Auke-Road_Earthwork_Report.pdf
PDF 77 KB Posted
- Attached to
- AK FS TNF 2(1), Auke Recreation Roadway Rehab
- Solicitation number
- DTFH7017B00008
About this file
Auke-Road_Earthwork_Report
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Auke.pdf | ||
| Q&A_4-27-17.pdf | ||
| IFB_AUKE.pdf | ||
| Auke-Road_Plans100_.pdf | ||
| Plan_Request_form_AUKE.pdf | ||
| Auke-Road_Alignment_Report.pdf | ||
| Project_Description.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Station
EXC.
(Sqft)
Avg. End Area
(sqft)
EMB.
(sqft)
Avg. End Area
(sqft)
105+50 0.3 1.46
105+75 0.58 11 0.71 27.125
106+00 0.67 15.625 0.84 19.375
106+25 2.05 34 0.49 16.625
106+50 2.19 53 0 6.125
106+75 2.21 55 0 0
107+00 2.03 53 0 0
107+25 2.33 54.5 0 0
107+50 0.41 34.25 0.3 3.75
107+75 0.3 8.875 0.24 6.75
108+00 0.32 7.75 0.25 6.125
108+25 2.09 30.125 0 3.125
108+50 2.57 58.25 0 0
108+75 2.09 58.25 0 0
109+00 1.91 50 0 0
109+25 0.76 33.375 0.4 5
109+50 0.76 19 0.78 14.75
109+75 0.84 20 0.34 14
110+00 0.79 20.375 1.02 17
110+25 0.74 19.125 0.35 17.125
110+50 3.92 58.25 0 4.375
110+75 4.26 102.25 0 0
111+00 4.19 105.625 0 0
111+25 3.87 100.75 0 0
111+50 3.26 89.125 0 0
111+75 2.36 70.25 0 0
112+00 2.21 57.125 0 0
112+25 2.46 58.375 0 0
112+50 2.64 63.75 0 0
112+75 1.85 56.125 0 0
113+00 2.13 49.75 0 0
113+25 0.84 37.125 1.48 18.5
113+50 0.45 16.125 4.58 75.75
113+75 0.38 10.375 7.75 154.125
114+00 0.49 10.875 5.57 166.5
114+25 0.45 11.75 4.64 127.625
114+50 0.54 12.375 1.57 77.625
114+75 2.07 32.625 0 19.625
115+00 1.59 45.75 0 0
115+25 0.83 30.25 0 0
115+50 0.27 13.75 3.36 42
115+75 0.33 7.5 4.11 93.375
AK FS TNF 2(1) Auke Recreation Roadway rehab Earthwork quantities (hand calculated)
116+00 0.32 8.125 3.71 97.75
116+25 0.51 10.375 1.3 62.625
116+50 0.51 12.75 0.18 18.5
116+75 1.92 30.375 0 2.25
117+00 0.91 35.375 0 0
117+25 0.79 21.25 0 0
117+50 0.86 20.625 0 0
117+75 0.7 19.5 0 0
118+00 0.66 17 0 0
118+25 0.58 15.5 0 0
118+50 0.57 14.375 0 0
118+75 0.61 14.75 0 0
119+00 0.62 15.375 0 0
119+25 0.62 15.5 0 0
119+50 0.61 15.375 0 0
119+75 0.57 14.75 0 0
120+00 0.37 11.75 0 0
120+25 0.25 7.75 0.11 1.375
120+50 0.48 9.125 0 1.375
120+75 0.51 12.375 0 0
121+00 0.97 18.5 0 0
121+25 1 24.625 0 0
121+50 0.53 19.125 0 0
121+75 0.41 11.75 0.45 5.625
122+00 0.55 12 0.73 14.75
122+25 0.5 13.125 1.74 30.875
122+50 0.57 13.375 1.27 37.625
122+75 0.7 15.875 1.28 31.875
123+00 0.75 18.125 1.06 29.25
123+25 0.45 15 2.83 48.625
123+50 0.72 14.625 1.15 49.75
123+75 0.4 14 1.88 37.875
124+00 0.36 9.5 1.24 39
124+25 0.3 8.25 3.5 59.25
124+50 0.21 6.375 7.79 141.125
124+75 0.32 6.625 3.79 144.75
125+00 0.33 8.125 3.85 95.5
125+25 0.32 8.125 3.59 93
125+50 0.32 8 3.42 87.625
125+75 0.3 7.75 5.14 107
126+00 0.29 7.375 8.1 165.5
126+25 0.31 7.5 10.4 231.25
126+50 0.28 7.375 0.29 133.625
126+75 0.39 8.375 5.23 69
127+00 0.39 9.75 3.59 110.25
127+25 3.09 43.5 0 44.875
127+50 1.71 60 0.37 4.625
127+75 1.17 36 0.12 6.125
128+00 1.11 28.5 0.26 4.75
128+25 0.84 24.375 0.63 11.125
128+50 4.66 68.75 0 7.875
128+75 4.4 113.25 0 0
129+00 0.75 64.375 1.98 24.75
129+25 0.75 18.75 2.17 51.875
129+50 0.98 21.625 1.06 40.375
129+75 1.07 25.625 0.64 21.25
130+00 1.59 33.25 0.14 9.75
130+25 1.16 34.375 0.27 5.125
130+50 0.64 22.5 0.82 13.625
130+75 0.63 15.875 0.14 12
131+00 0.72 16.875 0 1.75
131+25 0.57 16.125 0.07 0.875
131+50 0.47 13 0.04 1.375
131+75 0.52 12.375 3.44 43.5
132+00 0.5 12.75 6.83 128.375
132+25 0.41 11.375 3.21 125.5
132+50 0.39 10 0.34 44.375
132+75 0.36 9.375 1.73 25.875
133+00 0.46 10.25 5.79 94
133+25 0.71 14.625 4.09 123.5
133+50 0.63 16.75 4.66 109.375
133+75 0.57 15 5.46 126.5
134+00 0.54 13.875 6.39 148.125
134+25 0.42 12 9.17 194.5
134+50 0.37 9.875 3.89 163.25
134+75 1.44 22.625 0 48.625
135+00 0.83 28.375 0 0
RT side Subtotal (CY) 116.54 167.44
LT side Subtotal (CY) 5.07
Total (CY) 121.61
Left side turnout
822 sqft x .166 = 137 cuft
137/27= 5.07 CUYD Excavation
167.44
121.61
45.83Addt'l Embankment needed
Excavation (assumed suitable for embankment)
Embankment