B EACH 3 3
A0500 60704-0000 CLEANING CULVERT IN PLACE EACH 10 1 11
A0520 60901-0400 CURB, CONCRETE, 6-INCH DEPTH, ITD TYPE 3 LNFT 61 3 64
A0540 60901-1000 CURB, CONCRETE, 12-INCH DEPTH LNFT 1,591 57 82 1,730
A0560 61503-3000 MEDIAN, ASPHALT SQYD 12 1 13
A0580 61701-1200 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS LNFT 6,850.00 112.50 62.50 7,025.00
A0600 61702-0600 TERMINAL SECTION, TYPE FLARED EACH 1 1 2
A0620 61920-2000 REMOVE AND RESET GATE EACH 5 1 6
A0640 61921-1000 REMOVE AND RESET FENCE LNFT 21 4 25
A0660 62101-0000 MONUMENT, DAM MONITORING POINT CASE AND COVER EACH 114 6 120
A0680 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
A0700 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 30-INCH WIDTH HOUR 20 20
A0720 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 20 20
A0740 62201-3750 CHAIN SAW HOUR 20 20
A0760 62301-0000 GENERAL LABOR HOUR 100 100
-F eb -2
2:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 id
-a
4b a.
xl sx
]S he et
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.1 CANYON 2013(1) ID
NUMBER
Sheet and Description
Section C Section D Section E Section F Section G Section I Section J
Typical Section
Plan & Profile
Approach Roads
Erosion Control Drainage
Temporary Traffic Control
Permanent Traffic Control
ALLOWANCE Bid Schedule
A0780 63316-1000 REMOVE AND RESET SIGN EACH 85 5 90
A0800 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE EDGE LINE LNFT 107,899 5,401 113,300
A0820 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID YELLOW CENTERLINE LNFT 30,408 1,592 32,000
A0840 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE STOP LINE, 24-INCH WIDTH LNFT 1,212 68 1,280
A0860 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID WHITE HATCH LINE, 12-INCH WIDTH LNFT 540 30 570
A0880 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN YELLOW CENTERLINE LNFT 46,854 2,346 49,200
A0900 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED WHITE EDGE LINE LNFT 818 42 860
A0920 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW, LEFT EACH 2 2
A0940 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 6 6
A0960 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH EACH 300 300
A0980 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 53,924 2,676 56,600
A1000 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 534 26 560
A1020 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 1,200 1,200
A1040 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 150 150
A1060 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 2,400 2,400
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-F eb -2
2:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 id
-a
4b a.
xl sx
]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2 CANYON 2013(1) ID
NUMBER
TYPICAL SECTION
TABULATION OF
NOTE:
1. Quantities include minor approaches. See details Sheet E.5.
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a c a .d g n
ID CANYON 2013(1)
D e c e m b e r
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b
NO SCALE
FOOTNOTE:
1:3
1:3
LC
Travel lane
11' 11'
Shoulder
4'
Travel lane Shoulder
4'
2% Crown 2% Crown
TYPICAL SECTION NO. 1
REHABILITATION
Tack coat
SAFETY EDGE DETAIL
Second lift of asphalt
Full-depth reclamation
First lift of asphalt
Point available in survey notes
Red top
Sheet 1 of 4
TYPICAL SECTION
RIVERSIDE ROAD - 1201+48.00 to 1207+00.00
LAKE SHORE DRIVE - 16+52.56 to 151+00.00
1:3
Profile grade
1:3
5.
1:
(embankment construction)
Select borrow
Paved approach
See Note 1See Note 1 method 2
Roadway aggregate, TURNOUT DETAIL
125+10 to 125+90, RT
73+59 to 75+73, LT
See Typical Section
No.1
NOTE:
See layouts on Sheets D.6 and D.9 for widths.1.
where applicable
C le a r in g l im it
P r e s c r ip ti v e E a s e m e n t
L im it o f
25'25'
E x is ti g
LC
r e s c r ip ti v e E a s e m e n t
L im it o f
C le a r in g l im it
1:20
C le a r in g l im it s
Asphalt concrete pavement
5"7"
Tack coat e d g e o f p a v e m e n t
P r o p o s e d
Curb, concrete, 12-inch depth
See Detail A
DETAIL A
with cement 6-inch depth
Full depth reclamation with cement
Full depth reclamation
Roadway aggregate, method 2
Roadway aggreagate to cover safety edge
(will be placed by County forces under separate contract).
Roadway aggregate, method 2
Select borrow
(embankment compaction)
Roadway aggregate, method 2
See Sheet D.1 for curb locations.
Additional width for turnouts. See Turnout Detail.
method 2 as required to construct grade.
Supplement milled pavement and base with roadway aggregate, See Safety Edge Detail.
Construct slopes as shown in the Staking Report.
curve data on the plan-profile sheets.
Superelevate curves at maximum rate 'e' as indicated in the
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a c b .d g n
ID CANYON 2013(1)
D e c e m b e r
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
4-inch compacted depth (placed in two lifts) aggregate size, 0.3 to <3 million ESAL, -inch nominal maximum4 3-inch to 2
Asphalt concrete pavement, gyratory mix, 145+18 to 145+60
129+29 to 131+50
119+50 to 121+25
50+85 to 51+85
NO SCALE
FOOTNOTE:
Profile grade
2% Crown 2% Crown 1:3
1:3
1:3
LC
1 1
Travel lane
Tack coat
11' 11'
C le a r in g l im it
Shoulder ShoulderTravel lane
TYPICAL SECTION NO.2
4' 4'
RECONSTRUCTION
LAKE SHORE DRIVE - 151+00.00 to 176+30.85
Sheet 2 of 4
TYPICAL SECTION
1:3
5.
1:
Separation-stabilization geotextile, class 1, type B, woven Select borrow
(embankment construction)
1:20
Asphalt concrete pavement
Shoulder
4'5"7"
See Detail B
P r e s c r ip ti v e E a s e m e n t
L im it o f
P r e s c r ip ti v e E a s e m e n t
L im it o f
E x is ti
C le a r in g l im it
LC
Separation-stabilization geotextile
25'25'
10-inch compacted depth method 2, Roadway aggregate, 4-inch compacted depth (placed in two equal lifts)
-inch nominal aggregate size, 0.3 to <3 million ESAL4
-inch or2 1Asphalt concrete pavement, gyratory mix, Curb, concrete, 12-inch depth
Tack coat
DETAIL B
Roadway aggregate, method 2
C le a r in g l im it s
Select borrow
(embankment construction)
See Sheet D.1 for curb locations.
Place geotextile at subgrade along limit of excavation.
See Safety Edge Detail, on Sheet C.2.
Construct slopes as shown in the Staking Report.
curve data on the plan and profile sheets.
Superelevate curves at maximum rate "e" as indicated in the
C.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a c c .d g n
ID CANYON 2013(1)
F e b r u a r y
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
168+00 to 170+50
154+77 to 161+25
152+78 to 153+23
NO SCALE
REHABILITATION AND WIDENING
2% Crown
FOOTNOTE:
TYPICAL SECTION NO. 3
Install new G4 W-Beam guardrail with steel posts.
Remove existing guardrail and posts
LC
Profile grade
24' (approx.)
1 1
RIVERSIDE ROAD - 1207+00.00 to 1275+50.00
Sheet 3 of 4
TYPICAL SECTION
C le a r in g l im it
C le a r in g l im it o f p a v e m e n t
E x is ti n g e d o f p a v e m e n t
E x is ti n g e d
5.1:1 method 2, variable depth
Roadway aggregate, 3'
(embankment construction)
Select borrow
6"
2% Crown
4'
Shoulder
11'
Travel lane
11'
Travel lane
6'
Shoulder
5.1:1
Tack coat
E x is ti n g
LC
P e r s c r ip ti v e E a s e m e n t
L im it o f
L im it o f
P e r s c r ip ti v e E a s e m e n t
Existing stone masonry wall:
1206+92 to 1224+71 and
1272+75 to 1274+96
Existing concrete barrier:
1224+54 to 1272+81
25'25'
Asphalt concrete pavement, gyratory mix,12 4-inch or 3 -inch nominal maximum aggregate size, 0.3 to < 3 million ESAL, overlay 4-inch compacted depth (placed in two equal lifts) standard 6-foot post along terminals.
Use 7-foot long posts along the entire length of guardrail, use
See Safety Edge Detail on Sheet C.2.
as required to construct grade.
Supplement milled pavement with roadway aggregate method 2, Construct slopes as shown in the Staking Report.
data on the plan and profile sheets.
Superelevate curves at maximum rate 'e' as indicated in the curve
Varies separate contract to be placed by County forces under
Shoulder dressing (roadway aggregate)
C.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a c d .d g n
ID CANYON 2013(1)
O c to b e r
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y with cement, 6-inch depth
Full depth reclamation
NO SCALE
FOOTNOTE:
1:3
LC
OVERLAY
TYPICAL SECTION NO. 4
RIVERSIDE ROAD - 1275+50.00 to 1310+97.97
11'
Travel lane
11'
Travel lane
Varies 0' to 10'
Center turn lane
Sheet 4 of 4
TYPICAL SECTION
E d g e o f e x is ti n g p a v e m e n t
E d g e o f e x is ti n g p a v e m e n
Top of existing pavement Tack coat
Shoulder
Varies 2' to 4'
Match existing Match existing
Shoulder
Varies 2' to 4'
Construct center turn lane from 1287+94 to 1294+56.
See Safety Edge Detail, on Sheet C.2.
1:3
L im it o f
P e r s c r ip ti v e E a s e m e n t
L im it o f
P e r s c r ip ti v e E a s e m e n t
25'25'
E x is ti n g
LC
C.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a c e .d g n
ID CANYON 2013(1)
D e c e m b e r
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
Asphalt concrete pavement, gyratory mix, 2 4-inch to 3 compacted depth
-inch nominal maximum aggregate size, 0.3 to <3 million ESAL 2-inch
PLAN
TABULATION OF
NOTE:
1. Plan quantities include minor approaches. See details, Sheet E.5.
FOOTNOTE:
Sheet E.1. Mainline 1206+55 = Lowell Rd. 330+20.
Join proposed guardrail along Lowell Road described on
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fa .d g n
ID CANYON 2013(1)
J a n u a r y
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b
,5
.3
,5
.7
-0.3212%
-0.5048%
150' VC
K = 817
SSD = 5951'
,5
.6
-0.3273%
100' VC
K = 563
2544 2544
2545 2545 2545 2545
525452545
254525452545
25462546 254625462546
25462546
254625462546
2547 2547
2547 2547
254725472547
7 2547
48 2548
25482548
25482548
25492549
2 B
C
P O
T
.5
BEGIN PROJECT
LAKE SHORE DRIVE
CONNECTION DETAIL
Line to be constructed
16+52.56
BEGIN REHABILITATION
ID CANYON 2013(1)
M A
R S I N
G R
O A
D
Profile grade
Existing ground
Slope stake limit
NOTE:
1.
not adjusted for shrink/swell, and do not include topsoil.
Excavation and embankment volumes shown below are
LEGEND:
A 18+46 (Station)
Slope stake limit
A 17+65
A 18+46
.5 existing pavement
Top of
Sawcut
25'
Existing edge of gravel shoulder
Existing edge of pavement
See Typical Section No. 1
MINOR
APPROACH SYMBOL
Sheet E.5
See approach details, O B S E R
V A T
IO
N M O
N
IT
O R
IN
G
WELL
MW
Install culvert with concrete headwall El=2551.30
E=2369377.6994
N=686272.6705
2R =10' (Right return radius)
R =12' (Left return radius)
G=-10.0% (Approach grade)
Proposed edge of pavement
CUYD
EXC.
CUYD
EMB.
25+0022+5020+0017+5015+00
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fb .d g n
ID CANYON 2013(1)
D e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
Remove existing pavement
See detail, Sheet D.22.
Install dam monitoring point case and covers.
Dam monitoring point.
L = 9'
W = 20'
R = 17.5'
R = 17.5'
G=-5.0%
L = 9'
W = 18'
R = 10'
R = 12'
G=-6.5%
30 14
25402540 25402540
25412541
2541 2541 25412541
2541 2541
2542 2542 2542 2542
2542 2542
2542 25
2542 2542 2542 2542
2542 2542 2542
2543 25 43 2543 2543 2543 2543
2543 2543 2543
2543 2543
25432543
254325432543 2543
44 2544
25442544
2544 2544 2544
2544 2544
2544 2544 2544 2544 2
2545 2545 2545 2545 2545
2545254
254525452545254525452545
2546 2546
25462546 25462546254625462546
P C
.2
P T
.3
P C
.4
5 4
,5
.0
100' VC
K = 429
,5
.7
-0.0941%
100' VC
K = 1728
SSD = 18691'
,5
.3
-0.1520% -0.5521%
,5
.7
150' VC
K = 213
+0.1514%
-0.3273%
,5
.3
-0.1520% -0.5521%
100' VC
K = 250
SSD = 2747'
Existing edge of pavement
LAKE SHORE DRIVE
Curve= C40
D
R= 24,000.00'
T= 47.52'
Curve= C41
D
R= 12,000.00'
T= 363.60'
Profile grade
Existing ground gravel shoulder Existing edge of
GPS
15101 e= NC L= 95.04' e= NC L= 726.98' not adjusted for shrink/swell, and do not include topsoil.
Excavation and embankment volumes shown below are 1.
NOTE:
A 30+30
A 32+10
A 31+59
40+06
33+30 A 31+12
Slope stake limit Line to be constructed
Slope stake limit
Proposed edge of pavement
C le a n e x is ti n g p ip e c u lv e r t
L = 9'
W = 45'
R = 10'
R = 25'
G= -8.0%
L = 9'
W = 15'
R = 8'
R = 10'
G= -5.0%
L = 9'
W = 19'
R = 10'
R = 12.5'
G= -7.0%
L = 11'
W = 20'
R = 10'
R = 35'
G = -8.0%
See Connection Detail this sheet
Match existing bridge deck.
A 32+32
L = 9'
W = 17'
R = 3'
R = 10'
G = -8.0%
FOR BRIDGE DECK
CONNECTION DETAIL
Existing bridge deck
Section No. 1
See Typical
Section No. 1
See Typical li n e a n d o u tl e t d it c h e s t o e a s e m e n t a n d h e a d w a ll s C o n s tr u c t in le t
I n s ta ll p ip e c u lv e r t
CUYD
EXC.
CUYD
EMB.
40+0037+5035+0032+5030+0027+5025+00
2525 2525
2530 2530
2535 2535
2540 2540
2545 2545
2550 2550
2555 2555
2560 2560
2565 2565
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fc .d g n
ID CANYON 2013(1)
D e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
Asphalt concrete overlay.
Remove existing bridge deck overlay
L = 10'
W = 32'
R = 17.5'
R = 17.5'
G=-7.0%
L = 10'
W = 18'
R = 12.5'
R = 12.5'
G=-8.0%
Remove and reset gate
5 74
38253
25392539
253925392539
2539 2539 2539
25402540
2540 2540 2540 2540
2540 2540 2540
254025402540
0 2540
2540 2540 2540 2540 2540
2540 2540
41 254
2541 2541 2541 2541
2541 2541 2541 2541
2541 2541 2541 2541
2542 2542 2
25422542
2542 2542
2542 2542
254225
2542 2542 2542
2542 2542 2542 2542 2542
2543 2543
2543 2543 2543
2543 2543 2543
2543 2543
2543 2543 2543
2543 2543 2543 2543 2543
254425442544
2544 2544 2544
254425442544
2544 2544 2544
P T
.3
P C
.3
P T
.8
P C
.2
0 P
T
.5
P C
.2
,5
.3
-0.2136%
100' VC
K = 274
SSD = 3006'
,5
.3
100' VC
K = 357 4
,5
.6
+0.0667% -0.5657%
100' VC
K = 158
SSD = 1756'
LAKE SHORE DRIVE
Curve= C42
D
R= 8,000.00'
Curve= C43
D
R= 1,800.00'
T= 114.80'
Curve= C44
D
R= 8,000.00'
T= 182.70'
Curve= C41
D
R= 12,000.00'
T= 363.60'
LAKE SHORE DRIVE
N e= NC L= 726.98'
T= 72.25' e= NC L= 144.49' e= NC L= 365.33' not adjusted for shrink/swell, and do not include topsoil.
Excavation and embankment volumes shown below are 1.
NOTE:
A 41+40
A 44+64
A 50+92
A 51+63 e= 0.030 L= 229.29'
L = 7'
W =28'
R =10'
R =25'
G=+3.5%
L = 10'
W = 19'
R = 10'
R = 12.5'
G = -10.0%
L = 9'
W = 14'
R = 8'
R = 8'
G= -5.0%
L = 9'
W = 22'
R = 17.5'
R = 17.5'
G= -5.0% depth, LT concrete, 12-inch Construct curb, CUYD
EXC.
CUYD
EMB.
55+0052+5050+0047+5045+0042+5040+00
2520 2520
2525 2525
2530 2530
2535 2535
2540 2540
2545 2545
2550 2550
2555 2555
2560 2560
D.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fd .d g n
ID CANYON 2013(1)
D e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y reset gate
Remove and and reset gate
Remove and reset gate
Remove p ip e c u lv e r t to r e m a in
E x is ti n g i r r ig a ti o n
18912012
Existing edge of pavement
Line to be constructed
Existing edge of gravel shoulder
Profile grade
Existing ground
Slope Stake limit
Slope Stake limit
25352535
2535 253
25362536
P T
.5
P C
.7
0 P
T
.4
P C
.7
P T
.9
P C
.2
P T
.1
,5
.8
-0.5657%
100' VC
K = 151
,5
.1
+0.0966% -0.2625%
200' VC
K = 557
SSD = 3105'
,5
.0
100' VC
K = 322
,5
.1
+0.0483%
100' VC
K = 498
LAKE SHORE DRIVE
Curve= C44
D
R= 8,000.00'
T= 182.70'
LAKE SHORE DRIVE
Curve= C45
D
R= 500.00'
T= 166.63'
Curve= C46
D
R= 3,600.00'
T= 43.10'
Curve= C47
D
R= 2,200.00'
T= 166.77'
N e= NC L= 365.33' not adjusted for shrink/swell, and do not include topsoil.
Excavation and embankment volumes shown below are 1.
NOTE:
B 58+25 e= 0.040 L= 321.69' e= 0.022
L= 86.19'
Slope stake limit
Slope stake limit
Existing edge of gravel shoulder
Existing edge of pavement
Line to be constructed
Profile grade
Existing ground e= 0.028 L= 332.90'
Proposed edge of pavement e x is ti n g p ip e c u lv e r t
C le a n
CUYD
EXC.
CUYD
EMB.
70+0067+5065+0062+5060+0057+5055+00
2520 2520
2525 2525
2530 2530
2535 2535
2540 2540
2545 2545
2550 2550
2555 2555
2560 2560
D.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fe .d g n
ID CANYON 2013(1)
D e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
L = 24'
W = 23'
R = 12', 65'
R = 12', 25'
G= -5.5% p ip e c u lv e r t
C le a n e x is ti n g
25342534
25352535
25372537
P T
.1
P C
.6
P C
C
.6
P T
.4
,5
.9
+0.2492% -0.2012%
400' VC
K = 888
SSD = 2596'
,5
.1
-0.0114%
100' VC
K = 527
,5
.0
100' VC
K = 955 8
,5
.3
+0.0933% -0.0453%
100' VC
K = 721
SSD = 7832'
LAKE SHORE DRIVE
Curve= C48
D
R= 1,400.00'
T= 150.58' Curve= C49
D
R= 2,800.00'
T= 110.47'
Existing edge of gravel shoulder
Existing edge of pavement
Line to be constructed
Profile grade
Existing ground
N not adjusted for shrink/swell, and do not include topsoil.
Excavation and embankment volumes shown below are 1.
NOTE:
e= 0.034 L= 300.00' e= 0.026 L= 220.82'
Slope stake limit
Slope stake limit e x is ti n g c u lv e r t
C le a n see Layout Construct turnout, Proposed edge of gravel pavement (mainline)
Proposed edge pf
TURNOUT LAYOUT
73+59 to 75+73, LT
Paved apron
Proposed edge of pavement
Existing driveway approach
I n s ta ll p ip e c u lv e r t
CUYD
EXC.
CUYD
EMB.
85+0082+5080+0077+5075+0072+5070+00
2515 2515
2520 2520
2525 2525
2530 2530
2535 2535
2540 2540
2545 2545
2550 2550
2555 2555
D.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a ff .d g n
ID CANYON 2013(1)
D e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b
P C
.3
P T
.5
P C
.1
P T
.5
,5
.1
100' VC
K = 6195
,5
.1
-0.0292% +0.1276%
200' VC
K = 1276
-0.0453%
LAKE SHORE DRIVE
Curve= C50
D
R= 1,200.00'
T= 112.96'
Curve= C52
D
R= 980.00'
T= 212.96'
Line to be constructed
Existing edge of pavement Existing edge of gravel shoulder
Existing ground not adjusted for shrink/swell, and do not include topsoil.
Excavation and embankment volumes shown below are 1.
NOTE:
e= 0.038 L= 419.39'
Slope stake limit
95+08 B
94+40 B
Slope stake limit
GPS
15103
72193
C le a n e x is ti n g p ip e c u lv e r t e= 0.036 L= 225.26'
Proposed edge of pavement
C le a n e x is ti n g p ip e c u lv e r t
L = 28'
W = 22'
R = 20'
R = 20'
G= -4.0% Remove and reset gate
L = Varies 12' to 24'
W = 75'
R = 20'
R = 20'
G= -3.8%
CUYD
EXC.
CUYD
EMB.
100+0097+5095+0092+5090+0087+5085+00
2515 2515
2520 2520
2525 2525
2530 2530
2535 2535
2540 2540
2545 2545
2550 2550
2555 2555
D.7
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fg .d g n
ID CANYON 2013(1)
D e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b
25342534
25342534
25352535
25362536
25362536
2536 2536
25382538
25382538
25382538
P C
.9
5 P
T
.8
P C
.7
P C
C
.7
P C
C
.6
P T
.6
,5
.0
+0.1276% -0.1949%
200' VC
K = 620
SSD = 3446'
-0.1949%
100' VC
LAKE SHORE DRIVE
Curve= C53
D
R= 1,200.00'
T= 95.66'
Curve= C51
D
R= 3,000.00'
T= 138.10'
Curve= C54
D
R= 1,000.00'
T= 60.50'
Curve= C55
D
R= 6,000.00'
T= 105.01'
Line to be constructed
Existing edge of gravel shoulder
Existing edge of pavement
Profile grade
Existing ground
N e= NC L= 210.00' not adjusted for shrink/swell, and do not include topsoil.
Excavation and embankment volumes shown below are 1.
NOTE:
e= 0.036 L= 190.92' e= 0.024 L= 276.00' e= 0.038 L= 120.85'
112+09 A
Slope stake limit
Slope stake limit
C le a n e x is ti n g p ip e c u lv e r t
C le a n e x is ti n g p ip e c u lv e r t
Proposed edge of pavement
CUYD
EXC.
CUYD
EMB.
115+00112+50110+00107+50105+00102+50100+00
2515 2515
2520 2520
2525 2525
2530 2530
2535 2535
2540 2540
2545 2545
2550 2550
2555 2555
D.8
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fh .d g n
ID CANYON 2013(1)
D e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
L = 10'
W = 42'
R = 25'
R = 25'
G= -4.0%
25352535
6 2536
2538 2538
25402540
P T
.6
P C
.8
P C
C
.8
0 P
C C
.8
P T
.8
P C
.2
,5
.1
+0.1156%
100' VC
K = 322 1
,5
.7
600' VC
K = 2480
SSD = 4759'
,5
.9
-0.1264%
100' VC
K = 279
+0.2320%
LAKE SHORE DRIVE
Curve= C56
D
R= 3,000.00'
T= 70.01'
Curve= C57
D
R= 550.00'
T= 128.74'
Curve= C61
D
R= 3,000.00'
T= 131.08'
Curve= C58
D
R= 3,000.00'
T= 261.73'
Line to be constructed
Existing edge of pavement
Existing edge of gravel shoulder
Profile grade
Existing ground
N not adjusted for shrink/swell, and do not include topsoil.
Excavation and embankment volumes shown below are 1.
NOTE:
e= 0.024 L= 140.00' e= 0.040 L= 252.93' e= 0.024
L= 262.00' e= 0.024 L= 522.13'
Slope stake limits
Slope stake limits
See layout
Construct turnout.
Edge of gravel
15'R 'R
TURNOUT LAYOUT
Proposed edge of pavement
C le a n e x is ti n g p ip e c u lv e r t
Proposed edge of pavement
125+10 to 125+90, RT
R 'R
See Sheet C.2 for detail
See Sheet D.1 for stationing;
12-inch depth, LT.
Construct curb, concrete, See Sheet C.2 for detail
See Sheet D.1 for stationing;
12-inch depth, LT.
Construct curb, concrete, CUYD
EXC.
CUYD
EMB.
130+00127+50125+00122+50120+00117+50115+00
2515 2515
2520 2520
2525 2525
2530 2530
2535 2535
2540 2540
2545 2545
2550 2550
2555 2555
D.9
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fi .d g n
ID CANYON 2013(1)
D e c e m b e r
C h e c k e d b y
D e s ig n e d b y
Existing irrigation channel access
253325332533
2533253325332533
2534253425342534
2534253425342534
2535253525352535
2535253525352535
2535 2535
25362536
253625362536
25362536
25362536253625362536
25372537
25372537
25372537
25372537
2537 2537
2537 2537 2537 25372537
25372537
25372537
25372537
25372537
25372537
2537 2537
2537 2537
25372537
25372537
25372537
25372537
25382538
25382538
253825382538
2538 2538 2538 2538
2538 2538
2538 2538 2538 2538
25382538
253825382538
2539 2539 2539
2539 2539 2539 2539 2539 2539
253925392539
25392539
25392539
2539 2539 2539
2539 2539 2539 2539 2539 2539
25392539
253925392539
2540 2540 2540
2540 2540 2540 2540 2540 2540
254025402540
254025402540
254025402540
25402540
2540 2540 2540
2540 2540 2540
2540 2540 2540
2540 2540 2540
2540 2540 2540 2540 2540 2540
2541 2541 2541 2541
2541 2541 2541
2541 2541 2541
2541 2541 2541
2541 2541 2541 2541 2541 2541
2541 2541 2541
2541 2541 2541 2541
2541 2541
2541 2541 2541 2541
2542 2542
2542 2542
254225422542
P T
.4
5 P
C
.8
P T
.4
,5
.7
-0.0481%
200' VC
K = 714
SSD = 3952'
,5
.5
+0.1350%
200' VC
K = 1092
,5
.0
+0.6065%
100' VC
K = 212
Curve= C59
D
R= 12,000.00'
T= 38.79'
Line to be constructed
Existing edge of pavement
Existing edge of gravel shoulder
Profile grade
Existing ground
N e= NC L= 77.58' not adjusted for shrink/swell, and do not include topsoil.
Excavation and embankment volumes shown below are 1.
NOTE:
Slope stake limit
Slope stake limit
142+16 A
155 26
Curve= C58
D
R= 3,000.00'
T= 261.73' e= 0.024 L= 522.13'
Proposed edge of pavement
C le a n e x is ti n g p ip e c u lv e r t
L = 9'
W = 15'
R = 15'
R = 10'
G= -8.0%
Construct curb, concrete, 12-inch depth, LT
See Sheet D.1 for stationing;
See Sheet C.2 for detail
CUYD
EXC.
CUYD
EMB.
145+00142+50140+00137+50135+00132+50130+00
2515 2515
2520 2520
2525 2525
2530 2530
2535 2535
2540 2540
2545 2545
2550 2550
2555 2555
D.10
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fj .d g n
ID CANYON 2013(1)
D e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b
253925
2540 2540
2540254
41 2541
2544 25
P C
.6
P T
.0
P O
T
.0
,5
.3
-0.2704%
150' VC
K = 171
SSD = 1305'
,5
.7
100' VC
K = 185
+0.2696%
,5
.4
-0.1357%
100' VC
K = 247
SSD = 2712'
,5
.3
Curve= C60
D
R= 410.00'
T= 246.84'
GPS
14101
Line to be constructed
Existing edge of gravel shoulder
Existing edge of pavement
Existing ground
Profile grade
END REHABILITATION
Slope stake limits
O
T
.0
N
151+00.00
ID CANYON 2013(1)
not adjusted for shrink/swell, and do not include topsoil.
Excavation and embankment volumes shown below are 1.
NOTE:
e= 0.040 L= 444.38' to r e m a in
E x is ti n g i r r ig a ti o n p ip e c u lv e r t on Sheet D.12
See Connection Detail
El=2541.34
E=2361611.5933
N=694360.8790 edge of pavement
Proposed
See Sheet C.2 for detail
See Sheet D.1 for stationing;
Construct curb, concrete, 12-inch depth, LT
CUYD
EXC.
CUYD
EMB.
152+50150+00147+50145+00
2515 2515
2520 2520
2525 2525
2530 2530
2535 2535
2540 2540
2545 2545
2550 2550
2555 2555
D.11
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fk .d g n
ID CANYON 2013(1)
D e c e m b e r
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b
25362536
25372537
382538
25382538
2538 2538
25382538 25382538
25382538
2538 2538
25392539
25392539
25392539
4025402540
2540 2540
2540 2540
2542 2542
32543
2544 2544
,5
.3
,5
.1
-0.1357% -0.3098%
100' VC
K = 574
SSD = 6248'
,5
.0
100' VC
K = 164
,5
.8
+0.3014% -0.3463%
100' VC
K = 154
SSD = 1716'
P O
T
.0
P C
.6
P T
.9
P C
.3
P T
.8
P C
.0
D I
D I
D I
Curve= C1
D
R= 6,000.00'
T= 41.14'
L= 82.29'
Curve= C2
D
R= 800.00'
T= 153.61'
L= 303.53'
Curve= C3
R= 600.00'
T= 93.35'
L= 185.21'
D
151+00.00
Line to be constructed
Profile grade
Existing ground e= 0.040
LAKE SHORE DRIVE
W
ALKER LAKE ROAD
e= 0.040
NOTE:
1.
CONNECTION DETAIL
Sheet C.3
See Typical Section No. 2 plan and profile approach road
See Sheet E.3 for pavement
Asphalt concrete
Aggregate base c o n c r e te h e a d w a ll a t o u tl e t.
c o n c r e te in le t ty p e
B a n d c u lv e r t p r e c a s t r e in fo r c e d
I n s ta ll in c h p ip e
GPS
GPS
14101
14102 culvert to remain
Existing irrigation
Connection Detail
Sawcut. See
N not adjusted for shrink/swell, and do not include topsoil.
Excavation and embankment volumes shown below are
BEGIN RECONSTRUCTION
Sheet C.2
See Typical Section No. 1 existing pavement Top of
Proposed edge of pavement
Construct curb, concrete, 12-inch depth, LT
See Sheet C.3 for detail
See Sheet D.1 for stationing h e a d w a ll s c u lv e r t a n d c o n c r e te
I n s ta ll in c h p ip e
Install 12-inch pipe culvert
152+00, 21' LT
2539.16 2538.64
153+25, 26' LT
Existing edge of pavement drain system
Construct storm
See detail, Sheet G.6 method A, class 1, downdrain.
Construct placed riprap, e= NC
El=2541.34
E=2361611.5933
N=694360.8790 d r a in p r o fi le
S h e e t
G .5 a t o u tl e t.
S e e s to m a d c o n c r e te h e a d w a ll c u lv e r t, i n le ts t y p e
B
I n s ta ll in c h p ip e t o
See Sheet C.3 for detail
See Sheet D.1 for stationing;
Construct curb, concrete, 12-inch depth LT
CUYD
EXC.
CUYD
EMB.
162+50160+00157+50155+00152+50150+00
2520 2520
2525 2525
2530 2530
2535 2535
2540 2540
2545 2545
2550 2550
2555 2555
2560 2560
D.12
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fl .d g n
ID CANYON 2013(1)
D e c e m b e r
C h e c k e d b y
D e s ig n e d b
25372537
25382538
92539
25392539
25392539
2540 2540
2541 2541
2543 2543
P T
.3
P C
.1
P T
.3
P C
.2
P T
.5
P O
T
.3
,5
.5
-0.3463% +0.3019%
100' VC
K = 154
,5
.9
+0.3019% -0.5942%
84' VC
K = 94
SSD = 1246'
,5
.7
END RECONSTRUCTION
Curve= C4
D
R= 800.00'
T= 90.48'
L= 180.19'
Curve= C3
D
R= 600.00'
T= 93.35'
L= 185.21'
Curve= C5
D
R= 1,200.00'
T= 63.24'
L= 126.36'
RIVERSID
E RO
AD
e= 0.040 e= 0.040
LAKE SHORE DRIVE
NOTE:
1. SUSPEND WORK
See Sheet D.1 for stationing
12-inch depth, LT
Line to be constructed
Existing ground
N
Slope stake limit
Slope stake limit
B 173+81
Construct curb, concrete, See Sheet C.3 for detail c o n c r e te a n d c o n c r e te h e a d w a ll s p ip e c u lv e r t p r e c a s t r e in fo r c e d
I n s ta ll in h c o n c r e te a n d c o n c r e te h e a d w a ll s c u lv e r t p r e c a s t r e in fo r c e d
I n s ta ll in c h p ip e a n d w in g w a ll s to r e m a in w it h c o n c r e te h e a d w a ll s c u lv e r t d ia m e te r
E x is ti n g i r r ig a ti o n p ip e
Curve= C20
D
R= 6,000.00'
T= 82.31'
L= 164.62'
=1201+88.29, 24.75' RT
176+30.85
See details, Sheet G.6 method A, class 1, downdrain.
Construct placed riprap, Existing edge of pavement
El=2541.70
E=2360265.7782
N=696479.4089
= 0.050 (Right) e= 0.020 (Left)
CUYD
EXC.
CUYD
EMB.
177+50175+00172+50170+00167+50165+00162+50
2520 2520
2525 2525
2530 2530
2535 2535
2540 2540
2545 2545
2550 2550
2555 2555
2560 2560
D.13
STATE PROJECT
NUMBER
SHEET
D e c e m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fm .d g n
ID CANYON 2013(1)
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
1 Backfill sinkhole with material obtained from roadway excavation.
adjusted for shrink/swell.
Excavation and embankment volumes shown below are not
Backfill sinkhole
26 1
L = 21'
W = 28'
R = 20'
R = 17.5'
G= -10.0%
2526 2526
25382538
25382538
25392539
25392539
25402
P O
T
.0
0 P
C
.7
P T
.3
P C
.4
5 P
C C
.4
P T
.2
,5
.0
+1.0940%
-0.0242%
200' VC
K = 179
SSD = 1065'
,5
.5
,5
.3
-0.8275%
180' VC
K = 94
Line to be constructed
RIV
ERSID
E R
OAD
L A
K E S
H O
R E D
R
IV
E
L O
W E L L R
O A
D
RIVERSIDE ROAD
Existing edge of pavement
1201+48.00
Profile grade
NOTE:
1.
Remove existing guardrail
Slope stake limits
Connection Detail
Sawcut. See
Existing ground
CONNECTION DETAIL
AND WIDENING
BEGIN REHABILITATION
RESUME WORK
include topsoil.
are not adjusted for shrink/swell, and do not
Excavation and embankment volumes shown below
N and Profile, Sheet E.4
See Lowell Road Approach Plan
A 1203+39
A 1202+55
A 1202+10
D
Curve= C20
R= 6,000.00'
T= 82.31'
L= 164.62'
T= 100.94'
D
R= 600.00'
Curve= C31
T= 66.97'
R= 300.00'
D
Curve= C32
Slope stake limits
El=2542.52
E=2360239.9911
N=696439.8472
= 0.040 (Right) e= 0.020 (Left)
L= 200.00'
= 0.040 (Right) e= 0.020 (Left)
L= 131.78'
Proposed edge of pavement
L = 10'
W = 58'
R = 5'
R = 10'
G= -5.5%
L = 9'
W = 25'
R = 10'
R = 10'
G= -8.0%
L = 9'
W = 31'
R = 25'
R = 25'
G= -10.0%
Full depth reclamation with cement
See Sheet H.1 for detail
See Sheet D.1 for stationing.
Sawcut pavement existing
Top of
Sheet C.2
62' See Typical Section No. 1
Asphalt concrete pavement, 4" depth
CUYD
EXC.
CUYD
EMB.
1210+001207+501205+001202+501200+00
D.14
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fn .d g n
ID CANYON 2013(1)
D e c e m b e r
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
10" Steel case 4.5' above ground, with lock
CONTROL BOLLARD
DAM MONITORING SURVEY
BUREAU OF RECLAMATION
CAUTION:
above ground, with lock
10" Steel case 4.5'
CONTROL BOLLARD
DAM MONITORING SURVEY
BUREAU OF RECLAMATION
CAUTION:
class A, steel posts, LT
Install guardrail system G4, type 2, guardrail on Sheet E.4
See continuation of
25152516
2519 2519
2519 2519
2520 2520 2520 2520
2520 2520 2520 2520 2520 2520
1 2521 2521 2521 2521 2521 2521
2521 2521 2521 2521 2521 2521
2522 2522 2522 2522 2522 2522 252
2522 2522 2522 2522 2522 2522
2522 2522
2523 2523 2523 2523 2523 2523
2523 2523
2523 2523 2523 2523 2523
2523 2523
2524 2524 2524 2524 2524
2524 2524
2524 2524 2524 2524 2524 2524
25242524
2525 2525 2525 2525 2525 2525 2525
2525 2525
2525 2525 2525 2525 2525
2526 2526 2526 2526 2526 2526 2526
2526 2526 2526 2526 2526 2526 2526 2526
2527 2527 2527 2527 2527 2527 2527 2527
2527 2527
2527 2527 2527 2527 2527 2527 2527 2527
2528 2528
2528 2528
2528 2528 2528 2528 2528
252825282528
25282528
2528 2528 2528
2528 2528 2528 2528 2528 2528 2528
25292529
25292529
2529 2529 2529 2529
2529 2529
2529 2529 2529 2529 2529 2529
2529252925292529 25292529
2529 2529
2529 2529 2529 2529 2529 2529 2529 2529
2530253025302530 25302530
2530 2530 2530
2530 2530 2530 2530 2530 2530 2530 2530
2530253025302530 253025302530
2530 2530
2530 2530 2530 2530 2530 2530 2530 2530
2531253125312531 2531253125312531
25312531
2531 2531 2531 2531 2531 2531 2531
2531 2531 2531 2531 2531 2531 2531 2531
2531253125312531 2531253125312531
2531 2531 2531 2531
2531 2531 2531 2531 2531 2531 2531 2531 2531 2531 2531
2532253225322532 25322532253225322532
2532 2532 2532 2532 2532 2532
2532 2532 2532 2532 2532 2532 2532 2532
25322532253225322532253225322532253225322532
2532 2532 2532
2532 2532 2532 2532 2532 2532 2532 2532 2532
25332533253325332533253325332533253325332533
2533 2533 2533
2533 2533 2533 2533 2533 2533 2533 2533 2533
25332533253325332533253325332533253325332533
2533 2533 2533 2533 2533 2533 2533 2533 2533 2533 2533 2533 2533 2533
2534253425342534253425342534253425342534253425342534
2534 2534 2534 2534 2534 2534
2534 2534 2534 2534 2534 2534 2534 2534
2534253425342534253425342534253425342534253425342534
2534 2534 2534 2534 2534 2534
2534 2534 2534 2534 2534 2534 2534 2534
2535253525352535253525352535253525352535253525352535
2535 2535 2535 2535 2535 2535
2535 2535 2535 2535 2535 2535 2535 2535
52535253525352535253525352535253525352535253525352535
2535 2535 2535 2535 2535 2535 2535 2535 2535 2535 2535 2535 2535 2535
2536253625362536253625362536253625362536253625362536 25
2536 2536 2536 2536
2536 2536 2536 2536 2536 2536 2536 2536
2536253625362536253625362536253625362536253625362536 25
2536 2536 2536 2536 2536 2536 2536 2536 2536 2536 2536 2536 2536 2536
2537253725372537253725372537253725372537253725372537 25
2537 2537 2537 2537 2537 2537 2537 2537 2537 2537 2537 2537 2537
2537253725372537253725372537253725372537253725372537 25
2537 2537 2537 2537 2537 2537 2537 2537 2537 2537 2537 2537 2537 2537
2538253825382538253825382538253825382538253825382538 253
2538 2538 2538 2538
2538 2538 2538 2538 2538 2538 2538 2538 2538 2538
2538253825382538253825382538253825382538253825382538 253
2538 2538 2538 2538 2538 2538 2538 2538 2538 2538 2538 2538 2538 2538 2538
2539253925392539253925392539253925392539253925392539 2539
2539 2539 2539 2539 2539 2539 2539 2539 2539 2539 2539 2539 2539 2539 2539
2539253925392539253925392539253925392539253925392539 2539
2539 2539 2539 2539 2539 2539 2539 2539 2539 2539 2539 2539 2539
25402540254025402540254025402540254025402540254025402540 2540
2540 2540 2540 2540 2540 2540 2540 2540 2540 2540 2540 2540 2540 2540
2540254025402540254025402540254025402540254025402540 2540
2540 2540 2540 2540 2540 2540 2540 2540 2540 2540 2540 2540 2540
0 2541254125412541254125412541254125412541 25412541254125412541
2541254125412541254125412541254125412541254125412541 2541
25412541254125412541254125412541
25412541254125412541
2541254125412541254125412541254125412541254125412541
254225422542
25422542254225422542 25422542
254225422542
2542 2542 2542 2542 2542 2542 2542 2542
2542 2542 2542 2542 2542 2542
25422542
2542 2542 2542 2542 2542
25422542254225422542 254225422542254225422542254225422542
2542 2542 2542 2542 2542
25422542
2542 2542 2542
2 2
2543 2543 2543 2543 2543 2543 2543 2543 2543 2543 2543 2543 2543 2543
254325432543 254325432543254325432543
25432543254325432543 2543
2543 2543 2543 2543 2543 2543 2543 2543 2543 2543 2543 2543 2543 2543
254325432543 25432543
254325432543
2543254325432543 2543 2543
2544 2544 2544 2544 2544 2544 2544 2544 2544 2544
254425442544254425442544 25442544
2544 254425442544 25442
,5
.8
-0.0242% -0.0444%
100' VC
K = 4944
SSD = 53392'
,5
.6
100' VC
K = 947
,5
.9
+0.0612% +0.0056%
100' VC
K = 1798
SSD = 19449'
W
Line to be constructed Remove existing guardrail
Existing edge of pavement
Profile grade
NOTE:
1.
Proposed edge of pavement Existing stone masonry wall include topsoil.
are not adjusted for shrink/swell, and do not
Excavation and embankment volumes shown below
Existing ground
N
See Sheet D.1 for stationing. See Sheet H.1 for Detail
Install guardrail system G4, type 2, class A, steel posts, LT
Slope stake limit
Slope stake limit
CAUTION:
Existing edge of pavement
CUYD
EXC.
CUYD
EMB.
1225+001222+501220+001217+501215+001212+501210+00
2520 2520
2525 2525
2530 2530
2535 2535
2540 2540
2545 2545
2545 2550
2555 2555
2560 2560
D.15
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fo .d g n
ID CANYON 2013(1)
D e c e m b e r
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
See details, Sheet D.22
DAM MONITORING POINT (typ.)
2516 2516 2516 2516 2516 2516
2516 2516 2516 2516 2516
2517 2517
2517 2517 2517 2517 2517 2517
2517 2517 2517 2517 2517 2517 2517 2517
2518 2518
2518 2518 2518 2518 2518
2518 2518 2518 2518
2518 2518
2518 2518 2518
2518 2518 2518 25182519 2519 2519 2519 2519 2519 2519 2519 2519 2519
2519 2519 2519 2519
2519 2519 2519 2519 2519 2519 2519 2519 2519
2519 2519 2519 25192520 2520 2520 2520 2520 2520 2520 2520
2520 2520 2520 2520 2520 2520
2520 2520 2520 2520
2520 2520 2520 2520 2520 2520 2520 2520 2520 2520 25202521
2521 2521 2521 2521 2521 2521 2521 2521
2521 2521 2521 2521 2521 2521
2521 2521 2521 2521
2521 2521 2521 2521 2521 2521 2521
2521 2521 2521 2522 2522
2522 2522 2522 2522 2522 2522 2522 2522 2522
2522 2522 2522
2522 2522 2522 2522
2522 2522 2522 2522 2522 2522 2522
2522 2522 25222523 2523 2523 2523
2523 2523 2523 2523 2523 2523 2523 2523 2523 2523 25232523
2523 2523 2523 2523 2523 2523 2523 2523 2523 2523 2523 2523 2523 25232524 2524 2524
2524 2524 2524 2524 2524 2524 2524 2524 2524 2524 25242524 2524 2524
2524 2524 2524 2524 2524 2524 2524
2524 2524 2524 25242525 2525 2525 2525 2525 2525
2525 2525 2525 2525
2525 2525 2525 25252525 2525 2525 2525 2525 2525 2525 2525
2525 2525 2525 2525 2525 25252526 2526 2526 2526 2526
2526 2526 2526 2526 2526 2526 2526 2526 25262526 2526 2526 2526
2526 2526
2526 2526 2526 2526 2526 25262527 2527 2527 2527
2527 2527
2527 2527 2527 2527 2527 2527 25272527 2527 2527 2527
2527 2527
2527 2527 2527 2527 2527 25272528 2528 2528 2528 2528 2528 2528 2528 2528 2528 2528
2528 2528 2528 25282528 2528 2528 2528 2528 2528 2528 2528 2528 2528
2528 2528 2528 25282529 2529 2529 2529 2529 2529 2529 2529 2529 2529 2529
2529 25292529 2529 2529 2529
2529 2529 2529 2529 2529 2529 2529
2529 25292530 2530 2530 2530 2530 2530 2530 2530 2530 2530
2530 2530 2530 2530 2530 2530 2530 2530 2530 2530 2530 2530
2530 2530 2530 2530 2530 25302531 2531 2531 2531 2531 2531 2531 2531 2531 2531 2531
2531 2531 25312531 2531 2531 2531 2531 2531 2531 2531 2531 2531 2531
2531 2531 25312532 2532 2532 2532 2532 2532 2532 2532 2532
2532 2532
2532 2532 2532 2532 2532 2532 2532 2532 2532 2532 2532
2532 2532 2532 2532 2532 2532
2533 2533 2533 2533 2533 2533 2533 2533 2533 2533
2533 2533 2533 25332533 2533 2533 2533 2533 2533 2533
2533 2533 2533 2533 2533 2533 25332534 2534 2534 2534 2534 2534 2534 2534 2534 2534 2534
2534 2534 25342534 2534 2534 2534 2534 2534 2534 2534 2534 2534 2534
2534 2534 25342535 2535 2535 2535 2535 2535 2535 2535 2535 2535 2535
2535 2535 25352535 2535 2535 2535 2535 2535 2535 2535 2535
2535 2535
2535 2535 2535 2536 2536 2536 2536
2536 2536 2536 2536
2536 2536 2536 2536 2536 2536 2536
2536 2536 2536 2536
2536 2536 2536 2536
2537 2537 2537 2537
2537 2537 2537
2537 2537 2537 2537 25372537
2537 2537 2537 2537 2537
2537 2537 2537 2537
2537 25372538
2538 2538
2538 2538 2538 2538 2538 2538
2538 25382538
2538 2538 2538
2538 2538 2538 2538 2538 2538 2538 2538 2538 25382539 2539
2539 2539 2539 2539 2539 2539 2539 2539 2539 2539
2539 2539 2539 2539 2539 2539 2539
2539 2539 2539 2539
2539 2539 2539 2539 2539 2540 2540 2540
2540 2540 2540 2540 2540
2540 2540 2540 2540 2540
2540 25402540 25402540254025402540 2540 25402540
2540 2540 2540 2540 2540 2540 2540 2540 2540 2540 2540 2540 2540 2540 254125412541
2541254125412541254125412541 2541254125412541
254125412541254125412541254125412541254125412541254125412541
25412541
2541254125412541254125412541254125412541
25412541254125412541254125412541254125412541254125412541
25422542
254225422542254225422542 254225422542
254225422542
2542 2542 2542 2542 2542 2542 2542 2542 2542 2542 2542 2542 2542
2542 2542 2542 2542 2542
25422542 25422542
25422542254225422542
+0.0056%
6 10
Line to be constructed Remove existing guardrail
Existing edge of pavement
Proposed edge of pavement
Profile grade
NOTE:
1.
Existing concrete barrier include topsoil.
are not adjusted for shrink/swell and do not
Excavation and embankment volumes shown below
Existing ground
N
CAUTION:
Slope stake limit
Slope stake limit
See Sheet D.1 for stationing. See Sheet H.1 for detail
Install guardrail system G4, type 2, class A, steel posts, LT
CUYD
EXC.
CUYD
EMB.
1240+001237+501235+001232+501230+001227+501225+00
2520 2520
2525 2525
2530 2530
2535 2535
2540 2540
2545 2545
2550 2550
2555 2555
2560 2560
D.16
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d id a fp .d g n
ID CANYON 2013(1)
D e c e m b e r
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y : See details, Sheet D.22
DAM MONITORING POINT (typ.)
4 1
2515 2515 2515
2515 2515 2515
2515 2515 2515
2515 2515 2515 2515 2515
2515 2515 2515
2516 2516 2516 2516
2516 2516 2516 2516
2516 2516 2516
2516 2516 2516 2516 2516
2516 2516 2516 2516 2516
2516 2516
25162517
2517 2517 2517 2517
2517 2517
25172517
2517 2517 2517 2517
2517 2517
25172518
2518 2518 2518 2518 2518
2518 2518 2518 2518
2518 2518 25182518
2518 2518
2518 2518 2518 2518 2518 2518 2518 25182519 2519
2519 2519 2519 2519 2519 2519 2519 2519 2519 2519 25192519 2519
2519 2519 2519 2519 2519 2519 2519 2519 2519 2519 25192520 2520 2520
2520 2520 2520 2520 2520 2520 2520
2520 2520 2520 25202520 2520 2520 2520
2520 2520 2520 2520 2520 2520 2520 2520 2520 2520 2520 2521 2521
2521 2521 2521 2521 2521 2521
2521 2521 2521 2521 2521 2521 25212521 2521 2521 2521
2521 2521 2521 2521 2521 2521 2521 2521 2521 25212522 2522
2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522
2522 2522 2522 2522
2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522 2522
2523 2523 2523 2523
2523 2523 2523 2523 2523 2523 2523 2523 2523 2523 2523
2523 2523 2523 2523
2523 2523 2523 2523 2523 2523 2523 2523
2523 2523 2523 2524 2524
2524 2524 2524 2524 2524 2524
2524 2524 2524 2524 2524 2524 25242524 2524 2524 2524
2524 2524 2524 2524 2524 2524 2524
2524 2524 2524 25242525 2525 2525
2525 2525 2525 2525 2525 2525 2525
2525 2525 2525 25252525 2525 2525 2525 2525 2525 2525 2525 2525 2525
2525 2525 2525 25252526 2526 2526 2526 2526 2526 2526 2526 2526 2526 2526 2526 2526 25262526 2526 2526
2526 2526 2526 2526 2526 2526 2526 2526 2526 2526 25262527 2527 2527
2527 2527 2527 2527 2527 2527 2527 2527 2527 2527 25272527 2527 2527
2527 2527 2527 2527 2527 2527 2527 2527 2527 2527 25272528 2528
2528 2528 2528 2528 2528 2528 2528 2528 2528 2528 2528 2528 25282528 2528 2528 2528 2528 2528 2528 2528 2528 2528 2528 2528 2528 25282529 2529 2529 2529 2529 2529 2529 2529 2529 2529
2529 2529 2529 25292529 2529 2529 2529 2529 2529 2529 2529 2529 2529 2529 2529 2529 25292530
2530 2530 2530 2530 2530 2530 2530 2530 2530 2530 2530 2530 25302530
2530 2530 2530 2530 2530 2530 2530 2530 2530 2530 2530 2530 25302531 2531
2531 2531 2531 2531 2531 2531 2531 2531 2531 2531 2531 2531 25312531 2531
2531 2531 2531 2531 2531 2531 2531 2531 2531 2531 2531 2531 25312532 2532
2532 2532 2532 2532 2532 2532 2532 2532 2532 2532 2532 2532 25322532 2532 2532 2532 2532 2532 2532 2532 2532 2532 2532
2532 2532 2532 25322533 2533 2533 2533 2533 2533 2533 2533 2533 2533 2533 2533 2533 25332533 2533 2533 2533 2533 2533 2533 2533 2533 2533
2533 2533 2533 25332534 2534
2534 2534 2534 2534 2534 2534 2534 2534 2534 2534 2534 25342534 2534
2534 2534 2534 2534 2534 2534 2534
2534 2534 2534 2534 25342535 2535
2535 2535 2535 2535 2535 2535 2535 2535 2535 2535 2535 25352535 2535
2535 2535 2535 2535 2535 2535 2535 2535 2535…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .