Project_Description.pdf
PDF 28 KB Posted
- Attached to
- AK FS TNF 2(1), Auke Recreation Roadway Rehab
- Solicitation number
- DTFH7017B00008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Auke.pdf | ||
| Q&A_4-27-17.pdf | ||
| Auke-Road_Earthwork_Report.pdf | ||
| IFB_AUKE.pdf | ||
| Auke-Road_Plans100_.pdf | ||
| Plan_Request_form_AUKE.pdf | ||
| Auke-Road_Alignment_Report.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AK FS TNF 2(1), Auke Recreation Roadway Rehab, Tongass National Forest, Juneau Borough, Alaska
The work consists of reconditioning, base, paving, fencing, pavement markings, signs, and other small items of work.
Project length: 0.7 miles
Tentative Fixed Completion Date: Summer 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Between $500,000 and $1,000,000
Location: Approximately 11 miles northwest of Juneau, Alaska
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
Base Schedule
DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance
No 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Filter Rock Fiber Roll
2 CUYD
60 LNFT
DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (structures, demolition) Sign Fence Sawcutting Pavement
5 EACH
500 LNFT
3650 LNFT
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Boulder Remove and Reset Boulder
32 EACH
3 EACH
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 50 TON 303 Road Reconditioning 5000 SQYD
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 1350 TON
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
Base Schedule
412 Asphalt Tack Coat (asphalt surface treatment) 7 TON
DIVISION 600 – Incidental Construction 609 Curb & Gutter (concrete – minor structures) (indicate which) Curb, Concrete Curb, Asphalt, 4-Inch Depth
23 LNFT
39 LNFT
619 Fences, Gates, Cattle Guards & Bollard Posts Fence (2 Steel Pipe Rail) 1100 LNFT 620 Stone Masonry Stone Masonry Pillar 14 EACH 623 General Labor Yes 624 Topsoil (landscaping & related items) No 625 Turf Establishment (indicate seeding or mulching separately) Seeding 100 SQYD 633 Permanent Traffic Control (traffic control devices) Sign Speed Hump
40 SQFT
6 EACH
634 Permanent Pavement Markings (traffic pavement markings) Solid Accessibility Symbol Speed Hump Markings
33,405 LNFT
4 EACH
6 EACH
635 Temporary Traffic Control Barricade, Type 3 Sign
5 EACH
50 SQFT
636 Traffic Signal, Traffic Counter, Lighting, & Electrical Systems No 637 Facilities & Services (field offices, laboratories, & housing) Field Office 1 EACH 646 Roadside Development (use pay item description) Fixture, Stairway 2 EACH
| DIVISION 200 – Earthwork |
| DIVISION 250 – Slope Reinforcement and Retaining Walls |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |
File details come from the government source that posted it. Updated .